Amendment 0002.pdf

PDF 850 KB Posted

Attached to
Design/Build Rebuild Paint and Sandblast Facility at U. S. Coast Guard Base Miami Beach, Miami, FL.
Solicitation number
70Z04720RBASMIA00
Issued by

About this file

This amendment to a solicitation provides additional details and responses to questions for a federal contract opportunity to design and build a paint and sandblast facility for the U.S. Coast Guard in Miami, Florida. The solicitation is to rebuild the existing facility damaged during the 2017 hurricane season, including demolition of the current building, site work, groundwork, and construction of a new approximately 7,370 square foot paint and sandblast building. An optional item is to provide four multi-axis mast lifts, with two lifts for each paint and sandblast booth. The amendment extends the deadline for inquiries to December 11, 2020, with the deadline for receipt of proposals and past performance questionnaires remaining January 8, 2021. Additional requirements specified include chain link fencing, exterior access ladders, and clarification that hot-dipped galvanized steel can be used for certain interior and exterior structural components.

View the file

Other files

File Type Posted
Amendment No. 0004.pdf PDF
10877504 Miami P_SB CAD Files.zip ZIP file
Appendix F - Individual Space Criteria Sheets.pdf PDF
AMENDMENT 0003.pdf PDF
70Z04720RBASMIA00 AMENDMENT 0001.pdf PDF
1 10877504_Miami PSB Facility RFP Drawings.pdf PDF
Attachment A - Geotechnical Reference Documents.pdf PDF
Attachment J - Florida State Clearinghouse Correspondence.pdf PDF
General Wage Determination_FL20200215_Building.pdf PDF
Attachment I - Environmental Planning and Historic Preservation Decision Support System Project Approval.pdf PDF
Site Visit MAP.ppt PPT presentation
10877504_G100.pdf PDF
10877504_C103.pdf PDF
Attachment L - Spill Prevention Control and Countermeasures Plan.pdf PDF
10877504_O110.pdf PDF
Appendix A - ComputerGenDrwgs.pdf PDF
Appendix H - Construction Forms.pdf PDF
Attachment K - Air Emission Operating Permit.pdf PDF
Visitors Access List 70Z04720RBASMIA00.pdf PDF
Attachment H - DHS NEPA Record of Environmental Consideration for CatEx Actions.pdf PDF
Appendix J - Outfitting Items.pdf PDF
SPECIFICATIONS.pdf PDF
Attachment D - Boat Cradle.pdf PDF
10877504_A101.pdf PDF
Appendix B - Electronic Deliverables.pdf PDF
Appendix D - Design Narrative.pdf PDF
10877504_C104.pdf PDF
Appendix C - FDCC Adept File Naming.pdf PDF
Appendix E - Industry Standards for Const Docs.pdf PDF
10877504_C102.pdf PDF
Attachment F - USCG Base Miami Beach Asbestos Report.pdf PDF
Solicitation 70Z04720RBASMIA00 Final.pdf PDF
Attachment B - Homeporting FRC Miami Beach As-Builts.pdf PDF
Attachment M - Marine Facilities Annual Operating Permit.pdf PDF
Attachment G - USCG Base Miami Beach Lead Based Paint Report.pdf PDF
Attachment E - ICAM Data.pdf PDF
Appendix G - Operation and Maintenance.pdf PDF
Attachment C - Vessel Data 45RBM-601-001.pdf PDF
10877504_C101.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Solicitation No. 70Z04720RBASMIA00 is amended as follows:

Specification Section 01800 – Design Build Criteria

Specification Section 01800, paragraph 01800-1.4.4.2, Storage Laydown Areas - Delete

“At the former building 9 location provide two storage laydown areas.”

Replace with the following: “Provide two storage laydown areas, see RFP drawings.”

Specification Section 01800, Add the following paragraph in section 01800-1.4 Civil and

Sitework Design:

1.4.4.3 Fencing & Gates

Chain-link fencing shall be 8’ high. Chain link fabric and framework shall be coated in black poly-vinyl coating. Fence fabric shall consist of ASTM F668, Class 2a, polymer-coated steel wire with minimum coating weight of 0.30 ounces of zinc per square foot of coated surface. Thickness of polymer coating shall be in accordance with table 5 of

ASTM F668. Fabric shall be fabricated of 9-gauge wire (core gauge) woven in 2-inch mesh. Fabric height shall be 8 feet. Fabric shall be twisted and barbed on the top and bottom selvage.

All posts, supports, ties, and hardware shall be Class 1 Grade A steel galvanized with minimum coating weight of .30 ounces of zinc per square foot of coated surface and black poly-vinyl coated; sizing shall be IAW Federal Specification R-F-191/3E. Line post, end post, and gatepost diameters shall be in accordance with the manufacturer’s recommendations, Federal Specification R-F-191/3E, and ASTM F1184. Wherever a conflict of sizing occurs between the three references, the more robust solution shall be chosen.

Each laydown area shall have one 20' wide access. Gate shall be a class 2 type II cantilever slide gate and shall meet requirements of ASTM F1184. The gates should be two 10' sections, one for each side, to cover the main 20' entry access. Provide a shackle point where the two gates meet so they can be locked together when not in use.

Do not use aluminum fabric, posts or accessories. Install fencing in accordance with

ASTM F567 and the manufacturer's written installation instructions. Ground and bond the fence in accordance with the National Electric Safety Code (NESC) - IEEE C2 and

UFC 4-022-03.

Submittal Requirements: Layout of fences and gates with dimensions, details, finishes of components, accessories, and post foundations. Provide details at a minimum scale of

¾”=1’-0”. Provide site plan, minimum scale of 1”=40’-0” dimensioned to indicate location of fence and gates.”

THE FOLLOWING QUESTIONS WERE RECEIVED IN RESPOINSE TO THE

SOLICITATION:

1. The solicitation breaks the Base Bid amount down by Design and Construction inside and outside "5' Line". The drawings do not appear to define the 5' line. Please provide this delineation.

RESPONSE: The 5' line is defined as 5' from the face of the building. The RFP drawings do not typically show this line. The main purpose of the 5' line is to separate the cost associated with the building from the cost associated with the site & utilities.

2. Is there a requirement to "restore" the site at the location of the demolition of the existing paint/blast building? Any direction on what the finished site this area would be?

RESPONSE: Refer to sheet C103 and RFP section 01800-1.4.4.2 Storage

Laydown Areas. Existing Bldg. 9 will be demolished and replaced with Portland cement concrete pavement, which will be used for fenced storage laydown areas.

3. Is this facility exempt from the ATFP requirements?

RESPONSE: Refer to RFP section 01800-1.1.1.2 ATFP. This building is considered a low occupancy building and therefore will be exempt from ATFP standards.

4. Is this facility to be designated for able-bodied personnel only? Exempt from

ABA?

RESPONSE: Refer to RFP section 01800-1.1.1.5 Accessibility. This project is not required to be in compliance with ADAAG. However, we try to make CG facilities ADA friendly by having sloped entrances to the building & ADA compliant toilets, lavatories, and electric water coolers. While the admin area may have specified ADA features, the rest of the building (booths, open bay, paint storage, HAZMAT storage, mechanical, etc.) does not need to meet ADAAG compliance.

5. Are there any acoustic requirements?

RESPONSE: No additional sound requirements other than what is required by code.

6. Are there any additional security requirements?

RESPONSE: There are no additional security requirements than what is already identified in the RFP.

7. In drawing C103 shows a new fenced storage Area 1 that will interfere with the final planned sweep paths shown in the drawing C104. What other area is favorable for this storage Area 1?

RESPONSE: That sweep path is for a PLANNED/FUTURE boat lift. Area 1 will be relocated by the Coast Guard whenever the future boat lift is constructed.

8. Can you confirm fully conditioned area is only for rooms 102, 102A, 103, 104, 105 as shown in drawing A101?

RESPONSE: Confirm, spaces identified on A101 (rooms 102, 102A, 103, 104,

105) will be conditioned per RFP section 01800-1.12.

9. The drawings C102 shows a compressed air line running from the existing building 9 to building 7. Does this line need to be kept in service?

RESPONSE: The compressed air line from existing Building 9 to existing

Building 7 is abandoned. This line can be capped off. However the compressed air line from existing Building 8 to existing Building 9 is in use and can only be shut down for a short period of time.

10. Design Criteria for the Pre-Engineered Metal Building 1.8.6.2 state a minimum

Wind Exposure Category C. Due to proximity to the coastline, we understand the minimum Wind Exposure Category should be a D. Can the minimum Wind

Exposure Class for the Pre-Engineered Metal Building be clarified?

RESPONSE: In accordance with RFP Specification 01800- 1.8.6.2, the ‘Loads listed are supplemental minimum design loads or clarifications and shall be increased by the DOR as deemed necessary to ensure intended continued use and function of the facility or to provide adequate strength to support construction loads.’ The building shall be designed as a Risk CAT II structure; however, the

DOR shall be responsible for determining the Wind Exposure Class category.

11. Design Criteria 1.8.5.1 allows the use of hot-dipped galvanized structural steel for structural building components. However, Design Criteria 1.8.5.3 prohibits the use of hot dipped galvanized at the interior of unconditioned spaces. Drawing

A101 appears not indicate the High Bay area as a conditioned space. Can the use of hot-dipped galvanized steel inside the unconditioned, High Bay area of the Pre-

Engineered Metal Building be clarified? Also, Design Criteria 1.7.5.1.2 requires the painting of all interior exposed building structural members with water-based epoxy paint. Would this requirement hold if the use of Hot Dipped Galvanized

Structural Steel is permitted?

RESPONSE: It is likely that the major structural components such as the column-and-beam structural frames of a pre-engineered building will be delivered with a standard shop applied primer over the steel unless specified otherwise and will receive the finish paint system specified. Secondary supports such girts and purlins should be and typically are galvanized. If however, the structural specification author decides that hot-dipped galvanized major structural members should be provided in the best interest of the project, that decision should be clarified and the appropriate finish system for hot-dipped galvanized steel specified. It is true that the large work bay of the facility will not be conditioned other than by air movement (fans).

12. Design Criteria 1.7.4.6.1 requires a hot dipped galvanized steel exterior access ladder from the ground level to the lean-to roof level. However, Design Criteria

1.8.5.4 requires all exterior structural framing to be stainless steel type 316. Can the use of Hot Dipped Galvanized steel for exterior framing members and accessories such as railings, ladders, equipment supports be clarified?

RESPONSE: The wall-mounted lean-to ladder providing access to the lean-to roof. The architectural specification (1.7.4.6.1) specified hot-dipped galvanized because such ladders are typically galvanized. FDCC does not consider railings, ladders, and equipment supports as ‘exterior structural framing’ for the purposes of material structural specifications as stated within the Structural-1.8 sections of the RFP.

13. In drawing A101, a 14” above the highest point parapet, is specified at the end walls of the lean-to structure. Is the design intent of these parapets to visually hide the roof mounted chiller from the east and west viewpoints? If so, can it be confirmed the height of parapets should be sized according the chiller?

RESPONSE: The design intent of the specified MINIMUM parapet height is to allow sufficient vertical surface for the low-slope roof membrane to extend up and terminate in accordance with the roofing manufacturer’s suggested details. It is not the intent to screen any mechanical equipment that might be mounted on the roof. However, if the DOR decides that the roof-mounted equipment should be screened from view as a result of their overall design vison, they may do so.

14. Can exterior chain link fence requirements be provided?

RESPONSE: See amended Specification 01800 1.4 Civil and Sitework Design:

above for chain link fence requirements.

15. Are CPARS/PPQ to be submitted with proposal?

RESPONSE: Yes, due on January 8, 2021 with proposal.

END OF AMENDMENT

FAILURE TO ACKNOWLEDGE AMENDMENTS MAY BE CAUSE OF REJECTION

OF OFFER.

Amendment No. 0002 Page 1
Amendment 0002 page 2
topmostSubform[0]:
Page1[0]:
AmendmentNo[0]: 0002
Code[0]:
Code[1]:
AccountingData[0]:
A13[0]:
C13[0]:
D13[0]:
NameandTitleSigner[0]:
NameandTitleOfficer[0]:
Description[0]: DESIGN/BUILD REBUILD PAINT AND SANDBLAST FACILITY AT U.S. COAST GUARD BASE MIAMI, MIAMI, FL

THE DUE DATE FOR INQUIRIES DECEMBER 02, 2020 IS HEREBY EXTENDED TO DECEMBER 11, 2020.

THE DUE DATE FOR RECEIPT FOR PROPOSALS (JANUARY 8, 2021) REMAINS UNCHANGED

THE DUE DATE FOR PPQS IS JANUARY 8, 2021.

(See Continuation Page)

FacilityCode[0]:
Code[2]: NA
IssuedBy[0]: Contracting Division

USCG, Facilities Design and Construction Center 5505 Robin Hood Road, Suite K Norfolk, VA 23513-2431

NameandAddress[0]:
AdministeredBy[0]:
ContractIDCode[0]:
ReqNumber[0]: NA
AmendmentNo[1]: 70Z04721RBASMIA00
ModificationNo[0]:
ProjectNo[0]:
Page[0]: 1
Pages[0]: 5
EffectiveDate[0]: 12/11/2020
Dated9B[0]: 11/02/2020
Dated10B[0]:
CheckBox9[0]: 1
CheckBox10[0]: Off
CheckBox11[0]: 1
CheckBox13A[0]: Off
CheckBox13B[0]: Off
CheckBox13C[0]: Off
CheckBox13D[0]: Off
IsNot[0]: Off
Is[0]: Off
Extended[0]: Off
NotExtended[0]: 1
DateSigned[0]:
DateSigned[1]:
Copies[0]: 1
CopiesReturned[0]:

File details come from the government source that posted it. Updated .