P919 - Phase I, Bulk Fuel Tank Farm Improvements, Naval Station Rota, Spain
Solicitation number
N6247026R0006
Issued by

About this file

This document is Amendment 0005 to solicitation N6247026R0006 for bulk fuel storage and pipeline improvements at Naval Station Rota, Spain. The amendment extends the proposal due date to March 26, 2026, and provides responses to 136 pre-proposal inquiries (PPIs) that clarify scope, technical specifications, and cost allocation across contract line items (CLINs).

The project encompasses two primary components: Project P919 (Bulk Tank Fuel Farm Improvements and Pipeline) and Project F76 (Pipeline replacement), with work including decommissioning and demolition of existing pipelines, installation of new fuel pipelines via horizontal directional drilling (HDD) beneath the Salado River, construction of storage tanks and related infrastructure, and commissioning of fuel systems. Key technical clarifications address hazardous materials handling (asbestos and lead remediation per 29 CFR standards with allowances for equivalent Spanish certifications), HDD installation without protective casing (relying on external coating and cathodic protection or alternative Fuel CX pipe), low point drain alternatives for inaccessible HDD sections, piping sizes and valve specifications, and internal coating requirements for HDD pipe only. The amendment revises the construction experience requirement from ten to fifteen years, increases the government acceptance period from 180 to 270 calendar days, makes the Price Proposal Form submission using the most recent amendment version a material requirement, adds Attachment P (Photos) and a revised Attachment G (Certificates of Classification), and clarifies CLIN assignments for various work elements. Cost allocation guidance specifies that civil work, site piping, and restoration costs go to Line Item 1H; mechanical work to Line Item 1F; HDD for JP-5 pipeline to Line Item 1G; and additive injector building systems to Line Item 1D, with the F76 pipeline work assigned to CLIN 0004 rather than CLIN 0001 for P919.

View the file

Other files

File Type Posted
Amendment 0008 Revised Specifications_Section 01.pdf PDF
N6247026R0006 Amendment 0007.pdf PDF
P919 - Amendment 0007.pdf PDF
Amendment 0006_Revised F76 Pier 3 Civil Dwgs.pdf PDF
Attachment M - F76 2_PIER3-FINAL_SUBMITTAL-PGS-35-70_SET_2-OF-6.pdf PDF
P919 - Amendment 0006.pdf PDF
Amendment 0006_Revised 01 30 00.pdf PDF
Amendment 0006_Revised Specifications P919.pdf PDF
Amendment 0006_Revised Specifications F76 Pier 3.pdf PDF
Attachment M - F76 1_PIER3-FINAL-REV1_SUBMITTAL-PGS-1-34_SET_1-OF-6.pdf PDF
Attachment M - F76 3_PIER3-FINAL_SUBMITTAL-PGS-62-99_SET_3-OF-6.pdf PDF
Attachment M - F76 5_PIER3-FINAL_SUBMITTAL-PGS-130-149_SET_5-OF-6.pdf PDF
Attachment M - F76 6_PIER3_REFERENCE-DRAWINGS_SET_6-OF-6.pdf PDF
Amendment 0006_Revised EC502P CATHODIC PROTECTION DETAILS.pdf PDF
N6247026R0006 Amendment 0005.pdf PDF
Attachment G - Certificate of Classification Revised.pdf PDF
Attachment P - Photos.pdf PDF
N6247026R0006 Amendment 0003.pdf PDF
N6247026R0006 Amendment 0002.pdf PDF
P919 Amendment 0002.pdf PDF
N6247026R0006 Amedment 0001.pdf PDF
Attachment B - Bid Schedule Revised.pdf PDF
Attachment M - F74 4_PIER3-FINAL_SUBMITTAL-PGS-100-129_SET_4-OF-6.pdf PDF
Attachment N - Specifications -Replace Fuel Pipeline Pier 3 Rota.pdf PDF
Attachment M - F74 1_PIER3-FINAL-REV1_SUBMITTAL-PGS-1-34_SET_1-OF-6.pdf PDF
Attachment M - F74 2_PIER3-FINAL_SUBMITTAL-PGS-35-70_SET_2-OF-6.pdf PDF
Attachment M - F74 3_PIER3-FINAL_SUBMITTAL-PGS-62-99_SET_3-OF-6.pdf PDF
Attachment M - F74 5_PIER3-FINAL_SUBMITTAL-PGS-130-149_SET_5-OF-6.pdf PDF
Attachment M - F74 6_PIER3_REFERENCE-DRAWINGS_SET_6-OF-6.pdf PDF
N6247026R0006.pdf PDF
ATTACHMENT A - Pre-Proposal Inquiry Form.xlsx XLSX spreadsheet
Attachment E_P919_Specifications.pdf PDF
Attachment_F_P919__Volume_4_of_15.pdf PDF
Attachment_F_P919__Volume_8_of_15.pdf PDF
Attachment_F_P919__Volume_9_of_15.pdf PDF
Attachment D - Construction Experience Project Data Sheet.pdf PDF
Attachment_F_P919__Volume_1_of_15.pdf PDF
Attachment_F_P919__Volume_2_of_15.pdf PDF
Attachment_F_P919__Volume_5_of_15.pdf PDF
Attachment_F_P919__Volume_12_of_15.pdf PDF
Attachment_F_P919__Volume_14_of_15.pdf PDF
Attachment I - Work Pass Format.pdf PDF
Attachment L - Certificate Insurance Form.pdf PDF
Attachment B - Price Schedule.pdf PDF
Attachment C - Past Performance Questionnaire (PPQ).pdf PDF
Attachment_F_P919__Volume_6_of_15.pdf PDF
Attachment_F_P919__Volume_10_of_15.pdf PDF
Attachment_F_P919__Volume_11_of_15.pdf PDF
Attachment J - Employee Certification Form.pdf PDF
Attachment K - Temporary Pass Form.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N6247026R0006

Amendment 0005

The purpose of this amendment is to provide the following:

1. The due date for proposal submission has been extended to March 26, 2026.

2. Pre-Proposal Inquiries (PPIs) Responses

3. Solicitation Revisions

4. Provide Attachment P – Photos

5. Provide revised Attachment G - Certificates of Classification

6. Revise Block 13 Additional Solicitation Requirements

2. Responses to Pre-proposal Inquiries (PPIs) 7-136

7. Inquiry: The clin 1E of the Price Schedule is "Decommissioning and Demolition". Please clarify if the SOW of this clin includes all the demolitions of the project or only the pipe removal of JP-5 pipes and their associated accessories

Response: As stated in the Price Schedule, Line Item 1E is for "Decommissioning and Demolition" for “the entire work for P919” as a sub-part of CLIN 0001. Propose in accordance with the solicitation.

8. Inquiry: The General Note 1 of drawing M021P says: “INSTALLATION OF THE FOLLOWING PIPELINES

VIA HDD METHOD UNDER…”. On the other hand, the Line Item 1G of the Attachment B – Price Schedule corresponds to Horizontal Directional Drilling JP-5. Please confirm that all other drillings are part of the project scope and in which line item of the price schedule must be estimated.

Response: The other HDD drilling costs are under Line Items 4B and 4C.

9. Inquiry: The Contamination and Hazardous Material Note 7 of drawing G-010T says: “Painted surfaces with lead based paint include the fuel piping and associated components. For the basis of bid, include proper handling and disposal of lead waste”. The Contamination and Hazardous Material Note 8 of drawing G-010T says: “As basis of bid, piping gasket material contains non-friable asbestos. At any time, if a piping gasket is disturbed by this project, the construction activity must be performed in accordance with the specifications” The Contamination and

Hazardous Material Note 8 of drawing G-010T says: “As basis of bid, underground pipe coatings are a coal TAR emulsion system that will contain asbestos fibers, chromium, and lead.” Please clarify if the removal of all pipes must include the procedure of Hazardous Material in accordance with the specifications (02 81 00 Transportation;

02 82 00 Asbestos; 02 83 00 Lead).

Response: The pipe removal for both projects must include removal and disposal of hazardous materials such as asbestos and lead in accordance with Specification 02 81 00, TRANSPORTATION AND DISPOSAL OF

HAZARDOUS MATERIALS, Specification 02 82 00 ASBESTOS REMEDIATION, Specification 02 83 00 LEAD

REMEDIATION, and with Spanish and Junta de Andalucia requirements.

10. Inquiry: According to SECTION 02 82 00 ASBESTOS REMEDIATION and SECTION 02 83 00 LEAD

REMEDIATION for removal of materials containing asbestos and lead respectively, the workers must have accreditation 29 CFR 1926.1101 for asbestos and 29 CFR 1926.62, 29 CFR 1926.1126, 29 CFR 1926.1127 for lead.

Please clarify whether local accreditations or certificates can be used.

Response: The contractor may propose alternative local accreditations justifying that the worker’s qualification and experience are similar in performance to the ones indicated in the specification, such as the US accreditation can be replaced by Spanish and Junta Andalucia accreditation.

11. Inquiry: According to drawing CD133P, there is an area to remove existing asphalt paving of which we do not understand its purpose because the pipeline does not cross/pass through that area. It does not appear on the demolition plans either, therefore, it does not affect the project. Please clarify if the removal of existing paving in this area is necessary or not.

Response: The pavement removal is for installation of direct buried electrical conduit. See project P919 drawing E-

133P for electrical conduit location/routing.

12. Inquiry: According to demolition note 4 of drawing M-001T: “Abandon in place” – Clean piping by pigging, fill completely with grout, and cap open ends of pipe with a welded pipe cap or blind flange”. On the other hand, the keyed note 6 of drawing MD142P says: “Below grade fuel piping to be abandoned in place.” If this pipe must be

“fill completely”, please specify the range within which the filling process must be carried out. The exact location where the cut should be made is not sufficiently defined.

Response: Project P919 drawing M-001T only applies to P919 the tank portion of project ("T" dwgs). Piping abandoned by piping project ("P" dwgs) does not require grout fill.

13. Inquiry: The Item 1G of Attachment B - Price Schedule indicates that it is necessary to carry out 315 M of

Horizontal Directional Drilling (HDD) to pipe JP-5. However, according to drawings M-130P to M-133P, the total from HHD Pipe 1 to HDD Pipe 23 is 336,69 ml. Please clarify the start and completion of drilling.

Response: Please defer to lengths shown on drawings. The price schedule has been coordinated and aligned to what is shown on the drawings.

14. Inquiry: The solicitation specifies that demonstrated construction experience of an interterminal steel pipeline must also include the installation of permanent pig launcher(s) and/or receiver(s) suitable for maintenance or inspection (smart) pigging. We wish to remind the Government that there has been limited experience with the

Department of Defense in providing a pig launcher over the past 10 years. Will the Government permit Offerors to submit a project conforming to ASME B31.3 or ASME B31.8 standards, involving an interterminal steel pipeline that transports liquid hydrocarbon fuel (refined product) or hydrocarbon fluids (refined or unrefined, liquid or gas), separate and in addition to a project experience installing a pig launcher over a distance less than 1,000 linear feet?

Response: Propose in accordance with the solicitation.

15. Inquiry: The Fueling/Water Draw-Off pumps are specified to run at 1800 rpm and the motor voltage per paragraph 2.15 (b) is 460 V/3 ph/60 Hz. The Equipment Schedule (sheet M-306T) notes that the pumps are to be

460 volt/3 ph/60 Hz but the rpm is noted at 1500 rpm. Can you confirm that pumps for this service are to be 1800 rpm nominal?

Response: Yes, motors should be 1800 rpm connected to a 60 Hz system. Reference Specification 33 52 42.23 of

P919.

16. Inquiry: The installation of a fuel pipeline directly beneath the Salado River through Horizontal Directional

Drilling (HDD) raises potential environmental concerns in the event of a leak, especially considering that the river flows into the Bay of Cádiz, Atlantic Ocean. Spanish environmental regulations applicable to works under riverbeds—such as the Spanish Water Act (R.D.1/2001), which establishes special protection measures for water bodies discharging into sensitive areas such as estuaries or bays; the Regulation of the Public Hydraulic Domain

(R.D. 849/1986), which requires risk assessments for potential contamination events (including hydrocarbon leaks);

and the Environmental Liability Act (Law 26/2007), which obliges project operators to prevent any significant environmental damage—require that works affecting water bodies ensure an adequate level of environmental protection. Please confirm whether the proposed HDD installation without a protective casing is considered fully compliant with the required environmental protection measures, and whether any additional provisions (such as a casing) are required to mitigate the potential impact of a hypothetical leak beneath the river.

Response: HDD piping complies with Spanish legislation. Propose in accordance with the solicitation.

17. Inquiry: The project specifications require that Low Point Drains (LPD) be installed, accessible, and operable throughout the fuel pipeline system in order to remove accumulated water or sediments during flushing, cleaning, and commissioning activities. The specifications also require that, as part of these procedures, each low point drain be flushed for a minimum of 10 seconds at 207 kPa, ensuring the effective removal of residual water. Upon reviewing the Horizontal Directional Drilling (HDD) profile for the Salado River crossing, it is observed that the geometric low point of the pipeline is located approximately 20 m below the riverbed, with no possibility of providing above-ground access at that location. Due to the depth and the HDD installation method, no access structure can be constructed at the low point. Consequently:

- No accessible low point drain can be installed at the geometric low point beneath the river.

- The flushing and drainage operations required by the specifications, including the mandatory 10-second flushing at 207 kPa, cannot be performed at that location.

We respectfully request confirmation on how the specified requirements for Low Point Drains are to be satisfied within the HDD-installed section beneath the Salado River, given that no access points can be constructed at the geometric low point. Alternatively, please clarify whether the HDD segment is exempt from the low point drain requirement, or whether there is another approved alternative.

Response: A low point drain is not possible in the HDD runs. The solution is to coat the interior of the pipes to prevent water from getting to the steel and causing corrosion. The water would periodically be moved out of the low point by pigging, moving it toward the next low point drain. The other alternative is to utilize Fuel CX pipe by

Pestec (HDPE lined with an integral fuel proof inner layer) instead of the steel pipe. Water would have no effect on the polymer piping and could still be moved out by pigging. No interior or exterior coating would be necessary, and cathodic protection would be eliminated on the HDD sections.

18. Inquiry: The Fueling/Water Draw-Off pumps are specified to run at 1800 rpm and the motor voltage per paragraph 2.15 (b) is 460 V/3 ph/60 Hz. The Equipment Schedule (sheet M-306T) notes that the pumps are to be

460 volt/3 ph/60 Hz but the rpm is noted at 1500 rpm. Can you confirm that pumps for this service are to be 1800 rpm nominal?

Response: Yes, motors should be 1800 rpm connected to a 60 Hz system. This is per Specification 33 52 42.23 of project P919.

19. Inquiry: What type of valve is shown in Section B1 and Plan D1 for the 100 mm leak detection pipe? Is it a

DBB Plug valve?

Response: Reference project P919 drawing M-502T. This is a DBB valve.

20. Inquiry: The discharge piping downstream of each fueling pump (P-101, P-102, P-201, P-202) is labeled as 200

mm. But, it is drawn as 150 mm. This piping includes the flow control valves (FCV-101, -102, -201, -202). The control valve spec shows these valves as 150 mm. Is the discharge piping supposed to be 200 mm or 150 mm?

Response: See drawing M-401T for P919. Piping at the pump discharge should be DN150. The pipe changes to

DN200 after the discharge from the two pipes combined outside the pump vault.

21. Inquiry: What size are the (2) small "SDD" shown on the float pilot connections?

Response: Reference drawing M-401-T. They are sized to match the tubing provided, specifically DN25.

22. Inquiry: What size are the (2) stripper pump discharge connections?

Response: The stripper pump discharge connections are 50mm. See drawing M-525P.

23. Inquiry: Detail C4 shows (2) SDD's on the tank nozzle. Can the governement provide a size for these devices?

Response: Reference drawing M-501T. There is a DN50 SDD on the tank vent and (3) DN25 SDD's on the HLV

Tubing.

24. Inquiry: Detail C4 shows a connection for a hand pump. We assume that the hand pump is installed below the grating at the tank level and the discharge is pumped up an area above the grating. Can the Government provide a detail for this?

Response: The hand pump is shown above the grating in Section A1 of drawing M-501T.

25. Inquiry: Sheet M-423P shows (2) 2" ball valves for connection to the stripper pumps. Sheet M-634P shows (2)

DBB plug valves. Which type of valve is required?

Response: ASME Class 300 ball valves with blind flanges are required.

26. Inquiry: Can the Governement clarify in what bid item the FSII Offloading Stand, and the Underground Drain

Tank should be included. From the wording of the options, it appears that they should be included in item 1H. This assumes that Bid Item 1 is the total of Bid Items 1A thru Bid Items 1H. Please confirm.

Response: These items for P919 are to be included in Line item 1H.

27. Inquiry: Sheets M-002T & M-402T show the the FSII offload piping to the FSII tank as 50mm. Sheet M-404T shows the FSII offload piping to the tank as 80mm. Which size is correct?

Response: For P919, the off-load piping should be DN100 from the FSII receipt connection to the basket strainer and DN80 downstream of the basket strainer.

28. Inquiry: Sheet M-643P shows a motor operator for the 450 mm DBB plug valve. Sheet M-423P doesn't show a motor operator. Is a motor operator required?

Response: Yes.

29. Inquiry: The spec requires smart pigging for the JP-5 pipeline. In order to quote the smart pigging the length of the JP-5 pipeline is required. It is very difficult to determine the overall length of the pipeline by scaling the drawings. Is it possible to provide the overall length of the pipeline

Response: From STA 0+630 to STA 3+380 is approximately 2750 m (3380-630) or 9020 ft.

30. Inquiry: The amendment 0001 includes a new and complete project that extends the existing project. Also, the previous scope of the Replace Pipeline JP-5 has been expanded to include the Replace Pipeline F-76 and both works are carried out simultaneously. Regarding this amendment, please confirm that the new pipeline to be removed in free of asbestos and lead.

Response: All the samples taken in the pipeline F76 in the underground pathway (samples taken at manholes) and in the exposed to view piping in Pier 3 had lead containing coating. Similar to the other pipelines in this project, assume that the coating has lead and asbestos, and that the joints in the pipeline has non-friable asbestos.

31. Inquiry: The amendment 0001 includes a new and complete project that extends the existing project. Also, the previous scope of the Replace Pipeline JP-5 has been expanded to include the Replace Pipeline F-76 and both works are carried out simultaneously. Regarding this amendment, please find below a question to be clarified:

The pipeline to be removed is in service. Please clarify if it is necessary to drain and gas free the pipeline.

32. Inquiry: The amendment 0001 includes a new and complete project that extends the existing project. Also, the previous scope of the Replace Pipeline JP-5 has been expanded to include the Replace Pipeline F-76 and both works are carried out simultaneously. Regarding this amendment, please find below a question to be clarified:

For planning purposes, please clarify how both the JP-5 and F-76 alignments are to be executed. Given that both pipeline alignments run in parallel, please clarify whether they may be executed simultaneously or whether one must be completed before the other can begin.

Response: Both may be installed simultaneously.

33. Inquiry: Regarding Item 4C of Attachment+B+-+Bid+Schedule+Revised, our understanding is that the quantity of 1,230M corresponds to the sum of the four drillings: drilling JP-5 350mm, JP-8 500mm, F-76 500mm, JP-8

250mm according to drawing M-111 (Attachment+M+-+F74+3_PIER3-FINAL_SUBMITTAL-PGS-62-99_SET_3-

OF-6.pdf). Please clarify.

Response: Pipes From North to South are as follows:

355 mm JP-5 – 300m long

500mm JP-8 - 308m long

Both of these pipes end up north of the pool complex. The following pipes end up south of the pool complex:

500mm F76 - 341m long

250mm Enroute - 342m long

300mm F76 - 337m long

450mm JP-5 - 337m long

None of these total exactly 1230m, but any 4 of the six do total 1200-1300m.

34. Inquiry: According to drawing S-523 (page 20 of 70 in Attachment M – F74 2_PIER3-FINAL_SUBMITTAL-

PGS-35-70_SET_2-OF-6), the pig launcher equipment plan for F-76 shows a longitudinal dimension of 13.30 m.

However, drawing S-526P (page 3 of 38 in Attachment F_P919__Volume_10_of_15) indicates that the same pig launcher has a longitudinal dimension of 14.60 m. Please confirm which dimension is correct.

Response: The dimensions shown on drawing S-523 are consistent with the pad size shown on drawing C-404. The pad shown on drawing S-525P is in a different location, and the dimensions shown on drawing S-525P are consistent with the pas size shown on drawing C-140P. Both dimensions are correct because they are two distinct structures.

35. Inquiry: Based on the site visit, the pipes in Pie III to be removed (drawings MD122P and MD13P) and installed (drawings M-122P and M-123P) are located within a gallery covered by a removable concrete slab.

Since we did not have access to the gallery, we are unable to determine where these pipes are anchored or whether any working platform is provided. This information is essential for defining the safety measures required for removal and installation. We kindly request photographs or cross-sectional drawings of this area

Response: Please see Attachment P – Photos with the attached Pictures: 22551, 22549, 22550, 22548, and 22547.

36. Inquiry: Regarding the backing gas in TIG welding of carbon steel piping (API 5L or ASTM A53), our understanding is that it will not be necessary to use a welding procedure with backing gas. Please clarify.

Please note that: Although Section 33 52 23.15, paragraph 2.1 WELDING MATERIAL, generally states “All root passes must be made with shielding and backing gas,” according to Table 1 – 2.1 WELDING MATERIALS, for welding with filler rods E70S3 and E70S6 (carbon steel), purge gas is not required. For E308LTi-1 (stainless steel), purge gas must be used. On the other hand, Section 33 52 23.15, 3.1.5 Production Welding Instructions, paragraph

(d) states: “Back purges are required for austenitic stainless steels and nonferrous alloys welded from one side and must be set up such that the flow of gas from the inlet to the outlet orifice passes across the area to be welded.” It only specifies purge gas for austenitic materials and nonferrous alloys; in the case of carbon steel, nothing is indicated.

Response: Per paragraph 2.1 of Specification 33 52 23.15, all root passes must include a backing gas.

37. Inquiry: Will flushing be permitted through a loop consisting of the F76 DN500 and JP5 DN450 piping using

JP5? Due to the large volume of fuel required, it is not feasible to flush each line individually.

Response: Per the Specification 26 32 15.00, paragraph 3.4.2.1, each line must be flushed individually with the fuel used for the respective service and to prevent contamination. There is no looping of pipelines.

38. Inquiry: Is it permitted to perform hydrostatic testing and flushing at Pier 3 using fuel?

39. Inquiry: In the drawing "G-011T SEQUENCE OF CONSTURCTION" are defined 2 phases (I & II) for the

Sequence of Construction, but in the document "N6247026R0006", "Section 00 00 00 - Procurement and

Contracting Requirements" is stated the following "P919 Bulk Tank Fuel Farm Improvements and Pipeline Phase 1, Naval Station Rota, Spain". We have to considered both phases I&II or only phase I?

Response: Consider all work shown in the drawings and specifications. The phase number in the title indicates that this project is the first phase of future projects, and does not correlate to any construction schedule phasing that may be required.

40. Inquiry: In the seccion SECTION 01 11 00, SUMMARY OF WORK, point 1.2.1 Project Description, is stated the following: "Design a cathodic protection system for both the tanks and pipeline." In the project documentation is not defined any catodith protection for the fuel tanks. It is requeried?

Response: The tanks do not require cathodic protection.

41. Inquiry: In the Scope T.P919.P1 Tanks, Is neccessary define a Instrument Index.

Response: Instruments are indicated on the drawings and described in the specifications.

42. Inquiry: In the PFD show in the drawing M-613 P is shown a connection in each Marine Loading discharge point, for a Strippe Pump Discharge. No other information is available in the project documentation. Could you provide more details about the scope of this item?

Response: P919 drawing M-525P shows stripper pump and piping.

43. Inquiry: NOTES 3: MOV-F-76-01/76-02/MOV-JP-8/MOV-JP-5 Where is the location for this Valves?

Response: For P919, the location of the valve pit is VP-1.

44. Inquiry: In the drawing M-021P in the key note 2 is defined that 500 mm F-76 will have other funding source different from P-919 Milcon. We understand that this pipe is not part of the scope of the P919 - Cargo Transfer

Pipeline (JP-5). Please confirm.

Response: Confirmed. The F76 pipeline is under CLIN 0004.

45. Inquiry: Please clarify the scope of works for the HDD works.

In the drawings M-130P to M-133P, four (4) lines to be installed under HDD are indicated, and in the drawings M-

141P to M-143P, two (2) to be installed under HDD are indictaed.

In the drawing M-021P is defined that only one if these lines is under P919 funding, and the others coudl be optional. What lines do we need to consider within the scope?

Response: The new JP-5 pipeline HDD is part of P919. This is under Line item 1G of CLIN 0001. The new F76 pipeline HDD is under Line item 4B of CLIN 0004. The four other fuel pipelines are under Line item 4C of CLIN

0004.

46. Inquiry: In the pipes to be abandone in place we have to fill the total lenght of the pipe or only the edges?

Response: The abandoned pipes are not to be filled. Abandoned pipe is to be capped and welded.

47. Inquiry: In the Tanks area there is any restriction in height for the tower cranes or other temporary facilities?

Response: The areas immediately adjacent to the airfield are subject to height restrictions in accordance with

International aviation regulations. This includes the area for the 2 fuel storage tanks. Any time a portal crane is erected, or a mobile crane is used, the contractor needs to send notice to Air Operations through Resident Officers In

Charge of Construction (ROICC) with at least one week advance notice. Air Operations determines whether they need to publish a “Notice to Airmen” or NOTAM based on height and location. In summary, all works in the airfield and its adjacent areas are subject to international aviation regulations, including use of cranes.

48. Inquiry: Since the tank areas is located closer to the airport runway and there is a specifici access control for this area. Could define work premitis needed to acces to this area?

Response: The contractor is required to comply with all requirements of Base Security and Air Operations, including Foreign Object Debris (FOD) control.

49. Inquiry: Since we have to work in pier 3 in a reswtricited area. Could define work premitis needed to acces to this area?

Response: Pier#3 is a restricted area and all contractor personnel must be properly identified and provided with the personal protective equipment (PPE) required by EM385-1-1, including floating vests. Contractor shall coordinate works on a daily basis with Port Operations and ROICC.

50. Inquiry: There is a list of approved or banned suppliers?

Response: There are no restrictions on specific suppliers except by the provisions and clauses specified in the solicitation.

51. Inquiry: Could you provided a picture of the arrangment of the pipline in the trestle of the pier 3.

Response: Refer to contract drawings for all piping arrangement. Pictures will not be provided, however this was visible and fully accessible during site visit.

52. Inquiry: Could you provide a drawing defining the arrangement of the pipes in in the trestle of the pier 3?

Response: Refer to contract drawings for all piping arrangement.

53. Inquiry: The road of the pier 3 can be used for construction purpose?

Response: The road can be used, but shall remain operational at all times to access the pier head for any Port

Operations activities. This road is limited to small trucks and construction equipment.

54. Inquiry: Could you define the requeriments to obtain a hot work permit in the pipes lines?

Response: Hot work permits are provided by Rota Fire Department. Contractor needs to request daily inspections from Fire department, or when there is a changed condition from the previously approved hot work permit. Please see Specifications 01 11 00 and 01 35 26.

55. Inquiry: There is any enviromental restriction to place the prefabrciation yar of the HDD pit in the are in which we is located WEST HDD PIT?

Response: The same environmental requirements, restrictions, codes and regulations apply to all areas under the scope of this contract. This applies to actual work areas, preparation yards, storage areas or road access from the

Base access gates.

56. Inquiry: What construction activities can be carried out at pier 3 when there is a ship anchored?

Response: No hot work is be permitted near any Pier#3 fueling operations in accordance with all applicable safety regulations. Other construction activities may be authorized during fueling at the pier provided adequate distance is maintained from fuel operations.

Contractor shall coordinate all works with Port Operations and ROICC and shall assume a 24-to-1-hour advanced notice of fueling operations and ship schedule on a day-to-day basis. The contractor shall phase the work as necessary to allow one side of the Pier berthing area to remain 100% operational at all times (North or South). Work between the two berths, or work on the approach trestle that affects pier capacity or access, must be coordinated with

Port Operations authorities to be executed during extended windows of no anticipated ship berthings.

57. Inquiry: Keyed note 3 of drawing M-126P says: “500mm F-76 PIPELINE BY OTHERS”. However, the keyed notes of the subsequent drawings say: “PROVIDE 500MM F-76 PIPELINE”. Please clarify if providing this pipeline is included in the scope of works of this project.

Response: Keyed note 3 of drawing M-126P is correct. Please reference Amendment 0001 which added CLIN

00004 and provided attachments for project F76.

58. Inquiry: The RFP defines a relevant project as construction, installation, repair, and/or renovation of bulk fuel storage facilities, associated fuel facilities, and/or interterminal fuel pipelines with a minimum total construction value of $10 million USD at completion. Would the Government consider lowering the minimum project value threshold from $10 million to $5 million to allow additional relevant experience to be included? Projects valued at

$5M–$10M routinely include full-scope fuel system upgrades, pipeline work, and storage facility construction activities that are identical in complexity to those of larger projects. Please consider that lowering the threshold may broaden the competitive pool while maintaining technical relevance.

Response: The Government declines to revise this factor in this manner. Propose in accordance with the solicitation.

59. Inquiry: The RFP limits relevant project experience to work completed within the past ten (10) years. Would the

Government consider extending this timeframe to fifteen (15) years? Bulk fuel storage and pipeline projects often have long lifecycles, and projects completed 10–15 years ago remain technically relevant, particularly when they involved full-scope construction, commissioning, and compliance requirements similar to this RFP. Please consider that expanding the window would allow Offerors to present a more complete and accurate picture of their proven capabilities without diminishing the relevance of the experience.

Response: See solicitation revisions detailed below; projects completed within 15 years of the issuance of this RFP will be considered relevant.

60. Inquiry: Please confirm if to carry out the drillings, the contractor can perform an HDPE (high-density polyethylene) pipe jacket to accommodate the permanent pipe inside.

Response: No.

61. Inquiry: For scheduling purposes, can you please identify when we should consider Award Day and Notice to

Proceed dates? Also, please identify when the Option CLINs should be considered awarded - at the award date or after 365 calendar days?

Response: Per the solicitation, the Contractor shall begin performance within 15 calendar days after receiving the notice to proceed. Additionally, the Government reserves the unilateral right to award Option CLINs at the time of award or within 365 calendar days after the contract award.

62. Inquiry: The specifications require that the steel fuel pipeline be supplied with a continuously-extruded polyethylene and adhesive coating system, as described in Section 26 42 17. This type of coating corresponds to the requirements of DIN 30670, which establishes a minimum total coating thickness of 1.8 mm (Class A) to 2.5 mm (Class B) for buried fuel pipelines of the diameters included in the project.

In addition, the specifications require several coating integrity tests, including:

- High-voltage holiday testing in accordance with NACE SP0188

- Visual inspection of the entire coating surface

- Repair and retesting of any detected holidays or coating damage

These tests are intended to verify the continuity and integrity of the full coating system after installation and prior to backfilling. However, according to the Horizontal Directional Drilling (HDD) alignment shown in the drawings, the pipeline is to be installed directly through the HDD borehole without a protective casing. HDD installation typically subjects the outer coating to abrasion, contact with soil and drilled material, bending stresses, and pullback forces, which are not generally compatible with the performance limits and mechanical resistance characteristics of DIN 30670 coatings.

We respectfully request clarification on:

- Whether the coating system described (DIN 30670-type polyethylene coating, with 1.8–2.5 mm minimum thickness) is considered suitable for an HDD installation without a protective casing, given the required integrity tests and the mechanical stresses imposed during pullback.

- Whether the holiday test and other specified coating integrity inspections are expected to be performed after

HDD installation, and if so, how coating integrity is to be ensured during the pullback operation.

Response: The exterior coating of the pipe will very likely be damaged during installation, but a majority of the pipe's exterior coating will remain intact. The cathodic protection system will be used to protect the exterior of the pipe where the coating is damaged. The other alternative is to utilize Fuel CX pipe by Pestec (HDPE lined with an integral fuel proof inner layer) instead of the steel pipe. No interior or exterior coating would be necessary, the

HDPE is exceptionally resistant to abrasion damage, and cathodic protection would be eliminated on the HDD sections.

63. Inquiry: Where this cables from the Tanks will be routed? Additive Injector Building? We need connect them to a system actual? Which is the Brand DCS or PLC´s actual?

Response: The controls wiring routes back to the additive injector building control room PLC located in the Pump

Control Panel. This is a new control panel to be provided by contractor. The contractor must provide a complete system including shop drawings provided by the Single System Supplier as defined in Specification 33 52 43.11 and referenced in Specification 33 09 52 part 1.2.c of P919. The PLC and Pump Control Panel construction and operation must conform to Specification 33 09 52. The required cables are indicated on drawings E-101T, E-605T, E-608T, and E-609T.

64. Inquiry: What is the usual berth occupancy rate? And the duration of each mooring?

Response: The contractor shall assume one ship occupying one of the two areas of the pier 50% of the time during the performance of works.

65. Inquiry: What construction activities can be carried out at pier 3 when there is a ship moored?

Response: When the ship is performing fueling operations, there can be no hot work in the area. The contractor may perform other works in the occupied area of the pier that do not affect the operations of the ship, including ship crew access, vehicle access from land, ship mooring operations or providing necessary storage areas for ship operations.

66. Inquiry: The JP-5 pipe b eteween pk 2+540 and 2+560 crosses with a bundle of pipes (Exfuel. Ex-fuel JP-8, …). These pipes are in service? There is a special requeriments (procedures, permites, etc.) to do the crossing?

We have to build any protection structure (concrete culvert, ...) to protect the existing pipes?

Response: Assume all pipes are in service. There are no special requirements specified. Yes, a protection structure will need to be built, but it is determined by the Contractor means and methods.

67. Inquiry: All of the F-76 DBB plug valves show relief around them with a line and an arrow. Are s.s. balanced relief valves as shown on Detail C1 on sheet M-501 required for every DBB plug valve?

Response: Yes, as referenced on M-501 for F76 they are required for every DBB plug valve.

68. Inquiry: This table includes 500mm and 600m pipe, are these pipe sizes to be included under this task order?

69. Inquiry: M-123P, M-124P, M125P, and most of M-126P indicate 450mm pipe on the Pier. Drawings M-621PP

Pipe Table: JP-5 (450mm) and sheet M-622P Alignment; table 450 JP-5 Line 3 appear to start quantities from the shoreline and do not include the 450mm pipe on the pier. Is the 450mm pipeline on these drawings included in this task order?

Response: Piping on Pier 3 is included in design scope.

70. Inquiry: Base Price 1 CLINS A-E discuss the breakdown of the work within a “1.5-meter line” of said structure.

Drawing sheet M-101T piping layout shows piping outside said structure limit. What CLIN items will this site piping be assigned?

Response: Site piping will be assigned as support facilities in Line item 1H for P919.

71. Inquiry: No specs for elastomeric roof coating provided. Provide missing specifications.

Response: Elastomeric roof coating is covered in 07 14 00 Fluid-Applied Waterproofing.

72. Inquiry: The specifications do not include a section for commissioning.

Response: Commissioning of the fuel system for P919 is covered in Specification 33 08 55.01 and for F76 it is covered in Specification 33 08 55.02.

73. Inquiry: According to note 7 on drw. MD141P, note 6 on drw. MD142P and note 7 on drw. MD425P, the below grade piping is to be abonded in place. Commonly abandoned below grade fuel pipe is filled with grout. Please clarify.

Response: Grout fill is not required by "P" drawings on P919.

74. Inquiry: When removing pipelines through valve pits is it required to remove the existing pipe sleaves and to grout the concrete wall opening. Is there any other civil work actions, like recoating the vave pit walls, recoating the remaining pipelines, refreshing of stenciling, refurbishment of the remaining link seals, boot seals, pipe supports, etc., etc. to the remaining in place concrete valve pits?

Response: Any repair is to be completed in accordance with the notes on M-drawings. Refurbishing existing structure or existing pipelines is not required.

75. Inquiry: Is CLIN 1 the total value of CLINs 1A through 1H?

76. Inquiry: Will the new fuel pipeline running from the bulk storage to Pier 3 be located in the exact spot as the existing fuel pipeline or will it be running parallel to the existing pipeline as it cannot be decommissioned until the the new fuel pipeline is in operational conditions?

Response: Below grade piping may be removed prior to installing new piping where they occupy roughly the same space.

77. Inquiry: Should the Contractor include only the costs for mechanical works and associated testing in CLIN

1F? This is, that all related civil work including pipe coating at valve vaults is NOT to be included in CLIN 1F, but in CLIN 1H?

Response: All Civil work for P919 should be included in Line item 1H. The cost for mechanical work related to the

Cargo Transfer Pipeline under P919 should be in Line item 1F.

78. Inquiry: When decommissioning and demolishing the existing fuel pipelines (CLIN 1E) we also need to demolish existing civil work (pavements, sidewalks, chain link fence, etc.). When the cargo transfer pipeline is complete (CLIN 1F) the Contractor will need to restore the affected construction areas back to their original conditions. Where does the Contractor need to insert the costs for restoring the construction site to it's original conditions, in CLIN 1H or in CLIN 1?

Response: The cost to restore the construction site for P919 should be put in Line item 1H.

79. Inquiry: Specification index refers to section 33 08 55.01 and 33 08 55.02 and both have the same description.

However, we believe that 33 08 55.01 is for hydrant fuel systems while 33 08 55.02 applies to non-hydrant fuel systems. Please confirm.

Response: Specification 33 08 55.01 covers that tank storage and pipe systems (T drawings). Specification 33 08

55.02 covers the pipelines (P drawings).

80. Inquiry: Into which CLIN does the costs for section 26 12 19.10 go to?

Response: The pricing for P919 will go into Line item 1D.

81. Inquiry: Into which CLIN does the costs for section 26 13 00 go to?

Response: The pricing for P919 will go into Line item 1D.

82. Inquiry: Into which CLIN does the costs for section 26 20 00 go to?

Response: The pricing for P919 Interior Distribution System (additive injector building) will go into Line item 1D.

83. Inquiry: Into which CLIN does the costs for section 26 27 14 go to?

Response: The pricing for P919 Electricity metering (additive injector building). will go into Line item 1D.-

84. Inquiry: Into which CLIN does the costs for section 26 32 15 go to?

Response: The pricing for P919 Engine generator Set Stationary (additive injector building)will go into Line item

1D.-.

85. Inquiry: Into which CLIN does the costs for section 26 51 00 go to?

Response: The pricing for P919 Interior Lighting (additive injector building) will go into Line item 1D.-

86. Inquiry: Into which CLIN does the costs for section 26 56 00 go to?

Response: The pricing for P919 should be split between Line item 1A and Line item 1B.

87. Inquiry: We were not able to find the product description for the Underground Drain TanK? Where should we include the costs for the Drain Taink? Should it be in CLIN 1H?

Response: The cost for the P919 Underground Drain Tank will go into Line item 1H.

88. Inquiry: If we are understanding correctly the project drawings , the direccional boring under Rio Salado is required only for the Ø450 mm JP-5 fuel pipeline and for the Ø500 mm JP-8 fuel pipeline. Please confirm. Is there no need for a pipe encasement for the mentioned pipelines?

Response: All six of the directional bores are included in the P919 project. There is no need for casing pipes because the product pipes will be coated externally prior to installation and cathodically protected to take care of any damage to the coating during pullback operations.

89. Inquiry: If our above asumption is correct then the remaining above ground piping located along the bridge crossing Rio Salado is to be replace with new pipelines for the Ø500 mm JP-8 pipeline running towards the North-

East Pit, the Ø250 mm JP-8 pipeline running towards the South-East Pit, and the 2 ea. Ø500 mm F-76 pipelines running towards the South-East Pit. Please confirm.

Response: Bore six pipelines shown under Rio Salado.

90. Inquiry: Where do we fit the costs for the JP-5 and JP-8 pipelines passing under Rio Salado through the directional boring in CLIN 1F or in CLIN 1G?

Response: The cost for the new JP-5 pipeline (where it goes under the Rio Salado) will go under Line item 1G under CLIN 0001 for P919. The cost for the existing JP-8 pipelines passing under the Rio Salado will go on Line item 4C under CLIN 0004 for F76.

91. Inquiry: Where do we fit the costs for the West Pit, South-East Pit and North-East Pit? In CLIN 1F, CLIN 1G or

CLIN1H?

Response: The pricing for these P919 items under will go into Line item 1H.

92. Inquiry: Does CLIN 1G include only the costs for the civil work (directional boring and HDD pits) or do we need to include the costs for installing the Ø450 mm JP-5 fuel pipeline and the Ø500 mm JP-8 fuel pipeline?

Response: Line item 1G includes the cost for HDD for the JP-5 fuel pipeline under CLIN 0001 for P919. The JP-8

HDD is covered under Line item 4C under CLIN 0004 for F76.

93. Inquiry: Solicitation Price Schedule for CLIN 1C is described as Tin-In Vault Tank Pad. However drawing M-

403T is refering the JP-8 tie-in conexion as Tie-In Vault Pit. We believe that the different description are refering to the same CLIN item, this is 1C. Please confirm.

Response: Confirmed. Please use Line item 1C.

94. Inquiry: Tie-In Vault dimensions from the concrete wall inside face to the center of the Ø10" T (965 mm) seem to be a bit short. The distance needed from the edge of the pipe sleeve, plus the boot seal length to be able to strap the end of the boot seal with a stainlees steel clamp, plus the size of the weld neck flange and the minimum length of the Ø10" spool piece between the first WN flange anf the T should be more than the indicated 965 mm. A

1200 mm would be a confortable dimension in support to the welding crews.

Response: Reference drawing M-403T. At the contractor's discretion, for P919 the distance between the tee and the

DBB can be reduced to allow more than 965mm but the overall dimensions of the vault must remain the same.

95. Inquiry: Within the tie-in vault, Isolation flanges (IF) are only located on the new WN flanges conecting to the existing JP-8 pipeline. Should there not be IF on the WN flanges of the new JP-8 transfer return and issue pipelines?

Should spark arrestors be installed at these locations?

Response: Reference drawing M-403T. Insulating flange kits are shown at all four flanges on piping entering the vault. Lightning Surge Arrestors are required at all insulating flange kits.

96. Inquiry: Detail does not show any kind of protective barier betwene the Fuel Impermeable Liner and the cast in place concrete wall. As there will be a lot of form work and rebar work it is hily recommended that a protective layer be incorporated to the concrete side of the FI liner. A heavy grade geotextile or a geocomposite material could be installed and left in place aster the concrete pour.

Response: Reference drawing S-501T Detail A3. No question is posed, however, the specifications and drawings for

P919 do not require any additional layers outside of the liner between the concrete in this location.

97. Inquiry: The detail indicated a Protection Board but does not specify what it is or how to keep it in place. Any kind of wood or foam board will be difficult to keep inplace as fasteners cannot be used or they will damage the liner the board is ment to protect. Agian we would recomend a Geocomposie material be used in place of the board as it can be brought all the way up to the top of the tank and secured to the non woven geotextile indicated for this area.

Response: Reference drawing S-501T Detail A3. Substitutions for specified material would be reviewed for acceptability during construction. Propose in accordance with the solicitation.

98. Inquiry: Keyed Notes #4 Free Pipe Support detail B1/M-522P. The symbol used for the pipe supports seem to indicate addition pipe supports beyond the 450mm pipe. Are these new pipe supports for the replacement of existing? Are they in this contract?

Response: For P919, new pipe supports are for new 450mm JP-5 only.

99. Inquiry: Keyed Notes #5 Guided Pipe Support detail B3/M-522P. The symbol used for the pipe supports seem to indicate addition pipe supports beyond the 450mm pipe. Are these new pipe supports for the replacement of existing? Are they in this contract?

Response: For P919, new pipe supports are for new 450mm JP-5 only.

100. Inquiry: Sheet CD111, shows the Rio Salado Bridge with the hatched marks indicating asphalt removal. No match line drawings show the continuance sheet, nor do any of the civil drawings indicate replacement of asphalt.

Confirm the no work is to be done the Rio Salado Bridge.

Response: There is no asphalt paving removal on the Rio Salado Bridge.

101. Inquiry: Is the construction of Option 03 items to be within the POP of the original contract?

102. Inquiry: CLIN item 4C HDD for other Utilities…define. According to drawing sheets M-111, M-112, M-113, & M-114 all other utility work is by others or under another contract. There doesn’t appear to be any “other

Utilities” involved in this option.

Response: Line item 4C includes other 4 pipes installed via HDD (not including F76 pipe funded by CLIN 4A and

4B or JP-5 pipe included in Line item 1G).

103. Inquiry: For Offerors that are a joint venture, is a signed bank reference letter required from the JV or each JV partner?

Response: Propose in accordance with the solicitation, see section 00 21 00 of the solicitation.

104. Inquiry: Environmental Observer. Paragraph 1.5.4 Qualifications only state much be approved by Navy and the Spanish ECCA. Is this a fulltime position?

Response: The contractor shall hire the services of an ECCA certified company to provide the environmental observer services for the duration of the construction contract. These services shall be used on site as minimum once per week, or more frequently if required by the construction activities.

105. Inquiry: Does the Environmental Observer need to be a third party independent observer?

106. Inquiry: RFP states “Transport waste materials from demolished structures to designated spoil areas on

Government Property. Is there a spoil pile on site to dispose of excess material?

Response: No. The contractor shall dispose of all waste materials from demolished activities, as well as the waste originated by their own activities, in compliance with Spanish environmental regulations. The contractor cannot use the Base for storage or disposal of any waste material and they are not authorized to use any Base waste/garbage containers.

107. Inquiry: RFP states “If borrow is not available on site...”. Is there a spoil pile on site to use for suitable fill materials?

Response: No. Rota Base does not have any borrow material, in addition to the material to be excavated as part of their construction activities. In such case, the excavated materials shall be analyzed and tested, and it may only be used for backfill if they comply with all technical requirements of the contract specifications for any type of fill material.

108. Inquiry: Is an office trailer required at each site - Tank and Pier?

Response: The contractor shall provide the temporary facilities that they may need, based on the number of technical and administrative permanent and temporary personnel, as well as the sanitation and dining facilities required by the most strict requirements between Spanish codes and regulations and EM385-1-1.

109. Inquiry: Will space be provided at both the tank and pipeline construction area for staging and office trailers at both sites?

Response: Yes. The Government will provide available area in the vicinity of the job sites with the restriction that they cannot alter or affect the operations of the US Forces in Rota.

110. Inquiry: Will the contractor be responsible to provide an office for the government under this contract?

111. Inquiry: Please provide rates for the temporary utilities available on site.

Response: See solicitation revision adding clause 52.236-14.

112. Inquiry: Will water for hydrostatic testing be charged to the contractor, if so provide rates.

Response: We are testing with fuel for the respective service of the line, water is not necessary for hydrostatic testing.

113. Inquiry: Will a temporary site fence be required any place other than around the site office trailers and staging areas?

Response: Temporary fences shall be installed around all work, offices and storage areas, as required by EM385-1-

1.

114. Inquiry: Provide location(s) and size of staging areas at each project site, the pipeline and the tanks.

Response: The Government will provide available area in the vicinity of the job sites with the restriction that the contractor's activity cannot alter or affect the operations of the US Forces in Rota. As much as technically possible, all temporary facilities shall be placed within the "limits of disturbance", as described in contract drawings. This applies to the pipeline works. The Government will provide staging areas for the toilets and other temporary facilities as required by Spanish and US regulations with the restrictions outlined above. The contractor is responsible to restore all areas to original conditions.

115. Inquiry: Superintendent Qualifications, second paragraph references the superintendent may be permitted to serve as the QC manager. Is this applicable to this project, can the superintendent dualhat as the QCM?

Response: No. Superintendent shall not be the same person as the QC Manager.

116. Inquiry: 1.3 Submittals, fourth paragraph references a Preconstruction Historical and Archaeological Survey.

Does this project require said survey prior to construction?

Response: A preconstruction meeting is required to discuss the archaeological protection measures and the environmental protection measures.

117. Inquiry: What are the requirements/specifications for a Preconstruction Historical and Archaeological Survey?

Response: A preconstruction meeting will be held to discuss the archaeological protection measures.

118. Inquiry: Is an archaeologist required to be on site during construction?

Response: The archaeologist will have to be on site during the execution of excavations, and as requested by the

Consejería de Cultura de Junta de Andalucia.

119. Inquiry: Is the archaeologist to be full-time or part-time position?

Response: The archaeologist will have to be on site during the execution of excavations, and as requested by the

Consejería de Cultura de Junta de Andalucia.

120. Inquiry: Paragraph 1.5.5 Environmental Coordinator (EC). The paragraph states this person must be trained to adequately accomplish the duties and responsibilities.