B09 0040479708 Subcontracting Percentage Worksheet_Amend 0004_0004.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
NAMA THJE EXHIBIT DESIGN
Solicitation number
140P3020R0041
Issued by

About this file

This document contains a subcontracting percentage worksheet template for a federal contract opportunity to provide exhibit planning and design commercial services for the lower level of the Thomas Jefferson Memorial. The worksheet requires contractors to input direct labor costs, fringe benefits, and general and administrative costs for both the prime contractor and any subcontractors. These figures are then used to automatically calculate the subcontracting labor cost percentage. The related federal contract opportunity is issued by the Department of the Interior National Park Service National Office to design all exhibit structures, graphic layouts, audiovisual elements, interactive elements, artwork, artifacts, historical vignettes, sculpted models, lighting design, and an information/ticketing desk to improve visitor services and interpretive programming at the Thomas Jefferson Memorial.

View the file

Other files

File Type Posted
Sol_140P3020R0041_Amd_0004.pdf PDF
B09 0040479708 Q_A_ 09092020 Amend 0003_0003.pdf PDF
Sol_140P3020R0041_Amd_0003.pdf PDF
B09(d) - Past Performance (Facts Sheet) Amend 0002_0002.docx DOCX document
Sol_140P3020R0041_Amd_0002.pdf PDF
A04 0040479708 SOW THJE rev 090120_0001.pdf PDF
B11 0040479708 Virtual_Site Visit Presentation rev 09022020_0001.pdf PDF
Sol_140P3020R0041_Amd_0001.pdf PDF
B09 0040479708 Q_A_ 09022020 Amend 0001_0001.pdf PDF
A06 0040479708 A12 THJE_PDII_Drawings 46-91.pdf PDF
A06 0040479708 A12 THJE_PDII_Drawings 1-45.pdf PDF
A06 0040479708 A13 THJE_PDII_Graphics 40-78.pdf PDF
A06 0040479708 A14 NAMA_SignGuidelines.pdf PDF
A06 0040479708 A2 Exhibit Conservation Guidelines.pdf PDF
A06 0040479708 A13 THJE_PDII_Graphics 1-39.pdf PDF
B03 0040479708 SCA WD 15-4281_rev-16_42320.pdf PDF
A06 0040479708 A8 Sample Use Rights Letter.docx DOCX document
A04 0040479708 SOW THJE FINAL.pdf PDF
A06 0040479708 A7 Harpers Ferry Center Interpretive Media.pdf PDF
Sol_140P3020R0041.pdf PDF
B08 0040479708 Price Schedule_Bid Sheet.xlsx XLSX spreadsheet
A06 0040479708 A10 Tactile_Wayside_Map_Guidelines.pdf PDF
B08 140P3020R0041 Forms.zip ZIP file
A06 0040479708 A6 Production-Installation of Electronic Programs.pdf PDF
A06 0040479708 A9 NAMA Photo Release Schedule Form_Fillable.pdf PDF
A06 0040479708 A11 THJE_Lower_Level-Existing Footprint.pdf PDF
B08 0040479708 Solicitation Final 0801920.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Subcontracting % Worksheet Subcontracting Percentage Worksheet

**Contractor shall be responsible for checking the calculations within this worksheet for accuracy.

PRIME CONTRACTING:SOURCE:
SUBCONTRACTOR:SOURCE:
PRIME CONTRACTORSUBCONTRACTOR
DIRECT LABOR
FRINGE BENEFITS*
SUB TOTAL(A)$0.00(B)$0.00
LABOR G&A** @ %%$0.00%$0.00
TOTAL LABOR COSTS(C)$0.00(D)$0.00

To calculate the subcontracting percentage, first add DIRECT LABOR and FRINGE BENEFITS and enter the figures for the prime contractor in space (A) and for the subcontractor (if available)*** in space (B).

Calculate the prime's LABOR G&A (enter whole value and the % sign in cell B14: example 6%) by multiplying the G&A rate by the SUBTOTAL figure in space (A).

Calculate the subcontractor's LABOR G&A (enter whole value and the % sign in cell D14: example 6%) by multiplying the subcontractor's G&A rate by the subcontractor's SUBTOTAL figure In (B).

Add the LABOR G&A to the SUBTOTAL and record that figure in the spaces for TOTAL LABOR COSTS at (C) and (D) respectively.

Next, using the formula below, calculate the subcontracting labor percentage.

(D)
$0.00
$0.00
(C ) plus (D)

SUBCONTRACTING LABOR COST PERCENTAGE= ERROR:#DIV/0!

* The firm must demonstrate that their labor overhead is allowable in accordance with FAR 3 l.205- 6(m). Failure to do so will cause the entire overhead to be eliminated from the calculations.

** G&A denotes General and Administrative Cost.

*** You need to compare as like figures as possible. Therefore, if you have a breakdown of the subcontractor's costs use it in the formulation above. If you do not have a breakdown you need to use the TOTAL SUBCONTRACTING AMOUNT for item (D) even though you must still breakdown the contractor's costs.

Attachment 12

File details come from the government source that posted it. Updated .