Attachment_B_1_Schedule_of_Prices_Amendment_0007_0007.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
BF SISK SAFETY OF DAMS (SOD) MODIFICATIONS, PHASE I
Solicitation number
140R2021R0004
Issued by

About this file

This document contains a schedule of prices for a federal solicitation to perform safety modifications to the BF Sisk Dam. The solicitation is issued by the Bureau of Reclamation within the Department of the Interior and seeks construction services to address issues with the dam's select foundation materials and help prevent destabilization.

The schedule of prices lists 94 contract line item numbers with descriptions of supplies and services including construction of shear keys and stability berms, spillway modifications, concrete work, dewatering, excavation, backfill, drainage, fencing and restoration. Unit pricing is requested for some items while others are designated as lump sum. The total proposed price is listed as $0.00 pending offerors providing their proposed pricing.

View the file

Other files

File Type Posted
Sol_140R2021R0004_Amd_0011.pdf PDF
Amendment_No__0010_to_140R2021R0004_0010.pdf PDF
Sol_140R2021R0004_Amd_0010.pdf PDF
Amendment_No__0008_and_No__0009_to_140R2021R0004_0009.pdf PDF
Sol_140R2021R0004_Amd_0009.pdf PDF
Sol_140R2021R0004_Amd_0008.pdf PDF
047_508-D-60073_Amendment_0007_0007.pdf PDF
805-D-3221-RD-1_Amendment_0007_0007.PDF PDF
031_508-D-60044_Amendment_0007_0007.pdf PDF
Amendment_No__0007_to_140R2021R0004_0007.pdf PDF
Sol_140R2021R0004_Amd_0007.pdf PDF
059_508-D-60084_Amendment_0007_0007.pdf PDF
Attachment_J3_Past_Performance_Questionnaire_Amendment_0007_0007.pdf PDF
Attachment__J5_Key_Personnel_rev_1_Amendment_0007_0007.pdf PDF
048_508-D-60074_Amendment_0007_0007.pdf PDF
015_508-D-60025_Amendment_0007_0007.pdf PDF
068_508-D-60133_Amendment_0007_0007.pdf PDF
060_508-D-60085_Amendment_0007_0007.pdf PDF
061_508-D-60086_Amendment_0007_0007.pdf PDF
Sol_140R2021R0004_Amd_0006.pdf PDF
Amendment_No__0006_to_140R2021R0004_0006.pdf PDF
Sol_140R2021R0004_Amd_0005.pdf PDF
Amendment_No__0005_to_140R2021R0004_0005.pdf PDF
Sol_140R2021R0004_Amd_0004.pdf PDF
Amendment_No__0004_to_140R2021R0004_0004.pdf PDF
Sol_140R2021R0004_Amd_0003.pdf PDF
Amendment_No__0003_to_140R2021R0004_0003.pdf PDF
Amendment_No__0002_to_140R2021R0004_0002.pdf PDF
Sol_140R2021R0004_Amd_0002.pdf PDF
Sol_140R2021R0004_Amd_0001.pdf PDF
Amendment_No__0001_to_140R2021R0004_0001.pdf PDF
Attachment_J1_General_Decision_Number_CA20210018.pdf PDF
140R2021R0004.pdf PDF
Attachment_J10_Electronic_Proposal_Submission.pdf PDF
Attachment_J4_-_Past_Performance_Data_Form.pdf PDF
Attachment__J2_Subcontracting_Plan.pdf PDF
Sol_140R2021R0004.pdf PDF
Attachment_J8_Invoicing_Documents.pdf PDF
Attachment_J3_Past_Performance_Questionnaire.pdf PDF
Attachment__J6_Corporate_Experience_and_Management.pdf PDF
Attachment_B_1_Schedule_of_Prices.xlsx XLSX spreadsheet
Attachment__J7_Offeror_Responsibility_Information.pdf PDF
Attachment__J9_Release_of_Claims.pdf PDF
Attachment__J5_Key_Personnel.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

B.F. SISK Safety of Dams (SOD) Modifications, Phase ISolicitation 140R2021R0004
Amendment 0007Section B, Schedule of Prices
CLINSectionSupplies or ServicesQuantityUnitUnit PriceTOTAL
1WBR 1452.232-81Mobilization and Preparatory WorkFor the lump sum of:$0.00
201 31 30Contract Document Management System (CDMS)For the lump sum of:$0.00
301 35 50Site SecurityFor the lump sum of:$0.00
401 52 10Gov. Field Office Delivery and InstallationFor the lump sum of:$0.00
501 52 10Gov. Field Office MaintenanceFor the lump sum of:$0.00
601 52 14Gov. Field Laboratory Facility Delivery and InstallationFor the lump sum of:$0.00
701 52 14Gov. Field Laboratory Facility MaintenanceFor the lump sum of:$0.00
801 55 20Traffic ControlFor the lump sum of:$0.00
901 55 28Temporary Post-Mounted Traffic SignsFor the lump sum of:$0.00
1001 56 32Temporary Safety FenceFor the lump sum of:$0.00
1101 56 34Exclusion FenceFor the lump sum of:$0.00
11A01 57 20Purchase of Carbon OffsetsFor the lump sum of:$0.00
1201 57 30Stormwater Pollution Prevention Plan (SWPPP) General RequirementsFor the lump sum of:$0.00
1301 83 13Project MonitoringFor the lump sum of:$0.00
1402 01 60Wildlife Spillway CrossingFor the lump sum of:$0.00
1502 01 80Tule Elk Herd ManagementFor the lump sum of:$0.00
1602 21 34Structure Measurement PointsFor the lump sum of:$0.00
1703 15 12PVC Waterstops140lin ft$0.00$0.00
1803 15 14PVC Retro-Fit Waterstop64lin ft$0.00$0.00
1903 20 00Concrete Reinforcing91,000lbs$0.00$0.00
2003 20 30Drilling Holes for Anchor Bars and Grouting Bars in Place42lin ft$0.00$0.00
2103 30 00Concrete480yd3$0.00$0.00
2203 81 10Spillway Concrete RemovalFor the lump sum of:$0.00
2303 81 10Saw Cutting Existing ConcreteFor the lump sum of:$0.00
2405 50 00Metal Fabrications (Miscellaneous Metalwork)For the lump sum of:$0.00
2526 05 06Removal and Disposal of Existing Electrical EquipmentFor the lump sum of:$0.00
2626 05 10Conductors and CablesFor the lump sum of:$0.00
2726 05 22Medium-Voltage Power Cable1,300lin ft$0.00$0.00
2826 05 33Raceway and BoxesFor the lump sum of:$0.00
2931 02 10Water for Dust AbatementFor the lump sum of:$0.00
3031 02 30Dust PalliativeFor the lump sum of:$0.00
3131 03 33UnwateringFor the lump sum of:$0.00
3231 03 33Well Points230lin ft$0.00$0.00
3331 03 33Supplementary Well Points Materials10ea. (well)$0.00$0.00
3431 03 33Supplementary Well Points Installation/Removal10ea. (well)$0.00$0.00
3531 03 33Dewatering Wells210lin ft$0.00$0.00
3631 03 33Supplementary Dewatering Wells Materials4ea. (well)$0.00$0.00
3731 03 33Supplementary Dewatering Wells Installation/Removal4ea. (well)$0.00$0.00
3831 03 33Dewatering Sumps18ea. (sump)$0.00$0.00
3931 03 33Supplementary Dewatering Sumps Materials9ea. (sump)$0.00$0.00
4031 03 33Supplementary Dewatering Sumps Installation/Removal9ea. (sump)$0.00$0.00
4131 03 33Temporary Observation Wells120lin ft$0.00$0.00
4231 03 33Supplementary Temporary Observation Wells Materials3ea. (well)$0.00$0.00
4331 03 33Supplementary Temporary Observation Wells Installation/Removal3ea. (well)$0.00$0.00
4431 03 33Well Points OperationFor the lump sum of:$0.00
4531 03 33Dewatering Wells OperationFor the lump sum of:$0.00
4631 03 33Dewatering Sump OperationFor the lump sum of:$0.00
4731 09 10Abandoning and Removing Existing InstrumentationFor the lump sum of:$0.00
4831 09 12Temporary Inclinometers20each$0.00$0.00
4931 09 13Slope Stability MonitoringFor the lump sum of:$0.00
5031 09 22Protecting Existing InstrumentationFor the lump sum of:$0.00
5131 11 00Clearing and Grubbing450acres$0.00$0.00
5231 14 10Stripping370,000yd3$0.00$0.00
5331 23 11Common Excavation for Structures16,000yd3$0.00$0.00
5431 23 11Rock Excavation for Structures860yd3$0.00$0.00
5531 23 12Excavation for Electrical Trench700lin ft$0.00$0.00
5631 23 12Compacted Backfill for Electrical Trench700lin ft$0.00$0.00
5731 23 14Excavation of Rock Blanket Material31,000yd3$0.00$0.00
5831 23 17Excavation of Shear Key440,000yd3$0.00$0.00
5931 23 17Backfill Concrete Foundation Treatment400yd3$0.00$0.00
6031 23 20Quarry DevelopmentFor the lump sum of:$0.00
6131 23 21Stockpiling of Riprap50,000yd3$0.00$0.00
6231 23 22Constructing Haul RoadsFor the lump sum of:$0.00
6331 23 22Basalt Hill Quarry Haul RoadsFor the lump sum of:$0.00
6431 23 70Controlled Low Strength Material430yd3$0.00$0.00
6531 24 13Zone 1, Impervious Fill50,000yd3$0.00$0.00
6631 24 14Zone 9A, Sand Filter37,000yd3$0.00$0.00
6731 24 14Zone 9B, Crest Sand Filter3,100yd3$0.00$0.00
6831 24 15Zone 11, Gravel Drain2,800yd3$0.00$0.00
6931 24 16Zone 8, Miscellaneous Fill1,700,000yd3$0.00$0.00
7031 24 17Zone 10, Shear Key Rockfill320,000yd3$0.00$0.00
7131 24 18Downstream Rock Blanket Material34,000yd3$0.00$0.00
7231 24 19Zone 2A, Embankment Filter190,000yd3$0.00$0.00
7331 24 20Zone 4A, Embankment Drain45,000yd3$0.00$0.00
7431 32 32Geotextile6,800yd2$0.00$0.00
7532 10 16Remove Existing Asphalt Pavement and Base Course3,100yd2$0.00$0.00
7632 10 16Cold Plane Existing Asphalt PavementFor the lump sum of:$0.00
7731 11 23Aggregate Base Course810yd3$0.00$0.00
7832 12 22Asphalt Concrete Pavement3,300yd2$0.00$0.00
7932 15 10Gravel Surfacing12,000yd2$0.00$0.00
8032 17 20Traffic Lines and MarkingsFor the lump sum of:$0.00
8132 31 10Chain Link Fence60lin ft$0.00$0.00
8232 31 10Removal and Disposal of Existing Chain Link Fence230lin ft$0.00$0.00
8332 91 19Topsoil450acres$0.00$0.00
8432 92 20Restoration and Revegetation450acres$0.00$0.00
8533 05 31Toe Drain Terminal WellsFor the lump sum of:$0.00
8633 29 04Removing Existing Toe Drain Pipes250lin ft$0.00$0.00
8733 09 05Abandoning Existing Toe Drains Using Grout100yd3$0.00$0.00
8833 46 3612-inch Diameter Perforated HDPE Pipe1,700lin ft$0.00$0.00
8933 46 3612-inch Diameter Nonperforated HDPE Pipe600lin ft$0.00$0.00
9033 46 36Drain Cleanouts6each$0.00$0.00
9133 46 42Weir BoxesFor the lump sum of:$0.00
9234 71 19Roadway MarkersFor the lump sum of:$0.00
9335 21 95Spillway Vent Pipe ModificationsFor the lump sum of:$0.00
Grand Total:$0.00