B09(d) - Past Performance (Facts Sheet) Amend 0002_0002.docx

DOCX document 30 KB Posted

Attached to
NAMA THJE EXHIBIT DESIGN Federal contract opportunity
Solicitation number
140P3020R0041
Issued by
Department of the Interior National Park Service National Office

About this file

This document contains a Past Performance Facts Sheet template to be completed by offerors responding to Solicitation Number 140P3020R0041. The solicitation seeks exhibit planning and design commercial services for the lower level of the Thomas Jefferson Memorial from the Department of the Interior National Park Service National Office. Offerors must complete the Facts Sheet for each relevant past performance reference, providing details of contract type, period of performance, description of effort, and relevancy to the solicitation. A Relevancy Table assists in evaluating how prior experience relates to requirements for planning and designing exhibits of museum quality, implementing accessibility standards, utilizing AV and mechanical elements, designing multimodal experiences for a historic building, and developing plans throughout the exhibit process. Primary points of contact are also to be included.

View the file

Other files for this federal contract opportunity

Other files attached to NAMA THJE EXHIBIT DESIGN, newest first.
File Type Posted
B09 0040479708 Subcontracting Percentage Worksheet_Amend 0004_0004.xlsx XLSX spreadsheet
Sol_140P3020R0041_Amd_0004.pdf PDF
B09 0040479708 Q_A_ 09092020 Amend 0003_0003.pdf PDF
Sol_140P3020R0041_Amd_0003.pdf PDF
Sol_140P3020R0041_Amd_0002.pdf PDF
A04 0040479708 SOW THJE rev 090120_0001.pdf PDF
B11 0040479708 Virtual_Site Visit Presentation rev 09022020_0001.pdf PDF
B09 0040479708 Q_A_ 09022020 Amend 0001_0001.pdf PDF
Sol_140P3020R0041_Amd_0001.pdf PDF
A06 0040479708 A12 THJE_PDII_Drawings 46-91.pdf PDF
A06 0040479708 A12 THJE_PDII_Drawings 1-45.pdf PDF
A06 0040479708 A13 THJE_PDII_Graphics 40-78.pdf PDF
A06 0040479708 A14 NAMA_SignGuidelines.pdf PDF
A06 0040479708 A2 Exhibit Conservation Guidelines.pdf PDF
A06 0040479708 A13 THJE_PDII_Graphics 1-39.pdf PDF
B03 0040479708 SCA WD 15-4281_rev-16_42320.pdf PDF
A04 0040479708 SOW THJE FINAL.pdf PDF
B08 140P3020R0041 Forms.zip ZIP file
B08 0040479708 Price Schedule_Bid Sheet.xlsx XLSX spreadsheet
A06 0040479708 A7 Harpers Ferry Center Interpretive Media.pdf PDF
A06 0040479708 A10 Tactile_Wayside_Map_Guidelines.pdf PDF
A06 0040479708 A6 Production-Installation of Electronic Programs.pdf PDF
A06 0040479708 A11 THJE_Lower_Level-Existing Footprint.pdf PDF
A06 0040479708 A9 NAMA Photo Release Schedule Form_Fillable.pdf PDF
B08 0040479708 Solicitation Final 0801920.pdf PDF
Sol_140P3020R0041.pdf PDF
A06 0040479708 A8 Sample Use Rights Letter.docx DOCX document
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP Attachment #2 – Present/Past Performance Facts Sheet

RFP ATTACHMENT #2

Present/Past Performance “FACTS Sheet”

(TO BE COMPLETED BY OFFEROR)

A. Request the offeror, if applicable, complete a separate FACTS Sheet for each relevant contract that reflect performance of services that are similar in scope and size to the current effort. Offeror is requested to provide frank, concise comments regarding technical capability of performing the current effort.

OFFEROR:

1. Name (Company/Division)

1. Address

1. CAGE Code

B. PROGRAM/PROJECT TITLE and CONTRACT NUMBER*:

(* If contract listed is a Dept. of Interior contract, then attach electronic copy of Performance Work Statement to FACTS Sheet).

Role of the Offeror in Effort: __________ Prime Contractor _________ Subcontractor

Note that the information provided in the FACTS Sheet shall reflect the role that the offeror performed in the effort, i.e. an offeror who performed as a subcontractor shall identify the contract type, dollar value, description, etc. of its subcontract with the prime contractor.

NAME OF CONTRACTING ACTIVITY OR CUSTOMER:

CONTRACT TYPE(S) – CHECK ALL THAT APPLY

1. Firm Fixed Price ____________________________________

1. Time and Materials ____________________________________

1. Other (Explain) ____________________________________

CONTRACT $ VALUE: (If you performed work as a subcontractor, identify your contract $ value and the PRIME’s contract $ value, if known. Describe any changes in dollar value that may have occurred from time of contract award to the conclusion of the effort or the present, whichever is applicable.)

1. Original Contract Dollar Value:

1. Current Dollar Value:

1. If Award Fee Contract, what percentages of the fee have been awarded in each of last 3 years?

PERIOD OF PERFORMANCE: (includes start and end dates, i.e. Jan 2012 – Dec 2015)

BRIEF DESCRIPTION OF EFFORT:

1. As a part of this narrative description, highlight portions considered most relevant to the current acquisition; addressing how and to what extent the proposed effort relates to the program identified in B. above. To supplement the data provided in response to this paragraph, complete the following regarding relevancy of the effort identified in paragraph B to the proposed effort. This is limited to two pages beyond the page limitation of the FACTS sheet information.

1. This paragraph shall also include details to support the offeror’s record for on-time delivery, technical quantity and cost control for this effort identified in paragraph B above.

RELEVANCY TABLE

The Relevancy Table on the following page will assist the PCO in evaluating the relevancy of the proposed effort to the Exhibit Planning and Design requirement at National Park Service – National Capital Region (NPS-NCR). Offeror, if applicable, shall only complete column three. Offeror’s answers are applicable only to the effort identified in paragraph B. above, not the offeror’s proposed solutions to the instant effort. If additional space is needed, please attach a separate sheet to your response (limited to two pages).

RELEVANCY TABLE

Complete with each effort submitted for evaluation. Please follow guidance in paragraph I above.)

Category
The Proposed Effort

Requires:

(DO NOT CHANGE)

Fill-in for the Effort Identified in paragraph B above (Offeror completes) The effort in paragraph B required:

1. Type of contract

Commercial
Circle one
Commercial
Noncommercial

2. Requiring activity of contract

National Park Service
Circle all that apply
National Park Service
Department of Interior
other

3. Contract Requirements

Planning and design exhibits of museum quality
Ref. SOW
Circle one
Yes
No
Implementing accessibility requirements in the planning and design of the exhibits meeting federal, state, local and/or agency legal accessibility requirements
Ref. SOW
Circle one
Yes
No
Use of AV & mechanical elements, lighting, and graphics- media synchronized with each other by computer controls in the design
Ref. SOW
Circle one
Yes
No
Design of/for the multimodal, multisensory components
Ref. SOW
Circle one
Yes
No
Plan and design of experiences for a historic building
Ref. SOW
Circle one
Yes
No
Ability to develop plans and designs throughout the exhibit development process
Ref. SOW
Circle one
Yes
No

PRIMARY POINTS OF CONTACT: (The offeror/joint venture member/critical subcontractor is responsible for exerting its best efforts to ensure that current information is provided for all individuals.)

Name and Office Symbol
Phone Number
email
1. Procuring Contracting Officer
DSN & Comm
Email address
1. Govt Program Manager
DSN & Comm
Email address
1. Administrative Contracting Officer
DSN & Comm
Email address
1. Contracting Officer’s Rep (COR)
DSN & Comm
Email address

If the offeror, joint venture member or critical subcontractor (if applicable) is a newly formed (in existence less than (3) years from the issuance date of this solicitation) entity who either has no prior contracts or does not possess relevant corporate past performance, but does have key personnel with relevant past performance while employed by another company, specify by name, such key individual(s) who will participate in the proposed effort under this acquisition who also participated in the program identified in B. above, and indicate their contract role. Describe how participation of these key personnel contributed to the success of the previous effort and how this indicates probability of success on the proposed effort.

Use this space to address any aspect about this program considered unique. Describe quality awards or certifications that indicate the offeror possesses a high-quality process for developing and producing the product/service required.

Summarize contract issues relative to the number and severity of quality deficiencies recorded/contract discrepancy reports issued, cure notices, show cause letters, termination for default or cause, disputes, claims, latent defects; and, corrective actions taken for the contract listed in paragraph B. above.

Additionally, for those efforts where you are cognizant of unfavorable and/or marginal past performance ratings/reports previously assessed by customers or clients, but feel that significant progress has been made but not yet credited or formally documented, provide the program name, contract number, customer location and a narrative explaining "fixes" made to date, or any other information regarding the unfavorable/marginal assessment. This narrative portion is limited to one (1) additional page beyond the FACTS sheet required page limitation. It is not presumed that performance has been perfect. Rather, the proposal should contain evidence of the offeror's/joint venture member’s/critical subcontractor’s ability to isolate the root causes of problems and should describe programs or actions taken to resolve those causes. Demonstrated corrective actions (not just planned or promised), and the overall work record will be considered. Problems not addressed, but found by the Government during the evaluation of the information in this volume, will be assumed to still exist. Note: In the case of Contractor Performance Assessment Report System (CPARS), if your input has already been provided and the rationale/ circumstances have not changed, DO NOT repeat them here.

Was this contract effort (as identified in paragraph B. above) submitted as a past performance source of data for a previous National Park Service procurement. Yes _ No _ . If yes, identify the buyer and/or contracting officer, their phone number and office symbol and solicitation number of the procurement for which this effort was submitted.

PLEASE NOTE: The Government is not bound by the offeror's opinion of relevancy. The Government will perform an independent assessment of relevancy of the data provided or obtained.

SOURCE SELECTION INFORMATION - See FAR 2.101 and 3.104

FOR OFFICIAL USE ONLY

File details come from the government source that posted it. Updated .