This solicitation requests proposals for the BF Sisk Safety of Dams Modifications project. The Bureau of Reclamation seeks to construct shear keys, stability berms, and modify the spillway to address issues with select foundation materials and prevent dam embankment destabilization. Offerors must provide past performance information for up to three similar projects completed in the last twenty years, as well as responses to evaluation factors on quality and past performance. Proposals are due by November 19, 2021. The project will help maintain water supply deliveries and reduce safety concerns in the event of seismic activity.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140R2021R0004 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Sacramento CA 95825-1898 2800 Cottage Way, Room E-1815
R20
Division of Acquisition Services Regional Office Mid-Pacific Region Bureau of Reclamation
20-C090910/26/20210005
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
09/20/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
A. TITLE: B.F. Sisk Dam SOD Modifications, Phase I
B. PURPOSE: The purpose of this amendment is to incorporate various changes to solicitation documents and incorporate FAR Clause 52.223-99.
C. DESCRIPTION: This amendment hereby incorporates the following:
1) Offeror's Questions and Answers
2) FAR Clause 52.223-99, Ensuring Adequate COVID-19 Safety Protocols for Federal
Contractors (DEVIATION) (OCT 2021) into the solicitation.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Erik M. Danger
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R2021R0004/0005
3) Revision to Past Performance Contents in
Section L, WBR 1452.215-81 Proposal Instructions
- Bureau of Reclamation (f)(2a) allowing projects that are current or have been completed during the last twenty (20) years.
4) Revision to Attachment J4, Offeror Past
Performance Data Form, allowing contracts performed (past and current projects) within the last twenty (20) years.
5) Second Site Visit Sign in Sheet from October
20, 2021.
6) Confirms the offer due date and time is
November 19, 2021 at 14:00.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
B.F. Sisk Dam SOD Modifications, Phase I - Offeror’s Questions and Answers (Q&A) Amendment 0005
Question 1: Spillway Berm Access Road, Drawing 805-D-60073, Plan- Access Road shows a 50 ft width Access Road. Note 4 refers to Drawings 60125 and 60126, which Detail 1-New Permanent Gravel Access Roads shows the new Gravel Surfacing Access Roads to be 20 ft in width. Please clarify if the Spillway Be
Response 1: The spillway berm access road shall be gravel surfaced at completion of the contract to a width of 20 feet, as shown in 805-D-60125. The contractor may provide surfacing for their own use beyond these limits, in accordance with Section 31 23 22 - Constructing Haul Roads.
Question 2: Section 31 23 22 – 1.02B Constructing Haul Roads requires contractor to investigate, protect from movement, and monitor landslide. Section 53 20 00 -1.07C states… A landslide occurred through one of the access roads up to Basalt Hill Quarry. It is unknown what work may be required to provide or maintain stability at this location. Is it the government’s intention to have the contractor perform a slope analysis and any remediation work on the existing landslide to Basalt Quarry as shown on the plans?
Response 2: Yes, the contractor should perform whatever analysis and remediation is necessary to facilitate their own safe hauling of materials on the East Basalt Hill Quarry Haul Road if they desire to use that road. This is a private road and will be closed off to use by others.
Question 3: Paragraph 3.01C states...Clear, grub, and strip Basalt Hill Quarry excavation and stockpile areas in accordance with Section 31 11 00 – Clearing and Grubbing and Section 31 14 10 – Stripping. Is it BOR intension to strip the quarry and then topsoil and reveg the quarry?
Response 3: No. There is very little topsoil and vegetation within the quarry. Stripping, topsoil, and revegetation are not required.
Question 4: See paragraph 31 23 22-1.01A.1.a stating... Constructing Haul Roads includes 4) Furnishing and placing surfacing. Will the existing surfacing or earthfill from required excavation or borrow area 14 be acceptable surfacing? If not, please define surfacing. Same question for paragraph 1.01B.1.a Basalt Hill Quarry Haul Roads.
Response 4: Contractor may use whatever materials they choose if they are in accordance with the specifications.
Question 5: Per 05-D-60128, 805-D-60129, 805-D-60130, 805-D-60133 - The Schedule of Prices for Item 69 - Zone 8, Misc. Fill shows 1,700,000CY. The material distribution charts shown on plans total 1,657,000cy. Please clarify where the remaining Zone 8 Misc. Fill may be required.
Response 5: The sum of values shown in the material distribution charts has been rounded to
1,700,000 as shown in the bid schedule.
Question 6: In addition to the typical details provided for each slope wash, we would like to request that cross sections at 25’ intervals be provided that depict the zoned embankments? We are currently unable to match the provided quantities for each zone with the limited cross sections and details provided.
Response 6: Additional cross sections will not be provided. Reclamation believes that zoned material quantities can be approximated using the cross-sections currently provided.
Question 7: Plan sheet number 805-208-60147 shows the elevation limits of excavation within borrow area 12 & 14, the cross-sectional limits into borrow area 14 stop at 2700 feet into the borrow area, but do not extend to the entire limits of the borrow area as shown on the plan sheet 805-208-60145 of the borrow area. Please provide the extended cross section and elevation limits of excavation through the borrow area 14.
Response 7: An extended cross section will not be provided. The "limits of excavation" shown on 805-208-60147 are not binding and are for illustrative purposes only. Refer to drawings 805- D-60012 through 60020 for lateral boundaries.
Question 8: Who owns the existing waterline along basalt road called out for “protected in place”?
What is the pipe size and flow rate of this water line? Is there a quantity limitation on the amount of water used from this source? What amount of water can the contractor rely upon for use per year?
Response 8: The water line is owned by California State Parks. The pipe size and flow rate are unknown. Bidders should coordinate with California State Parks - Four Rivers Sector District Office regarding the availability of water from this line.
Question 9: Specification 31 23 22 Paragraph 1.02 B and 53 20 00 Paragraph 1.07 C both state potential stabilization and monitoring work to be done at the landslide area on East Basalt Hill Quarry Road. Is this work still required if East Basalt Road is not utilized by the contractor?
Response 9: No, if the road is not used, stabilization is not required.
Question 10: Reference the extent of existing landslide on plan sheet 805-D-60020 note 3 which states, “Refer to specifications for stabilization requirements.” Please provide the specification requirements for the East Basalt Hill Quarry haul road landslide stabilization.
Response 10: Refer to Section 31 23 22 - Constructing Haul Roads, and responses to inquiries #2 and #9 in this Q&A.
Question 11: Reference specification section 31 23 17- 3.07 FOUNDATION MAPPING AND INSPECTION, “the government is allowed 3 working days for geological mapping plus 1 working day for final foundation inspections.” This would leave each 150’ section bottom of every shear key excavation opens for a minimum of 4 days, if initial geological mapping starts later than a Tuesday it will extend the geological mapping and final inspection period up to 7 days. In order to reduce the amount of time that a shear key foundation will be exposed, will the Agency consider reducing the geological mapping time to two days plus one day for final inspection?
Response 11: The spec reads as "up to 3 working days" for mapping, and 1 day for approval.
Initial mapping/approval efforts may take the full required time, with subsequent efforts requiring less time. Likewise, larger areas may take the full duration of time, with smaller areas being approved more quickly. The government acknowledges that this process will have logistical challenges and will require effective communication. The government intends to work with the Contractor to facilitate a workflow that allows both parties to conduct their activities safely and efficiently. The Contractor may continue working in areas adjacent to the exposed foundation being mapped/approved.
Question 12: Reference Section 31 03 33-1.05 CONTRACTOR RESPONSIBILITY M.
Minimum Required Personnel: Please confirm that when dewatering system(s) are in operation, either one of the dewatering specialists, dewatering specialist assistant, or the operation/maintenance person experienced in pump operation and maintenance needs to be onsite 24 hours a day, 7 days a week, including holidays?
Response 12: Yes, when the dewatering system(s) are in operation, one of the dewatering team members (dewatering specialist, dewatering specialist assistant, or an operation/maintenance person experienced in pump operation and maintenance) needs to be onsite 24 hours a day, 7 days a week, including holidays.
Question 13: Reference Section 31 23 39-3.01 - DISPOSAL OF EXCAVATED MATERIALS states, “Unsuitable materials shall only be wasted after the waste location is approved by the COR.” Please provide a clearly identified designated disposal site within project limits.
Response 13: Section 31 23 39 - Disposal of Excavated Materials provides adequate language to address this question.
Question 14: Will trucks delivering materials (legal street loads) to the project site be able to use Gonzaga Road from Highway 33 to Basalt Road?
Response 14: Yes, trucks delivering materials (legal street loads) to the project site will be able to use Gonzaga Road from Highway 33 to Basalt Road, in accordance with any applicable encroachment permits.
Question 15: Specification Section 31 23 21, Table 31 23 21A, states that the Minimum Dimension of the Riprap is 15 Inches. It is impossible to produce Riprap with 0% less than 15 Inches. Please provide a range of material that will be allowed that is less than 15”, say 0 to 5%.
Response 15: The "Stockpiling Riprap" payment item is intended to provide payment for separation and stockpiling of riprap-sized materials. Riprap is not intended to be produced as an independent task.
Question 16: Specification 01 14 12, Paragraph B, Section 1, Subparagraph D, states “Excavation shall not begin after September 1 without approval from the COR”. If the contractor has started excavation work on a particular slope wash area, is the intent of this paragraph that all rolling excavations must be complete by September 1 or must the contractor only begin rolling excavation by September 1?
Response 16: The Contractor shall not begin excavation at a new shear key site (i.e., SW180) after September 1 without approval from the COR.
Question 17: Specification 02 21 34 paragraph 3.01 Part A states, “Install structure measurement points as shown on drawings.” Drawings 805-D-60059, provides pre-existing concrete structural measurement points. Please provide details and location of future structure measurement points to be installed.
Response 17: Refer to drawing 805-D-60065
Question 18: Please clarify locations of embankment measurement points.
Response 18: Existing Embankment Measuring Points near work areas are shown on 805-D- 60023 and 805-D-60035. There are no new Embankment Measurement Points to be installed.
Question 19: Reference Section 31 23 17 EXCAVATION OF SHEAR KEY subsection 1.05 CONTRACTOR RESPONSIBILITY and Subsection 3.02.D EXCAVATION. Will the Agency please confirm that 2 each monitors are required onsite 24/7 including weekends and holidays for the duration of the shear key excavation work? Can the dewatering monitor double as the second earthwork monitor, or will two earthwork monitors and one dewatering monitor be required?
Response 19: Yes, two monitors are required onsite 24/7 including weekends and holidays for the duration of the shear key excavation work. Yes, one dewatering monitor may double as an earthwork monitor.
Question 20: If the contractors plan is to work 6 days a week, will the foundation mapping crew be on the same schedule?
Response 20: Yes, the foundation mapping crew will be on site to perform foundation mapping in accordance with the specifications.
Question 21: Reference Specification 31 23 50 – Quarry Reclamation, paragraph 3.01 Restoration and STG-Pacific LLC and Gordon F Revey – BF Sisk Basalt Hill Quarry Exploration and Test Plan, Report 3, Paragraph 3.10. Will the contractor be required to reclaim the entire existing quarry, or will these restoration requirements only apply to the new areas mined under this contract?
Response 21: The contractor will only be required to restore new areas mined under this contract.
Question 22: Specification 31 23 21 – Stockpiling Riprap, paragraph 3.01.A states “All materials suitable for use as riprap shall be stockpiled in areas shown on drawings.” Please clarify where the riprap is to be stockpiled as there are no areas identified on the drawings.
Response 22: Refer to Drawing 805-D-60020. Drawing shows location of riprap stockpiling area.
Question 23: In the provided Geotechnical information, there are references to the 1985 report titled – Exploration Data – O’Neill Dam Riprap Repair – Basalt Hill Quarry, California Department of Water Resources, January 1985. Can this report and exploration data be provided to the Contractors?
Response 23: The report is available under separate cover via Kiteworks. To request, please email Roxana Ahola at rahola@usbr.gov and cc Erik Danger at edanger@usbr.gov.
Question 24: Specification 31 23 20 – Excavation from Quarry, paragraph 1.06.A states “Conform to MSHA rules and regulations …” Does the quarry fall under MSHA jurisdiction? It is our experience that since to commercial sale of product is occurring, this quarry would not fall under MSHA. If the quarry does not fall under MSHA jurisdiction, is the contractor required to follow MSHA rules?
Response 24: Yes, the quarry falls under MSHA jurisdiction. MSHA rules and regulations are required at the quarry and anywhere else materials are being processed.
Question 25: Specification 31 23 19, paragraph 1.05 E states “Borrow area shall meet MSHA requirements.” Paragraph 3.01 F 2 states “If processing at the borrow area includes sizing (other than screening out oversized material), then MSHA will have jurisdiction over the borrow excavation.” Please confirm if only screening is performed at the borrow area then paragraph
1.05 E will not apply to the borrow area.
Response 25: Offerors should contact MSHA to confirm whether their specific operations would be under MSHA jurisdiction.
Question 26: Specification Section 53 10 00, paragraph 1.04.2.b.2 states “Assume three to five percent of material will be of sufficient size and quality to be suitable for use as riprap”. Section B, Schedule of Prices CLIN 61 requires the stockpiling of 100,000 CY of riprap. Using the yield of 3%-5% for riprap the contractor would need to quarry 2,000,000 CY to 3,340,000 CY of rock from the Basalt Hill Quarry. This quantity is well in excess of the quantity indicated on the Material Distribution drawings. How and where should the contractor stockpile the additional quarried rock which does not meet the requirements of riprap, and is not needed for other materials on the project. We anticipate this quantity to be approximately 2,000,000 CY.
Response 26: The intent of CLIN 61 is to preserve riprap-sized materials encountered during typical blasting and processing operations for future use. Additional rock should not be quarried to meet the quantity shown in the bid schedule.
Question 27: Once a contractor has been selected will the owner work with and assist in obtaining additional permits if necessary, for haul roads?
Response 27: For the supplementary dewatering systems, materials are paid for under items C, F, I, and L; labor for installation is paid for under items D, G, J, and M; and labor for operation is paid for under items N, O, and P.
Question 28: Specifications 53 10 00 Paragraph 1.05 Commercial Materials Part A states “….and Aggregate Base Course will be purchased commercially.” Will the contractor be allowed to produce its own Aggregate Base from the Quarry?
Response 28: Yes, the contractor may produce aggregate base course from the quarry.
Question 29: Specification 32 91 19 Paragraph 3.01 states “Perform soil analysis on topsoil in stockpile to determine the content of organic matter and nutrients present. If necessary, amend the topsoil prior to or during placement, as approved by the COR.” The Specifications do not contain any information about topsoil nutrient content. How much topsoil amendment should the contractor assume?
Response 29: The contractor is not to assume topsoil amendment as part of their bid. Any required topsoil amendment will be paid for by modification.
Question 30: The RFP does not appear to provide page limits for Key Personnel resumes. Does the Bureau have a preferred or required page limit, if so, please provide?
Response 30: There is no maximum page limit for Key Personnel.
Question 31: The RFP does not appear to provide a page limit for the Executive Summary. Does the Bureau have a preferred or required page limit, if so, please provide?
Response 31: There is no maximum page limit for the Executive Summary.
Question 32: We were unable to locate pollution insurance requirements or the worker's compensation amount the employer is required to carry. Additionally, the liability and auto insurance requirements are below our usual thresholds. Please clarify pollution insurance and worker's compensation amounts and verify the liability and auto insurance rate requirements.
Response 32: We are not aware of pollution insurance requirements. FAR 52.228-3, Workers’ Compensation Insurance (Defense Base Act) is not applicable. The thresholds listed are the minimum, please see FAR clause at 52.228-5, Insurance—Work on a Government Installation and secure amount you believe is necessary.
Question 33: Regarding Offeror Past Performance to be submitted in Factor 1B of the proposal, the instructions on Attachment J4 states that Offers shall identify past or current contracts for efforts that are similar to the size, scope, and complexity if this solicitation and that these contracts had to be performed within the last ten (10) years. However, the proposal requirements in Section L state that these contracts submitted for past performance shall have been completed during the last ten (10) years. Please confirm that Offerors may present either completed or current projects that are comparable in size, scope, and complexity to this solicitation as long as the work has been performed within the last 10 years.
Response 33: Current projects are acceptable. This amendment No. 05 allows for projects (completed and current) during the last 20 years. See attached revised solicitation Section L, WBR 1452.215-81Proposal Instructions – Bureau of Reclamation (f)(2a), and attachment J4.
Question 34: We are listing a project we recently listed in a BOR solicitation. The client recently filled out the BOR’s past performance qualification form, which is provided as attachment J3. Would it be acceptable for us to submit this form with our proposal instead of asking the client to fill out this form for a second time?
Response 34: This is acceptable.
Question 35: Will BOR please provide Attachment J4 as an excel spreadsheet that we may fill out?
Response 35: Email Roxana Ahola at rahola@usbr.gov and cc: edanger@usbr.gov to request the excel spreadsheet.
Question 36: Reference Section "Proposal Instructions": The section states the following deliverable requirement: “(2) Cross-reference the work statement to the terms of the proposal and indicate how the proposal conforms to the evaluation factors contained in Part IV, Section M”. Can the Government explain this requirement in more detail? Please define “work statement”, “terms of the proposal” and those evaluation factors of “Part IV, Section M? We assume that “Part IV, Section M” is referring to “Section M
– Evaluations for Award”?
Response 36: Section M is referring to Evaluations for Awards and the valuation factors are found in this section under WBR 1452.215-82 “Evaluation For Award- Quality Predominance-Bureau Of Reclamation.”
Work Statement is Section C, Description/Specifications. Terms of the proposal is referring to any special terms of your proposal.
Question 37: With regards to FAR 52.228, we would like to know if a more comprehensive detail of insurance requirements will be made available.
Response 37: Refer to Response #32 in this Q&A.
Question 38: Will the Agency allow the contractor to use existing Basalt Campground and Basalt Bay Boat Launch Parking Lot for labor force housing location(s)?
Response 38: Reclamation will not allow labor force housing within Contractor Use Areas. Basalt Campground and Basalt Bay Boat launch are maintained and operated by California State Parks - Four Rivers Sector District Office - Contact State Parks regarding availability.
Question 39: Please confirm that a formal, completed USACE contractor evaluation form, executed within the SAMS/CPARS/CCASS system is an acceptable alternative to Attachment J3.
Response 39: Providing CPARS reports would not be an acceptable alternative. See WBR 1452.215-80 (b).
Question 40: Section 01 57 20, 1.04G States that the Contractor is to purchase carbon offsets before construction. It identifies a minimum purchase of 120,575 MTCOe and requires purchase of only emission mailto:rahola@usbr.gov mailto:edanger@usbr.gov offsets generated as part of "CARB's Compliance Offset Protocols". CARB states that "CARB's Compliance Offset Protocols" are not able to purchase for a project like this and they referred us to the Registries for purchase of offsets for a project like this. The Registries referenced in Mitigation Monitoring and Reporting Program Measure (GHG-1) are, American Carbon Registry, the Climate Action Reserve, and the Verified Carbon Standard. The latest "Summary of Auction Settlement Prices and Results" from the CARB's Cap and Trade Program identifies the last Auction posted from August 2021 resulted in a Current Auction Settlement Price of $23.30 per metric ton of CO2 offset and based on historical data there has been an increasing trend on the pricing. Even at the cost of $23.30 per metric ton, the minimum amount the Contractor would need to include in their bids to account for 120,575MTCOe at $23.30 is $2,809,397.50. Additionally, based on history this cost is going to be higher at the time the offsets will need to be purchased. Is it possible to make this an Allowance Item instead of a hard bid item, given the uncertainties in the pricing for this item?
Response 40: No, as this will be awarded as a Firm Fixed Priced contract.
Question 41: Please confirm if small businesses are exempt from completing a subcontracting plan at time of submission, in accordance with FAR 52.219-9 (a).
Response 41: Small businesses are not required to provide a subcontracting plan.
Question 42: What is the size and rating of the OH Power line that runs to the Basalt Hill Quarry, and how much power is available to the contractor?
Response 42: The existing overhead power line that runs near the Basalt Hill Quarry is owned by PG&E.
These powerlines service existing State Parks Facility's. Existing Power is believed to be 12kVA, 3-phase. Contractor shall verify existing power and availability with PG&E.
Question 43: Can Zone 11 “Gravel Drain” be produced from the Basalt Hill Quarry, or must it be purchased from a commercial source? There are conflicting statements within the Specifications and the Drawings.
Response 43: Yes, Zone 11 "Gravel Drain" can be produced from the Basalt Hill Quarry. Please refer to specifications section 31-24-15-2.01.C "Source".
Question 44: Section L, Proposal Instructions states that projects submitted in response to ”2a) Factor 1A: Past Performance Data” must have been completed during the last 10 years. Given the unique scope of this project, we request that the requirement be modified to allow for projects completed during the last 15 years.
Response 44: Refer to Response #33 in this Q&A.
Question 45: Specifications 31 23 12-1, Part 2.01 E requires backfill materials to be compacted no larger than 3/4 inch in size. Drawing 805-5-60120, Note 4 states, “Material removed during trench excavation shall be used to backfill trench, unless otherwise approved by the COR.” Please clarify if material removed during the trench excavation will be acceptable for backfill.
Response 45: Material removed during trench excavation shall be allowed to be used as backfill with the condition that it does not contain particles greater than 3/4 inch in size, as per specification section 31 23 12 2.01.E.
Question 46: Can contractors dig test pits in the borrow area and the quarry during the solicitation period?
Response 46: The second pre-bid site visit (10/20/21) allowed Contractor's the opportunity to dig test pits or trenches in the Basalt Quarry. No test pits will be allowed in Borrow Area 14.
Question 47: Section L, Factor 2A Past Performance Data BOR requests the offeror furnish a list of no more than three federal, state, local government, or commercial projects similar in scope, complexity and magnitude to the work required under this solicitation, that have been completed during the last ten years. Will the Bureau consider changing the specs to allow relevant projects that have been completed within the last 25 years?
Response 47: No, to projects in the last 25 years. However, refer to Answer #33 as Past Performance Data has been been revised to allow for similar projects completed or in progress in the last 20 years.
Question 48: 01 52 14-4 Field Laboratory Facility 2.02.A.7, 2.04.A.2, 2.04.B.2. -- 2.02.A.7 says, "Extra support of the trailer frame will be needed to support heavier than normal loads inside the trailer."
2.04.A.2 lists Laboratory Trailer Furniture. 2.04.B.2 lists Laboratory Facility Equipment. Will equipment listed in 2.04.B.2 be put into the trailer or into shelter? If equipment listed in 2.04.B.2 is placed in the shelter only, then can the "extra support" mentioned in 2.02A.7 be disregarded? This additional information will be helpful in developing Lab trailer floor plan and setup.
Response 48: Yes, some of the equipment listed will be installed inside of the trailer. Extra support of the trailer frame will be required as described in section 01 52 14.
Question 49: Amendment No. 003 references a revised Standard Form 1442; however, a revised SF 1442 was not provided with the amendment. Does the Bureau intend to release an updated SF 1442 based on the amendment's revisions?
Response 49: A revised SF 1442 will not be released based on Amendment No. 03. To clarify, the intent was to revise the proposal and inquiry due dates and not the amendment.
Question 50: Amendment 3, Section 11 has the box checked “is not extended." However, the text in Section 11 states “Standard Form 1442 is revised to extend the proposal due date and time from November 4, 2021 at 14:00 to November 19, 2021 at 14:00.” Please clarify if the bid due date is extended.
Response 50: The offer due date was extended to November 19, 2021 at 14:00.
52.223-99 Ensuring Adequate COVID-19 Safety Protocols Oct 2021 for Federal Contractors (DEVIATION)
(a) Definition. As used in this clause –
United States or its outlying areas means—
(1) The fifty States;
(2) The District of Columbia;
(3) The commonwealths of Puerto Rico and the Northern Mariana Islands;
(4) The territories of American Samoa, Guam, and the United States Virgin Islands; and
(5) The minor outlying islands of Baker Island, Howland Island, Jarvis Island, Johnston Atoll, Kingman Reef, Midway Islands, Navassa Island, Palmyra Atoll, and Wake Atoll.
(b) Authority. This clause implements Executive Order 14042, Ensuring Adequate COVID Safety Protocols for Federal Contractors, dated September 9, 2021 (published in the Federal Register on September 14, 2021, 86 FR 50985).
(c) Compliance. The Contractor shall comply with all guidance, including guidance conveyed through Frequently Asked Questions, as amended during the performance of this contract, for contractor or subcontractor workplace locations published by the Safer Federal Workforce Task Force (Task Force Guidance) at https:/www.saferfederalworkforce.gov/contractors/
(d) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (d), in subcontracts at any tier that exceed the simplified acquisition threshold, as defined in Federal Acquisition Regulation 2.101 on the date of subcontract award, and are for services, including construction, performed in whole or in part within the United States or its outlying areas.
Solicitation No. 140R2021R0004 – BF SISK Safety of Dams (SOD) Modifications
(2) Past Performance Contents. It is considered important to the Government that the Offeror has substantial past performance with construction of work similar in nature to the requirements contained within this solicitation. The Past Performance factor shall include a listing of the requested Past Performance Data (Factor 2A) and a corresponding written narrative (Factor 2B) for each past performance data reference provided in Factor 2A.
2a) Factor 1A: Past Performance Data. The Past Performance Data shall include:
a) Contents:
1. The Offeror shall furnish a list of no more than three (3) Federal, State, local government or commercial projects similar in scope, complexity, and magnitude to the work required under this solicitation, that are current or have been completed during the last ten (10) twenty (20) years. List only those contracts that are comparable in size, scope, and complexity to this solicitation. If the total number of such contracts exceeds three (3) the Offeror shall address the three most recent contracts that are closest to this solicitation in scope, complexity, and magnitude. The government will not acknowledge or evaluate past performance data submissions that exceed the requested amount.
2. Contractors shall utilize the formatted form at Section J, Attachment J4 and provide the following for each project:
i) Contract Number, name of project, and location of project.
ii) Client or agency point of contacts (include two (2) points of contact with telephone numbers and email addresses).
iii) Original completion time and date, and actual dates and duration of each project.
a. Period of Performance start date at time of the award (calendar days is also acceptable.)
b. Period of Performance end date at time of the award (calendar days is also acceptable).
iv) Initial contract amount and final contract amount (including modifications).
a. Total Value of contract at time of the award.
b. Total Value of contract at contract completion.
v) Percentage of work subcontracted.
a. Percentage subcontracted to small business.
vi) Contract Type: (Firm fixed price, cost reimbursement, etc.)
vii) The Offeror shall provide each reference with a copy of the Past Performance
Questionnaire (PPQ) in Section J and have the reference return the PPQ to the Bureau of Reclamation in accordance with instructions at the end of the form.
viii) Confirm the PPQ in Section J (Attachment J3) has been sent to POCs provided at item ii in accordance with RFP instructions.
a. If PPQ was not sent, state a reason.
Note: Contractors shall assume that the Government has no prior knowledge of them and that it will base its evaluation on the information presented in the Past Performance Proposal; as such, Past Performance Proposals must be fully self-sufficient and provide all necessary information.
rahola Cross-Out
Past Performance Propsal Attachment II
PPI Entry #1 Contract Details PPI Entry #2 Contract Details PPI Entry #3 Contract Details
i) Contract Number Contract Number Contract Number
Name of Project Name of Project Name of Project Location of project Location of project Location of project
ii) Client or Procuring Agency Client or Procuring Agency Client or Procuring Agency
iii) Client or Procuring Agency Points of Contact Client or Procuring Agency Points of Contact Client or Procuring Agency Points of Contact
Point of Contact (POC) 1 Point of Contact (POC) 1 Point of Contact (POC) 1 POC 1 email address POC 1 email address POC 1 email address
POC 1 telephone number POC 1 telephone number POC 1 telephone number
POC 2 POC 2 POC 2
POC 2 email address POC 2 email address POC 2 email address POC 2 telephone number POC 2 telephone number POC 2 telephone number
iv) Awarded Period of Performance (POP) Awarded Period of Performance (POP) Awarded Period of Performance (POP)
a. Actual POP at completion of contract. Actual POP at completion of contract. Actual POP at completion of contract.
v) Awarded Contract Amount Awarded Contract Amount Awarded Contract Amount
a. Total Value at completion of contract Total Value at completion of contract Total Value at completion of contract
vi) Percentage of work subcontracted Percentage of work subcontracted Percentage of work subcontracted
a. Percentage subcontracted to Small Business Percentage subcontracted to Small Business Percentage subcontracted to Small Business
vii) Contract Type (i.e. FFP, CPFF, CR) Contract Type (i.e. FFP, CPFF, CR) Contract Type (i.e. FFP, CPFF, CR) viii)
Confirm the Pass Performance Questionnaire (PPQ) in Section J has been sent to the POCs provided at item iii in accordance with RFP instructions.
Confirm the Pass Performance Questionnaire (PPQ) in Section J has been sent to the POCs provided at item iii in accordance with RFP instructions.
Confirm the Pass Performance Questionnaire (PPQ) in Section J has been sent to the POCs provided at item iii in accordance with RFP instructions.
a. If PPQ was not sent, state a reason. If PPQ was not sent, state a reason. If PPQ was not sent, state a reason.
Offeror Past Performance Data Form (Attachment No. J4) BF SISK Safety of Dams (SOD) Modifications, Phase 1
1. Offerors shall identify past or current contracts (including Federal, State, and local Government and/or commercial) for efforts that are similar to the size, scope, and complexity of this solicitation.
2. Offerors shall use this format to provide no more than three (3) contracts performed (past and current projects) within the last twenty ten (10 20) years.
3. Work performed and evaluated under Multiple Award type contracts may be listed more than once, however the Offeror shall isolate relevant Past Performance Information (PPI) for each separate Contract or task order (not to exceed the stated three (3) entries.)
rahola Cross-Out rahola Cross-Out
| 140R2021R0004 SF 30 only |
| Offeror’s Questions and Answers Amendment No. 0005 |
| FAR 52.223-99 |
| Page 861 |
| Attachment J4 - Past Performance Data Form rev. 1 |
| BF Sisk SOD Mods Site Visit 2 Attendance |