AMENDMENT 0003.pdf

PDF 766 KB Posted

Attached to
Design/Build Rebuild Paint and Sandblast Facility at U. S. Coast Guard Base Miami Beach, Miami, FL.
Solicitation number
70Z04720RBASMIA00
Issued by

About this file

This amendment modifies a solicitation for design-build services to rebuild a Paint and Sandblast Facility at a U.S. Coast Guard base in Miami, Florida. The amendment extends the due date for proposals from January 8, 2021 to January 15, 2021 and provides clarification on several aspects of the required work. Specifically, it clarifies that an instantaneous electric hot water heater is required for the whole building, that automatic sensors and flush valves must be provided, and that CAD files of the concept drawings are now included. The amendment also answers twenty-four questions from potential offerors seeking additional details on items like the fire protection system, fuel sources, makeup air conditioning needs, and required on-site personnel.

View the file

Other files

File Type Posted
Amendment No. 0004.pdf PDF
10877504 Miami P_SB CAD Files.zip ZIP file
Appendix F - Individual Space Criteria Sheets.pdf PDF
Amendment 0002.pdf PDF
70Z04720RBASMIA00 AMENDMENT 0001.pdf PDF
1 10877504_Miami PSB Facility RFP Drawings.pdf PDF
Attachment A - Geotechnical Reference Documents.pdf PDF
Attachment J - Florida State Clearinghouse Correspondence.pdf PDF
General Wage Determination_FL20200215_Building.pdf PDF
Attachment I - Environmental Planning and Historic Preservation Decision Support System Project Approval.pdf PDF
Site Visit MAP.ppt PPT presentation
10877504_G100.pdf PDF
10877504_C103.pdf PDF
Attachment L - Spill Prevention Control and Countermeasures Plan.pdf PDF
10877504_O110.pdf PDF
Appendix A - ComputerGenDrwgs.pdf PDF
Appendix H - Construction Forms.pdf PDF
Attachment K - Air Emission Operating Permit.pdf PDF
Visitors Access List 70Z04720RBASMIA00.pdf PDF
Attachment H - DHS NEPA Record of Environmental Consideration for CatEx Actions.pdf PDF
Appendix J - Outfitting Items.pdf PDF
SPECIFICATIONS.pdf PDF
Attachment D - Boat Cradle.pdf PDF
10877504_A101.pdf PDF
Appendix B - Electronic Deliverables.pdf PDF
Appendix D - Design Narrative.pdf PDF
10877504_C104.pdf PDF
Appendix C - FDCC Adept File Naming.pdf PDF
Appendix E - Industry Standards for Const Docs.pdf PDF
10877504_C102.pdf PDF
Attachment F - USCG Base Miami Beach Asbestos Report.pdf PDF
Solicitation 70Z04720RBASMIA00 Final.pdf PDF
Attachment B - Homeporting FRC Miami Beach As-Builts.pdf PDF
Attachment M - Marine Facilities Annual Operating Permit.pdf PDF
Attachment G - USCG Base Miami Beach Lead Based Paint Report.pdf PDF
Attachment E - ICAM Data.pdf PDF
Appendix G - Operation and Maintenance.pdf PDF
Attachment C - Vessel Data 45RBM-601-001.pdf PDF
10877504_C101.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Solicitation: 70Z04720RBASMIA00

Amendment 0003

Solicitation No. 70Z04720RBASMIA00 is amended as follows:

Specification Section 01800 – Design Build Criteria -Plumbing

1. DELETE AND REPLACE Section 01800, paragraph 1.11.1.2 with the following

1.11.1.2 Domestic hot water shall be provided by an electric instantaneous hot water system for the whole building. Tankless water heater shall have self-modulating flow control and shall be mounted indoors. EISA 2007 and EPACT- 2005 requirements shall be incorporated.

2. DELETE AND REPLACE Section 01800, paragraph 1.11.3.2 with the following:

1.11.3.2 Lavatories shall be manufacturer's standard sink depth, vitreous china, wall-hung. See architectural specification section for further details. Faucets shall be provided with hard-wired automatic sensors. Maximum flow rate shall be 0.5 gpm, provide with vandal resistant spray head. Drain/Strainer shall be copper alloy or stainless steel.

3. In Section 01800, paragraph 1.11.3.3, add the following sentence to the end of the paragraph: Provide water closet with hard-wired automatic flush valve.

4. In Section 01800, paragraph 1.12.1.9, delete the following sentence, “If gas dryers are used, combustion air shall be provided by either direct ducting to the outdoors with an interlocked damper or by means of transfer/supply air from adjacent spaces.”

5. DELETE Section 01800, paragraph 1.13.13 Uninterruptible Power Supply (UPS) in its entirety

6. DELETE Section 01800, paragraph 1.13.14 Special Power Systems in its entirety.

7. Add Appendix F – Individual Space Criteria Sheets.

8. Add “10877504 Miami P&SB CAD Files.zip”

THE FOLLOWING QUESTIONS WERE RECEIVED IN RESPONSE TO THE

SOLICITATION:

1. In Factor 4, Concept Design, the solicitation requires the following:

“Submit conceptual site plans. (Does not apply to page count)”

• Plans should show, at a minimum, improvements for grading, drainage, water, power, paving, and site lighting. Indicate all structure setbacks and separations.

Site plan should show strategy for coping with various site constraints and boat sweep paths, to include turning radii, from boatlift locations and the welding shop.

“Submit preliminary concept building plan. (Does not apply to page count)”

• Plans should show layout of all required spaces as well as typical building elevations.”

It appears that the concept drawings provided with the RFP contains a significant majority of this information already. What additional information is the government looking for us to provide at the concept stage?

RESPONSE: Contractor submittal should include, as indicated in Factor 4, conceptual floor plans (including layout of all spaces), conceptual site plans, and typical building elevations. RFP drawings do show a majority of this information, however the RFP drawings are conceptual in nature and provide a solution. The Contractor's proposal should either verify RFP concept will work (building & site layout, vehicle approach, etc.) or improve upon the RFP concept.

2. What will be the warranty requirements for the above ground water Reservoir Tank?

RESPONSE: The DoR shall specify the warranty for the product the DoR uses for the basis of design.

3. Does the Water Reservoir Tank need to be completely welded or a Bolted construction tank is acceptable?

RESPONSE: The DoR will determine which is best for the project.

4. The Horizontal Split Case Fire Pump will be electric motor or with diesel engine?

RESPONSE: The DoR will determine which is best for the project.

5. If electric motor, will it require a transfer switch?

RESPONSE: The DoR will have to meet all the applicable code requirements for providing an electric fire pump if selected.

6. Where will be the installation of the primary power source for the pump controllers and transfer switch?

RESPONSE: The RFP drawings are schematic in nature. The DoR will determine the best location of the primary power source and transfer switch. If additional room/space is required, the DoR may change/modify the RFP floorplan as needed.

7. To determine the Fire Water Reservoir Tank Size, what will be the Fire Sprinkler System Protection Time for this facility?

RESPONSE: DoR shall determine the duration as required per code.

8. NFPA 33, 2018 Edition, Section 9.1.3 provide several fire protection systems alternatives, please clarify which fire protection system will be provided for the building protection and for the paint and sand blast areas? 9.1.3 The automatic fire protection system shall be permitted to be, and shall be installed in accordance with, any of the following:

• (1) An automatic water sprinkler system that meets all applicable requirements of NFPA 13

• (2) An automatic foam water sprinkler system that meets all applicable requirements of NFPA 16

• (3) A carbon dioxide extinguishing system that meets all applicable requirements of NFPA 12

• (4) A dry chemical extinguishing system that meets all applicable requirements of NFPA 17

• (5) A gaseous agent extinguishing system that meets all applicable requirements of NFPA 2001

• (6) A water mist fire protection system that meets the applicable requirements of NFPA 750.

RESPONSE: Per RFP section 01800-1.10.2.2, the entire facility shall be protected by a wet pipe sprinkler system in accordance with NFPA 13.

Per RFP section 01800-1.10.2.2, the Paint Booth and Paint mixing room shall be protected by an automatic water sprinkler system in accordance with NFPA 33.

Per NFPA 33 Section 9.1.3, an automatic water sprinkler system that meets all applicable requirements of NFPA 13 would be acceptable.

9. What type of spray application will be utilized? Styrene cross-link thermoset resin application, powder coating operations or other type of spray application?

RESPONSE: The local unit will be utilizing Graco piston driven pump equipment and air assist spray guns for application of paints. The local unit does not have styrene cross-link thermoset resin applications or powder coating operations.

Otherwise, the local unit will roll or brush paint when applicable.

10.What Flammable and Combustible liquids type and size will be used in the reference facility?

RESPONSE: See Individual Space Criteria Sheet (ISCS) for Pharmacy spaces 107 and 108.

10. Section 01900 - List of Drawings:

In reference to section Facility Room/Space Requirements, it was mentioned Individual Space Criteria Sheets (ISCS) is included however we were not able to find these in any of the documents. Please advise.

RESPONSE: See amendment for Appendix F – Individual Space Criteria Sheets.

11. 1.13.1, 1.13.6 Please clarify intent of electrical service entrance. The existing and new facilities are a distance apart. 1.13.1 states to reuse the existing point of service; 1.13.6 states to provide service entrance equipment. Are we to maintain the existing electrical service disconnect location as our service entrance?

RESPONSE: The intent is for the existing local utility metered point to remain.

This point of service is the local utility connection. The local utility point of service and the service disconnect are not the same. There still should be a local disconnect for the new facility that will serve as the electrical service disconnect for the new building.

12. 1.13.13 Are there any secured areas, or any equipment that requires UPS backup?

RESPONSE: This is not required for this project.

13. 1.13.14 This section mentions frequency and power converters for aircraft hangars. Is there a need for this system in this facility?

RESPONSE: This is not required for this project.

14. 1.10.2.1 Indicates to provide cost in Base Bid for design and installation of fire pump to support the wet pipe sprinkler system. What type of fuel source should be assumed for the fire pump? If fuel source is to be electric, is this required to be on a backup generator?

RESPONSE: The DoR will determine which is best for the project. The DoR will have to meet all the code requirements for providing an electric fire pump if selected.

15. 11.1.2 Indicates domestic water heating system shall be electric. Verify if electric instantaneous point of use water heaters is required or if electric storage tank water heater is required.

RESPONSE: An instantaneous hot water heater for the whole building is required.

16. 1.11.2.3 Indicates flush valve plumbing fixtures are to be provided. Are these to be manual or automatic flush valves? If flush valves are to be automatic, what type of automatic valve is required, (battery or direct electric)?

RESPONSE: .Hard-wired automatic flush valves and automatic sensors for lavatories/faucets shall be provided.

17. 1.11.3.6 Break room sink to be provided. Is a garbage grinder required to be provided with breakroom sink?

RESPONSE: No, a garbage grinder is not required for the breakroom sink.

18. 1.12.2.1 Indicates to provide standalone programmable thermostats for control of HVAC systems. Confirm a completed DDC control system with front-end BAS is not required.

RESPONSE: A DDC system is not required for this project.

19. 1.12.1.9 References gas dryers as an option. Confirm if natural gas dryers should be evaluated for use in new facility.

RESPONSE: No gas is available on site.

20. Makeup air systems are to be provided for process equipment and associated process storage rooms. Is the supplemental makeup air required to be conditioned? If so, what are the design parameters for supplemental make-up air?

RESPONSE: Makeup air for process equipment and associated process storage rooms only need to be conditioned if the spaces are in a conditioned environment as indicated in 01800-1.12 or as called out specifically in 01800-1.7.5.3 for the Paint Booth.

21. Following up to the Response #1 issued in Amendment 0002 dated December 11th, 2020; Please confirm that the 5’ line defined from the face of the building refers to the New Paint/Sandblast building and therefore, all the work (Design and Construction) associated with the Demolition of existing building along with all the site work that falls outside of the 5’ line from the new building will be a part of the cost associated with the site and utilities.

RESPONSE: Confirm that the 5' line is defined as 5’ from the face of the new Paint/Sandblast building.

22. Please provide CAD files of the concept drawings provided in the original RFP.

RESPONSE: CADD files are being provided.

23. Please advise the Contractor Key-Personnel that will be required on-site for this project (Superintendent, Project Manager, Quality Control Manager, SSHO etc.). If all these personnel are required, please advise if any of these positions can be combined (multiple hats) or if different individuals are required for each position.

RESPONSE: Expectation is that the Superintendent and Quality Assurance Manager (QAM) would be on-site during construction. Per RFP section 01450-1.3.1, the QAM role may be designated as a supplemental role to a team member or as a dedicated individual but may not be the same person as the superintendent or project manager. The QAM must report directly to the principles of the company not to the on-site superintendent.

24. Would the Coast Guard please allow for a time extension to submit this proposal?

RESPONSE: The Due Date for Receipt of Proposals is hereby extended from January 8, 2021 until January 15, 2021, Close of Business Norfolk, VA time.

END OF AMENDMENT

FAILURE TO ACKNOWLEDGE AMENDMENTS MAY BE CAUSE OF REJECTION

OF OFFER.

Amendment No. 0003 Page 1
Amendment 0003 page 2
topmostSubform[0]:
Page1[0]:
AmendmentNo[0]: 0003
Code[0]:
Code[1]:
AccountingData[0]:
A13[0]:
C13[0]:
D13[0]:
NameandTitleSigner[0]:
NameandTitleOfficer[0]:
Description[0]: DESIGN/BUILD REBUILD PAINT AND SANDBLAST FACILITY AT U.S. COAST GUARD BASE MIAMI, MIAMI, FL

THE DUE DATE FOR RECEIPT FOR PROPOSALS IS HEREBY EXTENDED FROM JANUARY 8, 2021 UNTIL JANUARY 15, 2021, CLOSE OF BUSINESS LOCAL NORFOLK, VA TIME.

THE DUE DATE FOR PPQS IS HEREBY EXTENDED FROM JANUARY 8, 2021 UNTIL JANUARY 15, 2021..

(See Continuation Page)

FacilityCode[0]:
Code[2]: NA
IssuedBy[0]: Contracting Division

USCG, Facilities Design and Construction Center 5505 Robin Hood Road, Suite K Norfolk, VA 23513-2431

NameandAddress[0]:
AdministeredBy[0]:
ContractIDCode[0]:
ReqNumber[0]: NA
AmendmentNo[1]: 70Z04721RBASMIA00
ModificationNo[0]:
ProjectNo[0]:
Page[0]: 1
Pages[0]: 6
EffectiveDate[0]: 12/21/2020
Dated9B[0]: 11/02/2020
Dated10B[0]:
CheckBox9[0]: 1
CheckBox10[0]: Off
CheckBox11[0]: 1
CheckBox13A[0]: Off
CheckBox13B[0]: Off
CheckBox13C[0]: Off
CheckBox13D[0]: Off
IsNot[0]: Off
Is[0]: Off
Extended[0]: 1
NotExtended[0]: Off
DateSigned[0]:
DateSigned[1]:
Copies[0]: 1
CopiesReturned[0]:

File details come from the government source that posted it. Updated .