CONTRACTOR ACCEPTANCE INSPECTION (CAI) CHECKLIST
| Inspection Date __________ |
| City _______________ ST____ |
| LOC ID__________________ |
Equipment Type (UPS,VORTAC, VOR, DME, LPTA or DC BUS) ____________________
| VERIFICATION |
| Meets Requirements |
| Does Not Meet Requirements |
All battery system components installed:
| 1. Batteries |
| ____________ |
| ______________ |
| 2. Cables, Straps, and Hardware |
| ____________ |
| ______________ |
| 3 Rack |
| ____________ |
| ______________ |
| 4 Automated Battery Monitor (ABM)/existing BMS |
| ____________ |
| ______________ |
| 5 Spill Containment |
| ____________ |
| ______________ |
| 6 Full Eyewash or Cartridge Repl. or 1-gal rinse |
| ____________ |
| ______________ |
| All ventilation system components installed: |
| ____________ |
| ______________ |
| 1. Exhaust Fan and Damper |
| ____________ |
| ______________ |
| 2. Actuated Intake Damper |
| ____________ |
| ______________ |
| 3. Intake filter and screen |
| ____________ |
| ______________ |
| 4. Timer |
| ____________ |
| ______________ |
| 5. Hydrogen sensor and base unit |
| ____________ |
| ______________ |
| 6. Warning light |
| ____________ |
| ______________ |
| 7. Hand Off Auto switch |
| ____________ |
| ______________ |
| 8. Panel Box Breaker, Cable, Conduit |
| ____________ |
| ______________ |
Service test Result:
| 1. UPS: 10 min |
| ____________ |
| ______________ |
| 2. DC BUS or VOR with EG or Fuel Cell: 30 min. |
| ____________ |
| ______________ |
| 3 DC BUS or VOR: 4 hour |
| ____________ |
| ______________ |
| 4 Ventilation Manual Operation |
| ____________ |
| ______________ |
| 5 Ventilation Timer-based Operation |
| ____________ |
| ______________ |
| 6 Ventilation H2 Sensor-based Operation |
| ____________ |
| ______________ |
Baseline Data Provided (for each battery string):
| 1. String # |
| ____________ |
| ______________ |
| 2. Applied Float Voltage (full charge) |
| ____________ |
| ______________ |
| 3. Applied Equalization Voltage |
| ____________ |
| ______________ |
| 4. Cell Resistance |
| ____________ |
| ______________ |
| 5. Intercell Resistance |
| ____________ |
| ______________ |
| 6. Intercell Connection Torque |
| ____________ |
| ______________ |
| 7. String (Open Cell) Voltage: ________ V |
| ____________ |
| ______________ |
| 8. Individual Cell voltages (under float) |
| ____________ |
| ______________ |
| 9. String Current (under float): _______ A DC |
| ____________ |
| ______________ |
| 10. AC Ripple Voltage: _________ mV AC |
| ____________ |
| ______________ |
| 11. AC Ripple Current: _________ mA AC |
| ____________ |
| ______________ |
| 12. Temperature of Pilot (negative post) |
| ____________ |
| ______________ |
| 13 Ambient temperature |
| ____________ |
| ______________ |
| 14. Ground Faults |
| ____________ |
| ______________ |
| 15. Specific Gravity of each flooded cell |
| ____________ |
| ______________ |
| Baseline and service test data sheets provided: |
| ____________ |
| ______________ |
Existing BMS condition verified before removal:
| Existing BMS re-installed &operating properly: |
| ____________ |
| ______________ |
| New ABM interfaced to existing UPS or DC BUS: |
| ____________ |
| ______________ |
| RICI Device Installed and Operating |
| ____________ |
| ______________ |
| Battery System OEM Documentation Provided: |
| ____________ |
| ______________ |
| 1) Warranty |
| ____________ |
| ______________ |
| 2) MSDS Sheets |
| ____________ |
| ______________ |
| 3) COTS Operation & Maintenance Instructions |
| ____________ |
| ______________ |
| Ventilation System OEM Documentation Provided: |
| ____________ |
| ______________ |
| 1. Warranty |
| ____________ |
| ______________ |
| 2. COTS Operation & Maintenance Instructions |
| ____________ |
| ______________ |
| Battery Disposal Documentation Provided: |
| ____________ |
| ______________ |
| Facility Cleaned: |
| ____________ |
| ______________ |
UPS Service Report: Submit service report from authorized UPS service representative. When replacing UPS battery systems that are not like-for-like, the contractor shall utilize an authorized UPS service representative to program the UPS to the new battery where directed by the FAA. Contractor shall attach UPS Service Report to this CAI.
Automatic Battery Monitor (ABM) Commissioning Report. Contractor shall perform equipment commissioning and familiarization on new ABM equipment. The ABM commissioning shall be performed by an authorized battery monitor service technician.
At a minimum the ABM Commissioning Report shall contain the following information.
| -Commissioning Agent |
| -Calibration Certification |
| -Battery information |
| -ABM equipment serial numbers, model numbers and firmware version. |
| -Float Alarms, Logging, Discharge Selections |
| -String configuration |
| -Digital I/O |
| -Installation Verification |
| -Measurement Check |
| -Cell Voltage/Resistance |
Mounting Anchor Details:
Comments / Action Items:
SIGNATURES:
SSC Facility Representative
Name and SSC (or center): ___________________________
Signature: ___________________________
Phone Number: ___________________________
Contractor Representative
Name & Company: ____________________________
Signature: ____________________________
Phone Number: ____________________________
SEC J ATT J.14a 07/13/21