031_508-D-60044_Amendment_0007_0007.pdf

PDF 932 KB Posted

Attached to
BF SISK SAFETY OF DAMS (SOD) MODIFICATIONS, PHASE I
Solicitation number
140R2021R0004
Issued by

About this file

This drawing package and related solicitation provide details for the BF Sisk Dam Safety of Dams Modifications, Phase I federal contract opportunity. The Bureau of Reclamation is seeking construction services to address issues with select foundation materials at the BF Sisk Dam through the installation of shear keys, stability berms, and spillway modifications. This work aims to prevent dam embankment destabilization, reduce safety concerns, and ensure water supply deliveries in the event of seismic activity. Drawing details include plans, sections and zone delineations for the construction of berms and placement of geotextiles and soil/rock materials. Solicitation 140R2021R0004 has an anticipated award date in 2021 for these critical dam infrastructure upgrades at the BF Sisk facility.

View the file

Other files

File Type Posted
Sol_140R2021R0004_Amd_0011.pdf PDF
Amendment_No__0010_to_140R2021R0004_0010.pdf PDF
Sol_140R2021R0004_Amd_0010.pdf PDF
Amendment_No__0008_and_No__0009_to_140R2021R0004_0009.pdf PDF
Sol_140R2021R0004_Amd_0009.pdf PDF
Sol_140R2021R0004_Amd_0008.pdf PDF
047_508-D-60073_Amendment_0007_0007.pdf PDF
805-D-3221-RD-1_Amendment_0007_0007.PDF PDF
Amendment_No__0007_to_140R2021R0004_0007.pdf PDF
Sol_140R2021R0004_Amd_0007.pdf PDF
059_508-D-60084_Amendment_0007_0007.pdf PDF
Attachment_J3_Past_Performance_Questionnaire_Amendment_0007_0007.pdf PDF
Attachment__J5_Key_Personnel_rev_1_Amendment_0007_0007.pdf PDF
048_508-D-60074_Amendment_0007_0007.pdf PDF
Attachment_B_1_Schedule_of_Prices_Amendment_0007_0007.xlsx XLSX spreadsheet
015_508-D-60025_Amendment_0007_0007.pdf PDF
068_508-D-60133_Amendment_0007_0007.pdf PDF
060_508-D-60085_Amendment_0007_0007.pdf PDF
061_508-D-60086_Amendment_0007_0007.pdf PDF
Sol_140R2021R0004_Amd_0006.pdf PDF
Amendment_No__0006_to_140R2021R0004_0006.pdf PDF
Sol_140R2021R0004_Amd_0005.pdf PDF
Amendment_No__0005_to_140R2021R0004_0005.pdf PDF
Sol_140R2021R0004_Amd_0004.pdf PDF
Amendment_No__0004_to_140R2021R0004_0004.pdf PDF
Sol_140R2021R0004_Amd_0003.pdf PDF
Amendment_No__0003_to_140R2021R0004_0003.pdf PDF
Amendment_No__0002_to_140R2021R0004_0002.pdf PDF
Sol_140R2021R0004_Amd_0002.pdf PDF
Sol_140R2021R0004_Amd_0001.pdf PDF
Amendment_No__0001_to_140R2021R0004_0001.pdf PDF
Attachment_J1_General_Decision_Number_CA20210018.pdf PDF
140R2021R0004.pdf PDF
Attachment_J10_Electronic_Proposal_Submission.pdf PDF
Attachment_J4_-_Past_Performance_Data_Form.pdf PDF
Attachment__J2_Subcontracting_Plan.pdf PDF
Sol_140R2021R0004.pdf PDF
Attachment_J8_Invoicing_Documents.pdf PDF
Attachment_J3_Past_Performance_Questionnaire.pdf PDF
Attachment__J6_Corporate_Experience_and_Management.pdf PDF
Attachment_B_1_Schedule_of_Prices.xlsx XLSX spreadsheet
Attachment__J7_Offeror_Responsibility_Information.pdf PDF
Attachment__J9_Release_of_Claims.pdf PDF
Attachment__J5_Key_Personnel.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

433445 442 439 436

45047

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

LAR M TA IOCE N

C A D

S

YS

TE

M

A ut oC A D

4.

0s C A D

F

IL

EN

A M

E

5- D

-6

-R

D -1

.D W

G

LA

S T

S A V

ED

D A

TE

-1 0-

LA

S T

S A V

ED

B Y

C S

TR

IC

K

LA

N D

C

EN

TR

A L

V A

LL

EY

P

R O

JE

C T

W

ES

T S A N

J O

A Q

U

IN

D

IV

IS

IO

N

B

F.

S

IS

K D

A M

S O

D M

O D

IF

IC

A

TI

O N

S

PH

A S E

I S W

SW145 BERM INTERNAL

ZONING

PLAN, SECTIONS AND

DETAILS

DENVER, CO 2021-05-28

60044 0 10' 20'

60044 0 10' 20'

2A

REFERENCE DRAWINGS

Survey Control and Alignment_ _ _ _ _ _ _ _ _ _ _ 805-208-60101 SW145 Shear Key Excavation Plan and Section _ _ _ 805-D-60039 SW145 Berm Plan and Profile _ _ _ _ _ _ _ _ _ _ _ _ 805-D-60042 SW145 Plan, Section and Details_ _ _ _ _ _ _ _ _ _ _805-D-60044 SW145 Berm Sections _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _805-D-60045

LEGEND

Elevation reference point

Zone 2A

Zone 4A

Zone 9A

Geotextile

NOTES

1. All dimensions are in feet unless otherwise noted.

2. Contour interval is 5 feet.

3. For survey information, see (805-208-60101).

4. See table on (60045) for transitions of blankets over the upstream bench.

5. Details represent left and right abutments. Left abutment shown.

6. Zone 4A upper chimney is projected for display in Section E.

Zone 4A upper chimney will be placed to El. 360.0 within the center portion of the SW145 dam section, between approximate dam stations 141+68 and 146+85.

7. Zone 2A upper chimney is projected for display in Section E and Section F.

8. Section E and Section F are cut along the same alignment.

Section F represents an enlarged view of a portion of Section E.

9. Bench elevations shall be defined by control points 14573 through 14591 on (60039), or as approved by the COR.

10. Geotextile runout to extend 5.0 feet beyond soil/rock interface at bottom of shear key excavation, and 5.0 beyond shoulder of shear key excavation.

11. Zone 2A upper chimney shall be placed downstream of exposed existing blanket zones after removal of existing rock blanket. Zone 2A upper chimney shall extend 2.0 feet above existing Zone 2 blanket, or to 3.0 feet below top of berm, whichever is lower.

12. Topsoil not shown.

Bench surface, see Note 9

10.0

4A 2A 9A

2A

Excavated surface, see (60039)

0 100'50'

Geotextile

See Detail 1

60044 0 100'50'

3.0

4A

2A

9A

Bench blankets

4A

2A

9A

10.0

10.0

3.0 3.0

3.0

See Section F and Note 8

60044

2A

Geotextile, see Note 10

0 10' 20'

5.0

5.0

Excavated surface, see (60039)

Approximate limit of Zone 4A upper chimney

Top of Zone 4A upper chimney (projected), El. 360.0, see Note 6

Approximate location of Zone 2A separator chimney, see (60081)

2A

2A 4A

2A

9A

Bench blankets

Top of Zone 2A upper chimney (projected)

Top of Zone 2A upper chimney (projected)

3.0

Zone 4A upper chimney not shown, see Note 6

Top of Berm, see (60042)

Top of Berm, see (60042)

3.0

Shoulder of shear key excavation, El. 445.0, see Note 10

Footprint of chimney, see Note 11

Limits of stripping

Limits of berm construction

Bottom of excavation slope

Top of excavation slope

Toe of dam after rock blanket removal

5.0 5.0

LImits of stripping

Inferred bedrock surface

S ta

6+

Lower chimneys

Bench blankets

Upper chimney

Top of shear key excavation

-1 0-

D

U pd at ed r ef er en ce d ra w in g nu m be rs o n ca llo ut s fo r se ct io ns

H

J, K

L, a nd

M

Re le as ed

Specifications No. 20-C0909 Amendment No. 0007

File details come from the government source that posted it. Updated .