This document is a material distribution chart for the BF Sisk Safety of Dams (SOD) Modifications, Phase I federal contract opportunity issued by the Bureau of Reclamation within the Department of the Interior. The chart outlines the contractor's assumed quantities for excavated materials from the project site, as well as sources and quantities for materials to be placed. Key materials include 19,000 cubic yards of impervious fill, 3,100 cubic yards of common excavation for structures, 1,400 cubic yards of basalt hill quarry borrow, 1,200 cubic yards of miscellaneous fill, and 82 cubic yards each of gravel drain and crest sand filter materials. The chart provides descriptions and specifications quantities for excavation and placement items, notes on waste quantities and shrinkage factors, and requirements for contractors to obtain sufficient materials to account for waste and shrinkage.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
LAR M TA IOCE N
C A D
S
YS
TE
M
A ut oC A D
4.
0s C A D
F
IL
EN
A M
E
5- D
-6
-R
D -1
.D W
G
LA
S T
S A V
ED
D A
TE
-1 0-
LA
S T
S A V
ED
B Y
C S
TR
IC
K
LA
N D
C
EN
TR
A L
V A
LL
EY
P
R O
JE
C T
W
ES
T S A N
J O
A Q
U
IN
D
IV
IS
IO
N
B
F.
S
IS
K D
A M
S O
D M
O D
IF
IC
A
TI
O N
S
PH
A S E
I
SPILLWAY
MATERIAL DISTRIBUTION
CHART
DENVER, CO 2021-05-28
NOTES
1. This chart was prepared to show the contractor assumed quantities of excavated materials, and both quantities and sources of materials to be placed. This distribution of material should be used only as a guide and should be modified during progress of the work to fit field conditions.
This chart should be modified for as-built documentation.
2. The waste quantities and shrinkage factors are estimates and may vary.
3. Topsoil to be used for pay items elsewhere on the site.
4. Contractor to obtain sufficient volumes of materials from sources to account for waste and shrinkage.
5. Placement schedule items represent placed volume.
6. * Perforated HDPE pipe envelope materials (Zone 9B, Sand Filter and
Zone 11, Gravel Drain) are paid for by the lineal foot under Schedule Item 88 - 12-Inch Diameter Perforated HDPE Pipe.
DESCRIPTIONS
SPEC.
QUANTITIES
ACTUAL
QUANTITIES
EXCAVATION
EXCAVATION OF ROCK BLANKET MATERIAL 2,500 CY
DESCRIPTIONS
SPEC.
QUANTITIES
ACTUAL
QUANTITIES
PLACING DOWNSTREAM ROCK BLANKET MATERIAL 4,000 CY
ZONE 1, IMPERVIOUS FILL 5,700 CY
19,000 CY
PLACEMENT
COMMON EXCAVATION FOR STRUCTURES 16,000 CY
3,100 CY
1,400 CY
EX
C A V A
TI
O N
PL
A C
EM
EN
T
Shrinkage Factor
REQUIRED EXCAVATION BASALT HILL QUARRYBORROW 12/14
ZONE 11, GRAVEL DRAIN
ZONE 8, MISCELLANEOUS FILL
ZONE 9B, CREST SAND FILTER
COMMERCIAL SOURCE
SCHEDULE ITEM 88* (ZONE 9B) 1,200 CY
SCHEDULE ITEM 88* (ZONE 11) 82 CY
-1 0-
D
R ev is ed s ch ed ul e ite m to b e sc he du le it em in st ea d.
U pd at ed a ss oc ia te d qu an tit y.
-0 9-
D
A dd ed Z on e
9A a nd Z on e q ua nt iti es p ai d fo r as p ar t of t oe d ra in c on st ru ct io n
(S ch ed ul e It em
8)
Fi xe d m is ce lla ne ou s er ro rs
Te ch ni ca l A pp ro va l
Specifications No. 20-C0909 Amendment No. 0007
File details come from the government source that posted it. Updated .