068_508-D-60133_Amendment_0007_0007.pdf

PDF 698 KB Posted

Attached to
BF SISK SAFETY OF DAMS (SOD) MODIFICATIONS, PHASE I
Solicitation number
140R2021R0004
Issued by

About this file

This document is a material distribution chart for the BF Sisk Safety of Dams (SOD) Modifications, Phase I federal contract opportunity issued by the Bureau of Reclamation within the Department of the Interior. The chart outlines the contractor's assumed quantities for excavated materials from the project site, as well as sources and quantities for materials to be placed. Key materials include 19,000 cubic yards of impervious fill, 3,100 cubic yards of common excavation for structures, 1,400 cubic yards of basalt hill quarry borrow, 1,200 cubic yards of miscellaneous fill, and 82 cubic yards each of gravel drain and crest sand filter materials. The chart provides descriptions and specifications quantities for excavation and placement items, notes on waste quantities and shrinkage factors, and requirements for contractors to obtain sufficient materials to account for waste and shrinkage.

View the file

Other files

File Type Posted
Sol_140R2021R0004_Amd_0011.pdf PDF
Amendment_No__0010_to_140R2021R0004_0010.pdf PDF
Sol_140R2021R0004_Amd_0010.pdf PDF
Amendment_No__0008_and_No__0009_to_140R2021R0004_0009.pdf PDF
Sol_140R2021R0004_Amd_0009.pdf PDF
Sol_140R2021R0004_Amd_0008.pdf PDF
047_508-D-60073_Amendment_0007_0007.pdf PDF
805-D-3221-RD-1_Amendment_0007_0007.PDF PDF
031_508-D-60044_Amendment_0007_0007.pdf PDF
Amendment_No__0007_to_140R2021R0004_0007.pdf PDF
Sol_140R2021R0004_Amd_0007.pdf PDF
059_508-D-60084_Amendment_0007_0007.pdf PDF
Attachment_J3_Past_Performance_Questionnaire_Amendment_0007_0007.pdf PDF
Attachment__J5_Key_Personnel_rev_1_Amendment_0007_0007.pdf PDF
048_508-D-60074_Amendment_0007_0007.pdf PDF
Attachment_B_1_Schedule_of_Prices_Amendment_0007_0007.xlsx XLSX spreadsheet
015_508-D-60025_Amendment_0007_0007.pdf PDF
060_508-D-60085_Amendment_0007_0007.pdf PDF
061_508-D-60086_Amendment_0007_0007.pdf PDF
Sol_140R2021R0004_Amd_0006.pdf PDF
Amendment_No__0006_to_140R2021R0004_0006.pdf PDF
Sol_140R2021R0004_Amd_0005.pdf PDF
Amendment_No__0005_to_140R2021R0004_0005.pdf PDF
Sol_140R2021R0004_Amd_0004.pdf PDF
Amendment_No__0004_to_140R2021R0004_0004.pdf PDF
Sol_140R2021R0004_Amd_0003.pdf PDF
Amendment_No__0003_to_140R2021R0004_0003.pdf PDF
Amendment_No__0002_to_140R2021R0004_0002.pdf PDF
Sol_140R2021R0004_Amd_0002.pdf PDF
Sol_140R2021R0004_Amd_0001.pdf PDF
Amendment_No__0001_to_140R2021R0004_0001.pdf PDF
Attachment_J1_General_Decision_Number_CA20210018.pdf PDF
140R2021R0004.pdf PDF
Attachment_J10_Electronic_Proposal_Submission.pdf PDF
Attachment_J4_-_Past_Performance_Data_Form.pdf PDF
Attachment__J2_Subcontracting_Plan.pdf PDF
Sol_140R2021R0004.pdf PDF
Attachment_J8_Invoicing_Documents.pdf PDF
Attachment_J3_Past_Performance_Questionnaire.pdf PDF
Attachment__J6_Corporate_Experience_and_Management.pdf PDF
Attachment_B_1_Schedule_of_Prices.xlsx XLSX spreadsheet
Attachment__J7_Offeror_Responsibility_Information.pdf PDF
Attachment__J9_Release_of_Claims.pdf PDF
Attachment__J5_Key_Personnel.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

LAR M TA IOCE N

C A D

S

YS

TE

M

A ut oC A D

4.

0s C A D

F

IL

EN

A M

E

5- D

-6

-R

D -1

.D W

G

LA

S T

S A V

ED

D A

TE

-1 0-

LA

S T

S A V

ED

B Y

C S

TR

IC

K

LA

N D

C

EN

TR

A L

V A

LL

EY

P

R O

JE

C T

W

ES

T S A N

J O

A Q

U

IN

D

IV

IS

IO

N

B

F.

S

IS

K D

A M

S O

D M

O D

IF

IC

A

TI

O N

S

PH

A S E

I

SPILLWAY

MATERIAL DISTRIBUTION

CHART

DENVER, CO 2021-05-28

NOTES

1. This chart was prepared to show the contractor assumed quantities of excavated materials, and both quantities and sources of materials to be placed. This distribution of material should be used only as a guide and should be modified during progress of the work to fit field conditions.

This chart should be modified for as-built documentation.

2. The waste quantities and shrinkage factors are estimates and may vary.

3. Topsoil to be used for pay items elsewhere on the site.

4. Contractor to obtain sufficient volumes of materials from sources to account for waste and shrinkage.

5. Placement schedule items represent placed volume.

6. * Perforated HDPE pipe envelope materials (Zone 9B, Sand Filter and

Zone 11, Gravel Drain) are paid for by the lineal foot under Schedule Item 88 - 12-Inch Diameter Perforated HDPE Pipe.

DESCRIPTIONS

SPEC.

QUANTITIES

ACTUAL

QUANTITIES

EXCAVATION

EXCAVATION OF ROCK BLANKET MATERIAL 2,500 CY

DESCRIPTIONS

SPEC.

QUANTITIES

ACTUAL

QUANTITIES

PLACING DOWNSTREAM ROCK BLANKET MATERIAL 4,000 CY

ZONE 1, IMPERVIOUS FILL 5,700 CY

19,000 CY

PLACEMENT

COMMON EXCAVATION FOR STRUCTURES 16,000 CY

3,100 CY

1,400 CY

EX

C A V A

TI

O N

PL

A C

EM

EN

T

Shrinkage Factor

REQUIRED EXCAVATION BASALT HILL QUARRYBORROW 12/14

ZONE 11, GRAVEL DRAIN

ZONE 8, MISCELLANEOUS FILL

ZONE 9B, CREST SAND FILTER

COMMERCIAL SOURCE

SCHEDULE ITEM 88* (ZONE 9B) 1,200 CY

SCHEDULE ITEM 88* (ZONE 11) 82 CY

-1 0-

D

R ev is ed s ch ed ul e ite m to b e sc he du le it em in st ea d.

U pd at ed a ss oc ia te d qu an tit y.

-0 9-

D

A dd ed Z on e

9A a nd Z on e q ua nt iti es p ai d fo r as p ar t of t oe d ra in c on st ru ct io n

(S ch ed ul e It em

8)

Fi xe d m is ce lla ne ou s er ro rs

Te ch ni ca l A pp ro va l

Specifications No. 20-C0909 Amendment No. 0007

File details come from the government source that posted it. Updated .