B08 0040479708 Price Schedule_Bid Sheet.xlsx
XLSX spreadsheet 62 KB Posted
- Attached to
- NAMA THJE EXHIBIT DESIGN Federal contract opportunity
- Solicitation number
- 140P3020R0041
About this file
This document contains a bid sheet template for a federal contract solicitation to provide exhibit planning and design commercial services for improvements to the lower level of the Thomas Jefferson Memorial. The solicitation requests the completion of exhibit structures, graphic layouts, audiovisual elements, interactive elements, artwork, artifacts, historical vignettes, sculpted models, lighting design, and an information/ticketing desk. Offerors are to provide pricing for labor rates by category and costs for materials, shipping, and travel for each project task including pre-design, schematic design, design development, production design, production support, production, shop inspection, installation, and closeout. The National Park Service National Office is the contracting agency.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions Instructions to complete the Bid Sheet
Offeror is to complete each tab in order to provide a responsive pricing for the solicitation of this requirement. Please complete the following as provided below. Only complete the tabs and sections marked in "blue".
| Quote Summary: |
| This tab will provide the final quote to be submitted in response to this solicitation. This tab will calculate by pulling from all the other tabs. No changes should be required of this tab. |
| Rates Summary: |
| For each of the labor disciplines, the offeror is to insert the rate per hour. Insert this rate in the blue blocks for each discipline, do not skip a discpline when completing this section. This data is pulled into the required tab of the task that are to be performed within this solicited requirement. |
| 3.2 Pre-Design: |
| Labor Categories: complete the "# of Units" (how many hours) is required to meet this task need. |
Material Cost: Complete the "Quantity" and "Unit Cost" for each identified area that is required to meet this task need. **Anything that is priced as miscellanous required the offeror to list that out below the criteria.
Shipping Cost: Complete the "Quantity" and "Unit Cost" for each identified area that is required to meet this task need.
Travel Cost: Complete the "Quantity" and "Unit Cost" for each identified area that is required to meet this task need.
# of Person Trip: Insert how many individuals this section (specifically) the travel cost applies to for this criteria to meet the needs of the task.
| 3.3 SD (Schematic Design) |
| Labor Categories: complete the "# of Units" (how many hours) is required to meet this task need. |
Material Cost: Complete the "Quantity" and "Unit Cost" for each identified area that is required to meet this task need. **Anything that is priced as miscellanous required the offeror to list that out below the criteria.
Shipping Cost: Complete the "Quantity" and "Unit Cost" for each identified area that is required to meet this task need.
Travel Cost: Complete the "Quantity" and "Unit Cost" for each identified area that is required to meet this task need.
# of Person Trip: Insert how many individuals this section (specifically) the travel cost applies to for this criteria to meet the needs of the task.
| 3.4 DD (Design Development) |
| Labor Categories: complete the "# of Units" (how many hours) is required to meet this task need. |
Material Cost: Complete the "Quantity" and "Unit Cost" for each identified area that is required to meet this task need. **Anything that is priced as miscellanous required the offeror to list that out below the criteria.
Shipping Cost: Complete the "Quantity" and "Unit Cost" for each identified area that is required to meet this task need.
Travel Cost: Complete the "Quantity" and "Unit Cost" for each identified area that is required to meet this task need.
# of Person Trip: Insert how many individuals this section (specifically) the travel cost applies to for this criteria to meet the needs of the task.
| 3.5 PD (Production Design) |
| Labor Categories: complete the "# of Units" (how many hours) is required to meet this task need. |
Material Cost: Complete the "Quantity" and "Unit Cost" for each identified area that is required to meet this task need. **Anything that is priced as miscellanous required the offeror to list that out below the criteria.
Shipping Cost: Complete the "Quantity" and "Unit Cost" for each identified area that is required to meet this task need.
Travel Cost: Complete the "Quantity" and "Unit Cost" for each identified area that is required to meet this task need.
Image Acquisition Allowance: Complete the "# of Units" (how many hours) is required under the Labor Category; proceed to complete the "Quantity" and "Unit Cost" for each identified area that is required to meet this task need.
Original Art Allowance: Complete the "# of Units" (how many hours) is required under the Labor Category; proceed to complete the "Quantity" and "Unit Cost" for each identified area that is required to meet this task need.
| 3.6 PS (Production Support) |
| Labor Categories: complete the "# of Units" (how many hours) is required to meet this task need. |
Material Cost: Complete the "Quantity" and "Unit Cost" for each identified area that is required to meet this task need. **Anything that is priced as miscellanous required the offeror to list that out below the criteria.
Shipping Cost: Complete the "Quantity" and "Unit Cost" for each identified area that is required to meet this task need.
Travel Cost: Complete the "Quantity" and "Unit Cost" for each identified area that is required to meet this task need.
# of Person Trip: Insert how many individuals this section (specifically) the travel cost applies to for this criteria to meet the needs of the task.
| 3.7 Prod (Production)- NOT APPLICABLE DO NOT COMPLETE FOR THIS REQUIREMENT |
| Labor Categories: complete the "# of Units" (how many hours) is required to meet this task need. |
Material Cost: Complete the "Quantity" and "Unit Cost" for each identified area that is required to meet this task need.
Shipping Cost: Complete the "Quantity" and "Unit Cost" for each identified area that is required to meet this task need.
Travel Cost: Complete the "Quantity" and "Unit Cost" for each identified area that is required to meet this task need.
# of Person Trip: Insert how many individuals this section (specifically) the travel cost applies to for this criteria to meet the needs of the task.
| 3.8 Shop Insp - NOT APPLICABLE DO NOT COMPLETE FOR THIS REQUIREMENT |
| Labor Categories: complete the "# of Units" (how many hours) is required to meet this task need. |
Material Cost: Complete the "Quantity" and "Unit Cost" for each identified area that is required to meet this task need. **Anything that is priced as miscellanous required the offeror to list that out below the criteria.
Shipping Cost: Complete the "Quantity" and "Unit Cost" for each identified area that is required to meet this task need.
Travel Cost: Complete the "Quantity" and "Unit Cost" for each identified area that is required to meet this task need.
# of Person Trip: Insert how many individuals this section (specifically) the travel cost applies to for this criteria to meet the needs of the task.
| 3.10 Install - NOT APPLICABLE DO NOT COMPLETE FOR THIS REQUIREMENT |
| Labor Categories: complete the "# of Units" (how many hours) is required to meet this task need. |
Material Cost: Complete the "Quantity" and "Unit Cost" for each identified area that is required to meet this task need. **Anything that is priced as miscellanous required the offeror to list that out below the criteria.
Shipping Cost: Complete the "Quantity" and "Unit Cost" for each identified area that is required to meet this task need.
Travel Cost: Complete the "Quantity" and "Unit Cost" for each identified area that is required to meet this task need.
| 3.11 Closeout - NOT APPLICABLE DO NOT COMPLETE FOR THIS REQUIREMENT |
| Labor Categories: complete the "# of Units" (how many hours) is required to meet this task need. |
Material Cost: Complete the "Quantity" and "Unit Cost" for each identified area that is required to meet this task need.
Shipping Cost: Complete the "Quantity" and "Unit Cost" for each identified area that is required to meet this task need.
Travel Cost: Complete the "Quantity" and "Unit Cost" for each identified area that is required to meet this task need.
# of Person Trip: Insert how many individuals this section (specifically) the travel cost applies to for this criteria to meet the needs of the task.
Quote Summary Exhibit Planning and Design, Project Summary
3.2 Pre-Design Total : $ - 0
3.3 Schematic Design Total: $ - 0
3.4 Design Development Total: $ - 0
3.5 Production Design Total: $ - 0
3.6 Production Support Total: $ - 0
3.7 Production Total: $ - 0
3.8 Shop Inspection Total: $ - 0
3.10 Installation Total: $ - 0
3.11 Closeout Total: $ - 0
Project Total $ - 0
Rates Summary
LABOR RATE SUMMARY
| Labor Category | Rate |
| $ - 0 | |
| Project Manager | $ - 0 |
| Exhibit Developer | $ - 0 |
| Exhibit Designer | $ - 0 |
| Graphic Designer | $ - 0 |
| Exhibit Researcher | $ - 0 |
| Writer | $ - 0 |
| Lighting Designer | $ - 0 |
| Certified Value Specialist | $ - 0 |
| Audiovisual Systems Designer | $ - 0 |
| Exhibit Evaluator | $ - 0 |
| Audiovisual Director-Producer | $ - 0 |
| Exhibit Detailer | $ - 0 |
| Fabrication Shop Supervisor | $ - 0 |
| Graphics Shop Supervisor | $ - 0 |
| Exhibits Specialist (Fab) | $ - 0 |
| Exhibits Specialist (Graphics) | $ - 0 |
| Model Maker | $ - 0 |
| Artifact Mounter | $ - 0 |
| Lighting Technician | $ - 0 |
| Audiovisual Technician | $ - 0 |
| Electrical Technician | $ - 0 |
| AV Editor | $ - 0 |
| AV Researcher | $ - 0 |
| AV Programmer | $ - 0 |
3.2 Pre-Design
| Pre-Design (3.2) | ||||
| Labor Category | Unit | # of Units | Rate | Amount |
| Project Manager | Hours | $ - 0 | $ - 0 | |
| Exhibit Designer | Hours | $ - 0 | $ - 0 | |
| Graphic Designer | Hours | $ - 0 | $ - 0 | |
| Exhibit Researcher | Hours | $ - 0 | $ - 0 | |
| Writer | Hours | $ - 0 | $ - 0 | |
| Lighting Designer | Hours | $ - 0 | $ - 0 | |
| Labor Subtotal= | $ - 0 |
| Material Costs | Unit | Quantity | Unit Cost | |
| Copying/Printing | job | $ - 0 | $ - 0 | |
| Miscellaneous | job | $ - 0 | $ - 0 | |
| If you provided pricing under miscellaneous, please list specifics in this area. Offeror may expand this section if needed to provide for more room. Do not add costs in this section as they should already be lumped in miscellaneous. | Material Subtotal= | $ - 0 |
| Shipping Costs | Unit | Quantity | Unit Cost | |
| Packaging | job | $ - 0 | $ - 0 | |
| Shipping | job | $ - 0 | $ - 0 | |
| Shipping Subtotal= | $ - 0 |
| Travel Expenses | Unit | Quantity | Unit Cost | Amount |
| Air fare | roundtrip | $ - 0 | $ - 0 | |
| Per diem | days | $ - 0 | $ - 0 | |
| Lodging | nights | $ - 0 | $ - 0 | |
| Rental car and gas | days | $ - 0 | $ - 0 | |
| Per-Trip Cost = | $ - 0 | |||
| # of Person Trips | Travel Subtotal = | $ - 0 |
Pre-Design Total : $0
3.3 SD
| Schematic Design (3.3) | ||||
| Labor Category | Unit | # of Units | Rate | Amount |
| Project Manager | Hours | $ - 0 | $ - 0 | |
| Exhibit Developer | Hours | $ - 0 | $ - 0 | |
| Exhibit Designer | Hours | $ - 0 | $ - 0 | |
| Graphic Designer | Hours | $ - 0 | $ - 0 | |
| Exhibit Researcher | Hours | $ - 0 | $ - 0 | |
| Writer | Hours | $ - 0 | $ - 0 | |
| Lighting Designer | Hours | $ - 0 | $ - 0 | |
| Audiovisual Systems Designer | Hours | $ - 0 | $ - 0 | |
| Labor Subtotal= | $ - 0 |
| Material Costs | Unit | Quantity | Unit Cost | |
| Copying/Printing | job | $ - 0 | $ - 0 | |
| Miscellaneous | job | $ - 0 | $ - 0 | |
| If you provided pricing under miscellaneous, please list specifics in this area. Offeror may expand this section if needed to provide for more room. Do not add costs in this section as they should already be lumped in miscellaneous. | Material Subtotal= | $ - 0 |
| Shipping Costs | Unit | Quantity | Unit Cost | |
| Packaging | job | $ - 0 | $ - 0 | |
| Shipping | job | $ - 0 | $ - 0 | |
| Shipping Subtotal= | $ - 0 | |||
| Travel Expenses - Schematic Design 1 | Unit | Quantity | Unit Cost | Amount |
| Air fare | roundtrip | $ - 0 | $ - 0 | |
| Per diem | days | $ - 0 | $ - 0 | |
| Lodging | nights | $ - 0 | $ - 0 | |
| Rental car and gas | days | $ - 0 | $ - 0 | |
| Per-Trip Cost = | $ - 0 | |||
| # of Person Trips | Travel Subtotal = | $ - 0 |
| Travel Expenses - Schematic Design 2 | Unit | Quantity | Unit Cost | Amount |
| Air fare | roundtrip | $ - 0 | $ - 0 | |
| Per diem | days | $ - 0 | $ - 0 | |
| Lodging | nights | $ - 0 | $ - 0 | |
| Rental car and gas | days | $ - 0 | $ - 0 | |
| Per-Trip Cost = | $ - 0 | |||
| # of Person Trips | Travel Subtotal = | $ - 0 |
Schematic Design Total: $0
3.4 DD
| Design Development (3.4) | ||||
| Labor Category | Unit | # of Units | Rate | Amount |
| Project Manager | Hours | $ - 0 | $ - 0 | |
| Exhibit Developer | Hours | $ - 0 | $ - 0 | |
| Exhibit Designer | Hours | $ - 0 | $ - 0 | |
| Graphic Designer | Hours | $ - 0 | $ - 0 | |
| Exhibit Researcher | Hours | $ - 0 | $ - 0 | |
| Writer | Hours | $ - 0 | $ - 0 | |
| Lighting Designer | Hours | $ - 0 | $ - 0 | |
| Audiovisual Systems Designer | Hours | $ - 0 | $ - 0 | |
| Labor Subtotal= | $ - 0 |
| Material Costs | Unit | Quantity | Unit Cost | |
| Copying/Printing | job | $ - 0 | $ - 0 | |
| Graphic Samples | job | $ - 0 | $ - 0 | |
| Mock-Up Allowance | job | $ - 0 | $ - 0 | |
| Miscellaneous (mock-ups) | job | $ - 0 | $ - 0 | |
| If you provided pricing under miscellaneous, please list specifics in this area. Offeror may expand this section if needed to provide for more room. Do not add costs in this section as they should already be lumped in miscellaneous. | Material Subtotal= | $ - 0 |
| Shipping Costs | Unit | Quantity | Unit Cost | |
| Packaging | job | $ - 0 | $ - 0 | |
| Shipping | job | $ - 0 | $ - 0 | |
| Shipping Subtotal= | $ - 0 |
| Travel Expenses-Design Development 3 | Unit | Quantity | Unit Cost | Amount |
| Air fare | roundtrip | $ - 0 | $ - 0 | |
| Per diem | days | $ - 0 | $ - 0 | |
| Lodging | nights | $ - 0 | $ - 0 | |
| Rental car and gas | days | $ - 0 | $ - 0 | |
| Per-Trip Cost = | $ - 0 | |||
| # of Person Trips | Travel Subtotal = | $ - 0 |
| Travel Expenses-Design Development 3 | Unit | Quantity | Unit Cost | Amount |
| Air fare | roundtrip | $ - 0 | $ - 0 | |
| Per diem | days | $ - 0 | $ - 0 | |
| Lodging | nights | $ - 0 | $ - 0 | |
| Rental car and gas | days | $ - 0 | $ - 0 | |
| Per-Trip Cost = | $ - 0 | |||
| # of Person Trips | Travel Subtotal = | $ - 0 |
| Travel Expenses-Design Development 3 | Unit | Quantity | Unit Cost | Amount |
| Air fare | roundtrip | $ - 0 | $ - 0 | |
| Per diem | days | $ - 0 | $ - 0 | |
| Lodging | nights | $ - 0 | $ - 0 | |
| Rental car and gas | days | $ - 0 | $ - 0 | |
| Per-Trip Cost = | $ - 0 | |||
| # of Person Trips | Travel Subtotal = | $ - 0 |
Design Development Total: $0
3.5 PD
| Production Design (3.5) | ||||
| Labor Category | Unit | # of Units | Rate | Amount |
| Project Manager | Hours | $ - 0 | $ - 0 | |
| Exhibit Developer | Hours | $ - 0 | $ - 0 | |
| Exhibit Designer | Hours | $ - 0 | $ - 0 | |
| Graphic Designer | Hours | $ - 0 | $ - 0 | |
| Exhibit Researcher | Hours | $ - 0 | $ - 0 | |
| Writer | Hours | $ - 0 | $ - 0 | |
| Lighting Designer | Hours | $ - 0 | $ - 0 | |
| Audiovisual Systems Designer | Hours | $ - 0 | $ - 0 | |
| Labor Subtotal= | $ - 0 |
| Material Costs | Unit | Quantity | Unit Cost | Amount |
| Copying/Printing | job | $ - 0 | $ - 0 | |
| Miscellaneous | job | $ - 0 | $ - 0 | |
| If you provided pricing under miscellaneous, please list specifics in this area. Offeror may expand this section if needed to provide for more room. Do not add costs in this section as they should already be lumped in miscellaneous. | Material Subtotal= | $ - 0 |
| Shipping Costs | Unit | Quantity | Unit Cost | Amount |
| Packaging | job | $ - 0 | $ - 0 | |
| Shipping | job | $ - 0 | $ - 0 | |
| Shipping Subtotal= | $ - 0 |
| Travel Expenses | Unit | Quantity | Unit Cost | Amount |
| Air fare | roundtrip | $ - 0 | $ - 0 | |
| Per diem | days | $ - 0 | $ - 0 | |
| Lodging | nights | $ - 0 | $ - 0 | |
| Rental car and gas | days | $ - 0 | $ - 0 | |
| Per-Trip Cost = | $ - 0 |
| Image Acquisition Allowance | ||||
| Labor Category | Unit | # of Units | Rate | Amount |
| Project Manager | Hours | $ - 0 | $ - 0 | |
| Exhibit Developer | Hours | $ - 0 | $ - 0 | |
| Exhibit Researcher | Hours | $ - 0 | $ - 0 | |
| Labor Subtotal= | $ - 0 |
| Acquisition Costs | Unit | Quantity | Unit Cost | Amount |
| Use rights / Licenses | job | $ - 0 | $ - 0 | |
| Copying Reproducibles | job | $ - 0 | $ - 0 | |
| Packing & Shipping | job | $ - 0 | $ - 0 | |
| Miscellaneous | job | $ - 0 | $ - 0 | |
| If you provided pricing under miscellaneous, please list specifics in this area. Offeror may expand this section if needed to provide for more room. Do not add costs in this section as they should already be lumped in miscellaneous. | Acquisition Cost Subtotal= | $ - 0 | ||
| Image Acquisition Allowance | $ - 0 |
| Original Art Allowance | ||||
| Labor Category | Unit | # of Units | Rate | Amount |
| Project Manager | Hours | $ - 0 | $ - 0 | |
| Exhibit Developer | Hours | $ - 0 | $ - 0 | |
| Exhibit Designer | Hours | $ - 0 | $ - 0 | |
| Graphic Designer | Hours | $ - 0 | $ - 0 | |
| Labor Subtotal= | $ - 0 |
| Artwork Production Costs | Unit | Quantity | Unit Cost | Amount |
| Illustrations | job | $ - 0 | $ - 0 | |
| Photography | job | $ - 0 | $ - 0 | |
| Maps | job | $ - 0 | $ - 0 | |
| Miscellaneous | job | $ - 0 | $ - 0 | |
| If you provided pricing under miscellaneous, please list specifics in this area. Offeror may expand this section if needed to provide for more room. Do not add costs in this section as they should already be lumped in miscellaneous. | Artwork Cost Subtotal= | $ - 0 | ||
| Original Art Allowance= | $ - 0 |
Production Design Total: $0
3.6 PS
| Production Support (3.6) | ||||
| Labor Category | Unit | # of Units | Rate | Amount |
| Project Manager | Hours | $ - 0 | $ - 0 | |
| Exhibit Developer | Hours | $ - 0 | $ - 0 | |
| Exhibit Designer | Hours | $ - 0 | $ - 0 | |
| Graphic Designer | Hours | $ - 0 | $ - 0 | |
| Exhibit Researcher | Hours | $ - 0 | $ - 0 | |
| Writer | Hours | $ - 0 | $ - 0 | |
| Lighting Designer | Hours | $ - 0 | $ - 0 | |
| Exhibit Evaluator | Hours | $ - 0 | $ - 0 | |
| Audiovisual Systems Designer | Hours | $ - 0 | $ - 0 | |
| Labor Subtotal= | $ - 0 |
| Material Costs | Unit | Quantity | Unit Cost | |
| Copying/Printing | job | $ - 0 | $ - 0 | |
| Miscellaneous | job | $ - 0 | $ - 0 | |
| If you provided pricing under miscellaneous, please list specifics in this area. Offeror may expand this section if needed to provide for more room. Do not add costs in this section as they should already be lumped in miscellaneous. | Material Subtotal= | $ - 0 |
| Shipping Costs | Unit | Quantity | Unit Cost | |
| Packaging | job | $ - 0 | $ - 0 | |
| Shipping | job | $ - 0 | $ - 0 | |
| Shipping Subtotal= | $ - 0 |
| Travel Expenses | Unit | Quantity | Unit Cost | Amount |
| Air fare | roundtrip | $ - 0 | $ - 0 | |
| Per diem | days | $ - 0 | $ - 0 | |
| Lodging | nights | $ - 0 | $ - 0 | |
| Rental car and gas | days | $ - 0 | $ - 0 | |
| Per-Trip Cost = | $ - 0 | |||
| # of Person Trips | Travel Subtotal = | $ - 0 |
Production Support Total: $0
3.7 Prod
| Production (3.7) | ||||
| Labor Category | Unit | # of Units | Rate | Amount |
| Project Manager | Hours | $ - 0 | $ - 0 | |
| Exhibit Designer | Hours | $ - 0 | $ - 0 | |
| Graphic Designer | Hours | $ - 0 | $ - 0 | |
| Lighting Designer | Hours | $ - 0 | $ - 0 | |
| Audiovisual Systems Developer | Hours | $ - 0 | $ - 0 | |
| Audiovisual Director-Producer | Hours | $ - 0 | $ - 0 | |
| AV Editor | Hours | $ - 0 | $ - 0 | |
| AV Researcher | Hours | $ - 0 | $ - 0 | |
| AV Programmer | Hours | $ - 0 | $ - 0 | |
| Exhibit Detailer | Hours | $ - 0 | $ - 0 | |
| Fabrication Shop Supervisor | Hours | $ - 0 | $ - 0 | |
| Graphics Shop Supervisor | Hours | $ - 0 | $ - 0 | |
| Exhibits Specialist (Fab) | Hours | $ - 0 | $ - 0 | |
| Exhibits Specialist (Graphics) | Hours | $ - 0 | $ - 0 | |
| Model Maker | Hours | $ - 0 | $ - 0 | |
| Artifact Mounter | Hours | $ - 0 | $ - 0 | |
| Lighting Technician | Hours | $ - 0 | $ - 0 | |
| Audiovisual Technician | Hours | $ - 0 | $ - 0 | |
| Electrical Technician | Hours | $ - 0 | $ - 0 |
Labor Subtotal= $ - 0
| Material Costs | Unit | Quantity | Unit Cost | |
| Projectors | Lot | $ - 0 | $ - 0 | |
| Projector Mounts | Lot | $ - 0 | $ - 0 | |
| AV Control System | Lot | $ - 0 | $ - 0 | |
| AV Players | Lot | $ - 0 | $ - 0 | |
| Misc. AV Supplies | Lot | $ - 0 | $ - 0 | |
| Lighting | Lot | $ - 0 | $ - 0 | |
| Tactile Tables | Lot | $ - 0 | $ - 0 | |
| Taciles | Lot | $ - 0 | $ - 0 | |
| Prop Objects | Lot | $ - 0 | $ - 0 | |
| Electronically Controlled Blinds | Lot | $ - 0 | $ - 0 | |
| Image Use Rights | Lot | $ - 0 | $ - 0 | |
| Material Subtotal= | $ - 0 |
| Shipping Costs | Unit | Quantity | Unit Cost | |
| Packaging | job | $ - 0 | $ - 0 | |
| Shipping | job | $ - 0 | $ - 0 | |
| Shipping Subtotal= | $ - 0 |
| Travel Expenses | Unit | Quantity | Unit Cost | Amount |
| Air fare | roundtrip | $ - 0 | $ - 0 | |
| Per diem | days | $ - 0 | $ - 0 | |
| Lodging | nights | $ - 0 | $ - 0 | |
| Rental car and gas | days | $ - 0 | $ - 0 | |
| Per-Trip Cost = | $ - 0 | |||
| # of Person Trips | Travel Subtotal = | $ - 0 |
Production Total: $0
3.8 Shop Insp
| Shop Inspection (3.8) | ||||
| Labor Category | Unit | # of Units | Rate | Amount |
| Project Manager | Hours | $ - 0 | $ - 0 | |
| Exhibit Designer | Hours | $ - 0 | $ - 0 | |
| Graphic Designer | Hours | $ - 0 | $ - 0 | |
| Lighting Designer | Hours | $ - 0 | $ - 0 | |
| Audiovisual Systems Developer | Hours | $ - 0 | $ - 0 | |
| Audiovisual Director-Producer | Hours | $ - 0 | $ - 0 | |
| AV Editor | Hours | $ - 0 | $ - 0 | |
| AV Researcher | Hours | $ - 0 | $ - 0 | |
| AV Programmer | Hours | $ - 0 | $ - 0 | |
| Exhibit Detailer | Hours | $ - 0 | $ - 0 | |
| Fabrication Shop Supervisor | Hours | $ - 0 | $ - 0 | |
| Graphics Shop Supervisor | Hours | $ - 0 | $ - 0 | |
| Exhibits Specialist (Fab) | Hours | $ - 0 | $ - 0 | |
| Exhibits Specialist (Graphics) | Hours | $ - 0 | $ - 0 | |
| Model Maker | Hours | $ - 0 | $ - 0 | |
| Artifact Mounter | Hours | $ - 0 | $ - 0 | |
| Lighting Technician | Hours | $ - 0 | $ - 0 | |
| Audiovisual Technician | Hours | $ - 0 | $ - 0 | |
| Electrical Technician | Hours | $ - 0 | $ - 0 |
Labor Subtotal= $ - 0
| Material Costs | Unit | Quantity | Unit Cost | |
| Misc. Costs | Lot | $ - 0 | $ - 0 | |
| If you provided pricing under miscellaneous, please list specifics in this area. Offeror may expand this section if needed to provide for more room. Do not add costs in this section as they should already be lumped in miscellaneous. | Material Subtotal= | $ - 0 |
| Shipping Costs | Unit | Quantity | Unit Cost | |
| Packaging | job | $ - 0 | $ - 0 | |
| Shipping | job | $ - 0 | $ - 0 | |
| Shipping Subtotal= | $ - 0 |
| Travel Expenses | Unit | Quantity | Unit Cost | Amount |
| Air fare | roundtrip | $ - 0 | $ - 0 | |
| Per diem | days | $ - 0 | $ - 0 | |
| Lodging | nights | $ - 0 | $ - 0 | |
| Rental car and gas | days | $ - 0 | $ - 0 | |
| Per-Trip Cost = | $ - 0 | |||
| # of Person Trips | Travel Subtotal = | $ - 0 |
Shop Inspection Total: $0
3.10 Install
| Installation (3.10) | ||||
| Labor Category | Unit | # of Units | Rate | Amount |
| Project Manager | Hours | $ - 0 | $ - 0 | |
| Exhibit Designer | Hours | $ - 0 | $ - 0 | |
| Graphic Designer | Hours | $ - 0 | $ - 0 | |
| Lighting Designer | Hours | $ - 0 | $ - 0 | |
| Audiovisual Systems Developer | Hours | $ - 0 | $ - 0 | |
| Audiovisual Director-Producer | Hours | $ - 0 | $ - 0 | |
| AV Editor | Hours | $ - 0 | $ - 0 | |
| AV Researcher | Hours | $ - 0 | $ - 0 | |
| AV Programmer | Hours | $ - 0 | $ - 0 | |
| Exhibit Detailer | Hours | $ - 0 | $ - 0 | |
| Fabrication Shop Supervisor | Hours | $ - 0 | $ - 0 | |
| Graphics Shop Supervisor | Hours | $ - 0 | $ - 0 | |
| Exhibits Specialist (Fab) | Hours | $ - 0 | $ - 0 | |
| Exhibits Specialist (Graphics) | Hours | $ - 0 | $ - 0 | |
| Model Maker | Hours | $ - 0 | $ - 0 | |
| Artifact Mounter | Hours | $ - 0 | $ - 0 | |
| Lighting Technician | Hours | $ - 0 | $ - 0 | |
| Audiovisual Technician | Hours | $ - 0 | $ - 0 | |
| Electrical Technician | Hours | $ - 0 | $ - 0 |
Labor Subtotal= $ - 0
| Material Costs | Unit | Quantity | Unit Cost | |
| Misc. Costs | Lot | $ - 0 | $ - 0 | |
| If you provided pricing under miscellaneous, please list specifics in this area. Offeror may expand this section if needed to provide for more room. Do not add costs in this section as they should already be lumped in miscellaneous. | Material Subtotal= | $ - 0 |
| Shipping Costs | Unit | Quantity | Unit Cost | |
| Packaging | job | $ - 0 | $ - 0 | |
| Shipping | job | $ - 0 | $ - 0 | |
| Shipping Subtotal= | $ - 0 |
| Travel Expenses | Unit | Quantity | Unit Cost | Amount |
| Air fare | roundtrip | $ - 0 | $ - 0 | |
| Per diem | days | $ - 0 | $ - 0 | |
| Lodging | nights | $ - 0 | $ - 0 | |
| Rental car and gas | days | $ - 0 | $ - 0 | |
| Travel Subtotal | $ - 0 |
Installation Total: $0
3.11 CloseOut
| Closeout (3.11) | ||||
| Labor Category | Unit | # of Units | Rate | Amount |
| Project Manager | Hours | $ - 0 | $ - 0 | |
| Exhibit Designer | Hours | $ - 0 | $ - 0 | |
| Graphic Designer | Hours | $ - 0 | $ - 0 | |
| Lighting Designer | Hours | $ - 0 | $ - 0 | |
| Audiovisual Systems Developer | Hours | $ - 0 | $ - 0 | |
| Audiovisual Director-Producer | Hours | $ - 0 | $ - 0 | |
| AV Editor | Hours | $ - 0 | $ - 0 | |
| AV Researcher | Hours | $ - 0 | $ - 0 | |
| AV Programmer | Hours | $ - 0 | $ - 0 | |
| Exhibit Detailer | Hours | $ - 0 | $ - 0 | |
| Fabrication Shop Supervisor | Hours | $ - 0 | $ - 0 | |
| Graphics Shop Supervisor | Hours | $ - 0 | $ - 0 | |
| Exhibits Specialist (Fab) | Hours | $ - 0 | $ - 0 | |
| Exhibits Specialist (Graphics) | Hours | $ - 0 | $ - 0 | |
| Model Maker | Hours | $ - 0 | $ - 0 | |
| Artifact Mounter | Hours | $ - 0 | $ - 0 | |
| Lighting Technician | Hours | $ - 0 | $ - 0 | |
| Audiovisual Technician | Hours | $ - 0 | $ - 0 | |
| Electrical Technician | Hours | $ - 0 | $ - 0 |
Labor Subtotal= $ - 0
| Material Costs | Unit | Quantity | Unit Cost | |
| Binders, Etc. | Lot | $ - 0 | $ - 0 | |
| Material Subtotal= | $ - 0 |
| Shipping Costs | Unit | Quantity | Unit Cost | |
| Packaging | job | $ - 0 | ||
| Shipping | job | $ - 0 | ||
| Shipping Subtotal= | $ - 0 |
| Travel Expenses | Unit | Quantity | Unit Cost | Amount |
| Air fare | roundtrip | $ - 0 | ||
| Per diem | days | $ - 0 | ||
| Lodging | nights | $ - 0 | ||
| Rental car and gas | days | $ - 0 | ||
| Per-Trip Cost = | $ - 0 | |||
| # of Person Trips | Travel Subtotal = | $ - 0 |
Closeout Total: $0
File details come from the government source that posted it. Updated .