BF SISK SAFETY OF DAMS (SOD) MODIFICATIONS, PHASE I
Solicitation number
140R2021R0004
Issued by

About this file

This document includes construction drawings and specifications for grouting an existing toe drain at the BF Sisk Dam. The drawings provide details on the location of the toe drain, as well as the planned grouting sequence and general notes. Stage 1 grouting will involve grouting from the downstream end using two grout pipes and vent pipes monitored for returns. Stage 2 grouting will take place a minimum of 10 hours later through a smaller diameter pipe inserted through the first stage pipe. Notes provide requirements for equipment, materials, pressures, records and contingencies to address any grout returns in unanticipated locations. This work is part of the BF Sisk Safety of Dam Modifications, Phase I contract to address issues in select dam foundation materials through construction of shear keys, stability berms and spillway modifications to maintain water deliveries and safety.

View the file

Other files

File Type Posted
Sol_140R2021R0004_Amd_0011.pdf PDF
Amendment_No__0010_to_140R2021R0004_0010.pdf PDF
Sol_140R2021R0004_Amd_0010.pdf PDF
Amendment_No__0008_and_No__0009_to_140R2021R0004_0009.pdf PDF
Sol_140R2021R0004_Amd_0009.pdf PDF
Sol_140R2021R0004_Amd_0008.pdf PDF
047_508-D-60073_Amendment_0007_0007.pdf PDF
805-D-3221-RD-1_Amendment_0007_0007.PDF PDF
031_508-D-60044_Amendment_0007_0007.pdf PDF
Amendment_No__0007_to_140R2021R0004_0007.pdf PDF
Sol_140R2021R0004_Amd_0007.pdf PDF
059_508-D-60084_Amendment_0007_0007.pdf PDF
Attachment_J3_Past_Performance_Questionnaire_Amendment_0007_0007.pdf PDF
Attachment__J5_Key_Personnel_rev_1_Amendment_0007_0007.pdf PDF
048_508-D-60074_Amendment_0007_0007.pdf PDF
Attachment_B_1_Schedule_of_Prices_Amendment_0007_0007.xlsx XLSX spreadsheet
015_508-D-60025_Amendment_0007_0007.pdf PDF
068_508-D-60133_Amendment_0007_0007.pdf PDF
060_508-D-60085_Amendment_0007_0007.pdf PDF
Sol_140R2021R0004_Amd_0006.pdf PDF
Amendment_No__0006_to_140R2021R0004_0006.pdf PDF
Sol_140R2021R0004_Amd_0005.pdf PDF
Amendment_No__0005_to_140R2021R0004_0005.pdf PDF
Sol_140R2021R0004_Amd_0004.pdf PDF
Amendment_No__0004_to_140R2021R0004_0004.pdf PDF
Sol_140R2021R0004_Amd_0003.pdf PDF
Amendment_No__0003_to_140R2021R0004_0003.pdf PDF
Amendment_No__0002_to_140R2021R0004_0002.pdf PDF
Sol_140R2021R0004_Amd_0002.pdf PDF
Sol_140R2021R0004_Amd_0001.pdf PDF
Amendment_No__0001_to_140R2021R0004_0001.pdf PDF
Attachment_J1_General_Decision_Number_CA20210018.pdf PDF
140R2021R0004.pdf PDF
Attachment_J10_Electronic_Proposal_Submission.pdf PDF
Attachment_J4_-_Past_Performance_Data_Form.pdf PDF
Attachment__J2_Subcontracting_Plan.pdf PDF
Sol_140R2021R0004.pdf PDF
Attachment_J8_Invoicing_Documents.pdf PDF
Attachment_J3_Past_Performance_Questionnaire.pdf PDF
Attachment__J6_Corporate_Experience_and_Management.pdf PDF
Attachment_B_1_Schedule_of_Prices.xlsx XLSX spreadsheet
Attachment__J7_Offeror_Responsibility_Information.pdf PDF
Attachment__J9_Release_of_Claims.pdf PDF
Attachment__J5_Key_Personnel.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Apx 24.0 Apx 65.0

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

LAR M TA IOCE N

C A D

S

YS

TE

M

A ut oC A D

4.

0s C A D

F

IL

EN

A M

E

5- D

-6

-R

D -1

.D W

G

LA

S T

S A V

ED

D A

TE

-1 0-

LA

S T

S A V

ED

B Y

C S

TR

IC

K

LA

N D

C

EN

TR

A L

V A

LL

EY

P

R O

JE

C T

W

ES

T S A N

J O

A Q

U

IN

D

IV

IS

IO

N

B

F.

S

IS

K D

A M

S O

D M

O D

IF

IC

A

TI

O N

S

PH

A S E

I S W

SW180 EXISTING TOE

DRAIN GROUTING

SECTION, PROFILE, AND

DETAILS

DENVER, CO 2021-05-28

0 10' 20'

Existing drainage channel

Existing 8-inch sewer pipe toe drain, to be grouted and abandoned

Existing HDPE pipe extension to be removed

Existing weir boxes to be removed

Existing dam surface

Existing access road

Existing downstream outfall pipe to be removed to extent of excavation

GROUTING SEQUENCE

STAGE 1 GROUTING

1. Inflate Cherne Muni ball sewer plug.

2. Open all valves for grout pipes (GP) and vent pipes (VP) at the start of grouting.

3. Pump low pressure air into VP1 and monitor for blockages in all

GPs and VP2.

4. Remove blockages with low pressure water. Turn off water and air once all blockages are removed.

5. Begin grouting GP1.

6. Close VP1 when heavy grout return is observed.

7. Continue grouting GP1 until grout return is observed at VP2.

8. Close GP1 and begin grouting GP2.

9. Stage 1 grouting is complete when heavy grout return is observed from VP2 while grouting GP2.

STAGE 2 GROUTING

1. To begin a minimum of 10 hours after completion of Stage 1 grouting.

2. Deflate Cherne Muni ball sewer plug unless directed otherwise by the COR.

3. Seal the annulus between the 1-1/4" schedule 80 PVC stage 2 grout pipe and 1" PVC pipe inserted through Cherne Muni ball pass through.

4. Begin grouting 1" PVC stage 2 grout pipe.

5. Grouting is complete when:

5.1. Further grouting would require pumping at

pressures greater than 20 psi.

5.2. Based on conditions, the COR approves completion

of grouting prior to volume and pressure limits.

GENERAL GROUTING NOTES

1. Prior to grouting operations, the toe drain outfall pipe shall be cleaned with a low pressure wash to remove any sediment in the pipe invert.

2. Stage 1 and stage 2 grouting operations must be completed in a sequence with a minimum of 10 hours between activities.

3. Each toe drain pipe (left and right) will be grouted from the downstream outfall in two stages.

4. Grout pipes and vent pipes are 1" diameter schedule 40 PVC pipe.

5. Each PVC pipe is continuous, connected together using solvent-welded couplers.

6. Two air vent pipes (VP1 and VP2) are required in the bulkhead near the crown of the toe drain at the downstream outfall for Stage 1 grouting.

7. Vent pipes shall be equipped with vertical riser pipe on the downstream end and valves on the end of the risers. VP1 riser shall extend 1.0 above the downstream crown of the drain pipe. VP2 riser shall extend 2.5 above the downstream crown of the drain pipe.

8. Use a grout pressure of 5 to 20 psi for grouting operations as approved by COR.

9. Grout pipes should be installed on the toe drain invert or centralized.

Vent pipes should be installed as close as feasible to the toe drain crown as shown.

10. Grout soaked burlap is intended to provide backer for placement of the concrete plug and to prevent grout leaks.

11. The concrete plug is un-reinforced and placed as dry pack. The grout and vent pipes shall be thoroughly surrounded by the concrete plug.

12. Prior to grouting, install threaded brass valves with quick disconnect (cam-lock) connections, operated by lever handles for quick shutoff, into the exposed threaded ends of each grout and vent pipe. Plastic valves are not acceptable.

13. The grouting must be pressure-controlled using a grout manifold, see (40-D-7100).

14. The water/cement ratio of the grout mixture shall be 0.9:1 by volume. A grout fluidifier shall be added to the grout mix to improve flowability. Use manufacturer's recommended dosage rate.

15. The grout sequence presented may have to be modified in the field to fit field conditions. The COR may direct changes to the grout program to fit field conditions.

16. Record grout volumes from Stage 1 grouting and Stage 2 grouting for each toe drain outfall pipe (left and right) and submit to COR upon completion of grouting.

NOTES

1. All dimensions are in feet unless otherwise noted.

2. For survey information, see (805-208-60101).

3. For additional information regarding instrumentation, see

(60075) and (60076).

4. Toe drains consist of left and right toe drains sections. Grout left and right toe drains sections separately. Grouting may be performed from other access points, as approved by the COR.

5. If grout is observed in toe drain section separate from that currently being grouted, pause grout operations and notify COR.

COR will evaluate and approve further grouting operation.

VP1, 5.0

GP1, 5.0

GP2, 19.0

VP2, 19.0

Cherne muni-ball sewer plug

℄ 1-in dia PVC grout pipe inserted through Stage 2 grout pipe 1/4-in inflation pipe

1-1/4-in schedule 80 PVC pipe, stage 2 grout pipeSee Detail 1

Existing 8-in dia drain pipe, clay sewer pipe

See Detail 2

VP1 VP2

GP2

GP1

2-in female pipe connection

1/4-in inflation pipe 1-1/4-in schedule 80 PVC pipe, stage 2 grout pipe

1-in dia PVC pipe inserted through stage 2 grout pipe

Cherne muni-ball sewer plug

2-in female pipe connection

Adaptor from Cherne Muni-ball sewer plug to stage 2 grout pipe

1-1/4-in schedule 80 PVC pipe, stage 2 grout pipe

1-in dia PVC pipe inserted through stage 2 grout pipe

1/4-in inflation pipe

Sewer plug pass through

Existing 8-in dia clay sewer pipe

Apx location, 90-degree pipe bend

60086 NOT TO SCALE

2.0

1.5

Threaded to accommodate valves (not shown)

Vent pipe shall be equipped with riser pipe, see general grouting note 7

90° connection

Threaded to accommodate valves (not shown)

Dry pack concrete plug

VP1

VP2

GP1

GP2

1/4-in inflation pipe

Wrap grout and vent pipes and completely plug cross section of existing 8-in dia drain with grout soaked burlap

Existing 8-in dia clay sewer pipe

Remove HDPE drain pipe extension prior to grouting

60086

60086

VP1 0.5

VP2 2.5

0.50.5

60086 NOT TO SCALE

60086 NOT TO SCALE

R

EV

N O

-1 0-

D

R ud ki n, C al eb C

P .E

R ev is ed

N ot e 5.

3.

U pd at ed N ot e

4.

Re le as ed

Specifications No. 20-C0909 Amendment No. 0007

File details come from the government source that posted it. Updated .