048_508-D-60074_Amendment_0007_0007.pdf

PDF 1 MB Posted

Attached to
BF SISK SAFETY OF DAMS (SOD) MODIFICATIONS, PHASE I
Solicitation number
140R2021R0004
Issued by

About this file

This internal zoning plan, sections, and details drawing specifies construction requirements for Phase I of the BF Sisk Safety of Dams (SOD) Modifications project. The project includes building shear keys and stability berms for the dam embankment and modifying the spillway to address issues with select foundation materials, reduce safety concerns, and ensure water supply deliveries in the event of seismic activity. The drawing provides material placement control points, reference drawings, notes on dimensions, contours, zoning limits and details, specifications for geotextiles and drain pipes, and other requirements for internal zoning of the existing embankment and construction of the new spillway conduit. It will guide construction work by the Bureau of Reclamation to enhance dam safety as part of the BF Sisk SOD Modifications, Phase I project.

View the file

Other files

File Type Posted
Sol_140R2021R0004_Amd_0011.pdf PDF
Amendment_No__0010_to_140R2021R0004_0010.pdf PDF
Sol_140R2021R0004_Amd_0010.pdf PDF
Amendment_No__0008_and_No__0009_to_140R2021R0004_0009.pdf PDF
Sol_140R2021R0004_Amd_0009.pdf PDF
Sol_140R2021R0004_Amd_0008.pdf PDF
047_508-D-60073_Amendment_0007_0007.pdf PDF
805-D-3221-RD-1_Amendment_0007_0007.PDF PDF
031_508-D-60044_Amendment_0007_0007.pdf PDF
Amendment_No__0007_to_140R2021R0004_0007.pdf PDF
Sol_140R2021R0004_Amd_0007.pdf PDF
059_508-D-60084_Amendment_0007_0007.pdf PDF
Attachment_J3_Past_Performance_Questionnaire_Amendment_0007_0007.pdf PDF
Attachment__J5_Key_Personnel_rev_1_Amendment_0007_0007.pdf PDF
Attachment_B_1_Schedule_of_Prices_Amendment_0007_0007.xlsx XLSX spreadsheet
015_508-D-60025_Amendment_0007_0007.pdf PDF
068_508-D-60133_Amendment_0007_0007.pdf PDF
060_508-D-60085_Amendment_0007_0007.pdf PDF
061_508-D-60086_Amendment_0007_0007.pdf PDF
Sol_140R2021R0004_Amd_0006.pdf PDF
Amendment_No__0006_to_140R2021R0004_0006.pdf PDF
Sol_140R2021R0004_Amd_0005.pdf PDF
Amendment_No__0005_to_140R2021R0004_0005.pdf PDF
Sol_140R2021R0004_Amd_0004.pdf PDF
Amendment_No__0004_to_140R2021R0004_0004.pdf PDF
Sol_140R2021R0004_Amd_0003.pdf PDF
Amendment_No__0003_to_140R2021R0004_0003.pdf PDF
Amendment_No__0002_to_140R2021R0004_0002.pdf PDF
Sol_140R2021R0004_Amd_0002.pdf PDF
Sol_140R2021R0004_Amd_0001.pdf PDF
Amendment_No__0001_to_140R2021R0004_0001.pdf PDF
Attachment_J1_General_Decision_Number_CA20210018.pdf PDF
140R2021R0004.pdf PDF
Attachment_J10_Electronic_Proposal_Submission.pdf PDF
Attachment_J4_-_Past_Performance_Data_Form.pdf PDF
Attachment__J2_Subcontracting_Plan.pdf PDF
Sol_140R2021R0004.pdf PDF
Attachment_J8_Invoicing_Documents.pdf PDF
Attachment_J3_Past_Performance_Questionnaire.pdf PDF
Attachment__J6_Corporate_Experience_and_Management.pdf PDF
Attachment_B_1_Schedule_of_Prices.xlsx XLSX spreadsheet
Attachment__J7_Offeror_Responsibility_Information.pdf PDF
Attachment__J9_Release_of_Claims.pdf PDF
Attachment__J5_Key_Personnel.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

9B 11

9B 11

138+00

50525

41+00 42+00 43+00 44+00

E 6, 2, N 1,848,150

E 6, 1, N 1,848,250

E 6, 2, N 1,848,300

6.0, See Note 8

6.0, See Note 8

9B

Material Placement Point Table

Point #

Northing

1848228.0

1848263.5

1848271.1

1848280.8

1848285.0

1848286.2

1848261.5

1848269.0

1848275.1

1848275.4

1848274.6

1848199.1

1848165.9

1848197.1

1848165.4

1848225.9

1848143.5

1848286.8

Easting

6392150.6

6392132.2

6392116.0

6392094.0

6392075.0

6392057.7

6392122.0

6392105.8

6392085.9

6392068.5

6392052.3

6392136.4

6392119.9

6392126.2

6392108.8

6392140.5

6392108.8

6392046.7

Elevation

442.8

442.8

450.0

460.0

470.0

480.0

442.8

450.0

460.0

470.0

480.1

460.0

480.0

460.0

480.0

442.8

527.6

527.6

REFERENCE DRAWINGS

Survey Control and Alignment _ _ _ _ _ _ _ 805-208-60101 Spillway Modification General_ _ _ _ _ _ _ _ _ _ _805-D-60060 Spillway Tunnel Extension Plan and Profile_ _ _ _805-D-60061 Spillway Transition Sections and Details _ _ _ _ _805-D-60064 Spillway Reinforcement Extension_ _ _ _ _ _ _ _ 805-D-60069 Spillway Drains_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 805-D-60124 Permanent Access Roads (1 of 2) _ _ _ _ _ _ _ _805-D-60125 Permanent Access Roads (2 of 2) _ _ _ _ _ _ _ _805-D-60126

℄ Spillway

New spillway conduit section, see (60060)

60074

Excavated surface

12-inch, perforated HDPE pipe, see Note 11

9B

Excavated surface

60074 0 20' 40'10'

10.0

2.0 Rock blanket

See Note 7

See Note 5

Limits of excavation

See Note 6

See Note 7

See Note 8

℄ Spillway

0 20' 40'10'

60074 0 20' 40'10'

Excavated surface

Finished berm surface

Spillway conduit, see (60060)

Geotextile, see Note 9

9B

12-inch, perforated HDPE pipe, see Note 11

Excavated surface

LEGEND

Northing/Easting coordinates

Material placement control points

Zone 1

Zone 8

Zone 9B

Zone 11

Existing ground contours

Excavation surface contours

NOTES

1. All dimensions are in feet unless otherwise noted.

2. For survey information, see (805-208-60101).

3. Contour interval is 5 feet.

4. See material placement control points for internal zoning limits.

5. Gravel surfacing not shown. See (60125) and (600126) for typical details.

6. Chimney zones to extend up to El. 480.

7. Width of 9B chimney to vary due to geometry of excavated surface.

8. Footprint of Zone 11 chimney shown on plan. Zone 11 material to be underlain by Zone 9B material, except against spillway conduit. Zone 9B shall be placed with a minimum horizontal thickness of 6 feet between excavated surface and Zone 11.

9. Geotextile shall be placed to separate Zone 11 from Zones 1 and 8. Refer to specifications.

10. Material zones to continue up and wrap around spillway conduit.

11. Drain pipes to extend parallel to spillway. See (60124) for spillway drain details.

10.0

Geotextile, see Note 9

Spillway drains, see Note 11See Note 7

9B

1.0

1.0

1.0

1.0

12-inch, perforated HDPE pipe, see Note 11

New spillway conduit section, see (60060)

See Detail 1

See Note 10

1.0 min

0 2' 4'1'

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

LAR M TA IOCE N

C A D

S

YS

TE

M

A ut oC A D

4.

0s C A D

F

IL

EN

A M

E

5- D

-6

-R

D -1

.D W

G

LA

S T

S A V

ED

D A

TE

-1 0-

LA

S T

S A V

ED

B Y

C S

TR

IC

K

LA

N D

C

EN

TR

A L

V A

LL

EY

P

R O

JE

C T

W

ES

T S A N

J O

A Q

U

IN

D

IV

IS

IO

N

B

F.

S

IS

K D

A M

S O

D M

O D

IF

IC

A

TI

O N

S

PH

A S E

I S

PI

LL

W

A Y

SPILLWAY INTERNAL

ZONING

PLAN, SECTIONS AND

DETAILS

DENVER, CO 2021-06-02

0 10' 20'

-1 0-

D

U pd at ed s ca le b ar f or S ec tio n F, a nd u pd at ed dr aw in g tit le b lo ck

-0 9-

D

R ev is ed in te rn al z on in g of e xi st in g em ba nk m en t.

Re le as ed

Specifications No. 20-C0909 Amendment No. 0007