Attachment J.20 Example UPS Battery RFQ.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
GNAS Battery System Equipment and Replacement Federal contract opportunity
Solicitation number
6973GH-23-R-00094
Issued by
Department of Transportation Federal Aviation Administration Franchise Acquisition Services

About this file

This document contains an example request for quote for battery system equipment and replacement from the Federal Aviation Administration. The RFQ seeks bids to provide 36 Deka HR3500ET batteries for an airport location in Houston, Texas, along with flex bus bars, standard installation, battery disposal, delivery, testing, and arc flash labeling. The existing battery rack and batteries are also specified. Additional requirements include battery removal and disposal per OEM instructions, inspection and anchoring of existing racks, new AFHA labels, installation per OEM guidelines, service testing, and resistance readings. Bids are associated with the federal contract opportunity for GNAS battery system equipment and replacement from the Department of Transportation. Site points of contact and delivery address are provided.

View the file

Other files for this federal contract opportunity

Other files attached to GNAS Battery System Equipment and Replacement, newest first.
File Type Posted
Public Announcement.docx DOCX document
Attachment J.19 Example DC Systems RFQ.xlsx XLSX spreadsheet
Attachment J.2 - GNAS Equipment Characteristics_revised.docx DOCX document
Questions_Answers.pdf PDF
Attachment J.26 Sample Client Auth Ltr.docx DOCX document
Attachment J.21 BVM Requirements.docx DOCX document
Attachment J.12 Contract Data Requirements List.pdf PDF
Attachment J.22 Example BVM Survey Report.pdf PDF
Attachment J.13 Data Item Description.docx DOCX document
Attachment J.3 - J.11 Battery Technical Exhibits A-I_revised.xlsx XLSX spreadsheet
Attachment J.24 Relevant Experience.docx DOCX document
Attachment J.23 Example BVM Design Package.pdf PDF
J.29 BIL Data Report.xlsx XLSX spreadsheet
Attachment J.1 Pricing.xlsx XLSX spreadsheet
Attachment J.28 SOW.docx DOCX document
Attachment J.14b DC BUS & VOR Installation Battery Monitoring System UXTM CAI Checklist.docx DOCX document
Attachment J.15 BAT SYS TEST PROC.docx DOCX document
6973GH-23-R-00094.pdf PDF
Attachment J.17 FAA Forms 3900-17 and 3900-18.pdf PDF
Attachment J.27 Battery Equip Charact Comp Review.xlsx XLSX spreadsheet
Attachment J.18 Program Management Report.xlsx XLSX spreadsheet
Attachment J.3 - J.11 Battery Technical Exhibits A-I.xls XLS spreadsheet
Attachment J.2 - GNAS Equipment Characteristics.docx DOCX document
Attachment J.14a Battery Replacement Contractor Acceptance Inspection Checklist.docx DOCX document
Attachment J.16 Test Data Sheets.pdf PDF
Attachment J.25 Past Performance Questionnaire.docx DOCX document
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

LocationHouston
StateTX
LOC IDIAH
Facility TypeASR
Delivery DateTBD
Requestor NameSean Smith
Order Date11/29/21
Contract Number(610) 675-4153
JCN#19005617
Purchaser POC/Ph#:Brandon Mainer
CLINItem DescriptionPart NumberEquipment CostOther Cost
QTYListHandlingEach UnitTotal
XXXXXDeka HR3500ET Battery -- Front Access36$0.00$0.00$0.00
XXXXXFlex Bus Bars 350-600A, 432VDC1$0.00$0.00$0.00
XXXXXStandard Installation1$0.00$0.00$0.00
XXXXXBattery Disposal1$0.00$0.00$0.00
XXXXXBattery Delivery1$0.00$0.00$0.00
XXXXXBattery Service Test1$0.00$0.00$0.00
XXXXXArc Flash Label1$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
TOTAL$0.00

Batteries must be provided in accordance with requirements listed below and "Battery Installation Scope" tab.

1. Old batteries must be removed in accordance with OEM instructions and contract requirements. New racks must be provide where required. (CLIN XXXXX)

2. Where the existing rack will remain in service, it must be inspected to ensure it is properly anchored in accordance with battery rack OEM installation instructions. Contact UPS Program Office if rack is not bolted to the floor. (CLIN XXXXX)

3. New or existing battery rack must have AFHA labels based on OEM calculations for the new batteries. (CLIN XXXXX)

4. New batteries must be installed in existing rack in accordance with OEM installation instructions.(CLIN XXXXX)

5. Service test must be performed to confirm correct installation and operation. (CLIN XXXXX)

6. Battery cell corder resistance readings must be taken after an overnight charge following battery installations. Note: 12 hour charge is preffered before taking the resistance readings. (CLIN XXXXX)

7. Removed batteries must be disposed of in accordance with disposal instructions, please see the"Battery Installation Scope" tab. (CLIN XXXXX)

8. C&C battery conversion kits must be provide where required. (In association with CLIN XXXXX)

9. Where new battery rack is required, the rack must meet IBC seismic requirements for the facility location and rack anchoring details must be included within a seismic report with a PE stamp if the SDS rating in column W is greater than 0.167g. (CLIN XXXXX)

11. Coordinate with rack OEM to obtain a new rack OEM nameplate that reflects specifications based on the new battery make and model. (CLIN XXXXX) *Please note the dates above are tentative.*

Existing UPS9390 80KVA 480V
Existing Battery RackBR-62
Existing BatteriesHR3500ET (36)
Site POC:SSC Manager: Paul Drobnik 281-784-7661 SSC Tech: Mark Spahr 281-784-5269
Delivery Address:SSC address: 4005 Greens RD, Houston TX 77032
GSA Address Code:
Delivery Instructions:Facility is on IAH airport, Escorting will be required, Confirm desired shipping address with SSC prior to shipment.