This document outlines a solicitation for exhibit planning and design commercial services at the lower level of the Thomas Jefferson Memorial. The solicitation was issued by the Department of the Interior National Park Service National Office and seeks a contractor to provide all elements of exhibit design and development including structures, graphics, audiovisual components, interactives, artwork, artifacts, historical representations, lighting, and an information desk. The work will improve visitor experiences and interpretive programming through redevelopment of the lower level exhibition space, removing outdated elements and implementing an accessible design with a clear flow that dedicates more room to exhibits while consolidating support functions. Interested offerors should review the solicitation package for additional requirement details and response instructions.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1P A G E
National Mall and Memorial Parks Washington, DC
U.S. Department of the Interior National Park Service
Exhibit Planning and Design Services Thomas Jefferson Memorial Lower Level Exhibits
Virtual Site Visit
2P A G E Project Location
Project Location Thomas Jefferson Memorial 701 East Basin Drive, SW Washington, DC 20042
Project Meeting Locations National Mall and Memorial Parks Headquarters 900 Ohio Drive, SW Washington, DC 20042
Division of Interpretation and Education 750 Buckeye Drive, SW Washington, DC 20042
3P A G EProject Location
4P A G E
Secondary Visitor Flow
Plaza
Main Steps
Bus Drop-off
Primary Visitor Flow
East EntranceWest Entrance
Existing Conditions • Visitor Flow Patterns
The Thomas Jefferson Memorial sits along the southern bank of the Tidal Basin. It is typically accessed by visitors on foot since there is no public parking near the memorial with the exception of accessible parking. The memorial is also accessed by buses which drop off passengers to the south west of the memorial. The majority of visitors walk to the plaza and the main steps of the memorial from the west side. If they enter the lower level of the memorial, they typically enter from the west side which is why that entrance is represented in the following photos.
5P A G EExisting Conditions • West Entrance to Lower Level
6P A G E
Store 1 Store 2
Existing Conditions • Lower Level
Restroom
Restroom
Elevator
West Ramp West Ramp
Exhibits
The lower level space was unfinished from the monument’s dedication in 1943 until 1999 when it was upgraded to include restrooms, elevator access, retail, and exhibits. The current layout creates a space that is mostly for circulation, has redundant stores, poor lighting, and a confusing path to the elevator. Additionally, the exhibits are text heavy and hard to read, and lack accessible features such as tactile models, proper contrast, audio description, and assistive listening. Under current A/E and Construction contracts, the space will be demolished and reconfigured (see page 12). Any free-standing exhibitry is available for reuse.
7P A G E
Store 1 Store 2
Restroom
Restroom
Elevator
West Ramp West Ramp1 2 3 4
Existing Conditions • Lower Level
8P A G E
Store 2
Restroom
Elevator
West Ramp
Store 1
Restroom
West Ramp
9P A G E
Restroom
West Ramp
14 15 1817
Store 1
Elevator
10P A G E
Restroom
West Ramp
23 24
Store 2
Restroom
11P A G EDemolition Plan • Lower Level
DN
DN
DN DN
AD1.2
AD1.2
HHIISSTTOORRIICC MMEENN''SS
RROOOOMM//SSTTOORRAAGGEE
EEAASSTT
VVEESSTTIIBBUULLEE
AARRTTIIFFAACCTT
SSTTOORRAAGGEE
SSTTOORRGGIIFFTTSSHHOOPP
WWOOMMEENN''SS RROOOOMM
FFAAMMIILLYY
RREESSTT
RROOOOMM
EEXXHHIIBBIITT SSPPAACCEE
BBOOOOKKSSTTOORREE
SSTTOORR..
WWEESSTT
VVEESSTTIIBBUULLEE
MMEECCHH..
RROOOOMM
MMEENN''SS RROOOOMM
LLIIFFTT
SSTTOORR..
EEMMRR
UUNNCCOONNDDIITTIIOONNEEDD
BBAASSEEMMEENNTT
SSPPAACCEE
UUNNDDEERR SSTTAAIIRR SSTTOORRAAGGEE
EEXXHHIIBBIITT
SSPPAACCEE
SSUUPPPPOORRTT
EEXXHHIIBBIITT SSPPAACCEE
SSUUPPPPOORRTT
55..11
EELLEEVVAATTOORR
99..44
99..44 TTYYPP..
TTYYPP..
TTHHRROOUUGGHHOOUUTT
1122..22
1122..22
88..11
55..11
55..11 55..11
99..88
99..88
EEAASSTT
CCOOOORRIIDDOORR
WWEESSTT
CCOOOORRIIDDOORR 55..2255..22 55..22 55..22
88..22
88..11
88..22
88..11
AARRTTIIFFAACCTT
SSTTOORRAAGGEE
55..11
99..33 TTYYPP..
88..33
88..33
55..11
88..11
88..11
99..55
TTYYPP..
88..11
99..55
88..11
55..11 88..11
55..11
99..11
99..66
99..11
99..66
2233..11
99..6699..112266..11
99..66
99..11
99..11 99..22
33..11
99..66
99..11
99..11 99..662266..11
99..99
55..11 RREEMMOOVVEE PPOORRTTIIOONN OOFF SSTTUUDD WWAALLLL..
99..44 RREEMMOOVVEE AANNDD SSAALLVVAAGGEE ((TTYYPPEE 22))
EEXXIISSTTIINNGG EEXXHHIIBBIITTSS..
DDEEMMOOLLIITTIIOONN NNOOTTEESS OONN TTHHIISS SSHHEEEETT
99..11 RREEMMOOVVEE AACCTT AANNDD LLIIGGHHTT FFIIXXTTUURREE..
1122..22 RREEMMOOVVEE CCOOUUNNTTEERR AANNDD DDIISSPPLLAAYY
CCAASSEE..
99..66 RREEMMOOVVEE VVCCTT FFLLOOOORRIINNGG..
2266..11 RREEMMOOVVEE EELLEECCTTRRIICCAALL
PPAANNEELLBBOOAARRDDSS..
88..33 RREEMMOOVVEE SSTTOORREEFFRROONNTT WWIINNDDOOWW..33..11 RREEMMOOVVEE PPOORRTTIIOONN OOFF CCMMUU WWAALLLL.. 2233..11 RREEMMOOVVEE HHVVAACC SSYYSSTTEEMM
IINNCCLLUUDDIINNGG SSPPLLIITT SSYYSSTTEEMMSS,,
DDUUCCTTWWOORRKK,, AAIIRR DDEEVVIICCEESS,, PPIIPPIINNGG,,
EETTCC..
99..55 RREEMMOOVVEE GGRRAANNIITTEE VVEENNEEEERR
CCOOLLUUMMNN WWRRAAPPSS..
99..22 RREEMMOOVVEE PPOORRCCEELLAAIINN TTIILLEE FFLLOOOORR
AANNDD BBAASSEE..
99..33 RREEMMOOVVEE CCMMUU AANNDD GGRRAANNIITTEE
VVEENNEEEERR CCOOLLUUMMNN WWRRAAPP.. SSAALLVVAAGGEE
((TTYYPPEE 22)) GGRRAANNIITTEE..
88..22 RREEMMOOVVEE GGLLAASSSS DDOOOORR,, FFRRAAMMEE
AANNDD HHAARRDDWWAARREE..
88..11 RREEMMOOVVEE DDOOOORR,, FFRRAAMMEE AANNDD
HHAARRDDWWAARREE..
55..22 RREEMMOOVVEE AANNDD SSAALLVVAAGGEE ((TTYYPPEE 22))
BBRROONNZZEE HHAANNDDRRAAIILL AANNDD
BBRRAACCKKEETTSS..
99..88 RREEMMOOVVEE AANNDD SSAALLVVAAGGEE ((TTYYPPEE 22))
EEXXIISSTTIINNGG EEQQUUIIPPMMEENNTT AASSSSOOCCIIAATTEEDD
WWIITTHH EEXXHHIIBBIITT DDEESSIIGGNN
99..99 RREEMMOOVVEE AARRCCHHEEDD CCEEIILLIINNGG..
8 0 8 16
SCALE OF FEET
A/E FIRM - P15PC00037
TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
PRIME/ARCH:
GWWO, INC.
BALTIMORE, MD
SECURITY:
GHD
CHANTILLY, VA
PLUMBING:
HENRY ADAMS LLC
BALTIMORE, MD
STRUCTURAL:
SGH
WASHINGTON D.C.
MECHANICAL:
HENRY ADAMS LLC
BALTIMORE, MD
ELECTRICAL:
HENRY ADAMS LLC
BALTIMORE, MD
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SCALE A
:1 :0
P M
C A u to d e sk Lo c a l F ile s\
JE
F M S D d p e te rs g w w o in c .c o m .r vt
LOWER LEVEL
DEMOLITION PLAN
NATIONAL MALL & MEMORIAL PARKS
165367
303091
9 14
AD1.1
DLP
DLP
JRG
6/17/2020
SCALE AAD1.1
1 LOWER LEVEL DEMOLITION PLAN
12P A G E Redesigned Space • Lower Level
DN
DN
DN DN
HHIISSTTOORRIICC MMEENN''SS
RROOOOMM//SSTTOORRAAGGEE
UUNNCCOONNDDIITTIIOONNEEDD
BBAASSEEMMEENNTT SSPPAACCEE
UUNNDDEERR SSTTAAIIRR SSTTOORRAAGGEE
EELLEEVVAATTOORR
88..22
55..22
448899 SSFF
GGIIFFTT
SSHHOOPP
110088
SSTTOORRAAGGEE
110088AA
MMEENNSS
110066
WWOOMMEENNSS
110077
FFAAMMIILLYY
110044
EEXXHHIIBBIITT
111100
WWOOMMEENNSS
111111
MMEENNSS
111122
WWEESSTT
VVEESSTTIIBBUULLEE
110022
MMEECCHH
RROOOOMM
110011
7799 SSFF
LLIIFFTT
SSTTOORR..
110099
112299 SSFF
EEMMRR
110099AA
JJAANNIITTOORR
110055
FFAAMMIILLYY
111144
JJAANNIITTOORR
111133
EEAASSTT
VVEESSTTIIBBUULLEE
111166
WWEESSTT
CCOOOORRIIDDOORR
110033
EEAASSTT
CCOOOORRIIDDOORR
111155 55..33 55..33 55..33 55..33
55..22
33..11
33..11
33..11
88..22
99..33
EEXXIISSTTIINNGG CCOONNCCRREETTEE
BBEEAAMMSS AABBOOVVEE
88..22 PPRROOVVIIDDEE GGLLAASSSS DDOOOORR WWIITTHH
AAUUTTOOMMAATTIICC OOPPEENNEERR..
CCOONNSSTTRRUUCCTTIIOONN NNOOTTEESS OONN TTHHIISS SSHHEEEETT
55..22 PPRROOVVIIDDEE WWAALLKK--OOFFFF GGRRAATTEESS..
99..33 CCLLAADDDDIINNGG MMAATTEERRIIAALL AASS
CCOOOORRDDIINNAATTEEDD WWIITTHH TTHHEE EEXXHHIIBBIITT
DDEESSIIGGNNEERR..
55..33 PPRROOVVIIDDEE AABBAAAASS CCOOMMPPLLIIAANNTT
SSTTAAIINNLLEESSSS SSTTEEEELL HHAANNDDRRAAIILLSS..
55..11 PPRROOVVIIDDEE MMEETTAALL SSTTUUDD WWAALLLL WWIITTHH
GGYYPPSSUUMM BBOOAARRDD OONN BBOOTTHH SSIIDDEESS..
33..11 IINNFFIILLLL CCMMUU WWAALLLL IINN PPLLAACCEE OOFF
RREEMMOOVVEEDD DDOOOORR..
88..11 PPRROOVVIIDDEE DDOOOORR,, HHAARRDDWWAARREE,, AANNDD
AAUUTTOOMMAATTIICC OOPPEENNEERR..
99..11 PPRROOVVIIDDEE DDRROOPP CCEEIILLIINNGG..
8 0 8 16
SCALE OF FEET
A/E FIRM - P15PC00037
TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
PRIME/ARCH:
GWWO, INC.
BALTIMORE, MD
SECURITY:
GHD
CHANTILLY, VA
PLUMBING:
HENRY ADAMS LLC
BALTIMORE, MD
STRUCTURAL:
SGH
WASHINGTON D.C.
MECHANICAL:
HENRY ADAMS LLC
BALTIMORE, MD
ELECTRICAL:
HENRY ADAMS LLC
BALTIMORE, MD
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SCALE A
:1 :0
P M
C A u to d e sk Lo c a l F ile s\
JE
F M S D d p e te rs g w w o in c .c o m .r vt
LOWER LEVEL NEW
WORK PLAN
NATIONAL MALL & MEMORIAL PARKS
165367
303091
13 14
A1.1
DLP
DLP
JRG
6/17/2020
SCALE AA1.1
1 LOWER LEVEL NEW WORK PLAN
The new floor plan for the lower level includes a single gift shop, a clear path to the elevator, men’s and women’s restrooms at both entrances that are accessed much closer to the entrances, and a more dedicated, intentional space for exhibits.