This document is an amendment to a federal solicitation for the BF Sisk Dam Safety of Dams (SOD) Modifications, Phase I project. The amendment incorporates offeror questions and answers, revises various contract specifications and attachments, replaces and adds drawings, and includes additional geologic files. The project involves construction of shear keys, stability berms, and spillway modification to address issues with the dam's select foundation materials and help prevent destabilization, reduce safety concerns, and ensure water supply deliveries. The Bureau of Reclamation is the contracting agency. The amendment sets a new offer due date of November 19, 2021 at 2:00 PM and revises pricing and technical requirements.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140R2021R0004 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Sacramento CA 95825-1898 2800 Cottage Way, Room E-1815
R20
Division of Acquisition Services Regional Office Mid-Pacific Region Bureau of Reclamation
20-C090911/02/20210007
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
09/20/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
A. TITLE: B.F. Sisk Dam SOD Modifications, Phase I
B. PURPOSE: The purpose of this amendment is to incorporate various changes to solicitation documents.
C. DESCRIPTION: This amendment hereby incorporates the following:
1) Offeror¿s Questions and Answers
2) Remove SF-1442 and replace with SF-1442, Amendment 0007 (incorporates November 19, 2021, 14:00 pm offer due date).
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Erik M. Danger
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 5
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R2021R0004/0007
3) Revised Contract Sections:
Remove and Replace the following specifications in Section C:
Specification 01 55 20 - Traffic Control, with
Specification 01 55 20 - Traffic Control, Amendment No 0007
Specification 01 56 32 - Temporary Safety Fence, with Specification 01 56 32 - Temporary Safety
Fence, Amendment No 0007
Specification 01 56 34 - Exclusion Fence, with
Specification 01 56 34 - Exclusion Fence, Amendment No 0007
Specification 01 57 20 - Environmental Controls, with Specification 01 57 20 - Environmental
Controls, Amendment No 0007
Specification 01 57 50 - Tree and Plant
Protection, with Specification 01 57 50 - Tree and Plant Protection, Amendment No 0007
Specification 01 57 90 - Preservation of
Historical and Archeological Data, with
Specification 01 57 90 - Preservation of
Historical and Archeological Data, Amendment No
Specification 01 71 20 - Surveying, with
Specification 01 71 20 - Surveying, Amendment No
Specification 03 20 30 - Grouted Anchor Bars, with Specification 03 20 30 - Grouted Anchor
Bars, Amendment No 0007
Specification 03 30 00 - Cast-In-Place Concrete, with Specification 03 30 00 - Cast-In-Place
Concrete, Amendment No 0007
Specification 05 50 00 - Metal Fabrications, with
Specification 05 50 00 - Metal Fabrications, Amendment No 0007
Specification 08 31 20 - Access Hatches, with
Specification 08 31 20 - Access Hatches, Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
3 5
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R2021R0004/0007
Amendment No 0007
Specification 26 05 33 - Raceways and Boxes, with
Specification 26 05 33 - Raceways and Boxes, Amendment No 0007
Specification 31 23 17 - Excavation of Shear Key, with Specification 31 23 17 - Excavation of Shear
Key, Amendment No 0007
Specification 31 23 21 - Stockpiling Riprap, with
Specification 31 23 21 - Stockpiling Riprap, Amendment No 0007
Specification 31 23 22 - Constructing Haul Roads, with Specification 31 23 22 - Constructing Haul
Roads, Amendment No 0007
Specification 31 24 12 - General Earthfill
Construction, with Specification 31 24 12 -
General Earthfill Construction, Amendment No 0007
Specification 31 24 14 - Zone 9A, Sand Filter
Zone 9B, Crest Sand Filter, with Specification 31
24 14 - Zone 9A, Sand Filter Zone 9B, Crest Sand
Filter, Amendment No 0007
Specification 31 24 15 - Zone 11, Gravel Drain, with Specification 31 24 15 - Zone 11, Gravel
Drain, Amendment No 0007
Specification 31 24 19 - Zone 2A, Embankment
Filter, with Specification 31 24 19 - Zone 2A, Embankment Filter, Amendment No 0007
Specification 32 17 20 - Painted Traffic Lines and Markings, with Specification 32 17 20 -
Painted Traffic Lines and Markings, Amendment No
Specification 33 05 31 - Toe Drain Terminal
Wells, with Specification 33 05 31 - Toe Drain
Terminal Wells, Amendment No 0007
Specification 33 46 36 - Toe Drains, with
Specification 33 46 36 - Toe Drains, Amendment No
Specification 35 21 95 - Spillway Vent Pipe
Modifications, with Specification 35 21 95 -
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
4 5
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R2021R0004/0007
Spillway Vent Pipe Modifications, Amendment No
Specification 53 10 00 - Geotechnical Baseline
Conditions, with Specification 53 10 00 -
Geotechnical Baseline Conditions, Amendment No
Specification 53 30 00 - Records of Geologic and
Subsurface Investigations, with Specification 53
30 00 - Records of Geologic and Subsurface
Investigations, Amendment No 0007
4) Remove and Replace the following Attachments:
Remove Attachment J3 and replace with Attachment
J3, Amendment 0007
Remove Attachment J5 and replace with Attachment
J5, Amendment 0007
Remove Section B_1, Schedule of Prices and replace with Section B_1, Schedule of Prices
Amendment 0007
5) Remove and Replace the following Drawings:
Drawing 015 508-D-60025, with 015 508-D-60025, Amendment No. 0007
Drawing 031 508-D-60044, with 031 508-D-60044, Amendment No. 0007
Drawing 047 508-D-60073, with 047 508-D-60073, Amendment No. 0007
Drawing 048 508-D-60074, with 048 508-D-60074, Amendment No. 0007
Drawing 059 508-D-60084, with 059 508-D-60084, Amendment No. 0007
Drawing 060 508-D-60085, with 060 508-D-60085, Amendment No. 0007
Drawing 061 508-D-60086, with 061 508-D-60086, Amendment No. 0007
Drawing 068 508-D-60133, with 068 508-D-60133, Amendment No. 0007
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
5 5
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R2021R0004/0007
6) New Incorporated Drawing:
Drawing 805-D-3221-RD-1, with 805-D-3221-RD-1, Amendment No. 0007
7) The following geologic files have been added to Kiteworks:
BOR 1974 - Tech Record of D&C - Volume II Design
BOR 1966 - Preconstruction Investigation and
Construction Preliminary Report
Request the Kiteworks link by emailing Roxana
Ahola at rahola@usbr.gov with a cc: to Erik
Danger at edanger@usbr.gov.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
File details come from the government source that posted it. Updated .