Attachment B - Homeporting FRC Miami Beach As-Builts.pdf
PDF 19 MB Posted
- Attached to
- Design/Build Rebuild Paint and Sandblast Facility at U. S. Coast Guard Base Miami Beach, Miami, FL.
- Solicitation number
- 70Z04720RBASMIA00
About this file
This document outlines a federal contract opportunity for the design and construction of a new paint and sandblast facility. The solicitation seeks bids to rebuild the Paint and Sandblast Facility at the U.S. Coast Guard Base in Miami Beach, Florida that was damaged during the 2017 hurricane season. The project scope includes demolition of the existing building, site work, construction of a new approximately 7,370 square foot Paint and Sandblast Facility, and an optional item to provide four multi-axis mast lifts, with two lifts for each paint and sandblast booth. The solicitation was issued by the Department of Homeland Security U.S. Coast Guard, and the number is 70Z04720RBASMIA00.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CIVIL LEGENDGENERAL NOTES:
ABBREVIATIONS:
SURVEY NOTES:
SITE SPECIFICATIONS;
LEGEND
BISCAYNE BAY
BISCAYNE BAY
NOTES:
MASTER SITE PLAN
METAL
BOX
METAL
BOX
ELECTRICAL
PANELELECTRICAL
PANEL
8' H
IG
H
C
A
IN
L
IN
K
F E
N C
E
8' HIGH
CHAIN LINK FENCE
LIFT
STATION
CONC. SLAB WITH
METAL ACCESS LID
O N
E S
T O
R Y
A
LU
M
IN
U
M B
U
IL
D
IN
G
METAL
ACCESS LID
METAL
ACCESS LID
METAL
ACCESS LID
TRANSFORMERS
ON CONC. SLAB
TRANSFORMERS
ON CONC. SLAB
O N
E S
T O
B S
B U
IL
D
IN
G
N O
. 8 F
IN
.F
L.
=1
0.
' B A
Y D
A T
U M
METAL
ACCESS LID
HIGH
VOLTAGE
ELEC. BOX
DUST
COLLECTOR T
R A
N S
F O
R M
E R
ASPHALT
COOLER
SYSTEM
ELECTRICAL
PANEL
LIFT
STATION
METAL
ACCESS LID
6" Ø WATER
PIPE
2" Ø PVC
(4 PIPES)
METAL
ACCESS LID
METAL
ACCESS LID
G A
TE
G A
TE
FIN.FL.=10.08'
GRAVEL
PERMANENT TRAILER
FIN.FL.=13.58' BAY DATUM
STAIRSSTAIRS
ONE STORY
CBS BUILDING NO. 5
FIN.FL.=10.33' BAY DATUM
.0
.3
ALUMINUM ROOFED
COVERED STRUCTURE
DIESEL
TANK
RAILING
C O
N C
R E
T E
S
LA
B
G A
TEG
A
TE
ASPHALT
PAVEMENT
CONCRETE SLAB
2' ROOF OVERHANG
ASPHALT
PAVEMENT
ASPHALT
PAVEMENT
ASPHALT
PAVEMENT
CONCRETE
SLAB
CONCRETE
SLAB
CONCRETE
A/C UNIT
ON CONC.
SLAB
METAL
ACCESS LID
CONC. SLAB WITH
METAL ACCESS LID
CONCRETE
RAMP
0.
6'
C O
N C
. C U
(T
P
IC
A
L)
METAL
ACCESS LID
ELECTRICAL
PANEL
CONC. CURB
EXTRACTOR
MACHINE
METAL
ACCESS
LID
POTABLE
WATER
METAL
ACCESS LID
6"Ø PIPE
4"Ø PIPE
4"Ø PIPE
COMPRESSOR
METAL BOX
B R
IC
K
G R
A V
E L
ONE STORY
CBS BUILDING NO. 6
FIN.FL.=9.86' BAY DATUM
ASPHALT
PAVEMENT
ASPHALT
PAVEMENT
CONCRETE
SLAB
CONC.
SLAB
CONC.
SLAB
BISCAYNE BAY
ELECTRICAL
PANEL
BOLLARD
(8'x8')
(TYPICAL)
8' H
A
IN
L
IN
K F
E N
C E
8' HIGH
CHAIN LINK FENCE
METAL BOX
METAL
ACCESS LID
4" PIPE
ELECTRICAL
PANEL
SUBSTATION
ON CONC. SLAB
METAL
ACCESS LID
O N
E S
T O
M
IN
U
M B
U
IL
D
IN
G N
O . 9
F
IN
.F L.
=1 1.
' B
A Y
D A
T U
M
R O
O F
O V
E R
H A
N G
ELECTRICAL
PANEL
FIRE
LADDER
METAL BOX
METAL
ACCESS
LID
METAL
ACCESS LID
METAL
ACCESS LID
METAL
ACCESS LID
CONC. SLAB WITH
METAL ACCESS LID
CONCRETE
SLAB
CONCRETE
SLAB
CONCRETE
SLAB
CONCRETE
SLAB
CONCRETE
SLAB
ONE STORY
CBS BUILDING
BISCAYNE BAY
T W
O S
T O
S
B U
IL
D
IN
G
N O
. 4 F
IN
.F
L.
=1
1.
' B A
Y D
A T
U M
DEMOLITION PLAN - PHASE 1
DEMOLITION NOTES:
KEY PLAN
METAL
BOX
ELECTRICAL
PANELELECTRICAL
PANEL
8' H
A
IN
L
IN
K
F E
N C
E
8' HIGH
CHAIN LINK FENCE
LIFT
STATION
CONC. SLAB WITH
METAL ACCESS LID
O N
E S
T O
M
IN
U
M B
U
IL
D
IN
G
METAL
ACCESS LID
METAL
ACCESS LID
METAL
ACCESS LID
TRANSFORMERS
ON CONC. SLAB
TRANSFORMERS
ON CONC. SLAB
O N
E S
T O
S
B U
IL
D
IN
G
N O
. 8 F
IN
.F
L.
=1
0.
' B A
Y D
A T
U M
METAL
ACCESS LID
HIGH
VOLTAGE
ELEC. BOX
DUST
COLLECTOR T
R A
N S
F O
R M
E R
ASPHALT
COOLER
SYSTEM
ELECTRICAL
PANEL
LIFT
STATION
METAL
ACCESS LID
6" Ø WATER
PIPE
2" Ø PVC
(4 PIPES)
METAL
ACCESS LID
METAL
ACCESS LID
G A
TE
G A
TE
FIN.FL.=10.08'
GRAVEL
PERMANENT TRAILER
FIN.FL.=13.58' BAY DATUM
STAIRSSTAIRS
ONE STORY
CBS BUILDING NO. 5
FIN.FL.=10.33' BAY DATUM
.0
.3
ALUMINUM ROOFED
COVERED STRUCTURE
DIESEL
TANK
RAILING
C O
N C
R E
T E
S
LA
B
G A
TEG
A
TE
ASPHALT
PAVEMENT
CONCRETE SLAB
2' ROOF OVERHANG
ASPHALT
PAVEMENT
ASPHALT
PAVEMENT
ASPHALT
PAVEMENT
CONCRETE
SLAB
CONCRETE
SLAB
CONCRETE
CON
MET
CONCRETE
RAMP
0.
6'
C O
N C
. C U
(T
P
IC
A
L)
METAL
ACCESS LID
CONC. CURB
EXTRACTOR
MACHINE
METAL
ACCESS
LID
POTABLE
WATER
METAL
ACCESS LID
6"Ø PIPE
4"Ø PIPE
4"Ø PIPE
COMPRESSOR
METAL BOX
B R
IC
K
G R
A V
E L
ONE STORY
CBS BUILDING NO. 6
FIN.FL.=9.86' BAY DATUM
ASPHALT
PAVEMENT
ASPHALT
PAVEMENT
CONCRETE
SLAB
CONC.
SLAB
CONC.
SLAB
BISCAYNE BAY
BOLLARD
(8'x8')
(TYPICAL)
8' H
A
IN
L
IN
K F
E N
C E
8' HIGH
CHAIN LINK FENCE
METAL
ACCESS LID
4" PIPE
SUBSTATION
ON CONC. SLAB
METAL
ACCESS LID
O N
E S
T O
M
IN
U
M B
U
IL
D
IN
G N
O . 9
F
IN
.F L.
=1 1.
' B
A Y
D A
T U
M
R O
O F
O V
E R
H A
N G
FIRE
LADDER
METAL
ACCESS
LID
METAL
ACCESS LID
METAL
ACCESS LID
METAL
ACCESS LID
CONC. SLAB WITH
METAL ACCESS LID
CONCRETE
SLAB
CONCRETE
SLAB
CONCRETE
SLAB
CONCRETE
SLAB
CONCRETE
SLAB
ONE STORY
CBS BUILDING
BISCAYNE BAY
T W
O S
T O
S
B U
IL
D
IN
G
N O
. 4 F
IN
.F
L.
=1
1.
' B A
Y D
A T
U M
CONSTRUCTION NOTES:
SITE PLAN - PHASE 1
ELECTRICAL
PANEL
6" PIPE
ELECTRICAL
PANEL
LIFT STATION
METAL
ACCESS
LID
METAL
ACCESS LID
BRICK
B R
IC
K
B R
IC
C
O N
C . S
W K
C O
N C
CONC.
PAVERS
COOLER
SYSTEM
2" Ø GAS PIPE
6" Ø WATER
PIPE
2" Ø PVC
(4 PIPES)
METAL
ACCESS LID
METAL
ACCESS LID
G A
TE
G A
TE
BRICK
GRAVEL
LOADING
DOCK
PERMANENT TRAILER
FIN.FL.=13.58' BAY DATUM
ONE STORY
CBS BUILDING NO. 5
FIN.FL.=10.33' BAY DATUM
.0
.3
ALUMINUM ROOFED
COVERED STRUCTURE
DIESEL
TANK
RAMP
BR
IC
K
3' HIGH RAILING
A S
P H
A
LT
P A
V E
M E
N T C
O N
C R
E T
E S
LA
B
CONC. SLAB
G A
TEG
2' ROOF OVERHANG
5' ROOF
OVERHANG
ELECTRICAL
PANEL
ELECTRICAL
PANEL
ELECTRICAL
PANEL
4" ELECTRICAL PIPE
FIRE
LADDER
METAL BOX
METAL BOX
METAL BOX
METAL
ACCESS
LID
METAL
ACCESS LID
METAL
ACCESS LID
METAL
ACCESS LID
METAL
ACCESS LID
4" PIPE
2" PIPE
DIESEL
TANK
ELECTRICAL
PANEL
ELECTRICAL
PANEL
ELECTRICAL
PANEL
FIRE LADDER
METAL BOX METAL
ACCESS LID
DIESEL
TANK
TWO STORY
CBS BUILDING NO. 4
FIN.FL.=11.18' BAY DATUM
METAL BOX
CANOPY
METAL
ACCESS LID
B R
IC
K
B R
IC
K
1.5"Ø AIR
PRESSURE PIPE
1.5"Ø AIR
PRESSURE PIPE
2.5"Ø
PIPE
2.5"Ø AIR
PRESSURE PIPE
2"Ø PIPE4"Ø PVC PIPEONC.
STEP
WOOD
STAIR
TWO STORY
CBS BUILDING
F.F.ELEV.=10.14' BAY DATUM
F O
U R
S T
O
S B
U
IL
D
IN
G F
.F .E
LE
V
.8 1'
B A
Y D
A T
U M
3.5' HIGH POST
& RAIL FENCE
3.5' HIGH POST
& RAIL FENCE
METAL STEP
(1'x2')
RAMP
HAND
RAIL
C O
N C
C
O N
C . S
W K
RAMP
CONC. SWK
RAMP
ASPHALT
PAVEMENT
ASPHALT
PAVEMENT
CONCRETE
SLAB
CONCRETE
SLAB CONCRETE
SLAB
CONCRETE
SLAB
METAL
ACCESS LID
ASPHALT PAVEMENT
ASPHALT PAVEMENT
ONE STORY
CBS BUILDING
BISCAYNE BAY
T W
O S
T O
S
B U
IL
D
IN
G
N O
. 4 F
IN
.F
L.
=1
1.
' B A
Y D
A T
U M
DEMOLITION PLAN - PHASE 2
NOTES:DEMOLITION NOTES:
6" PIPE
ELECTRICAL
PANEL
LIFT STATION
METAL
ACCESS
LID
METAL
ACCESS LID
BRICK
B R
IC
K
B R
IC
C
O N
C . S
W K
C O
N C
CONC.
PAVERS
COOLER
SYSTEM
2" Ø GAS PIPE
6" Ø WATER
PIPE
2" Ø PVC
(4 PIPES)
METAL
ACCESS LID
METAL
ACCESS LID
G A
TE
G A
TE
BRICK
GRAVEL
LOADING
DOCK
PERMANENT TRAILER
FIN.FL.=13.58' BAY DATUM
ONE STORY
CBS BUILDING NO. 5
FIN.FL.=10.33' BAY DATUM
.0
.3
ALUMINUM ROOFED
COVERED STRUCTURE
DIESEL
TANK
RAMP
BR
IC
K
3' HIGH RAILING
A S
P H
A
LT
P A
V E
M E
N T C
O N
C R
E T
E S
LA
B
CONC. SLAB
G A
TEG
2' ROOF OVERHANG
5' ROOF
OVERHANG
4" ELECTRICAL PIPE
FIRE
LADDER
METAL
ACCESS
LID
METAL
ACCESS LID
METAL
ACCESS LID
METAL
ACCESS LID
METAL
ACCESS LID
4" PIPE
2" PIPE
DIESEL
TANK
ELECTRICAL
PANEL
FIRE LADDER
METAL
ACCESS LID
DIESEL
TANK
TWO STORY
CBS BUILDING NO. 4
FIN.FL.=11.18' BAY DATUM
METAL BOX
CANOPY
METAL
ACCESS LID
B R
IC
K
B R
IC
K
1.5"Ø AIR
PRESSURE PIPE
1.5"Ø AIR
PRESSURE PIPE
2.5"Ø
PIPE
2.5"Ø AIR
PRESSURE PIPE
2"Ø PIPE4"Ø PVC PIPEONC.
STEP
WOOD
STAIR
TWO STORY
CBS BUILDING
F.F.ELEV.=10.14' BAY DATUM
F O
U R
S T
O
S B
U
IL
D
IN
G F
.F .E
LE
V
.8 1'
B A
Y D
A T
U M
3.5' HIGH POST
& RAIL FENCE
3.5' HIGH POST
& RAIL FENCE
METAL STEP
(1'x2')
RAMP
HAND
RAIL
C O
N C
C
O N
C . S
W K
RAMP
CONC. SWK
RAMP
ASPHALT
PAVEMENT
ASPHALT
PAVEMENT
CONCRETE
SLAB
CONCRETE
SLAB CONCRETE
SLAB
CONCRETE
SLAB
METAL
ACCESS LID
ASPHALT PAVEMENT
ASPHALT PAVEMENT
ONE STORY
CBS BUILDING
BISCAYNE BAY
T W
O S
T O
S
B U
IL
D
IN
G
N O
. 4 F
IN
.F
L.
=1
1.
' B A
Y D
A T
U M
SITE PLAN - PHASE 2
NOTES:CONSTRUCTION NOTES:
METAL
BOX
ELECTRICAL
PANEL
BOLLARD
(8'x8')
(TYPICAL)
ELECTRICAL
PANEL
8' H
A
IN
L
IN
K
F E
N C
E
8' HIGH
CHAIN LINK FENCE
8' H
A
IN
L
IN
K F
E N
C E
8' HIGH
CHAIN LINK FENCE
LIFT
STATION
STEEL I BEAM
CONC. SLAB WITH
METAL ACCESS LID
CONC. SLAB WITH
METAL ACCESS LID
O N
E S
T O
M
IN
U
M B
U
IL
D
IN
G
TWO STORY
CBS BUILDING NO. 7
FIN.FL.=11.28' BAY DATUM
A/C UNIT
ON CONC.
SLAB
A/C UNIT
ON CONC.
SLAB
A/C UNIT
ON CONC.
SLAB
A/C UNIT
ON CONC.
SLAB
A/C UNIT
ON CONC.
SLAB
0.7' WIDE
CBS WALL 0.7' WIDE
CBS WALL
CONC. SLAB WITH
METAL ACCESS LIDMETAL
ACCESS LID
1.0' WIDE
CONC. BULKHEAD
CONC. CURB
METAL
ACCESS LID
0.6' CONC.
CURB
CONC.
STEPS
METAL
ACCESS LID
METAL
ACCESS LID
METAL
ACCESS LID
4" PIPE
0.7' WIDE
CBS WALL
0.7' WIDE
CBS WALL
TRANSFORMERS
ON CONC. SLAB
TRANSFORMERS
ON CONC. SLAB
O N
E S
T O
S
B U
IL
D
IN
G
N O
. 8 F
IN
.F
L.
=1
0.
' B A
Y D
A T
U M
METAL
ACCESS LID
SUBSTATION
ON CONC. SLAB
METAL
ACCESS LID
HIGH
VOLTAGE
ELEC. BOX
DUST
COLLECTOR T
R A
N S
F O
R M
E R
ASPHALT
O N
E S
T O
M
IN
U
M B
U
IL
D
IN
G N
O . 9
F
IN
.F L.
=1 1.
' B
A Y
D A
T U
M
R O
O F
O V
E R
H A
N G
CONC. SLAB WITH
METAL ACCESS LID
CONCRETE
SLAB
CONCRETE
SLAB
CONCRETE
SLAB
CONCRETE
SLAB
CONCRETE
SLAB
CONCRETE
SLAB
CONCRETE
SLAB
CONCRETE
SLAB
BISCAYNE BAY
BISCAYNE BAY
DEMOLITION PLAN - PHASE 3
DEMOLITION NOTES:
BOLLARD
(8'x8')
(TYPICAL)
ELECTRICAL
PANEL
8' H
A
IN
L
IN
K
F E
N C
E
8' HIGH
CHAIN LINK FENCE
8' H
A
IN
L
IN
K F
E N
C E
8' HIGH
CHAIN LINK FENCE
LIFT
STATION
STEEL I BEAM
CONC. SLAB WITH
METAL ACCESS LID
CONC. SLAB WITH
METAL ACCESS LID
O N
E S
T O
M
IN
U
M B
U
IL
D
IN
G
TWO STORY
CBS BUILDING NO. 7
FIN.FL.=11.28' BAY DATUM
A/C UNIT
ON CONC.
SLAB
A/C UNIT
ON CONC.
SLAB
A/C UNIT
ON CONC.
SLAB
A/C UNIT
ON CONC.
SLAB
A/C UNIT
ON CONC.
SLAB
0.7' WIDE
CBS WALL 0.7' WIDE
CBS WALL
CONC. SLAB WITH
METAL ACCESS LIDMETAL
ACCESS LID
1.0' WIDE
CONC. BULKHEAD
CONC. CURB
METAL
ACCESS LID
0.6' CONC.
CURB
CONC.
STEPS
METAL
ACCESS LID
METAL
ACCESS LID
METAL
ACCESS LID
4" PIPE
0.7' WIDE
CBS WALL
0.7' WIDE
CBS WALL
TRANSFORMERS
ON CONC. SLAB
TRANSFORMERS
ON CONC. SLAB
O N
E S
T O
S
B U
IL
D
IN
G
N O
. 8 F
IN
.F
L.
=1
0.
' B A
Y D
A T
U M
METAL
ACCESS LID
SUBSTATION
ON CONC. SLAB
METAL
ACCESS LID
HIGH
VOLTAGE
ELEC. BOX
DUST
COLLECTOR T
R A
N S
F O
R M
E R
ASPHALT
O N
E S
T O
M
IN
U
M B
U
IL
D
IN
G N
O . 9
F
IN
.F L.
=1 1.
' B
A Y
D A
T U
M
R O
O F
O V
E R
H A
N G
CONC. SLAB WITH
METAL ACCESS LID
CONCRETE
SLAB
CONCRETE
SLAB
CONCRETE
SLAB
CONCRETE
SLAB
CONCRETE
SLAB
CONCRETE
SLAB
CONCRETE
SLAB
CONCRETE
SLAB
BISCAYNE BAY
BISCAYNE BAY
SITE PLAN - PHASE 3
NOTES:
CONSTRUCTION NOTES:
TYPICAL PIPE AND DUCTBANK TRENCH
BITUMINOUS CONCRETE PAVEMENT PATCHCONCRETE PAVEMENT DETAILS
BITUMINOUS CONCRETE PAVEMENT
A3
B1
A1
B3
TYPICAL PIPE BEDDING DETAILB2
FIRE HYDRANT
TYPICAL SHIP/SHORE POTABLE WATER CONNECTION
WATER LINE CROSSING UTILITY LINE
VALVE
CORPORATION STOP CONNECTIONNON PRESSURE CONNECTION
C2C1
C4 B2
B3
C3
WATER LINE CROSSING SANITARY SEWERA2
TYPICAL SHIP/SHORE POTABLE WATER
CONNECTION LAYOUTA3
TYPICAL SHIP/SHORE SEWAGE CONNECTION DETAIL
CLEANOUTC1
A2
CHAIN LINK FENCEB3
C2 GUARD POST
CONCRETE PIPE ENCASEMENTB1
A1 TYPICAL THRUST BLOCKS
CONCRETE PAD, ELEC. SHORE TIEC3
| A07457957G001 |
| A07457957C001 |
| A07457957C002 |
| A07457957C101 |
| A07457957C102 |
| A07457957C103 |
| A07457957C104 |
| A07457957C105 |
| A07457957C106 |
| A07457957C107 |
| A07457957C501 |
| A07457957C502 |
| A07457957C503 |
| A07457957SG001 |
| A07457957SG002 |
| A07457957SD101 |
| A07457957SD102 |
| A07457957SD103 |
| A07457957SD104 |
| A07457957S101 |
| A07457957S102 |
| A07457957S103 |
| A07457957S104 |
| A07457957S105 |
| A07457957S106 |
| A07457957S301 |
| A07457957S302 |
| A07457957S303 |
| A07457957S304 |
| A07457957S501 |
| A07457957S502 |
| A07457957A001 |
| A07457957A101 |
| A07457957A201 |
| A07457957A301 |
| A07457957A501 |
| A07457957A502 |
| A07457957P001 |
| A07457957P101 |
| A07457957M001 |
| A07457957M101 |
| A07457957E001 |
| A07457957E002 |
| A07457957E003 |
| A07457957ES101 |
| A07457957ES102 |
| A07457957ES103 |
| A07457957ES201 |
| A07457957ES202 |
| A07457957ES203 |
| A07457957E101 |
| A07457957E102 |
| A07457957E501 |
| A07457957E601 |
| A07457957E701 |
| A07457957E702 |
| A07457957E703 |
| A07457957E704 |
| A07457957E705 |
File details come from the government source that posted it. Updated .