Appendix H - Construction Forms.pdf

PDF 134 KB Posted

Attached to
Design/Build Rebuild Paint and Sandblast Facility at U. S. Coast Guard Base Miami Beach, Miami, FL.
Solicitation number
70Z04720RBASMIA00
Issued by

About this file

This document contains construction forms and a federal contract opportunity to rebuild a Paint and Sandblast Facility at a U.S. Coast Guard base in Miami, Florida. The project will demolish the existing facility damaged during the 2017 hurricane season and construct a new approximately 7,370 square foot Paint and Sandblast Facility. The forms include a notice of nonconformance, daily construction report templates, and non-compliance form. The federal contract opportunity is a design-build solicitation from the Department of Homeland Security Coast Guard seeking to rebuild the Paint and Sandblast Facility. An option item is included to provide four multi-axis mast lifts, with two lifts for each paint and sandblast booth.

View the file

Other files

File Type Posted
Amendment No. 0004.pdf PDF
10877504 Miami P_SB CAD Files.zip ZIP file
Appendix F - Individual Space Criteria Sheets.pdf PDF
AMENDMENT 0003.pdf PDF
Amendment 0002.pdf PDF
70Z04720RBASMIA00 AMENDMENT 0001.pdf PDF
1 10877504_Miami PSB Facility RFP Drawings.pdf PDF
Attachment A - Geotechnical Reference Documents.pdf PDF
Attachment J - Florida State Clearinghouse Correspondence.pdf PDF
General Wage Determination_FL20200215_Building.pdf PDF
Attachment I - Environmental Planning and Historic Preservation Decision Support System Project Approval.pdf PDF
Site Visit MAP.ppt PPT presentation
10877504_G100.pdf PDF
10877504_C103.pdf PDF
Attachment L - Spill Prevention Control and Countermeasures Plan.pdf PDF
10877504_O110.pdf PDF
Appendix A - ComputerGenDrwgs.pdf PDF
Attachment K - Air Emission Operating Permit.pdf PDF
Visitors Access List 70Z04720RBASMIA00.pdf PDF
Attachment H - DHS NEPA Record of Environmental Consideration for CatEx Actions.pdf PDF
Appendix J - Outfitting Items.pdf PDF
SPECIFICATIONS.pdf PDF
Attachment D - Boat Cradle.pdf PDF
10877504_A101.pdf PDF
Appendix B - Electronic Deliverables.pdf PDF
Appendix D - Design Narrative.pdf PDF
10877504_C104.pdf PDF
Appendix C - FDCC Adept File Naming.pdf PDF
Appendix E - Industry Standards for Const Docs.pdf PDF
10877504_C102.pdf PDF
Attachment F - USCG Base Miami Beach Asbestos Report.pdf PDF
Solicitation 70Z04720RBASMIA00 Final.pdf PDF
Attachment B - Homeporting FRC Miami Beach As-Builts.pdf PDF
Attachment M - Marine Facilities Annual Operating Permit.pdf PDF
Attachment G - USCG Base Miami Beach Lead Based Paint Report.pdf PDF
Attachment E - ICAM Data.pdf PDF
Appendix G - Operation and Maintenance.pdf PDF
Attachment C - Vessel Data 45RBM-601-001.pdf PDF
10877504_C101.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Miami Paint & Sand Blast Facility Project Number: 10877504 USCG Base Miami, FL

APPENDIX H

CONSTRUCTION FORMS

Base Miami Paint & Sand Blast Facility Project Number: 10877504 USCG Base Miami, FL

Page 1 of ____

Routing: Original to Contracting Officer Copy – Contractor Copy - C

NOTICE OF NONCONFORMANCE

NOTICE NO.

PROJECT TITLE: REBUILD PAINT & SANDBLAST FACILITY AT BASE MIAMI BEACH, FL

CONTRACT NO:

CONTRACTOR:

NONCONFORMANCE INFORMATION

NONCONFORMANCE INFORMATION

DRAWING

REFERENCE

SPECIFICATION

SECTION

CONDITION REQUIRING CORRECTION:

GOVERNMENT REPRESENTATIVE:

(SIGNATURE) DATE

ACKNOWLEDGEMENT

I ACKNOWLEDGE RECEIPT OF THIS NOTICE.

CONTRACTOR’S REPRESENTATIVE:

Rebuild Family Housing & Construct UPH Project Number: 10877509 USCG STA Marathon, FL

Page 2 of ____ Routing: Original to Contracting Officer Copy – Contractor Copy - C

CORRECTION INFORMATION

RESOLUTION:

GOVERNMENT REPRESENTATIVE:

Daily Construction Report

Complete Report in detail daily and submit to the Government Representative by 10:00AM on the following workday. Attach additional sheets if required. Contractor shall initial and date additional sheets. Attach test reports, records of inspection , delivery slips, and references. Box 7 - Indicate contractor or trade responsible for work described in Box 8. Note all deficiencies where indicated.

1. Contractor - 2. Report # 3. % Complete:

4. Contractor No. Project Title Location

5. Date:

6. Weather: A.M. Temp. Weather: P.M. Temp.

7. Contractor or Worker Class No. of Workers Total Hours

Subcontractor ID

Material Delivered to Site

10. Spec. Para. and/or Dwg No. Description of material ID Submittal No.

Routing : Original to Contracting Officer via Project Manager Copy - Contractor Copy - COR

Work Performed Today

Location & Description of

9. Idle Equipment & Personnel on Job8. Equipment Used on Site

Daily Construction Report Inspection and Tests Performed

11. Spec Para and/or Dwg No Description (Attach Report) Tester Results

14. I certify this report to be complete and accurate and all equipment and material used and all work performed during this report period are in compliance with the contract documents to the best of my knowledge, except as noted above.

Date Superintendent -

Discrepancies Discovered

15. Spec Para and/or Dwg No. Location Nature of Discrepancy

COR/Govt. Inspector Date PM Contract Spec.

12 Directives Received or Issued:

13. Remarks: Include Visitors & Compliance Notices:

16. Contractors Proposed Remedial Action 17. Corrective Action Taken

18. Cor/Govt. Inspector Remarks (attach additional sheets as required):

DCR Page 1, Continuation Sheet

7. Contractor or Worker Class No. of Workers Total Hours

Subcontractor

Continuation of Page 1 (if necessary)

Location & Description of

Work Performed Today

ID

Non-Compliance Form
Daily Construction Report Form