Attachment__J5_Key_Personnel.pdf
PDF 216 KB Posted
- Solicitation number
- 140R2021R0004
About this file
This attachment provides requirements for key personnel on a federal dam safety modification project. The contractor must provide resumes for individuals filling key roles of project manager, quarry/blasting superintendent, earthwork superintendent, and concrete structures superintendent. Resumes must include name, assigned tasks, education, experience, certifications, accomplishments, and other information demonstrating suitability for the role. Experience must include project names, locations, dates, position held, and description of duties. If any key personnel will be subcontractors, the contractor must provide a letter of commitment signed by both parties. The attachment also requires the contractor to provide alternate personnel sources in the event planned key personnel become unavailable.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment J5_Key Personnel Responsibility Determination BF SISK Safety of Dams (SOD) Modifications
Key Personnel Responsibility Determination
Key Personnel: Provide resume information, which includes previous jobsite responsibilities on major contracts for individuals who will occupy the key function on this project.
1) Key personnel include:
a) Project Manager
b) Quarry/Blasting Superintendent(s)
c) Earthwork Superintendent(s)
d) Concrete Structures Superintendent(s)
2) The resume information shall include:
a) Name and tasks to be assigned.
b) Education, background, experience, certifications, accomplishments, and other pertinent information that demonstrates their suitability for the work assigned to them.
c) Include project names, locations, dates, details, position occupied, and description of duties.
3) If the offeror intends on subcontracting any of the key personnel, listed above, the offeror shall include a Letter of Commitment. The Letter of Commitment shall be signed by both parties and shall demonstrate the commitment of both parties to this project.
4) Provide a list of alternate personnel sources to be utilized in the event proposed personnel are not available as planned. (Include full resume by name of all additional personnel listed).