Replacement of B647 Roofing System Project 612A4-25-018
Solicitation number
36C26126R0018_2
Issued by

About this file

This is a Statement of Work (SOW) for the replacement of the roofing system on Building 647 at the VA Medical Center Mather in Sacramento, California. The project (612A4-25-018) requires complete demolition of the existing asphalt roofing system and installation of a new Ketone Ethylene Ester (KEE) roofing system covering approximately 8,500 square feet, including rolled-up roofing to parapet caps and a small first-floor roof area. The contractor must complete all work within 150 calendar days and furnish all labor, materials, equipment, and supervision necessary for demolition, installation, and finishing. The new roofing system must meet specific physical properties outlined in Table 1, including a minimum 60-mil thickness membrane with reinforced polyester knit fabric and thermoplastic coating, vapor barrier underlayment, expanded polystyrene insulation, and replacement of 10 roof drains with new strainers and clamp rings. Installation must include new stainless-steel flashings, coping, column caps, metal wall panel covers, galvanized metal terminations over piping, rubber-based Uni-Strut fasteners, and worker access walkways (up to 250 linear feet, three feet wide, yellow in color) connecting to all serviceable roof equipment.

The contractor must engage a third-party roofing inspector with at least five years of experience to perform inspections during and after installation. All work must be performed by fully qualified and certified personnel trained on the manufacturer's products, with odor-producing work conducted after regular business hours. The contractor is responsible for providing a design layout showing all roof equipment and drainage locations following field verification, managing weather protection, and obtaining necessary certifications and permits including FAA approval for crane operations if required. The deliverables include a 30-year manufacturer's warranty certificate and maintenance instructions in physical and digital formats identifying methods that would void the warranty. The contractor may propose equivalent substitutions with detailed justification and must submit a fume/odor control plan to the Contracting Officer Representative prior to construction. All records and data generated during contract execution are owned by the U.S. Government, and the contractor must comply with federal records management policies and Privacy Act requirements.

View the file

Other files

File Type Posted
B647-Design.pdf PDF
14 RFI Drico Response.pdf PDF
S06-36C26126R0018 0005.pdf PDF
15 RFI Borja Engineering and Construction Inc Response.pdf PDF
12 RFI Talion Contracting Inc. Response.pdf PDF
13 RFI Advanced Technology Construction Response.pdf PDF
S06-36C26126R0018 0004.pdf PDF
8 RFI D Square Construction LLC Response.pdf PDF
7 RFI D Square Construction LLC Response.pdf PDF
11 RFI DHC Contracting Inc. Response.pdf PDF
10 RFI Trinity Builders Response.pdf PDF
9 RFI SNH Contracting LLC Response.pdf PDF
5 RFI D Square Construction LLC Response 2.pdf PDF
6 RFI Panacea Construction Group Response.pdf PDF
S06-36C26126R0018 0003.pdf PDF
RFI Advanced Technology Construction Response.pdf PDF
S06-36C26126R0018 0002.pdf PDF
RFI Bexar Response.pdf PDF
RFI Borja Engineering Construction Inc Response.pdf PDF
Site Visit Log Sheet.jpeg JPEG file
B647-VANCHCS-LF-00072.pdf PDF
RFI D Square Construction LLC Response.pdf PDF
Site Visit Log Sheet 2.jpeg JPEG file
S06-36C26126R0018 0001.pdf PDF
SOW - Replace Roofing on B647 KEE 2_3_26.docx DOCX document
ATTACHMENT REQUEST FOR INFORMATION FORM.pdf PDF
ATTACHMENT SITE VISIT LOG 36C26126R0018.pdf PDF
ATTACHEMNT FULL SPECS B647 ROOFING.rtf RTF text file
S02-36C26126R0018_2.pdf PDF
ATTACHMENT WD CA20260007 01-16-2026.pdf PDF
ATTACHMENT PRICE BREAKDOWN.docx DOCX document
ATTACHMENT 852.219-75 VA NOTICE OF LIMITATIONS.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA Medical Center Mather 10535 Hospital Way 612A4-26-008 Mather, CA 95665

ARCHITECT-ENGINEER DESIGN SCOPE OF WORK

Replace Roofing System on B647

PROJECT NO: 612A4-25-018

PROJECT NAME: Replacement of B647 Roofing System

1. GENERAL INTENT:

The existing asphalt roofing is at the end of its service life and needs to be completely removed and replaced with a new roofing system.

The Contractor shall furnish labor and materials needed to perform all demolition, renovation, installation and finishes required by this scope located at Mather VA Medical Center/Sacramento VA Medical Center (SMC) – 10535 Hospital Way Bldg. 647, Mather, CA 95655 in accordance with this design scope of work.

This project is to take no longer than 150 calendar days.

2. STATEMENT OF WORK:

A. Contractor shall furnish all labor, material, equipment, and supervision for the selective demolition, installation of roofing of Bldg. 647, and/or other corrections noted for the locations described therein.

B. Contractor shall ensure all services are performed by fully qualified/ certified and trained personnel of the manufacturer of the product(s). Individuals completing the work shall possess the necessary skills and experience with the devices/ hardware/ controls to perform the work as described in this SOW (statement of work).

C. The contractor is responsible for managing a schedule of installation that eliminates the risk for damage due to weather; the contractor will need to provide protection to the building if weather were to become a factor. All odor producing work to be done after regular business hours.

D. Contractor shall provide design layout showing all equipment located on the roof and all drainage location. It is the contractor's responsibility to field verify all equipment locations and create a design layout of the roof system.

E. Contractor shall provide new roofing system equivalent to the Ketone Ethylene Ester interpolymer (KEE) roofing system as described in TABLE 1. Contractor shall provide a new roofing system to replace the existing asphalt roofing system of approximately 8,500 square feet including the existing rolled up roofing to the parapet roof caps and a small 1st floor roof area. All devices and equipment in TABLE 1 are to be considered the ‘base standard of product quality’. Contractor will have the option to substitute items and this shall be clearly detailed in the contractor’s proposal in addition to a fume/odor control plan which shall be provided to the contracting officer representative (COR) prior to construction. Contractor shall provide all demo including; Removing all debris and preparing roof for complete and total roof replacement and including cleaning / prepping entire roof surface. Repair and re-roof around all roof drains without deviating from original sloping to allow runoff to travel toward the roof drains (10 total).

F. In addition to adhering to part 1.19 of section 01 35 26 of the VANCHCS Master Specification, the contractor shall provide crane lift plan to include: a description of the job followed by load charts or crane profile, applicable rigging diagram, signals and/or communication to be used, rigger designation, wind and environmental factors, diagram of crane set up and swing area, notable hazards and precautions, access requirements, crane and operator certifications, and appropriate permit(s) and operations required by the local agencies including the Federal Aviation Administration (FAA).

G. Roof Demolition: Contractor shall provide and demolish roofing to requirements outlined below using a phasing or sectioning approach to include an exposure allowance of no more than 14 days in total:

1. Work vehicles shall be staged in approved gravel lot or furthest employee parking lot from work location.

2. Repair damaged mechanical curbs which contain metal caps where necessary for installation of new roofing, whereas a mechanical cap consists of at least four corners.

3. At least one dumpster shall be staged near work area, as approved by the COR.

H. The contractor shall provide a 3rd party roofing inspector with at least 5 years of experience to perform inspections with manufacturers representative prior to, during and after installation of new roof or as required for manufacturers roof warranty.

I. Installation requirements: Contractor shall provide and install roofing to requirements outlined below:

1. Install a fiber type water proofing vapor barrier equal to or better than GCP’s Tri-flex ®15 Synthetic Underlayment to the concrete deck.

2. Install insulation (Expanded polystyrene or equal) over entire roof and secure.

3. Install roof membrane (submittal approved) 60mil or better.

4. Use reinforced roof membrane of polyester knit fabric with thermoplastic coating similar to Tremco’s TremPly Kee system, white in color.

5. The reinforced roof membrane of polyester knit fabric with thermoplastic shall be at least and mostly mechanically attached to said roofing. Finish edges of laps with sealants as specified.

6. The contractor shall replace 10 roof drains including the pee traps (connect to existing drainpipe. Replace pipe boots, conduit boots, provide new strainers and clamp rings.

7. Cut-out and seal all roof drains and vent penetrations.

8. Install galvanized coned metal over roof membrane terminations on piping.

9. Replace all piping supports on the roof with rubber base Uni-Strut fasteners.

10. Install new stainless-steel flashings, coping, column caps and metal wall panel covers.

11. Install worker access 3 feet wide walkways in total length up to 250 linear feet to all serviceable roof equipment continuously from room access point. Walkways shall be in accordance with “flexible walkways” in attachment 075416. Additionally, walkways shall be mostly yellow in color.

12. Ensure no screws or plates are exposed.

13. The contractor shall also include an all new roof ladder for building 645 from the 1st floor roof to the second floor roof.

14. If the above outline may void the warranty, notify COR with possible alternate installation methods.

15. The contractor shall remove all debris and clean-up site and request final inspection from COR as the project is not considered complete until COR approves completion.

16. Follow all warranty information as outlined in attachment 07 54 16 for manufacturer’s warranty with an exception that the manufacturer shall warranty their KEE roofing system for a minimum of 30 years. In addition, the warranty shall be submitted to the engineering department, as directed by the COR.

17. Deliverable required is a roofing manufacturer 30-year warranty certificate.

18. Maintenance instructions shall be submitted by the contractor in physical and digital formats and these instructions shall include a complete list of maintenance methods that would void such warranty.

J. Tables.

TABLE 1. Physical Properties of Ethylene Interpolymer Kee Roofing.

PROPERTY
MINIMAL ROOFING MATERIAL
Thickness ASTM D 751 (inches)
0.060
Thickness over Fiber Optical method (inches)
0.016

Breaking Strength (MD/XMd) D 751 proc. B

- strip (lbf/in) 520/406

Elongation at Break (MD/XMD) D 751 - strip
22/20
Tear Strength (MD/XMD) ASTM D 751 proc. B. Tongue Tear (lbf)
125/145

VA Medical Center Mather 10535 Hospital Way 612A4-26-008 Mather, CA 95665

Linear dimensional change (MD/XMD) ASTM D 1204 max (%)
6
Fabric Adhesion d 751 min (lb/in)
no peel
Low temperature Bend ASTM D 2136 (0f)
-30

Retention of Properties after heat Aging Practice D 3045 - 1750f/56 days

Breaking Strength min ASTM D 751 proc.

B (lbf/in)

Elongation at break ASTM D 751 proc. B
20/20
Low Temperature Blend ASTM D 2136 (°F)
pass
Change in Weight after Exposure in Water D 471 1580f one side only, max. (%)
0.7
Seam Strength D 751 Grab Method, min. (lbf)
800
Hydrostatic Resistance (psi) ASTM D751
>1,000
Static Puncture Resistance ASTM D 5602 (99lbf)
pass
Dynamic Impact/ Puncture Resistance ASTM D 5635 min. (J)
pass
Cracking (7x magnification)
none
Casting (7x magnification)
none
Cracking (7x magnification)
none
Casting (7x magnification)
none
Fungi Resistance practice G 21, 28 days
none
Abrasion, D 3389 H-18 wheel 1,000 g load, (min. cycles)
>2,000

3. Attachments A. Project Specifications 01 00 00 – General Requirements 01 32 16 – Project Schedules 01 33 23 – Submittals 01 35 26 – Safety Requirements 01 45 00 – Quality Control 01 74 19 – Construction Waste Management 02 41 00 – Demolition 07 22 00 – Insulation 07 54 16 – Ethylene Interpolymer (KEE) Roofing 07 60 00 – Flashing and Sheet Metal 07 72 00 – Roof Accessories 22 14 00 – Flashing of Roof Drains 07 01 50.19 – Preparation for Re-roofing

4. Records Management Requirements

The following standard items relate to records generated in executing the contract and should be included in a typical Electronic Information Systems (EIS) procurement contract:

1. Citations to pertinent laws, codes and regulations such as 44 U.S.C chapters 21, 29, 31 and 33; Freedom of Information Act (5 U.S.C. 552); Privacy Act (5 U.S.C. 552a); 36 CFR Part 1222 and Part 1228.

2. Contractor shall treat all deliverables under the contract as the property of the U.S. Government for which the Government Agency shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest.

3. Contractor shall not create or maintain any records that are not specifically tied to or authorized by the contract using Government IT equipment and/or Government records.

4. Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected by the Freedom of Information Act.

5. Contractor shall not create or maintain any records containing any Government Agency records that are not specifically tied to or authorized by the contract.

6. The Government Agency owns the rights to all data/records produced as part of this contract.

7. The Government Agency owns the rights to all electronic information (electronic data, electronic information systems, electronic databases, etc.) and all supporting documentation created as part of this contract. Contractor must deliver sufficient technical documentation with all data deliverables to permit the agency to use the data.

8. Contractor agrees to comply with Federal and Agency records management policies, including those policies associated with the safeguarding of records covered by the Privacy Act of 1974. These policies include the preservation of all records created or received regardless of format [paper, electronic, etc.] or mode of transmission [e-mail, fax, etc.] or state of completion [draft, final, etc.].

9. No disposition of documents will be allowed without the prior written consent of the Contracting Officer. The Agency and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. Records may not be removed from the legal custody of the Agency or destroyed without regard to the provisions of the agency records schedules.

Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, this contract. The Contractor (and any sub-contractor) is required to abide by Government and Agency guidance for protecting sensitive and proprietary information.

End of SOW