This document is an amendment to a federal solicitation for design-build services to rebuild a paint and sandblast facility at a U.S. Coast Guard base in Miami, Florida. The amendment extends the deadline for submission of questions to December 11, 2020, reduces the minimum value of relevant construction experience examples to $2 million, allows such experience from the past ten years, and confirms that proposed experience in areas such as fuel systems and indoor firing ranges would meet requirements. It also requires a separate dedicated quality assurance manager on-site in addition to a superintendent. The solicitation remains for design and construction of a new approximately 7,370 square foot paint and sandblast facility, with an option for mast lifts, at Coast Guard Base Miami. The response deadline of January 8, 2021 is unchanged.

View the file

Other files

File Type Posted
Amendment No. 0004.pdf PDF
10877504 Miami P_SB CAD Files.zip ZIP file
Appendix F - Individual Space Criteria Sheets.pdf PDF
AMENDMENT 0003.pdf PDF
Amendment 0002.pdf PDF
1 10877504_Miami PSB Facility RFP Drawings.pdf PDF
Attachment A - Geotechnical Reference Documents.pdf PDF
Attachment J - Florida State Clearinghouse Correspondence.pdf PDF
General Wage Determination_FL20200215_Building.pdf PDF
Attachment I - Environmental Planning and Historic Preservation Decision Support System Project Approval.pdf PDF
Site Visit MAP.ppt PPT presentation
10877504_G100.pdf PDF
10877504_C103.pdf PDF
Attachment L - Spill Prevention Control and Countermeasures Plan.pdf PDF
10877504_O110.pdf PDF
Appendix A - ComputerGenDrwgs.pdf PDF
Appendix H - Construction Forms.pdf PDF
Attachment K - Air Emission Operating Permit.pdf PDF
Visitors Access List 70Z04720RBASMIA00.pdf PDF
Attachment H - DHS NEPA Record of Environmental Consideration for CatEx Actions.pdf PDF
Appendix J - Outfitting Items.pdf PDF
SPECIFICATIONS.pdf PDF
Attachment D - Boat Cradle.pdf PDF
10877504_A101.pdf PDF
Appendix B - Electronic Deliverables.pdf PDF
Appendix D - Design Narrative.pdf PDF
10877504_C104.pdf PDF
Appendix C - FDCC Adept File Naming.pdf PDF
Appendix E - Industry Standards for Const Docs.pdf PDF
10877504_C102.pdf PDF
Attachment F - USCG Base Miami Beach Asbestos Report.pdf PDF
Solicitation 70Z04720RBASMIA00 Final.pdf PDF
Attachment B - Homeporting FRC Miami Beach As-Builts.pdf PDF
Attachment M - Marine Facilities Annual Operating Permit.pdf PDF
Attachment G - USCG Base Miami Beach Lead Based Paint Report.pdf PDF
Attachment E - ICAM Data.pdf PDF
Appendix G - Operation and Maintenance.pdf PDF
Attachment C - Vessel Data 45RBM-601-001.pdf PDF
10877504_C101.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Amend Solicitation No. 70Z04720RBASMIA00 as follows:

Section J; List of Attachments: Delete Attachment J.4 DOL Wage Determination:

General Decision Number FL20200215 Building Modification Number 4 dated 08/28/2020 and REPLACE with General Wage Decision Number FL20200215 Building Modification Number 5 dated 11/13/2020, which accompanies this amendment.

Section M; Evaluation Factors For Award

Evaluation Factor 1 – Corporate Experience: Construction Team, delete

Submittal Requirement In Its Entirety.

Replace with the following Submittal Requirement:

• Submit a maximum of three (3) relevant projects for the Construction Team that best demonstrates your experience consistent with the size and scope of the RFP. Each project shall reflect a minimum price of $2 million. Examples of such projects, including but not limited to: a building or pre-engineered building including the required coordination of installed machinery or equipment, such as a building housing a large-equipment paint booth and/or large-equipment blast booth; a light commercial manufacturing facility that included product line, manufacturing, processing, and shipping equipment; or a large-vehicle repair facility.

Projects submitted shall be completed or ongoing for a minimum of one year within the past ten (10) years of the date of issuance of this RFP.

Include a detailed description with each project that explains the scope of work and indicate if the effort was Design-Bid-Build, Design-Build, or Other. If the Construction and design team have not performed together, state so. Projects submitted that do not meet the minimum construction value or time requirements will not be considered.

THE FOLLOWING QUESTIONS WERE RECEIVED IN RESPOINSE TO THE

SOLICITATION:

1. Regarding the recovery system in solicitation #70Z04720RBASMIA00, would a pneumatic recovery system suffice the requirement in 1.7.5.4.6?

RESPONSE: No, a pneumatic recovery system will not suffice. Provide the auger recovery system as specified in 01800-1.7.5.4.6.

2. From Solicitation, Evaluation Factor 1 – Corporate Experience: Construction Team: We request the Government revise the minimum construction value requirement for relevant projects to $2M.

RESPONSE: For Evaluation Factor 1 - Corporate Experience: Construction Team, the minimum construction value of each project submitted will be reduced to $2 million. See amended Section M, Evaluation Factors for Award.

3. From Solicitation, Evaluation Factor 1 – Corporate Experience: Construction Team: We request the Government revise the time requirement to allow projects performed in last 10 years to be relevant.

RESPONSE: For Evaluation Factor 1 - Corporate Experience: Construction Team, the time requirement will be changed to include projects completed within the last 10 years of the date of issuance of this RFP.

4. From Solicitation, Evaluation Factor 1 – Corporate Experience: Construction Team: With respect to the scope of proposed relevant projects, the criteria provided seems to allow installed systems/equipment beyond the examples provided, but can the Government confirm that the following conceptually meet the requirement?:

• Aviation fuel receipt/pumping/treatment systems;

• Specialty ventilation, bullet trap/filtration, and target retrieval systems unique to indoor firing ranges;

• Product refrigeration, loading dock equipment, and vehicle fuel storage/dispensing systems at a base exchange/mini-mart facility.

• Government-furnished weapons simulators, submarine weapons payload tube test module, telecommunications equipment (hub for an entire base), etc. within buildings constructed by the offeror and requiring intensive coordination.

RESPONSE: For Evaluation Factor 1 - Corporate Experience: Construction Team, the basis of evaluation does not limit relevant experience to the examples provided. The projects listed in the contractor's inquiry would be considered relevant as those projects are similar or more complex in scope to the requirements of the RFP.

5. From Solicitation, Section I, Contract Clauses: The Solicitation includes FAR clause 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013), which reminds offerors “the contract price includes all applicable Federal, State, and local taxes…” As the Federal government is an exempt entity, state sales/use taxes are not applicable. Please confirm that the project is exempt from state sales/use tax and that the Government will “furnish evidence appropriate to establish (this) exemption” for use by the successful offeror as indicated in this clause.

RESPONSE: Contractors are NOT exempt from taxes therefore all taxes shall be included in the price proposal.

From Solicitation (General): Please confirm that other than the requirement for a superintendent to be onsite at all times during performance of this contract, there is no requirement for additional full-time on-site personnel dedicated to quality control and safety duties, as sometimes required on Federal contracts.

RESPONSE: Per RFP section 01450-1.1.2, the contractor shall provide a separate dedicated Quality Assurance Manager (QAM) on-site dedicated to ensuring conformance with the contract requirements. The safety duties may be assigned to the QAM as indicated in section 01450-1.3.1, the QAM role may be designated as a supplemental role to a team member or as a dedicated individual but may not be the same person as the superintendent or project manager.

6. The Solicitation states that the deadline for submitting questions is December 2, 2020. Since the bid due date is January 8, 2021 (more than 5 weeks after the RFI deadline). The standard cut-off for questions is around 10 days before the bid date. Would the Coast Guard please consider additional time allowing the Contractors to send more questions especially with the Thanksgiving holiday week coming up?

RESPONSE: The due date for Inquiries is hereby extended from December 2, 2020 until December 11, 2020, close of business local Norfolk, VA time.

END OF AMENDMENT

FAILURE TO ACKNOWLEDGE AMENDMENTS MAY BE CAUSE

OF REJECTION OF OFFER.

SITE VISIT ACCESS LIST FOR

TASK ORDER ANNOUNCEMENT NO. 70Z04720RBASMIA00

Design/Build Rebuild Paint and Sandblast Facility at U.S. Coast Guard Base Miami, Miami, Florida

Site Visit Date/Time and Location: November 19, 2020, 9:00 AM Eastern Standard Time (EST) at Building #9. POC: LT Becker, Facility Engineer at Steven.A.Becker@uscg.mil, Cell: (786) 447-7394, Desk (305) 535-4589.

Contracting Officer: Cheryl Allen, Office Number: (757) 852-3415, E-mail:

Cheryl.P.Allen@uscg.mil, Contract Specialist: Loretta P. Shanks, CTR; Office Number: (757) 852-3430, E-mail: Loretta.P.Shanks@uscg.mil

Name (Last, First)

Company Address Telephone #

Gomez, Richard

TGSV Hialeah, FL 305-823-5755

Ortiz, Juan

DYSEDC Miami, FL 787-586-1161

Harwood, Lynn

Lemartec Miami, FL 336-210-0678

Thayer, Matt

FGC Federal Ponte Verda, FL

904-571-6266

Hoffman, James

Hernandez Pompano Beach, FL

305-876-5142

Mori, Davion E2DC Jacksonville, 786-718-9887

Perez-Gurri, John E2DC Jacksonville, 786-294-8640

Loor, Sebastian Falcon 6 Infrastructure Group

Miami, FL

305-399-5491

Obrakta, Mike Alpha Wreaking Pompano Beach, FL

954-708-0445

Villarreal, Angel Hernandez Miami, FL

305-300-8983

Rodriguez, Abel Rodriguez

ACAI Associates Ft.

Lauderdale, FL

954-484-4000 mailto:Steven.A.Becker@uscg.mil mailto:Cheryl.P.Allen@uscg.mil mailto:Loretta.P.Shanks@uscg.mil

Collins, Steven Consulting Engineering Services

Ft.

Lauderdale, 954-990-0556

Blanc, Lim Waypoint Contracting, Inc.

Doral, FL 786-472-6716

Villa, Javier CPM Builders Coral Gables, 787-457-7448

Santiago, Carlos CPM Builders Coral Gables, 787-368-6546

Rivera, Robert Industrial Sprinkler Coral Gables, 787-391-6000

Mills, Nick Mills Construction

LLC

Mandeville, LA

985-400-1574

Guerrero, Miguel LEGO Construction Miami, FL 786-385-0934

Nethi, Satya LEGO Construction Miami, FL 217-305-1693

Adavalli, Ajeeth LEGO Construction Miami, FL 405-780-5730

Bersson, Bill HCR Construction Norcross, GA 678-938-8697

Tavera, Jorge Luna Development Miami, FL 954-651-1208

Patel, Jignesh P&S Construction North Chelmsford, MA

508-509-1560

Hoang, Ha P&S Construction North Chelmsford, 978-452-3782

Patel, Harsh P&S Construction North Chelmsford, 603-943-1305

Loomer, Ben

Norton Sandblasting Chesapeake, VA

904-544-0083

Poore, Matt

Norton Sandblasting Chesapeake, VA

757-408-8069

Cooper, Josh Martinez Construction

Merritt Island, 415-246-7322

Partridge, James Cemartec Miami, FL 305-962-0972

Bichachi, Moises ELCI Construction Miami, FL 305-891-7990

Delgado, Adalberto

ADARC Miami, FL 305-776-3276

Roig, Luis

Advanced SS/CPM Humacao PR / Miami, FL

787-231-6787

*Valid ID is required to be in your possession at all times.

NOTE: Guest shall have the following documents:

1) Current Drivers Licenses

2) Current Vehicle Registration/Car Rental Agreement

3) Current proof of vehicle insurance/Car Rental Agreement

Amendment No. 0001 Page 1
Amendment 0001 page 2
Submit a maximum of three (3) relevant projects for the Construction Team that best demonstrates your experience consistent with the size and scope of the RFP. Each project shall reflect a minimum price of $2 million. Examples of such projects, in...
Wage Deter FL 20200215
Visitor's Access List 70Z04720RBASMIA00
topmostSubform[0]:
Page1[0]:
AmendmentNo[0]: 0001
Code[0]:
Code[1]:
AccountingData[0]:
A13[0]:
C13[0]:
D13[0]:
NameandTitleSigner[0]:
NameandTitleOfficer[0]:
Description[0]: DESIGN/BUILD REBUILD PAINT AND SANDBLAST FACILITY AT U.S. COAST GUARD BASE MIAMI, MIAMI, FL

THE DUE DATE FOR INQUIRIES DECEMBER 02, 2020 IS HEREBY EXTENDED TO DECEMBER 11, 2020.

THE DUE DATE FOR RECEIPT FOR PROPOSALS (JANUARY 8, 2021) REMAINS UNCHANGED

(See Continuation Page)

FacilityCode[0]:
Code[2]: NA
IssuedBy[0]: Contracting Division

USCG, Facilities Design and Construction Center 5505 Robin Hood Road, Suite K Norfolk, VA 23513-2431

NameandAddress[0]:
AdministeredBy[0]:
ContractIDCode[0]:
ReqNumber[0]: NA
AmendmentNo[1]: 70Z04721RBASMIA00
ModificationNo[0]:
ProjectNo[0]:
Page[0]: 1
Pages[0]: 4
EffectiveDate[0]: 11/24/2020
Dated9B[0]: 11/02/2020
Dated10B[0]:
CheckBox9[0]: 1
CheckBox10[0]: Off
CheckBox11[0]: 1
CheckBox13A[0]: Off
CheckBox13B[0]: Off
CheckBox13C[0]: Off
CheckBox13D[0]: Off
IsNot[0]: Off
Is[0]: Off
Extended[0]: Off
NotExtended[0]: 1
DateSigned[0]:
DateSigned[1]:
Copies[0]: 1
CopiesReturned[0]:

File details come from the government source that posted it. Updated .