This is a Questions and Answers document for a federal contract opportunity with the VA (Department of Veterans Affairs) for roofing work at a facility identified as "Panacea."

Staffing and On-Site Requirements: The Prime Contractor must directly employ a Superintendent who must be on-site at all times during work. The Site Safety Health Officer (SSHO) does not need to be directly employed by the Prime but must be on-site at all times. A Quality Control representative is also a mandatory on-site role. The Superintendent and SSHO may be the same dual-hatted individual if qualified for both positions. Project Scope and Technical Requirements: The work involves installing a new roof system including insulation, cover boards, and KEE membrane on a plywood deck with a vapor barrier. The polyiso insulation thickness is specified in specification section 07 22 03 2.1, with mechanical curbs and roof penetrations requiring adjustment based on insulation thickness. Cover boards are required per specification section 07 22 00-8 3.7 to achieve Class A fire rating. Stainless steel copings and flashings specifications are detailed in section 07 22 00-5 2.3. Wood sleepers for ducting must be replaced with rubber or uni-strut clamps. The standing seam metal roof over the stairwell is not being replaced. Mechanical equipment does not require shutdown unless removal is necessary for roofing work, in which case the contractor must provide temporary systems. The project includes environmental considerations with asbestos and lead survey requirements per SOW Section 5, and ICRA (Infection Control Risk Assessment) requirements apply. The project start date is to be determined following award.

View the file

Other files

File Type Posted
S06-36C26126R0018 0005.pdf PDF
15 RFI Borja Engineering and Construction Inc Response.pdf PDF
12 RFI Talion Contracting Inc. Response.pdf PDF
13 RFI Advanced Technology Construction Response.pdf PDF
B647-Design.pdf PDF
14 RFI Drico Response.pdf PDF
7 RFI D Square Construction LLC Response.pdf PDF
11 RFI DHC Contracting Inc. Response.pdf PDF
10 RFI Trinity Builders Response.pdf PDF
9 RFI SNH Contracting LLC Response.pdf PDF
S06-36C26126R0018 0004.pdf PDF
8 RFI D Square Construction LLC Response.pdf PDF
S06-36C26126R0018 0003.pdf PDF
5 RFI D Square Construction LLC Response 2.pdf PDF
S06-36C26126R0018 0002.pdf PDF
RFI Advanced Technology Construction Response.pdf PDF
RFI Bexar Response.pdf PDF
Site Visit Log Sheet 2.jpeg JPEG file
RFI D Square Construction LLC Response.pdf PDF
S06-36C26126R0018 0001.pdf PDF
RFI Borja Engineering Construction Inc Response.pdf PDF
Site Visit Log Sheet.jpeg JPEG file
B647-VANCHCS-LF-00072.pdf PDF
SOW - Replace Roofing on B647 KEE 2_3_26.docx DOCX document
S02-36C26126R0018_2.pdf PDF
ATTACHEMNT FULL SPECS B647 ROOFING.rtf RTF text file
ATTACHMENT WD CA20260007 01-16-2026.pdf PDF
ATTACHMENT PRICE BREAKDOWN.docx DOCX document
ATTACHMENT 852.219-75 VA NOTICE OF LIMITATIONS.docx DOCX document
ATTACHMENT REQUEST FOR INFORMATION FORM.pdf PDF
ATTACHMENT SITE VISIT LOG 36C26126R0018.pdf PDF
ATTACHMENT SOW 12-17-2025.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Panacea

• Does the Superintendent need to be directly employed by the Prime Contractor? Yes

• Must the Superintendent be on site at all times while work is commencing? Yes

• Does the SSHO (Site Safety Health Officer) need to be directly employed by the Prime

Contractor? No

• Must the SSHO be on site at all times while work is commencing? Yes

• Can the Superintendent & SSHO be a dual-hatted individual assuming that individual is qualified for both roles? Yes

• Are there any other mandatory on-site roles required in this contract? Quality Control

• When does the VA expect the project to start following the award? To be determined.

• Are there any concerns for Asbestos Containing Material or Lead in the areas being worked in? See SOW Section 5 “Environmental Protection”

• Are there any ICRA requirements for this project? Yes

• Per the SOW section I item 1. States to adhere vapor barrier to concrete deck. As built drawings and onsite cores during the pre-bid walk shows plywood deck? The deck is plywood.

• Per SOW section I item 2. What is the thickness of the insulation to be installed? Also how are we achieving a class A fire rating with no gypsum coverboard? See specification section 07 22 00-3 2.1 A1 & A2. Cover boards are required, see specification section 07 22 00- 8 3.7

• Per SOW section I item 10. What is the thickness of the stainless steel for copings and flashings? See the specification section 07 22 00-5 2.3

• Are there project specifications attachment - 07 54 16 KEE Roofing, 07 22 00 Insulation, 07 60 00 Flashing and sheet metal, 07 72, 00 Roof Accessories? Yes, see specification section 07 54 16

• Are the wood sleepers for the ducting also expected to be replaced with rubber / uni-strut clamps? Yes

• Is the mechanical equipment expected to be shut down during construction? No, not unless the contractor requires it to be removed to do the roofing work.

o Must the contractor provide temporary systems while they are down? Yes

• What is the course of action following the asbestos/lead survey should these hazardous materials be identified in the existing material? See SOW 5.0 “Environmental Protection”

• Is the new roof system (insulation, cover board and KEE membrane is fully adhered or mechanically attached)? See section 07 22 00-7 3.6 in the specification and I 5.0 in the

SOW.

• Are the standing seam metal roofs also being roofed? (Plan page AE102 Roof Plan). No, the metal roofing over the stairwell is not being replaced.

• What thickness of poly iso insulation is to be installed? The insulation requirements are in the specification section 07 22 03 2.1 Depending on the thickness some mechanical curbs and roof penetrations will need to be raised.