Attachment_F_P919__Volume_6_of_15.pdf

PDF 8 MB Posted

Attached to
P919 - Phase I, Bulk Fuel Tank Farm Improvements, Naval Station Rota, Spain
Solicitation number
N6247026R0006
Issued by

About this file

These documents are detailed engineering and mechanical design drawings for the Naval Facilities Engineering System Command (NAVFAC) Atlantic's P-919 Bulk Tank Farm Improvements, Phase 1 project located at Naval Station Rota, Spain. The comprehensive set of technical drawings covers multiple aspects of the fuel system infrastructure, including mechanical site plans, fuel line profiles, pump vault piping, additive injector building plans, storage tank configurations, piping and instrument diagrams, and HVAC systems.

Key design elements include two main storage tanks (15,000-liter capacity), a pump vault, additive injector building, leak detection systems, and associated piping networks for fuel transfer, storage, and additive injection. The project involves complex mechanical engineering components such as vertical turbine pumps, flow control valves, tank nozzle configurations, and detailed pipe routing. Supporting systems include leak detection wells, high and low point vents, thermal relief valves, and specialized environmental control mechanisms. The drawings provide precise technical specifications for equipment placement, pipe penetrations, support structures, and system interconnections, indicating a comprehensive upgrade to the existing fuel farm infrastructure.

View the file

Other files

File Type Posted
N6247026R0006 Amendment 0009.pdf PDF
N6247026R0006 Amendment 0008.pdf PDF
Amendment 0008 Revised Specifications_Section 01.pdf PDF
P919 - Amendment 0007.pdf PDF
N6247026R0006 Amendment 0007.pdf PDF
Amendment 0006_Revised Specifications P919.pdf PDF
Amendment 0006_Revised Specifications F76 Pier 3.pdf PDF
Attachment M - F76 6_PIER3_REFERENCE-DRAWINGS_SET_6-OF-6.pdf PDF
Attachment M - F76 5_PIER3-FINAL_SUBMITTAL-PGS-130-149_SET_5-OF-6.pdf PDF
Amendment 0006_Revised Tank DWGs Prime.pdf PDF
Attachment M - F76 3_PIER3-FINAL_SUBMITTAL-PGS-62-99_SET_3-OF-6.pdf PDF
Amendment 0006_Revised F76 Pier 3 Mech Dwgs.pdf PDF
Attachment M - F76 4_PIER3-FINAL_SUBMITTAL-PGS-100-129_SET_4-OF-6.pdf PDF
Amendment 0006_Revised P-919 Dwgs_Pipeline Dwgs.pdf PDF
N6247026R0006 Amendment 0006.pdf PDF
Attachment M - F76 2_PIER3-FINAL_SUBMITTAL-PGS-35-70_SET_2-OF-6.pdf PDF
Attachment M - F76 1_PIER3-FINAL-REV1_SUBMITTAL-PGS-1-34_SET_1-OF-6.pdf PDF
Amendment 0006_Revised 01 30 00.pdf PDF
Amendment 0006_Revised F76 Pier 3 Civil Dwgs.pdf PDF
P919 - Amendment 0006.pdf PDF
Amendment 0006_Revised EC502P CATHODIC PROTECTION DETAILS.pdf PDF
Amendment 0006_Revised 01 45 00.pdf PDF
Amendment 0006_Revised 01 35 26.pdf PDF
Attachment G - Certificate of Classification Revised.pdf PDF
P-919 - Amendment 0005.pdf PDF
N6247026R0006 Amendment 0005.pdf PDF
Attachment P - Photos.pdf PDF
N6247026R0006 Amendment 0004.pdf PDF
N6247026R0006 Amendment 0003.pdf PDF
P919 Amendment 0002.pdf PDF
Site Visit Log (Attachment O).pdf PDF
N6247026R0006 Amendment 0002.pdf PDF
Attachment B - Bid Schedule Revised.pdf PDF
N6247026R0006 Amedment 0001.pdf PDF
Attachment N - Specifications -Replace Fuel Pipeline Pier 3 Rota.pdf PDF
Attachment M - F74 4_PIER3-FINAL_SUBMITTAL-PGS-100-129_SET_4-OF-6.pdf PDF
Attachment M - F74 5_PIER3-FINAL_SUBMITTAL-PGS-130-149_SET_5-OF-6.pdf PDF
Attachment M - F74 6_PIER3_REFERENCE-DRAWINGS_SET_6-OF-6.pdf PDF
Attachment M - F74 2_PIER3-FINAL_SUBMITTAL-PGS-35-70_SET_2-OF-6.pdf PDF
Attachment M - F74 3_PIER3-FINAL_SUBMITTAL-PGS-62-99_SET_3-OF-6.pdf PDF
Attachment M - F74 1_PIER3-FINAL-REV1_SUBMITTAL-PGS-1-34_SET_1-OF-6.pdf PDF
Attachment_F_P919__Volume_12_of_15.pdf PDF
Attachment_F_P919__Volume_2_of_15.pdf PDF
Attachment_F_P919__Volume_9_of_15.pdf PDF
Attachment_F_P919__Volume_1_of_15.pdf PDF
Attachment L - Certificate Insurance Form.pdf PDF
Attachment_F_P919__Volume_7_of_15.pdf PDF
Attachment G - Certificates of Classifications.pdf PDF
Attachment_F_P919__Volume_14_of_15.pdf PDF
Attachment D - Construction Experience Project Data Sheet.pdf PDF
Show 40 more

Latest 50 of 67 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

P-

BU

LK

T

AN

K

FA

RM

IM

PR

O

VE

M

EN

TS

, P

H

AS

E

M-001T

³ ³

A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

P-

BU

LK

T

AN

K

FA

RM

IM

PR

O

VE

M

EN

TS

, P

H

AS

E

M-002T

CUT-AND-COVER FUEL SYSTEM FLOW SCHEMATIC

XXXXXXXXXXXXXXXXXX

X X

X

X

X

X

X

X

X

X

X

X

X

X X

M-101T

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

P-

BU

LK

T

AN

K

FA

RM

IM

PR

O

VE

M

EN

TS

, P

H

AS

E

MECHANICAL SITE PLAN

0+093 0+100

0+000

0+100 0+1510+200

0+265

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

P-

BU

LK

T

AN

K

FA

RM

IM

PR

O

VE

M

EN

TS

, P

H

AS

E

M-201T

FUEL LINE PROFILE

PLAN

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

P-

BU

LK

T

AN

K

FA

RM

IM

PR

O

VE

M

EN

TS

, P

H

AS

E

M-202T

FUEL LINE PROFILE

PLAN

PRVV

A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

P-

BU

LK

T

AN

K

FA

RM

IM

PR

O

VE

M

EN

TS

, P

H

AS

E

M-401T

PUMP VAULT PIPING PLAN

C1

SECTION

A1

SECTION

A4

SECTION

A3

TANK NOZZLES

D4

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

P-

BU

LK

T

AN

K

FA

RM

IM

PR

O

VE

M

EN

TS

, P

H

AS

E

M-402T

ADDITIVE INJECTOR BUILDING PIPING PLAN

C1

SECTION

A2

1565 965965

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

P-

BU

LK

T

AN

K

FA

RM

IM

PR

O

VE

M

EN

TS

, P

H

AS

E

M-403T

TIE-IN VAULT PIPING PLAN

C1

SECTION

C4

A4

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

P-

BU

LK

T

AN

K

FA

RM

IM

PR

O

VE

M

EN

TS

, P

H

AS

E

M-404T

OFF-LOADING PIPING PLAN

D1

SECTION

A1

A4

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

P-

BU

LK

T

AN

K

FA

RM

IM

PR

O

VE

M

EN

TS

, P

H

AS

E

M-405T

15,000 LITERS ABOVEGROUND STORAGE TANK

A1

SECTION

B3

15,000 LITERS ABOVEGROUND STORAGE TANK PLAN

C1

M-501T

A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

P-

BU

LK

T

AN

K

FA

RM

IM

PR

O

VE

M

EN

TS

, P

H

AS

E

UNDERGROUND DRAIN TANK

D1

SECTION

A1

TANK NOZZLE

C4

TANK ANCHOR

B4

LEAK DETECTION VAULT

D1

SECTION

B1

MANHOLE WITH TANK VENT PIPING

B1

SECTION

B1

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

P-

BU

LK

T

AN

K

FA

RM

IM

PR

O

VE

M

EN

TS

, P

H

AS

E

M-502T

HIGH POINT VENT (HPV)

D1

LOW POINT DRAIN (LPD)

D3

PRESSURE INDICATOR (PI)

D5

FUEL SAMPLE POINT (FSP)

C1

THERMAL RELIEF VALVE (TRV)

C3 METER PROVING CONNECTION (MPC)

C5

FLOW SWITCH (FS)

A3

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

P-

BU

LK

T

AN

K

FA

RM

IM

PR

O

VE

M

EN

TS

, P

H

AS

E

M-503T

DETAIL PIPE PENETRATION

A4

DETAIL PIPE PENETRATION

A3

TYPE 1 SMALL PIPE SUPPORT TYPE 2 FLOOR SUPPORTED LARGE PIPE SUPPORT

LOW POINT DRAIN (LPD) PIT

A1

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

P-

BU

LK

T

AN

K

FA

RM

IM

PR

O

VE

M

EN

TS

, P

H

AS

E

M-504T

RECEIPT NOZZLE

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

P-

BU

LK

T

AN

K

FA

RM

IM

PR

O

VE

M

EN

TS

, P

H

AS

E

M-601T

PIPING & INSTRUMENT DIAGRAM (STORAGE TANKS)

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

P-

BU

LK

T

AN

K

FA

RM

IM

PR

O

VE

M

EN

TS

, P

H

AS

E

M-602T

PIPING & INSTRUMENT DIAGRAM (ADDITIVE SYSTEM)

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

P-

BU

LK

T

AN

K

FA

RM

IM

PR

O

VE

M

EN

TS

, P

H

AS

E

M-603T

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

P-

BU

LK

T

AN

K

FA

RM

IM

PR

O

VE

M

EN

TS

, P

H

AS

E

M-604T

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

P-

BU

LK

T

AN

K

FA

RM

IM

PR

O

VE

M

EN

TS

, P

H

AS

E

M-605T

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

P-

BU

LK

T

AN

K

FA

RM

IM

PR

O

VE

M

EN

TS

, P

H

AS

E

MH401T

HVAC FLOOR PLAN - PUMP VAULT 200HVAC FLOOR PLAN - PUMP VAULT 100

EQUIPMENT ROOM

300 ELECTRICAL ROOM

EF-3

IU-1

OU-1

1200x1350 WEATHERPROOF COMBINATION

LOUVER/DAMPER. INTERLOCK WITH EF-3.

1200x1350 DUCT SLEEVE

915 mm STRAIGHT DUCT BEFORE ELBOW. FAN TO RUN WHEN

ROOM TEMPERATURE IS ABOVE 26.7°C OR WHEN TURNED ON BY

SWITCH. GRAVITY DAMPER TO OPEN WHEN FAN ON.

DUCT DOWN TO 150 AFF WITH BOTTOM END

OPEN. PROVIDE ALUMINUM 12 mm MESH SCREEN

ON EXHAUST DUCT OPENING

T

EL CONDUCTO BAJA HASTA 150 SOBRE EL NIVEL

DE SUELO ACABADO CON EL EXTREMO INFERIOR

ABIERTO. PROVEER MALLA DE ALUMINIO DE 12mm

EN EL HUECO DEL CONDUCTO DE EXTRACCIÓN

CONDUCTO RECTO DE 915 mm ANTES DEL CODO.

EL VENTILADOR ARRANCARÁ CUANDO LA TEMPERATURA

DE LA HABITACIÓN ESTÉ POR ENCIMA DE 26.7ºC O CUANDO

SE ENCIENDA MEDIANTE EL INTERRUPTOR. LA COMPUERTA

ANTIRRETORNO SE ABRIRÁ CUANDO SE ENCIENDA EL VENTILADOR.

PASATUBOS PARA

CONDUCTO DE 1200x1350

COMBINACIÓN DE REJILLA / COMPUERTA

DE 1200x1350 RESISTENTES A LA INTEMPERIE.

INTERCONECTAR CON EF-3.

0x

32mm CD ROUTE TO SPLASH

BLOCK OUTSIDE BUILDING

CONDUCIR DRENAJE DE CONDENSADO

DE 32mm HASTA SALPICADERO

EXTERIOR DEL

PRE-INSULATED REFRIGERANT LINE SET

CONJUNTO DE LÍNEAS DE REFRIGERANTE PREAISLADAS

T

GRAVITY BACKDRAFT DAMPER

COMPUERTA ANTIRRETORNO POR GRAVEDAD

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

1 2 3 4 5

1 2 3 4 5

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

SHEET OF

NAVFAC DRAWING NO.

CONSTR. CONTR. NO.

EPROJECT NO.:

SCALE:

D E

P A

R T

M E

T

O

F

T H

E

V Y

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

A

T

LA

N T

IC

N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

N O

R F

O L

K

V A

P -9

B U

L K

T A

N K

F A

R M

I M

P R

O V

E M

E N

T S

P

H A

S E

DES DRW CHK

SATISFACTORY TO : DATE :

AS NOTED

225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com

A

B

C

D

A

B

C

D

DESIGN MANAGER:

BRANCH MANAGER:

PM/DM:

FIRE PROTECTION:

CCA/EJL

A T

L A

N T

IC

D

E S

IG

N

A N

D C

O N

S T

R U

C T

IO

N

NAVFAC METRIC DRAWFORM REVISION: 07 AUGUST 2018

C U se rs

\r h op ki ns

\D o cu m e nt s\ 1-

B

LD

G A

IB

C

E N

T R

A L M

O D

E L_ rh op ki n s@ br oc ke n br ou gh

.c o m

.r vt

MH402T

DWN DKW CSB

14140197

H

VA

C P

LA

N

IN

JE

C

TO

R

B U

IL

D

IN

G

R O

TA

, S

P A

IN

N

A V

A L

S

TA

TI

O

N R

O

TA

SCALE:

ESCALA:

1 : 30 1 : 30

A1

HVAC PLAN - INJECTOR BUILDING

1:30 2 0000 3 0001 000

PLAN

NORTH

PLANTA DE CLIMATIZACIÓN - EDIFICIO DEL INYECTOR

NOTAS DE CLIMATIZACIÓN

HVAC NOTES

PL

AN

TA

D

E

CL

IM

AT

IZ

AC

IÓ

N

ED

IF

IC

IO

D

EL

I

NY

EC

TO

R

1. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND ARE NOT INTENDED

TO SHOW THE EXACT LOCATIONS OF COMPONENTS, NOR SHOW ALL

SYSTEM COMPONENTS. CONTRACTOR MUST VERIFY STRUCTURAL AND

ELECTRICAL INSTALLATIONS AND DRAWINGS TO AVOID OBSTRUCTIONS OR

INTERFERENCE.

ESTOS PLANOS TIENEN CARÁCTER ESQUEMÁTICO Y NO SE ENTIENDEN

COMO QUE MUESTRAN LAS POSICIONES EXACTAS DE LOS COMPONENTES,

NI MUESTRAN TODOS LOS COMPONENTES DEL SISTEMA EL CONTRATISTA

DEBERÁ COMPROBAR LAS INSTALACIONES Y PLANOS DE ESTRUCTURA

YELECTRICIDAD PARA EVITAR OBSTRUCCIONES O INTERFERENCIAS.

2. MOUNT ALL MECHANICAL EQUIPMENT IN ACCORDANCE WITH

MANUFACTURER'S INSTRUCTIONS.

MONTAR TODOS LOS EQUIPOS MECÁNICOS DE ACUERDO CON LAS

INSTRUCCIONES DEL FABRICANTE.

GRAPHIC SCALE(S):

ESCALA(S) GRÂFICA(S):

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

P-

BU

LK

T

AN

K

FA

RM

IM

PR

O

VE

M

EN

TS

, P

H

AS

E

MH501T

LEAK DETECTION WELL SECTION 2

A3

LEAK DETECTION WELL SECTION 1

A1

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

P-

BU

LK

T

AN

K

FA

RM

IM

PR

O

VE

M

EN

TS

, P

H

AS

E

MH502T

DUCTLESS AIR CONDITIONER UNIT

C3

OUTDOOR UNIT WALL MOUNTING DETAIL

EF-1 CONTROL SCHEMATIC

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

P-

BU

LK

T

AN

K

FA

RM

IM

PR

O

VE

M

EN

TS

, P

H

AS

E

MH601T

MECHANICAL
M-001T MECHANICAL ABBREVIATIONS
M-002T CUT-AND-COVER FUEL SYSTEM FLOW SCHEMATIC
M-101T MECHANICAL SITE PLAN
M-201T FUEL PIPELINE PLAN
M-202T FUEL PIPELINE PLAN
M-401T PUMP VAULT PIPING PLAN
M-402T ADDITIVE INJECTOR BUILDING PIPING PLAN
M-403T TIE-IN VAULT PIT
M-404T OFF LOADING
M-405T MECHANICAL TANK PLAN
M-501T DETAILS
M-502T DETAILS
M-503T DETAILS
M-504T SUPPORT DETAILS
M-601T PIPING & INSTRUMENT DIAGRAM (STORAGE TANKS)
M-602T PIPING & INSTRUMENT DIAGRAM (ADDITIVE SYSTEM)
M-603T SCHEDULES
M-604T SEQUENCE OF OPERATION
M-605T SEQUENCE OF OPERATION
MECHANICAL HVAC
MH401T TANK VAULT HVAC PLAN
MH402T ADDITIVE INJECTOR BUILDING HVAC
MH501T DETAILS
MH502T DETAILS
MH601T HVAC SCHEDULES

2024-07-11T16:20:38-0400

2024-07-11T16:19:52-0400

2024-07-11T16:23:34-0400

2024-07-11T16:24:10-0400

2024-07-11T16:20:10-0400

2024-07-11T16:20:11-0400

2024-07-11T16:20:11-0400

2024-07-11T16:20:11-0400

2024-07-11T16:20:11-0400

2024-07-11T16:20:11-0400

2024-07-11T16:20:11-0400

2024-07-11T16:20:12-0400

2024-07-11T16:20:12-0400

2024-07-11T16:20:12-0400

2024-07-11T16:20:12-0400

2024-07-11T16:20:13-0400

2024-07-11T16:20:13-0400

2024-07-11T16:20:13-0400

2024-07-11T16:20:13-0400

2024-07-11T16:20:14-0400

2024-07-11T16:20:14-0400

2024-07-11T16:20:15-0400

2024-07-11T16:21:01-0400

2024-07-11T16:21:01-0400

2024-07-11T16:21:02-0400

2024-07-11T16:21:02-0400

2024-07-11T16:21:02-0400

2024-07-11T16:21:02-0400

2024-07-11T16:21:02-0400

2024-07-11T16:21:03-0400

2024-07-11T16:21:03-0400

2024-07-11T16:21:03-0400

2024-07-11T16:21:03-0400

2024-07-11T16:21:04-0400

2024-07-11T16:21:04-0400

2024-07-11T16:21:04-0400

2024-07-11T16:21:04-0400

2024-07-11T16:21:05-0400

2024-07-11T16:21:05-0400

2024-07-11T16:21:05-0400

2024-07-11T16:23:57-0400

2024-07-11T16:23:57-0400

2024-07-11T16:23:57-0400

2024-07-11T16:23:58-0400

2024-07-11T16:24:21-0400

2024-07-11T16:24:21-0400

2024-07-11T16:24:21-0400

2024-07-11T16:24:22-0400

2025-01-23T07:00:08-0500
FORBES.WILLIAM.BAHRANDT.1049879608
I am approving this document.
2025-01-23T07:00:16-0500
FORBES.WILLIAM.BAHRANDT.1049879608
I am approving this document.
2025-01-23T07:00:23-0500
FORBES.WILLIAM.BAHRANDT.1049879608
I am approving this document.
2025-01-23T07:00:30-0500
FORBES.WILLIAM.BAHRANDT.1049879608
I am approving this document.
2025-01-23T07:00:37-0500
FORBES.WILLIAM.BAHRANDT.1049879608
I am approving this document.
2025-01-23T07:00:44-0500
FORBES.WILLIAM.BAHRANDT.1049879608
I am approving this document.
2025-01-23T07:00:52-0500
FORBES.WILLIAM.BAHRANDT.1049879608
I am approving this document.
2025-01-23T07:01:01-0500
FORBES.WILLIAM.BAHRANDT.1049879608
I am approving this document.
2025-01-23T07:01:08-0500
FORBES.WILLIAM.BAHRANDT.1049879608
I am approving this document.
2025-01-23T07:01:15-0500
FORBES.WILLIAM.BAHRANDT.1049879608
I am approving this document.
2025-01-23T07:01:23-0500
FORBES.WILLIAM.BAHRANDT.1049879608
I am approving this document.
2025-01-23T07:01:30-0500
FORBES.WILLIAM.BAHRANDT.1049879608
I am approving this document.
2025-01-23T07:01:37-0500
FORBES.WILLIAM.BAHRANDT.1049879608
I am approving this document.
2025-01-23T07:01:44-0500
FORBES.WILLIAM.BAHRANDT.1049879608
I am approving this document.
2025-01-23T07:01:53-0500
FORBES.WILLIAM.BAHRANDT.1049879608
I am approving this document.
2025-01-23T07:02:01-0500
FORBES.WILLIAM.BAHRANDT.1049879608
I am approving this document.
2025-01-23T07:02:08-0500
FORBES.WILLIAM.BAHRANDT.1049879608
I am approving this document.
2025-01-23T07:02:15-0500
FORBES.WILLIAM.BAHRANDT.1049879608
I am approving this document.
2025-01-23T07:02:22-0500
FORBES.WILLIAM.BAHRANDT.1049879608
I am approving this document.
2025-01-23T07:02:30-0500
FORBES.WILLIAM.BAHRANDT.1049879608
I am approving this document.
2025-01-23T07:02:37-0500
FORBES.WILLIAM.BAHRANDT.1049879608
I am approving this document.
2025-01-23T07:02:45-0500
FORBES.WILLIAM.BAHRANDT.1049879608
I am approving this document.
2025-01-23T07:02:52-0500
FORBES.WILLIAM.BAHRANDT.1049879608
I am approving this document.
2025-01-23T07:02:59-0500
FORBES.WILLIAM.BAHRANDT.1049879608
I am approving this document.

File details come from the government source that posted it. Updated .