Attachment J.27 Battery Equip Charact Comp Review.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
GNAS Battery System Equipment and Replacement Federal contract opportunity
Solicitation number
6973GH-23-R-00094
Issued by
Department of Transportation Federal Aviation Administration Franchise Acquisition Services

About this file

This document is a compliance review of specifications for battery system equipment and components. It details over 200 individual technical requirements across numerous sections for items such as battery modules, battery management systems, auxiliary power units, and monitoring equipment. Compliance is denoted as conforming, deviating, or excepted.

The related federal contract opportunity is solicitation number 6973GH-23-R-00094 from the Department of Transportation Federal Aviation Administration Franchise Acquisition Services for battery system equipment and replacement parts supporting the GNAS program. Responses are due by the date specified. The award date is to be determined. Pricing and delivery terms will be negotiated with the awardee. There are no set-aside provisions or restrictions on incumbent contractors.

View the file

Other files for this federal contract opportunity

Other files attached to GNAS Battery System Equipment and Replacement, newest first.
File Type Posted
Public Announcement.docx DOCX document
Attachment J.19 Example DC Systems RFQ.xlsx XLSX spreadsheet
Attachment J.2 - GNAS Equipment Characteristics_revised.docx DOCX document
Questions_Answers.pdf PDF
Attachment J.26 Sample Client Auth Ltr.docx DOCX document
Attachment J.21 BVM Requirements.docx DOCX document
Attachment J.12 Contract Data Requirements List.pdf PDF
Attachment J.24 Relevant Experience.docx DOCX document
Attachment J.23 Example BVM Design Package.pdf PDF
Attachment J.22 Example BVM Survey Report.pdf PDF
Attachment J.13 Data Item Description.docx DOCX document
Attachment J.3 - J.11 Battery Technical Exhibits A-I_revised.xlsx XLSX spreadsheet
J.29 BIL Data Report.xlsx XLSX spreadsheet
Attachment J.1 Pricing.xlsx XLSX spreadsheet
Attachment J.28 SOW.docx DOCX document
Attachment J.14b DC BUS & VOR Installation Battery Monitoring System UXTM CAI Checklist.docx DOCX document
Attachment J.20 Example UPS Battery RFQ.xlsx XLSX spreadsheet
Attachment J.15 BAT SYS TEST PROC.docx DOCX document
6973GH-23-R-00094.pdf PDF
Attachment J.17 FAA Forms 3900-17 and 3900-18.pdf PDF
Attachment J.18 Program Management Report.xlsx XLSX spreadsheet
Attachment J.25 Past Performance Questionnaire.docx DOCX document
Attachment J.3 - J.11 Battery Technical Exhibits A-I.xls XLS spreadsheet
Attachment J.2 - GNAS Equipment Characteristics.docx DOCX document
Attachment J.14a Battery Replacement Contractor Acceptance Inspection Checklist.docx DOCX document
Attachment J.16 Test Data Sheets.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Compliance Review

Battery Specification Attachment J.2, ReferenceCompliance Review DesignationExplanation of "D" Deviations and "E" Exceptions
"C", "D", "E"
1.1
1.2
1.3
2.1.1
2.1.1.1.A
2.1.1.1.B
2.1.1.1.C
2.1.1.1.D
2.1.1.1.E
2.1.1.1.F
2.1.1.1.G
2.1.1.1.H
2.1.1.1.I
2.1.1.1.J
2.1.1.1.K
2.1.1.1.L
2.1.1.1.M
2.1.1.1.N.a
2.1.1.1.N.b
2.1.1.1.N.c
2.1.1.1.N.d
2.1.1.1.N.e
2.1.1.1.N.f
2.1.1.1.N.g
2.1.1.2.A
2.1.1.2.B.a
2.1.1.2.B.b
2.1.1.3.A
2.1.1.3.B
2.1.1.3.C.a
2.1.1.3.C.b
2.1.1.3.C.c
2.1.1.3.C.d
2.1.2
2.1.2.1.A
2.1.2.1.B
2.1.2.1.C
2.1.2.1.D
2.1.2.1.E
2.1.2.1.F
2.1.2.1.G
2.1.2.1.H
2.1.2.1.I
2.1.2.1.J
2.1.2.1.K
2.1.2.1.L
2.1.2.1.M
2.1.2.1.N.a
2.1.2.1.N.b
2.1.2.1.N.c
2.1.2.1.N.d
2.1.2.1.N.e
2.1.2.1.N.f
2.1.2.1.N.g
2.1.2.2
2.1.2.2.A
2.1.2.2.B.a
2.1.2.2.B.b
2.1.2.3
2.1.2.3.A
2.1.2.3.B
2.1.2.3.C.a
2.1.2.3.C.b
2.1.2.3.C.c
2.1.2.3.C.d
2.1.3
2.1.3.1.A
2.1.3.1.B
2.1.3.1.C
2.1.3.1.D
2.1.3.1.E
2.1.3.1.F
2.1.3.1.G
2.1.3.1.H
2.1.3.1.I
2.1.3.1.J
2.1.3.1.K
2.1.3.1.L
2.1.3.1.M
2.1.3.1.N.a
2.1.3.1.N.b
2.1.3.1.N.c
2.1.3.1.N.d
2.1.3.1.N.e
2.1.3.1.N.f
2.1.3.1.N.g
2.1.3.2
2.1.3.2A
2.1.3.2.B.a
2.1.3.2.B.b
2.1.3.3
2.1.3.3.A
2.1.3.3.B
2.1.3.3.C.a
2.1.3.3.C.b
2.1.3.3.C.c
2.1.3.3.C.d
2.1.4
2.1.4.1
2.1.4.1.A
2.1.4.1.B
2.1.4.1.C
2.1.4.1.D
2.1.4.1.E
2.1.4.1.F
2.1.4.1.G
2.1.4.1.H
2.1.4.1.I.a
2.1.4.1.I.b
2.1.4.1.I.c
2.1.4.1.I.d
2.1.4.1.I.e
2.1.4.1.I.f
2.1.4.2
2.1.4.2.A
2.1.4.2.B.a
2.1.4.2.B.b
2.1.4.3
2.1.4.3.A
2.1.4.3.B
2.1.4.3.C.a
2.1.4.3.C.b
2.1.4.3.C.c
2.2
2.2.1
2.2.1.1
2.2.1.1.A
2.2.1.1.B
2.2.1.1.C
2.2.1.1.D
2.2.1.1.E
2.2.1.1.F
2.2.1.1.G
2.2.1.1.H.a
2.2.1.1.H.b
2.2.1.1.H.c
2.2.1.1.H.d
2.2.1.2
2.2.1.2.A.a
2.2.1.3
2.2.1.3.A
2.2.1.3.B
2.2.1.3.C
2.2.2
2.2.2.1
2.2.2.1.A
2.2.2.1.B
2.2.2.1.C
2.2.2.1.D
2.2.2.1.E
2.2.2.1.F
2.2.2.1.G
2.2.2.1.H
2.2.2.1.I.a
2.2.2.1.I.b
2.2.2.1.I.c
2.2.2.1.I.d
2.2.2.2
2.2.2.2.A
2.2.2.2.B.a
2.2.2.2.B.b
2.2.2.3
2.2.2.3.A
2.2.2.3.B
2.2.2.3.C
2.2.2a
2.2.2a.1
2.2.2a.1.A
2.2.2a.1.B
2.2.2a.1.C
2.2.2a.1.D
2.2.2a.1.E
2.2.2a.1.F
2.2.2a.1.G.a
2.2.2a.1.G.b
2.2.2a.1.G.c
2.2.2a.1.G.d
2.2.2a.2
2.2.2a.2.A
2.2.2a.2.B.a
2.2.2a.3
2.2.2a.3.A
2.2.3
2.2.3.1
2.2.3.1.A
2.2.3.1.B
2.2.3.1.C
2.2.3.1.D
2.2.3.1.E
2.2.3.1.F
2.2.3.1.G
2.2.3.1.H.a
2.2.3.1.H.b
2.2.3.1.H.c
2.2.3.1.H.d
2.2.3.2
2.2.3.2.A
2.2.3.2.B.a
2.2.3.2.B.b
2.2.3.3
2.2.3.3.A
2.2.3.3.B
2.2.3.3.C
2.2.4
2.2.4.1
2.2.4.1.A
2.2.4.1.B
2.2.4.1.C
2.2.4.1.D
2.2.4.1.E
2.2.4.1.F
2.2.4.1.G
2.2.4.1.H
2.2.4.1.I.a
2.2.4.1.I.b
2.2.4.1.I.c
2.2.4.1.I.d
2.2.4.2
2.2.4.2.A
2.2.4.2.B.a
2.2.4.2.B.b
2.2.4.3
2.2.4.3.A
2.2.4.3.B
2.2.4.3.C
2.3
2.3.1

&"Arial,Bold"&12ATTACHMENT J.27 BATTERY SYSTEM EQUIPMENT CHARACTERISTICS COMPLIANCE REVIEW

File details come from the government source that posted it. Updated .