Attachment J.14a Battery Replacement Contractor Acceptance Inspection Checklist.docx

DOCX document 33 KB Posted

Attached to
GNAS Battery System Equipment and Replacement Federal contract opportunity
Solicitation number
6973GH-23-R-00094
Issued by
Department of Transportation Federal Aviation Administration Franchise Acquisition Services

About this file

This document is a contractor acceptance inspection checklist for battery replacement projects at federal navigation facilities. The checklist specifies verification requirements for new battery system components including batteries, cables, racks, monitors, spill containment, ventilation equipment, and documentation. It also lists service test procedures and baseline data collection needs covering float voltages, resistance measurements, temperature readings, and more. Signatures are required from the facility representative and contractor representative to confirm inspection results and note any necessary action items.

The related federal contract opportunity is a solicitation from the Department of Transportation Federal Aviation Administration seeking battery system equipment and replacement services for its GNAS navigation sites. Services requested include equipment installation, commissioning, disposal, and maintenance support.

View the file

Other files for this federal contract opportunity

Other files attached to GNAS Battery System Equipment and Replacement, newest first.
File Type Posted
Public Announcement.docx DOCX document
Attachment J.24 Relevant Experience.docx DOCX document
Attachment J.23 Example BVM Design Package.pdf PDF
Questions_Answers.pdf PDF
Attachment J.26 Sample Client Auth Ltr.docx DOCX document
Attachment J.21 BVM Requirements.docx DOCX document
Attachment J.12 Contract Data Requirements List.pdf PDF
Attachment J.19 Example DC Systems RFQ.xlsx XLSX spreadsheet
Attachment J.2 - GNAS Equipment Characteristics_revised.docx DOCX document
Attachment J.22 Example BVM Survey Report.pdf PDF
Attachment J.13 Data Item Description.docx DOCX document
Attachment J.3 - J.11 Battery Technical Exhibits A-I_revised.xlsx XLSX spreadsheet
Attachment J.25 Past Performance Questionnaire.docx DOCX document
Attachment J.17 FAA Forms 3900-17 and 3900-18.pdf PDF
Attachment J.27 Battery Equip Charact Comp Review.xlsx XLSX spreadsheet
Attachment J.18 Program Management Report.xlsx XLSX spreadsheet
J.29 BIL Data Report.xlsx XLSX spreadsheet
Attachment J.1 Pricing.xlsx XLSX spreadsheet
Attachment J.28 SOW.docx DOCX document
Attachment J.14b DC BUS & VOR Installation Battery Monitoring System UXTM CAI Checklist.docx DOCX document
Attachment J.20 Example UPS Battery RFQ.xlsx XLSX spreadsheet
Attachment J.15 BAT SYS TEST PROC.docx DOCX document
6973GH-23-R-00094.pdf PDF
Attachment J.3 - J.11 Battery Technical Exhibits A-I.xls XLS spreadsheet
Attachment J.2 - GNAS Equipment Characteristics.docx DOCX document
Attachment J.16 Test Data Sheets.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR ACCEPTANCE INSPECTION (CAI) CHECKLIST

Inspection Date __________
City _______________ ST____
LOC ID__________________

Equipment Type (UPS,VORTAC, VOR, DME, LPTA or DC BUS) ____________________

VERIFICATION
Meets Requirements
Does Not Meet Requirements

All battery system components installed:

1. Batteries
____________
______________
2. Cables, Straps, and Hardware
____________
______________
3 Rack
____________
______________
4 Automated Battery Monitor (ABM)/existing BMS
____________
______________
5 Spill Containment
____________
______________
6 Full Eyewash or Cartridge Repl. or 1-gal rinse
____________
______________
All ventilation system components installed:
____________
______________
1. Exhaust Fan and Damper
____________
______________
2. Actuated Intake Damper
____________
______________
3. Intake filter and screen
____________
______________
4. Timer
____________
______________
5. Hydrogen sensor and base unit
____________
______________
6. Warning light
____________
______________
7. Hand Off Auto switch
____________
______________
8. Panel Box Breaker, Cable, Conduit
____________
______________

Service test Result:

1. UPS: 10 min
____________
______________
2. DC BUS or VOR with EG or Fuel Cell: 30 min.
____________
______________
3 DC BUS or VOR: 4 hour
____________
______________
4 Ventilation Manual Operation
____________
______________
5 Ventilation Timer-based Operation
____________
______________
6 Ventilation H2 Sensor-based Operation
____________
______________

Baseline Data Provided (for each battery string):

1. String #
____________
______________
2. Applied Float Voltage (full charge)
____________
______________
3. Applied Equalization Voltage
____________
______________
4. Cell Resistance
____________
______________
5. Intercell Resistance
____________
______________
6. Intercell Connection Torque
____________
______________
7. String (Open Cell) Voltage: ________ V
____________
______________
8. Individual Cell voltages (under float)
____________
______________
9. String Current (under float): _______ A DC
____________
______________
10. AC Ripple Voltage: _________ mV AC
____________
______________
11. AC Ripple Current: _________ mA AC
____________
______________
12. Temperature of Pilot (negative post)
____________
______________
13 Ambient temperature
____________
______________
14. Ground Faults
____________
______________
15. Specific Gravity of each flooded cell
____________
______________
Baseline and service test data sheets provided:
____________
______________

Existing BMS condition verified before removal:

Existing BMS re-installed &operating properly:
____________
______________
New ABM interfaced to existing UPS or DC BUS:
____________
______________
RICI Device Installed and Operating
____________
______________
Battery System OEM Documentation Provided:
____________
______________
1) Warranty
____________
______________
2) MSDS Sheets
____________
______________
3) COTS Operation & Maintenance Instructions
____________
______________
Ventilation System OEM Documentation Provided:
____________
______________
1. Warranty
____________
______________
2. COTS Operation & Maintenance Instructions
____________
______________
Battery Disposal Documentation Provided:
____________
______________
Facility Cleaned:
____________
______________

UPS Service Report: Submit service report from authorized UPS service representative. When replacing UPS battery systems that are not like-for-like, the contractor shall utilize an authorized UPS service representative to program the UPS to the new battery where directed by the FAA. Contractor shall attach UPS Service Report to this CAI.

Automatic Battery Monitor (ABM) Commissioning Report. Contractor shall perform equipment commissioning and familiarization on new ABM equipment. The ABM commissioning shall be performed by an authorized battery monitor service technician.

At a minimum the ABM Commissioning Report shall contain the following information.

-Commissioning Agent
-Calibration Certification
-Battery information
-ABM equipment serial numbers, model numbers and firmware version.
-Float Alarms, Logging, Discharge Selections
-String configuration
-Digital I/O
-Installation Verification
-Measurement Check
-Cell Voltage/Resistance

Mounting Anchor Details:

Comments / Action Items:

SIGNATURES:

SSC Facility Representative

Name and SSC (or center): ___________________________

Signature: ___________________________

Phone Number: ___________________________

Contractor Representative

Name & Company: ____________________________

Signature: ____________________________

Phone Number: ____________________________

SEC J ATT J.14a 07/13/21