Attachment J.14b DC BUS & VOR Installation Battery Monitoring System UXTM CAI Checklist.docx

DOCX document 46 KB Posted

Attached to
GNAS Battery System Equipment and Replacement Federal contract opportunity
Solicitation number
6973GH-23-R-00094
Issued by
Department of Transportation Federal Aviation Administration Franchise Acquisition Services

About this file

This document is a checklist for contractor acceptance inspection of battery monitoring system installations. The checklist covers inspection of UXTM battery monitor equipment installation, documentation and familiarization materials, and setup of the UXTM system. Key items inspected include the battery monitor, harness and tab washers, laptop and security box, alarm cable connection, and facility cleanup. Documentation includes startup reports, product guides, installation guides, interface guides, protocol references, and on-site training materials. Battery configuration and setup is inspected, including resistance test interval, temperature scale, and voltage, current, temperature and resistance thresholds. Signatures are required from the SSC facility representative and contractor representative to confirm inspection.

View the file

Other files for this federal contract opportunity

Other files attached to GNAS Battery System Equipment and Replacement, newest first.
File Type Posted
Public Announcement.docx DOCX document
Attachment J.22 Example BVM Survey Report.pdf PDF
Attachment J.13 Data Item Description.docx DOCX document
Attachment J.3 - J.11 Battery Technical Exhibits A-I_revised.xlsx XLSX spreadsheet
Questions_Answers.pdf PDF
Attachment J.26 Sample Client Auth Ltr.docx DOCX document
Attachment J.21 BVM Requirements.docx DOCX document
Attachment J.12 Contract Data Requirements List.pdf PDF
Attachment J.24 Relevant Experience.docx DOCX document
Attachment J.23 Example BVM Design Package.pdf PDF
Attachment J.19 Example DC Systems RFQ.xlsx XLSX spreadsheet
Attachment J.2 - GNAS Equipment Characteristics_revised.docx DOCX document
Attachment J.3 - J.11 Battery Technical Exhibits A-I.xls XLS spreadsheet
Attachment J.2 - GNAS Equipment Characteristics.docx DOCX document
Attachment J.14a Battery Replacement Contractor Acceptance Inspection Checklist.docx DOCX document
Attachment J.16 Test Data Sheets.pdf PDF
Attachment J.17 FAA Forms 3900-17 and 3900-18.pdf PDF
Attachment J.27 Battery Equip Charact Comp Review.xlsx XLSX spreadsheet
Attachment J.18 Program Management Report.xlsx XLSX spreadsheet
Attachment J.25 Past Performance Questionnaire.docx DOCX document
J.29 BIL Data Report.xlsx XLSX spreadsheet
Attachment J.1 Pricing.xlsx XLSX spreadsheet
Attachment J.28 SOW.docx DOCX document
Attachment J.20 Example UPS Battery RFQ.xlsx XLSX spreadsheet
Attachment J.15 BAT SYS TEST PROC.docx DOCX document
6973GH-23-R-00094.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract 693KA8-20-D-00011 Contract 693KA8-20-D-00011

DC BUS & VOR Installation Battery Monitoring System UXTM Contractor Acceptance Inspection (CAI) Checklist

Inspection Date: __________________
City:___________________

State:__________________

LOC

ID

FAC

Type

Equipment Type:

Verification
Meets Requirements
Does Not Meet Requirements

I. UXTM Equipment Installation

1. UXTM Battery Monitor, Harness, and Tab Washers

2. Laptop and Security Box

3. Alarm cable to DCBUS LMS-1000 Binary Channel 8 / DCBUS Config. (DCBUS Sites Only)

4. Facility Cleanup

II. UXTM Documentation and Familiarization

1. UXTM Startup Report

2. UXTM Product Description Guide (Alber)

3. UXTM Installation Guide (Alber)

4. UXTM Getting Started Guide (Alber)

5. DIM Getting Started Guide

6. UXTM Modbus Protocol Reference Guide (Alber)

8. UXTM Web Interface Guide (Alber)

9. UXTM Configurator Overview (Alber)

10. UXTM Wiring Schematic (Alber)

11. BXE System Installation Guide (Alber)

12. Battery Xplorer Enterprise Quick Start Instructions (Alber)

13. Battery Monitoring On Site Training

14. Site Drawings

III. UXTM Set Up

A. Battery Configuration and Setup Information

1. Resistance Test Day Interval (90 Days)

2. Cell Temperature Enable (Yes)

3. Cell Temperature Scale (Celsius required for DCBUS, Fahrenheit ok for VOR )

B. Thresholds

String Alarm Thresholds
Value
Major
Minor

Enable

Latch
Enable
Latch
1. High Ambient Temperature °C (°F)
29 (84)
No
No
Yes
No
2. Low Ambient Temperature °C (°F)
18 (64)
No
No
Yes
No
3. High Overall Voltage V DC DCBUS (2nd Gen VOR) [3rd Gen VOR]
28.5 (42.8) [57]
No
No
Yes
No
4. Low Overall Voltage V DC DCBUS (2nd Gen VOR) [3rd Gen VOR]
22.5 (35.7) [45]
No
No
Yes
No
5. High Discharge Current A DC DCBUS (2nd Gen VOR) [3rd Gen VOR]
201 (110) [100]
No
No
Yes
No
6. High Ripple Current A DC
5
No
No
Yes
No
7. High Float Current mA DC
5000
No
No
Yes
No
8. Low Float Current mA DC
0
No
No
Yes
No
9. Cell to Ambient Delta °C (°F)
11 (20)
No
No
Yes
No
Cell Alarm Thresholds
Value
Major
Minor

Enable

Latch
Enable
Latch
1. High Cell Voltage (V DC)
2.35
No
No
Yes
No
2. Low Cell Voltage (V DC)
2.18
No
No
Yes
No
3. High Resistance (microhms)
150% of avg.
Yes
No
No
No
4. Low Resistance (microhms)
0
No
No
Yes
No
5. High Cell Temperature °C (°F)
32 (90)
Yes
Yes
No
No
6. Low Cell Temperature °C (°F)
10 (50)
No
No
Yes
No
7. High Intercell Resistance (microhms)
150% of avg.
No
No
Yes
No
Charger Cable / Intertier
Value
Major
Minor
1. Charger Cable Measurement
N/A
No
No
No
No
2. Intertier 1 -4
Not
No
No
No
No

Comments / Actions:

Make:
Model:
Serial #:
kVA:

UXTM DatakW:

Is Site using Local MDT instead of dedicated monitor?:_________________________ BXE Software Key:___________________________ UXTM Firmware Version:________________________ Configurator Tool Version Installed:________________________ BXE Software Version Installed:___________________________ Monitor Laptop Information Make:

Model:

Operating System (OS):

OS Version:

Hard Drive Size:

RAM:

Screen Size:

Processor:___________________________________

SIGNATURES:

SSC Facility Representative Name and SSC (or Center):

Signature:

Phone Number:

Contractor Representative Name and Company:

Signature:

Phone Number:

SEC J ATT J.14b 07/13/21 image1.emf image10.emf

File details come from the government source that posted it. Updated .