Attachment I - Environmental Planning and Historic Preservation Decision Support System Project Approval.pdf

PDF 137 KB Posted

Attached to
Design/Build Rebuild Paint and Sandblast Facility at U. S. Coast Guard Base Miami Beach, Miami, FL.
Solicitation number
70Z04720RBASMIA00
Issued by

About this file

This document summarizes an environmental planning review for the rebuild of a Paint and Sandblast Facility at U.S. Coast Guard Base Miami Beach. The project will demolish the existing 4,900 square foot facility damaged during Hurricane Irma and construct a new 9,534 square foot facility to meet Coast Guard standards. Work will include site preparation, construction of the new building, installation of utilities, and demolition of the existing structure. The estimated cost is $8.3 million to be funded in Fiscal Year 2018. The Department of Homeland Security U.S. Coast Guard is listed as the lead agency. Construction is slated to begin in February 2021 and be completed by February 2023. The environmental review found the project qualifies for two Categorical Exclusions and identified no significant environmental impacts provided standard conditions and best practices are followed.

View the file

Other files

File Type Posted
Amendment No. 0004.pdf PDF
10877504 Miami P_SB CAD Files.zip ZIP file
Appendix F - Individual Space Criteria Sheets.pdf PDF
AMENDMENT 0003.pdf PDF
Amendment 0002.pdf PDF
70Z04720RBASMIA00 AMENDMENT 0001.pdf PDF
1 10877504_Miami PSB Facility RFP Drawings.pdf PDF
Attachment A - Geotechnical Reference Documents.pdf PDF
Attachment J - Florida State Clearinghouse Correspondence.pdf PDF
General Wage Determination_FL20200215_Building.pdf PDF
Site Visit MAP.ppt PPT presentation
10877504_G100.pdf PDF
10877504_C103.pdf PDF
Attachment L - Spill Prevention Control and Countermeasures Plan.pdf PDF
10877504_O110.pdf PDF
Appendix A - ComputerGenDrwgs.pdf PDF
Appendix H - Construction Forms.pdf PDF
Attachment K - Air Emission Operating Permit.pdf PDF
Visitors Access List 70Z04720RBASMIA00.pdf PDF
Attachment H - DHS NEPA Record of Environmental Consideration for CatEx Actions.pdf PDF
Appendix J - Outfitting Items.pdf PDF
SPECIFICATIONS.pdf PDF
Attachment D - Boat Cradle.pdf PDF
10877504_A101.pdf PDF
Appendix B - Electronic Deliverables.pdf PDF
Appendix D - Design Narrative.pdf PDF
10877504_C104.pdf PDF
Appendix C - FDCC Adept File Naming.pdf PDF
Appendix E - Industry Standards for Const Docs.pdf PDF
10877504_C102.pdf PDF
Attachment F - USCG Base Miami Beach Asbestos Report.pdf PDF
Solicitation 70Z04720RBASMIA00 Final.pdf PDF
Attachment B - Homeporting FRC Miami Beach As-Builts.pdf PDF
Attachment M - Marine Facilities Annual Operating Permit.pdf PDF
Attachment G - USCG Base Miami Beach Lead Based Paint Report.pdf PDF
Attachment E - ICAM Data.pdf PDF
Appendix G - Operation and Maintenance.pdf PDF
Attachment C - Vessel Data 45RBM-601-001.pdf PDF
10877504_C101.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Environmental Planning and Historic Preservation Decision Support System

USCG Base Miami Beach - rebuild Paint and Sandblast Facility - Project Approved

Status

In Preparation (04/23/2020)

Environmental Review (04/27/2020)

Environmental Approval (04/27/2020)

Proponent Approval (05/13/2020)

Project Approved (05/13/2020)

Project Information

General Name: USCG Base Miami Beach - rebuild Paint and Sandblast Facility

DSS ID: DSS-USCG-2020-9690

Security: Unclassified Description: Rebuild to resilient standards the USCG Base Miami Beach Paint and Sandblast Facility, which sustained structural and roof damage during Hurricane Irma. The existing 4,900 GSF facility is undersized and does not meet Coast Guard standards. To resolve the current building space and functional deficiencies, a new 9,534 GSF facility will be built adjacent to the existing building on Base Miami Beach. The project includes but is not limited to: site work, construction of a new building, site utility work, grounds work, and demolition of the existing facility.

Critical Infrastructure?: No Project Types:

· Construction & Maintenance - New construction upon, or improvement of land where - the structure and proposed use are substantially in compliance with prevailing local planning and zoning standards; the site is on heavily developed property and/or located on a previously disturbed site in a developed area; the proposed use will not substantially increase the number of motor vehicles at the facility; and the site and scale of construction are consistent with those of existing, adjacent, or nearby buildings

· Construction & Maintenance - Demolition and disposal of buildings, structures, or fixtures

· Construction & Maintenance - Removal or demolition, of non-historic buildings, structures, other improvements, and/or equipment in compliance with applicable environmental and safety requirements.

Existing EA/EIS?: No Requires EA/EIS?: No Project Priority: Normal Federal Assistance: No Type of Permit: N/A

Page 1 of 15 Printed On 5/13/2020 4:09:31 PM

1.

Estimated Project Cost: $8,300,000

Component Component: USCG - U.S. Coast Guard Region/Area: USCG Facilities Design & Construction Center - Norfolk Va

Dates FY Funding: 2018 Proposed Project Start: 02/26/2021 Proposed Project End: 02/25/2023 Review Start: 03/19/2020

Project Location

Site Specific: 100 MacArthur Causeway

Team

Document Preparer, Davis Smith, davis.w.smith@uscg.mil

Environmental Reviewer, Richard Hylton (Level II), rick.d.hylton@uscg.mil

Senior Environmental Professional, Richard Hylton (Level II), rick.d.hylton@uscg.mil

Proponent, John Barresi (USCG,CAPT), John.F.Barresi@uscg.mil

Categorical Exclusions

L14* - Coast Guard new construction upon, or improvement of, land where all of the following conditions are met:

(a) The structure and proposed use are substantially in compliance with prevailing local planning and zoning standards.

(b) The site is on heavily developed property and/or located on a previously disturbed site in a developed area.

(c) The proposed use will not substantially increase the number of motor vehicles at the facility.

(d) The site and scale of construction are consistent with those of existing, adjacent, or nearby buildings.

L21* - Demolition of buildings, structures, or fixtures and disposal of subsequent building, structure, or fixture waste materials.

Required Conditions

A change in project scope may void this NEPA document, which is based on the project scope of work presented by the USCG Planners. Do not add additional work to this project without reconsulting with the signer (the proponent) of this NEPA document.

USCG Base Miami Beach - rebuild Paint and Sandblast Facility (Unclassified)

Page 2 of 15 Printed On 5/13/2020 4:09:31 PM

2.

3.

Any change to the Proposed Action that may cause a physical interaction with the human environment will require re-evaluation for compliance with NEPA and other EP&HP requirements before the action can proceed.

This review addresses NEPA and other EP&HP requirements as described in DHS Directive 023-01.

This review may identify the need for additional federal, state, and/or local permits, approvals, etc.

required for the Proposed Action. However, this review may not satisfy those requirements and the

Proponent is responsible for ensuring that all other appropriate federal, state, and/or local permits, approvals, etc. have been obtained.

Decision Documents

Record of Environmental Consideration (REC), 5.30kB

Attachments

Asbestos Report, 1.02MB

Lead Based Paint Report, 1.12MB

Site Photos, 25.54MB

Site Plan, 4.05MB

Comments

Richard Hylton (Level II), As this is a design-build project, the USCG will obtain and comply with all required state and federal permit conditions during the design phase of this project. It is anticipated that the on-shore work will require some state permitting, primarily focused on ground disturbing activities associated with construction. It is anticipated that some permanent storm water

BMPs may be required to meet CWA and subsequent state regulatory requirements. (04/27/2020

06:38:06)

Richard Hylton (Level II), A change in project scope may void this NEPA document, which is based on the project scope of work presented by the USCG Planners. Do not add additional work to this project without reconsulting with the signer (the proponent) of this NEPA document. (04/27/2020

06:34:31)

Richard Hylton (Level II), The island is man-made and no native American Tribes are known to have resided or used this land since it was created. (04/27/2020 06:29:51)

Richard Hylton (Level II), The new construction takes place on a fully developed industrial site. The area has either concrete or asphalt pavement. There are no wetlands and no natural features that will be disturbed. (04/27/2020 06:14:17)

Richard Hylton (Level II), This is a standalone project. It is not part of a segmented or partial project. (04/27/2020 06:07:45)

Page 3 of 15 Printed On 5/13/2020 4:09:31 PM

Davis Smith, The Florida State Clearinghouse was consulted. See attachment: "Florida State

Clearinghouse". (04/21/2020 09:06:52)

Davis Smith, The proposed project is in conformance with IPF Miami 2025 Vision Facilities Land

Use Plan. (04/21/2020 09:00:05)

Davis Smith, Base Miami Beach is a fully developed small island (see photos). It is highly unlikely the minimal ornamental trees or mowed grass provide a valuable habitat. In the rare case of migratory birds being present, any impacts would be minimal and temporary due to the temporary nature of demolition and construction activities. (04/21/2020 07:57:45)

Davis Smith, The proposed project is a new free standing structure that will be built adjacent to the existing structure. (04/21/2020 07:27:36)

Davis Smith, This proposal includes construction of a new 9,534 GSF Paint and Sandblast Facility to meet present and future mission support requirements, with all necessary site preparation, utilities, equipment, and equipment access requirements; as well as demolition and disposal of the current paint and sandblast structure. (04/21/2020 07:27:20)

Davis Smith, This proposal includes construction of a new 9,534 GSF Paint and Sandblast Facility to meet present and future mission support requirements, with all necessary site preparation, utilities, equipment, and equipment access requirements; as well as demolition and disposal of the current paint and sandblast structure. (04/21/2020 07:27:04)

EPHP Review

Environmental Resources

Is the proposed action associated with any other proposed actions? -- No

Comments:

Richard Hylton (Level II), This is a standalone project. It is not part of a segmented or partial project. (04/27/2020 18:07:45)

Davis Smith, This proposal includes construction of a new 9,534 GSF Paint and Sandblast Facility to meet present and future mission support requirements, with all necessary site preparation, utilities, equipment, and equipment access requirements; as well as demolition and disposal of the current paint and sandblast structure. (04/21/2020 07:27:04)

Will the proposed action take place ENTIRELY WITHIN the interior of an existing building or structure? -- No

Comments:

Davis Smith, This proposal includes construction of a new 9,534 GSF Paint and Sandblast Facility to meet present and future mission support requirements, with all necessary site preparation, utilities, equipment, and equipment access requirements; as well as demolition and disposal of the current paint and sandblast structure. (04/21/2020 07:27:20)

Page 4 of 15 Printed On 5/13/2020 4:09:31 PM

Will the proposed action take place ENTIRELY ON an existing building/structure? -- No

Comments:

Davis Smith, The proposed project is a new free standing structure that will be built adjacent to the existing structure. (04/21/2020 07:27:36)

Will there be any ground disturbing activities? -- Yes

Please provide a brief description of the projecct site (size, current/past land uses) and the proposed ground disturbance (square feet, depth, reason for disturbance). A longer description can be attached.: Rebuild to resilient standards a new 9,534 gross square foot (GSF) Paint and Blast Facility adjacent to the existing Paint and Blast Facility on USCG Base Miami Beach, Florida. The project includes, but is not limited to: site work, construction of a new building, installation of new utilities, grounds work and demolition of the existing Paint and Blast Facility.

Attachments: Additional Description of Land Disturbance: (No files uploaded yet.)

Is the proposed action located in an urban area as designated by the U.S. Census Bureau? -- Yes

Are there any sole source aquifers or wellhead/wellfield protection zones in or adjacent to the project area? -- No

Will the proposed action increase impervious surfaces (i.e., buildings, parking lots) or stormwater runoff? -- No

Will any part of the proposed action involve creating, disturbing, and/or removing vegetated areas? -

- No

Will elements of the proposed action occur on, in, or adjacent to bodies of water? -- Yes

Please Explain: USCG Base Miami Beach is an 11.5 acre site located on Causeway Island in Miami

Beach, Florida. Base Miami Beach covers all of the island with access along a causeway bridge.

Biscayne Bay is located on the east coast of Florida. Base Miami Beach is located on an island in

Biscayne Bay.

Is there essential fish habitat in the vicinity of the proposed action? -- Yes

Please Explain: EFHs (mostly corals) are present in the water adjacent to the site, but none of the work will occur in the water and all landside work will be performed in a manner that will protect the nearby waters from sedimentation, entry of potential chemical contaminants, etc. There is no reasonable expectation of any impacts to essential fish habitat.

Could the proposed action adversely affect essential fish habitat? -- No

Please Explain: EFHs (mostly corals) are present in the water adjacent to the site, but none of the work will occur in the water and all landside work will be performed in a manner that will protect the nearby waters from sedimentation, entry of potential chemical contaminants, etc. There is no reasonable expectation of any impacts to essential fish habitat.

Are there any marine sanctuaries within the immediate vicinity of the proposed action? -- No

Are there wetlands or waters of the U.S. on the project site or in the vicinity of the proposed action? -

- Yes

Explain and attach map of wetlands/waters of the U.S.: The site is located on an island that is

Page 5 of 15 Printed On 5/13/2020 4:09:31 PM surrounded by Biscayne Bay.

Attachments: Wetland Map: Base Miami Beach Map (Base Miami Beach Map (2).PNG, 112.40kB)

Does the proposed action involve construction in, filling of, placement of a structure (culvert, levy, etc.) in, discharge to, or crossing of the wetland/waters of the U.S.? -- No

Please Explain: The new building will be constructed adjacent to the existing building. New construction does not involve filling of, placement of a structure in, discharge to, or crossing of a wetland/waters.

Comments:

Richard Hylton (Level II), The new construction takes place on a fully developed industrial site. The area has either concrete or asphalt pavement. There are no wetlands and no natural features that will be disturbed. (04/27/2020 18:14:17)

Is the proposed action on or adjacent to a Wild and Scenic River? -- No

Is there a Coastal Barrier Unit or otherwise protected area on or adjacent to the proposed action? --

No

Please Explain: Base Miami Beach, where the existing facility is located and the new facility will be built, is located on island built of fill material. However it is not a coastal barrier.

Is the proposed action in or adjacent to a wilderness area? -- No

Is the proposed action in or adjacent to a Wildlife Refuge? -- No

Is the proposed action on or adjacent to a National Natural Landmark? -- No

Is the proposed action in or adjacent to a National Park and/or Monument? -- No

Could a state or federal listed threatened or endangered species and/or critical habitat be present in the area of the proposed action? -- No

Explain how you know that there are no protected species or habitat in areas that may be influenced by the proposed action.: The proposed action is to build a building in an already highly developed/urbanized area.

Attachments: Federal and/or State correspondence: Florida State Clearinghouse (Florida State

Clearinghouse - Base Miami Beach.pdf, 470.75kB)

Could any part of the proposed action have the potential to affect migratory birds, and/or their habitat? -- No

Comments:

Davis Smith, Base Miami Beach is a fully developed small island (see photos). It is highly unlikely the minimal ornamental trees or mowed grass provide a valuable habitat. In the rare case of migratory birds being present, any impacts would be minimal and temporary due to the temporary nature of demolition and construction activities. (04/21/2020 07:57:45)

Is the proposed action or any part located within the 100-year floodplain, also known as a Special

Flood Hazard Area (SFHA)? -- Yes

Please indicate the FEMA flood zone your project/proposal is in.: The proposed construction is located within the 100-year floodplain. Project design will need to minimize potential impact of

Page 6 of 15 Printed On 5/13/2020 4:09:31 PM flooding. Zone AE - EL 10.0

Attachments: FEMA Flood Map: Flood Zone Map (Flood Zone Map.pdf, 2.43MB)

Can the action be undertaken outside of the floodplain? -- No

Could the proposed action impact the floodplain and/or could flooding affect the proposed action? --

No

Explain how you know there would be no impacts to the floodplain or that flooding would not impact the proposed action.: This is a small project constructed in a tidal zone. There will be no impact on the flood plain created by this project. The structure will be hardened and "flood" proofed to the maximum extant practicable.

This structure is built to service large boats/watercraft. It must be located in close proximity to existing travel lift.

Will any part of the proposed action take place within the coastal zone and/or State's Coastal

Management Area? -- Yes

Is a Coastal Zone Consistency Determination needed? -- Yes

Attachments: Consistency Determination: Florida State Clearinghouse (Florida State Clearinghouse

- Base Miami Beach.pdf, 470.75kB)

Will the proposed action require the use of or increased use of potable water? -- No

Will noise levels be temporarily or permanently elevated by the proposed action? -- Yes

Please Explain: There will be increased noise levels during demolition and construction. Noise levels will return to normal upon completion of the project.

Could the increased noise impact nearby sensitive receptors (e.g., residential areas, schools, daycare, place of worship, hospitals, parks, wildlife refuges)? -- No

Are there any local or State noise laws/regulations with which the proposed action must comply?

-- Yes

Describe requirement: Florida has specific laws regarding noise violations and sound ordinances.

There's no single set of laws, however, since noise ordinances are established and enforced at county or city level.

Miami Beach City (and Miami-Dade County) regulation: Unreasonably loud, excessive, unnecessary, or unusual noise will result in a violation of the ordinance, and possibly a fine if not promptly remedied.

Will the proposed action be in compliance with local/State noise requirements? -- Yes

Will the project generate air emissions?

-- Yes

Please Explain: Construction and demolition projects typically generate several different types of air emissions including:

- Exhaust Emissions (Particulate Matter and Nitrous Oxide) from equipment

- Particulate Matter from demolition

Page 7 of 15 Printed On 5/13/2020 4:09:31 PM

- Architectural coatings/road paving (Reactive Organic Gas and Volatile Organic Compounds)

- Greenhouse Gases (CO2, CH4, N2O)

Is the proposed action located in a nonattainment area? -- No

Could the increase in emissions exceed the EPA de minimis levels for criteria pollutants? -- No

Describe emission levels.: This is a small construction project, not expected to exceed EPA de minimis levels. Additionally this is a paint and sandblast facility that will be replacing the old paint and sandblast facility. Base Miami Beach has an existing air emissions operations permit that will be modified or replaced to include any requirements for the new building.

Will any part of the proposed action take place at an existing site where there is potential for environmental contamination? -- No

Will any part of the proposed action involve the use of hazardous materials or substances or generate hazardous waste? -- Yes

Please describe the hazardous or toxic chemicals, radioactive materials, munitions, or explosives that may be used or generated.: Demolition of the current Paint and Sand Blasting Facility will include the removal of any light ballasts (PCB and non-PCB), PCB Caulking, asbestos, mercury switches, etc.

Lead-based paint is not expected to be present above the current US Department of Housing and

Urban Development (HUD) and EPA regulatory limits.

See Lead Based Paint Report and Asbestos Report under attachments.

Does the proposed action include safety measures for the use, disposal, or transport of these media? -

- Yes

Please Describe: All regulatory requirements for proper handling and disposal will be followed.

For all hazardous waste identified and generated, the Contractor shall provide proper storage, labeling, handling, and meet all other applicable RCRA hazardous waste regulation requirements for on-site management of hazardous waste. The Contractor’s personnel managing hazardous waste must have demonstrated experience and knowledge in managing hazardous waste and a working knowledge of all RCRA regulatory requirements. The Contractor shall arrange and provide all shipping and disposal of hazardous waste.

If needed, are there measures included in the proposed action to address potential effects to worker safety and public health? -- Yes

Please Describe: All hazardous waste and hazardous material will be handled in accordance with state and federal regulatory requirements to include OSHA and EPA federal standards, and 29 CFR

1910 "Worker Safety Requirements". This includes all RCRA standards governing solid waste and any hazardous waste generated during demolition.

Could the proposed action increase the potential for a terrorist attack on critical infrastructure or a sensitive target? -- No

Will the proposed action involve the use of new or unproven technology? -- No

Page 8 of 15 Printed On 5/13/2020 4:09:31 PM

Could the proposed action degrade current environmental conditions? -- No

Are there low-income and/or minority populations in the vicinity of the proposed action? -- Yes

What is the makeup of the population?: For the 33139 Zip Code:

Minority Population: 62%

Low-income Population: 35%

If low income or minority populations are identified, are there characteristics or practices of these populations that DHS should be particularly sensitive to or that could be affected by the proposed action? -- No

Would the proposed action be consistent with the local master plan, existing zoning, surrounding land use, or the official land use plan for the specific site and/or the affected delineated areas? -- Yes

Comments:

Davis Smith, The proposed project is in conformance with IPF Miami 2025 Vision Facilities Land

Use Plan. (04/21/2020 09:00:05)

Is there potential for controversy (public or scientific) regarding the environmental impacts associated with the proposed action? -- No

Are there any other requirements for the protection of the environment that need to be considered for this proposed action? -- Yes

Describe the requirements and how they have been taken into consideration under the proposed action.: The current/existing Base Miami Beach air emissions operations permit will be updated as required for the replacement facility.

** This question should be carefully checked by the Environmental Reviewer.

Historic Preservation & Cultural Resources

Is the proposed action associated with any other proposed actions? -- No

Comments:

Richard Hylton (Level II), This is a standalone project. It is not part of a segmented or partial project. (04/27/2020 18:07:45)

Davis Smith, This proposal includes construction of a new 9,534 GSF Paint and Sandblast Facility to meet present and future mission support requirements, with all necessary site preparation, utilities, equipment, and equipment access requirements; as well as demolition and disposal of the current paint and sandblast structure. (04/21/2020 07:27:04)

Will the proposed action take place ENTIRELY WITHIN the interior of an existing building or structure? -- No

Comments:

Davis Smith, This proposal includes construction of a new 9,534 GSF Paint and Sandblast Facility to meet present and future mission support requirements, with all necessary site preparation, utilities, equipment, and equipment access requirements; as well as demolition and disposal of the current paint and sandblast structure. (04/21/2020 07:27:20)

Page 9 of 15 Printed On 5/13/2020 4:09:31 PM

Will the proposed action take place ENTIRELY ON an existing building/structure? -- No

Comments:

Davis Smith, The proposed project is a new free standing structure that will be built adjacent to the existing structure. (04/21/2020 07:27:36)

Will there be any ground disturbing activities? -- Yes

Please provide a brief description of the projecct site (size, current/past land uses) and the proposed ground disturbance (square feet, depth, reason for disturbance). A longer description can be attached.: Rebuild to resilient standards a new 9,534 gross square foot (GSF) Paint and Blast Facility adjacent to the existing Paint and Blast Facility on USCG Base Miami Beach, Florida. The project includes, but is not limited to: site work, construction of a new building, installation of new utilities, grounds work and demolition of the existing Paint and Blast Facility.

Attachments: Additional Description of Land Disturbance: (No files uploaded yet.)

Is the proposed action located in an urban area as designated by the U.S. Census Bureau? -- Yes

Are there any sole source aquifers or wellhead/wellfield protection zones in or adjacent to the project area? -- No

Will the proposed action increase impervious surfaces (i.e., buildings, parking lots) or stormwater runoff? -- No

Will any part of the proposed action involve creating, disturbing, and/or removing vegetated areas? -

- No

Will elements of the proposed action occur on, in, or adjacent to bodies of water? -- Yes

Please Explain: USCG Base Miami Beach is an 11.5 acre site located on Causeway Island in Miami

Beach, Florida. Base Miami Beach covers all of the island with access along a causeway bridge.

Biscayne Bay is located on the east coast of Florida. Base Miami Beach is located on an island in

Biscayne Bay.

Is there essential fish habitat in the vicinity of the proposed action? -- Yes

Please Explain: EFHs (mostly corals) are present in the water adjacent to the site, but none of the work will occur in the water and all landside work will be performed in a manner that will protect the nearby waters from sedimentation, entry of potential chemical contaminants, etc. There is no reasonable expectation of any impacts to essential fish habitat.

Could the proposed action adversely affect essential fish habitat? -- No

Please Explain: EFHs (mostly corals) are present in the water adjacent to the site, but none of the work will occur in the water and all landside work will be performed in a manner that will protect the nearby waters from sedimentation, entry of potential chemical contaminants, etc. There is no reasonable expectation of any impacts to essential fish habitat.

Are there any marine sanctuaries within the immediate vicinity of the proposed action? -- No

Are there wetlands or waters of the U.S. on the project site or in the vicinity of the proposed action? -

- Yes

Explain and attach map of wetlands/waters of the U.S.: The site is located on an island that is

Page 10 of 15 Printed On 5/13/2020 4:09:31 PM surrounded by Biscayne Bay.

Attachments: Wetland Map: Base Miami Beach Map (Base Miami Beach Map (2).PNG, 112.40kB)

Does the proposed action involve construction in, filling of, placement of a structure (culvert, levy, etc.) in, discharge to, or crossing of the wetland/waters of the U.S.? -- No

Please Explain: The new building will be constructed adjacent to the existing building. New construction does not involve filling of, placement of a structure in, discharge to, or crossing of a wetland/waters.

Comments:

Richard Hylton (Level II), The new construction takes place on a fully developed industrial site. The area has either concrete or asphalt pavement. There are no wetlands and no natural features that will be disturbed. (04/27/2020 18:14:17)

Is the proposed action on or adjacent to a Wild and Scenic River? -- No

Is there a Coastal Barrier Unit or otherwise protected area on or adjacent to the proposed action? --

No

Please Explain: Base Miami Beach, where the existing facility is located and the new facility will be built, is located on island built of fill material. However it is not a coastal barrier.

Is the proposed action in or adjacent to a wilderness area? -- No

Is the proposed action in or adjacent to a Wildlife Refuge? -- No

Is the proposed action on or adjacent to a National Natural Landmark? -- No

Is the proposed action in or adjacent to a National Park and/or Monument? -- No

Could a state or federal listed threatened or endangered species and/or critical habitat be present in the area of the proposed action? -- No

Explain how you know that there are no protected species or habitat in areas that may be influenced by the proposed action.: The proposed action is to build a building in an already highly developed/urbanized area.

Attachments: Federal and/or State correspondence: Florida State Clearinghouse (Florida State

Clearinghouse - Base Miami Beach.pdf, 470.75kB)

Could any part of the proposed action have the potential to affect migratory birds, and/or their habitat? -- No

Comments:

Davis Smith, Base Miami Beach is a fully developed small island (see photos). It is highly unlikely the minimal ornamental trees or mowed grass provide a valuable habitat. In the rare case of migratory birds being present, any impacts would be minimal and temporary due to the temporary nature of demolition and construction activities. (04/21/2020 07:57:45)

Is the proposed action or any part located within the 100-year floodplain, also known as a Special

Flood Hazard Area (SFHA)? -- Yes

Please indicate the FEMA flood zone your project/proposal is in.: The proposed construction is located within the 100-year floodplain. Project design will need to minimize potential impact of

Page 11 of 15 Printed On 5/13/2020 4:09:31 PM flooding. Zone AE - EL 10.0

Attachments: FEMA Flood Map: Flood Zone Map (Flood Zone Map.pdf, 2.43MB)

Can the action be undertaken outside of the floodplain? -- No

Could the proposed action impact the floodplain and/or could flooding affect the proposed action? --

No

Explain how you know there would be no impacts to the floodplain or that flooding would not impact the proposed action.: This is a small project constructed in a tidal zone. There will be no impact on the flood plain created by this project. The structure will be hardened and "flood" proofed to the maximum extant practicable.

This structure is built to service large boats/watercraft. It must be located in close proximity to existing travel lift.

Will any part of the proposed action take place within the coastal zone and/or State's Coastal

Management Area? -- Yes

Is a Coastal Zone Consistency Determination needed? -- Yes

Attachments: Consistency Determination: Florida State Clearinghouse (Florida State Clearinghouse

- Base Miami Beach.pdf, 470.75kB)

Will the proposed action require the use of or increased use of potable water? -- No

Will noise levels be temporarily or permanently elevated by the proposed action? -- Yes

Please Explain: There will be increased noise levels during demolition and construction. Noise levels will return to normal upon completion of the project.

Could the increased noise impact nearby sensitive receptors (e.g., residential areas, schools, daycare, place of worship, hospitals, parks, wildlife refuges)? -- No

Are there any local or State noise laws/regulations with which the proposed action must comply?

-- Yes

Describe requirement: Florida has specific laws regarding noise violations and sound ordinances.

There's no single set of laws, however, since noise ordinances are established and enforced at county or city level.

Miami Beach City (and Miami-Dade County) regulation: Unreasonably loud, excessive, unnecessary, or unusual noise will result in a violation of the ordinance, and possibly a fine if not promptly remedied.

Will the proposed action be in compliance with local/State noise requirements? -- Yes

Will the project generate air emissions?

-- Yes

Please Explain: Construction and demolition projects typically generate several different types of air emissions including:

- Exhaust Emissions (Particulate Matter and Nitrous Oxide) from equipment

- Particulate Matter from demolition

Page 12 of 15 Printed On 5/13/2020 4:09:31 PM

- Architectural coatings/road paving (Reactive Organic Gas and Volatile Organic Compounds)

- Greenhouse Gases (CO2, CH4, N2O)

Is the proposed action located in a nonattainment area? -- No

Could the increase in emissions exceed the EPA de minimis levels for criteria pollutants? -- No

Describe emission levels.: This is a small construction project, not expected to exceed EPA de minimis levels. Additionally this is a paint and sandblast facility that will be replacing the old paint and sandblast facility. Base Miami Beach has an existing air emissions operations permit that will be modified or replaced to include any requirements for the new building.

Will any part of the proposed action take place at an existing site where there is potential for environmental contamination? -- No

Will any part of the proposed action involve the use of hazardous materials or substances or generate hazardous waste? -- Yes

Please describe the hazardous or toxic chemicals, radioactive materials, munitions, or explosives that may be used or generated.: Demolition of the current Paint and Sand Blasting Facility will include the removal of any light ballasts (PCB and non-PCB), PCB Caulking, asbestos, mercury switches, etc.

Lead-based paint is not expected to be present above the current US Department of Housing and

Urban Development (HUD) and EPA regulatory limits.

See Lead Based Paint Report and Asbestos Report under attachments.

Does the proposed action include safety measures for the use, disposal, or transport of these media? -

- Yes

Please Describe: All regulatory requirements for proper handling and disposal will be followed.

For all hazardous waste identified and generated, the Contractor shall provide proper storage, labeling, handling, and meet all other applicable RCRA hazardous waste regulation requirements for on-site management of hazardous waste. The Contractor’s personnel managing hazardous waste must have demonstrated experience and knowledge in managing hazardous waste and a working knowledge of all RCRA regulatory requirements. The Contractor shall arrange and provide all shipping and disposal of hazardous waste.

If needed, are there measures included in the proposed action to address potential effects to worker safety and public health? -- Yes

Please Describe: All hazardous waste and hazardous material will be handled in accordance with state and federal regulatory requirements to include OSHA and EPA federal standards, and 29 CFR

1910 "Worker Safety Requirements". This includes all RCRA standards governing solid waste and any hazardous waste generated during demolition.

Could the proposed action increase the potential for a terrorist attack on critical infrastructure or a sensitive target? -- No

Will the proposed action involve the use of new or unproven technology? -- No

Page 13 of 15 Printed On 5/13/2020 4:09:31 PM

Could the proposed action degrade current environmental conditions? -- No

Are there low-income and/or minority populations in the vicinity of the proposed action? -- Yes

What is the makeup of the population?: For the 33139 Zip Code:

Minority Population: 62%

Low-income Population: 35%

If low income or minority populations are identified, are there characteristics or practices of these populations that DHS should be particularly sensitive to or that could be affected by the proposed action? -- No

Would the proposed action be consistent with the local master plan, existing zoning, surrounding land use, or the official land use plan for the specific site and/or the affected delineated areas? -- Yes

Comments:

Davis Smith, The proposed project is in conformance with IPF Miami 2025 Vision Facilities Land

Use Plan. (04/21/2020 09:00:05)

Is there potential for controversy (public or scientific) regarding the environmental impacts associated with the proposed action? -- No

Are there any other requirements for the protection of the environment that need to be considered for this proposed action? -- Yes

Describe the requirements and how they have been taken into consideration under the proposed action.: The current/existing Base Miami Beach air emissions operations permit will be updated as required for the replacement facility.

** This question should be carefully checked by the Environmental Reviewer.

Will the proposed action take place ENTIRELY WITHIN the interior of an existing building or structure? -- No

Will the proposed action take place ENTIRELY ON an existing building or structure? -- No

Does any part of the proposed project involve ground disturbing activities? -- Yes

Please provide a brief description of the projecct site (size, current/past land uses) and the proposed ground disturbance (square feet, depth, reason for disturbance). A longer description can be attached.: This project includes construction of a new 9,534 GSF Paint and Sandblast Facility to meet present and future mission support requirements, with all necessary site preparation, utilities, equipment, and equipment access requirements; as well as demolition and disposal of the current paint and sandblast structure. The new building will meet current life safety and industrial requirements.

Attachments: Additional Description of Land Disturbance: (No files uploaded yet.)

Is the project on Federal land? -- Yes

Does the proposed action have the potential to impact Native American graves or objects of cultural patrimony? -- No

Explain: The project is located on an island built on filled land that is owned by the Federal

Government.

Page 14 of 15 Printed On 5/13/2020 4:09:31 PM

Comments:

Richard Hylton (Level II), The island is man-made and no native American Tribes are known to have resided or used this land since it was created. (04/27/2020 18:29:51)

Have archeological studies been undertaken on the site? -- No

Has the SHPO/THPO been contacted to determine if there is potential for archeological sites? -- No, the SHPO/THPO has not been contacted

Comments:

Davis Smith, The Florida State Clearinghouse was consulted. See attachment: "Florida State

Clearinghouse". (04/21/2020 09:06:52)

** This question should be carefully checked by the Environmental Reviewer.

Is any portion of the proposed action located in, on, or in the vicinity of buildings or structures that are 45 years of age or older or have potential for historic significance? -- No

Page 15 of 15 Printed On 5/13/2020 4:09:31 PM