Attachment_F_P919__Volume_9_of_15.pdf
PDF 29 MB Posted
- Solicitation number
- N6247026R0006
About this file
This document is a detailed engineering drawing (Attachment F) for the P919 Bulk Tank Farm Improvements, Phase 1 project at Naval Station Rota, Spain, focusing on civil and structural site plans for a fuel pipeline infrastructure upgrade. The drawing set includes multiple site plan sheets (C-135P through C-144P and C-427P through C-440P) detailing the installation of a 450mm JP-5 fuel pipeline, with specific annotations for pavement restoration, utility relocations, and site grading across various locations including HDD (Horizontal Directional Drilling) pits, valve locations, and infrastructure crossings.
The technical drawings provide comprehensive engineering details for pipeline installation, including structural steel plans for HDD pits, typical reinforcing details, foundation specifications, and site-specific civil engineering requirements. Key elements include galvanized steel grating, rolling cover track supports, concrete slab configurations, and precise specifications for pipeline trench construction, with notes on soil conditions, pavement restoration limits, and maintaining access to existing buildings during construction. The drawings are part of a larger naval facilities engineering project at Naval Station Rota, demonstrating meticulous planning for fuel infrastructure improvements.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B
450mm JP-5
PIPELINE
1+600
1+620
1+640
1+660
1+680
1+700
1+760
1+780
1+820
1+860
1+880
1+900
1+600
1+620
1+640
1+660
1+680
1+700
1+760
1+780
1+820
1+860
1+880
1+900
1+600
1+620
1+640
1+660
1+680
1+700
1+760
1+780
1+820
1+860
1+880
1+900
1+600
1+620
1+640
1+660
1+680
1+700
1+760
1+780
1+820
1+860
1+880
1+900
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
0 20 30 40 50
1:500
B1
1:500
SITE PLAN
C-135P
KEYED NOTES:
F O
R
C
O N
T I N
U A
T I O
N
S
E
S
H E
T
C
P
GENERAL NOTES:
1. SOIL BORINGS AND SOIL TEST INFORMATION PROVIDED IN REFERENCE
DRAWINGS.
2. EXISTING CONDITIONS/SURVEY DRAWINGS PROVIDED IN REFERENCE
DRAWINGS.
3. PAVEMENT RESTORATION LIMITS FOR UTILITY REMOVAL OR
INSTALLATION ARE APPROXIMATE AND SUBJECT TO CONTRACTOR
MEANS AND METHODS.
4. SEE "M" SHEETS FOR FUEL PIPING ALIGNMENT INFORMATION.
5. RESTORE PAVEMENTS TO EXISTING ELEVATIONS.
6. PEDESTRIAN AND VEHICLE PARKING ACCESS MUST BE MAINTAINED TO
BUILDINGS 134 AND 1741 AT ALL TIMES.
PLANTA DE EXTERIORES
NOTAS DE REFERENCIA:NOTAS GENERALES:
1. INFORMACIÓN DE SONDEOS Y ENSAYOS DEL TERRENO PROVISTA EN
LOS PLANOS DE REFERENCIA.
2. PLANOS DE ESTADO ACTUAL / TOPOGRAFÍA PROVISTOS EN LOS
PLANOS DE REFERENCIA.
3. LOS LÍMITES DE REPARACIÓN DEL PAVIMENTO PARA LA RETIRADA O
COLOCACIÓN DE LAS INSTALACIONES SON APROXIMADOS Y SUJETOS A
LOS MEDIOS Y MÉTODOS DEL CONTRATISTA.
4. VER PLANOS "M" PARA INFORMACIÓN DE ALINEACIÓN DE TUBERÍAS
DE COMBUSTIBLE.
5. RESTABLECER LOS PAVIMENTOS A LAS COTAS EXISTENTES.
6. MANTENER EN TODO MOMENTO EL ACCESO PEATONAL Y PARA
ESTACIONAMIENTO DE VEHÍCULOS A LOS EDIFICIOS 134 Y 1741.
P A
R A
O N
T I N
U A
C I Ó
N
V
P
L A
N
P
P
A R
A
C
O N
T I N
U A
C I Ó
N
V
A
P
LÍNEA DE TUBERÍA
JP-5 DE 450mm
F O
R
C
O N
T I N
U A
T I O
N
S
E
450mm JP-5
PIPELINE
1+900
1+920
1+940
1+960
2+000 2+020
2+040 2+060
2+080 2+100
2+160 2+180 2+200
1+900
1+920
1+940
1+960
2+000 2+020
2+040 2+060
2+080 2+100
2+160 2+180 2+200
1+900
1+920
1+940
1+960
2+000 2+020
2+040 2+060
2+080 2+100
2+160 2+180 2+200
1+900
1+920
1+940
1+960
2+000 2+020
2+040 2+060
2+080 2+100
2+160 2+180 2+200
CP CP CP
CP
CP CP CP CP
C1
C-502P
SEE ENLARGED
SITE PLAN
A1
C-437P
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
0 20 30 40 50
1:500
B1
1:500
SITE PLAN
C-136P
KEYED NOTES:
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
1. 390mm CONCRETE CULVERT AND HEADWALLS
2. DO NOT DISTURB FENCE
3. PCC SIDEWALK WITH PRECAST EDGES. MATCH
EXISTING CURB
GENERAL NOTES:
1. SOIL BORINGS AND SOIL TEST INFORMATION PROVIDED IN REFERENCE
DRAWINGS.
2. EXISTING CONDITIONS/SURVEY DRAWINGS PROVIDED IN REFERENCE
DRAWINGS.
3. PAVEMENT RESTORATION LIMITS FOR UTILITY REMOVAL OR
INSTALLATION ARE APPROXIMATE AND SUBJECT TO CONTRACTOR
MEANS AND METHODS.
4. SEE "M" SHEETS FOR FUEL PIPING ALIGNMENT INFORMATION.
5. RESTORE PAVEMENTS TO EXISTING ELEVATIONS.
6. PEDESTRIAN AND VEHICLE PARKING ACCESS MUST BE MAINTAINED TO
BUILDINGS 134 AND 1741 AT ALL TIMES.
PLANTA DE EXTERIORES
NOTAS DE REFERENCIA:NOTAS GENERALES:
1. INFORMACIÓN DE SONDEOS Y ENSAYOS DEL TERRENO PROVISTA EN
LOS PLANOS DE REFERENCIA.
2. PLANOS DE ESTADO ACTUAL / TOPOGRAFÍA PROVISTOS EN LOS
PLANOS DE REFERENCIA.
3. LOS LÍMITES DE REPARACIÓN DEL PAVIMENTO PARA LA RETIRADA O
COLOCACIÓN DE LAS INSTALACIONES SON APROXIMADOS Y SUJETOS A
LOS MEDIOS Y MÉTODOS DEL CONTRATISTA.
4. VER PLANOS "M" PARA INFORMACIÓN DE ALINEACIÓN DE TUBERÍAS
DE COMBUSTIBLE.
5. RESTABLECER LOS PAVIMENTOS A LAS COTAS EXISTENTES.
6. MANTENER EN TODO MOMENTO EL ACCESO PEATONAL Y PARA
ESTACIONAMIENTO DE VEHÍCULOS A LOS EDIFICIOS 134 Y 1741.
P A
N
T I N
U A
C I Ó
N
V
A
P
P
A R
A
C
O N
T I N
U A
C I Ó
N
V
A
P
2. NO ALTERAR LA VALLA
3. ACERADO DE HORMIGÓN CON BORDILLOS
PREFABRICADOS. IGUALAR AL BORDILLO EXISTENTE
1. CUNETA DE HORMIGÓN 390mm Y PASACUNETAS
LÍNEA DE
TUBERÍA JP-5
VER PLANTA
AMPLIADA DE
URBANIZACIÓN
LEGEND:
LEYENDA:
SIDEWALK PAVEMENT
PAVIMENTO DE ACERADO
BLDG 1741
450mm JP-5
PIPELINE
C3
C-504T
D1
C-502P
C3
C-504T
D1
C-502P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
BLDG 659
SEE ENLARGED
SITE PLAN
A1
C-439P
SEE ENLARGED
SITE PLAN
LÍNEA DE TUBERÍA
JP-5 DE 450mm
EDIFICIO 1741
VER PLANTA
AMPLIADA DE
EXTERIORES
VER PLANTA
AMPLIADA DE
EXTERIORES
BOLSA DE APARCAMIENTO
DE ASFALTO
EDIFICIO 659
C4
S-522P
ASPHALT PARKING LOT
N 4056816.469
E 741387.7078
N 4056820.849
E 741390.3646
C1
C-502P
A1
C-438P
D1
C-502P
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
0 20 30 40 50
1:500
B1
1:500
SITE PLAN
C-137P
KEYED NOTES:
1. ASPHALT PAVEMENT
2. DO NOT DISTURB FENCE
3. 2000mm CHAIN LINK FENCE , WITH TOP RAIL AND BOTTOM TENSION
WIRE, PLUS 3 STRAND BARBED WIRE
4. 2000mm CHAIN LINK FENCE WITH TOP AND BOTTOM TENSION WIRES. NO
BARBED WIRE. REINSTALL GREEN FABRIC SCREENING
5. PCC SIDEWALK
6. 300mm CONCRETE CULVERT AND HEADWALLS
7. BUS STOP CONCRETE PAVING AND SHELTER.
GENERAL NOTES:
1. SOIL BORINGS AND SOIL TEST INFORMATION PROVIDED IN REFERENCE
DRAWINGS.
2. EXISTING CONDITIONS/SURVEY DRAWINGS PROVIDED IN REFERENCE
DRAWINGS.
3. PAVEMENT RESTORATION LIMITS FOR UTILITY REMOVAL OR
INSTALLATION ARE APPROXIMATE AND SUBJECT TO CONTRACTOR
MEANS AND METHODS.
4. SEE "M" SHEETS FOR FUEL PIPING ALIGNMENT INFORMATION.
5. RESTORE PAVEMENTS TO EXISTING ELEVATIONS.
6. PEDESTRIAN AND VEHICLE PARKING ACCESS MUST BE MAINTAINED TO
BUILDINGS 134 AND 1741 AT ALL TIMES.
PLANTA DE EXTERIORES
NOTAS DE REFERENCIA:
NOTAS GENERALES:
1. INFORMACIÓN DE SONDEOS Y ENSAYOS DEL TERRENO PROVISTA EN
LOS PLANOS DE REFERENCIA.
2. PLANOS DE ESTADO ACTUAL / TOPOGRAFÍA PROVISTOS EN LOS
PLANOS DE REFERENCIA.
3. LOS LÍMITES DE REPARACIÓN DEL PAVIMENTO PARA LA RETIRADA O
COLOCACIÓN DE LAS INSTALACIONES SON APROXIMADOS Y SUJETOS A
LOS MEDIOS Y MÉTODOS DEL CONTRATISTA.
4. VER PLANOS "M" PARA INFORMACIÓN DE ALINEACIÓN DE TUBERÍAS
DE COMBUSTIBLE.
5. RESTABLECER LOS PAVIMENTOS A LAS COTAS EXISTENTES.
6. MANTENER EN TODO MOMENTO EL ACCESO PEATONAL Y PARA
ESTACIONAMIENTO DE VEHÍCULOS A LOS EDIFICIOS 134 Y 1741.
P
A
N
T
I
N
U
A
C
I
Ó
V
A
P
P
A
N
T
I N
U
A
C
I
A
P
1. PAVIMENTO DE ASFALTO
2. NO ALTERAR LA VALLA
3. VALLA DE SIMPLE TORSIÓN DE 2000mm, CON RAÍL SUPERIOR Y
CABLE DE TENSIÓN INFERIOR. MÁS 3 ALAMBRES DE ESPINO
TRENZADO.
5. ACERADO DE HORMIGÓN
6. CUNETA DE 300mm Y PASACUNETA
4. VALLA DE SIMPLE TORSIÓN DE 2000mm, CON CABLES DE TENSIÓN
SUPERIOR E INFERIOR. SIN ALAMBRES DE ESPINO. REINSTALAR LA
MALLA VERDE.
F
N
T
I N
U
A
T
I
E
P
F
N
T
I
N
U
A
T
I
E
P
SIDEWALK PAVEMENT
LEGEND:
LEYENDA:
PAVIMENTO DE ACERADO
ASPHALT PAVEMENT
PAVIMENTO ASFÁLTICO
7. PAVIMENTO DE HORMIGÓN DE PARADA DE AUTOBÚS Y MARQUESINA.
ML-1
V-BRDG-OTLN
A2003
FH #14
PIT #1
TANK-7
F-76
600mm F-76
500mm JP-8
500mm F-76
350mm JP-5
350mm INACTIVE
150mm JP-5
150mm JP-8
150mm INACTIVE
450mm JP-5
PIPELINE
D1
C-502P
2+580
2+600
2+620
2+660
2+680
2+700
2+720
2+740
2+760
2+780
2+800
2+820
2+580
2+600
2+620
2+660
2+680
2+700
2+720
2+740
2+760
2+780
2+800
2+820
2+580
2+600
2+620
2+660
2+680
2+700
2+720
2+740
2+760
2+780
2+800
2+820
2+580
2+600
2+620
2+660
2+680
2+700
2+720
2+740
2+760
2+780
2+800
2+820
ML-1
BLDG
LÍNEA DE TUBERÍA
JP-5 DE 450mm
EDIFICIO
D1
C-502P
C3
C-504T
C3
C-504T
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
0 20 30 40 50
1:500
B1
1:500
SITE PLAN
C-138P
KEYED NOTES:
1. 2150mm CHAIN LINK FENCE WITH TOP RAIL AND BOTTOM TENSION WIRE
PLUS 3-STRAND BARBED WIRE
2. ASPHALT PAVEMENT
3. 100mm SOLID WHITE PAVEMENT MARKING
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
GENERAL NOTES:
1. SOIL BORINGS AND SOIL TEST INFORMATION PROVIDED IN REFERENCE
DRAWINGS.
2. EXISTING CONDITIONS/SURVEY DRAWINGS PROVIDED IN REFERENCE
DRAWINGS.
3. PAVEMENT RESTORATION LIMITS FOR UTILITY REMOVAL OR
INSTALLATION ARE APPROXIMATE AND SUBJECT TO CONTRACTOR
MEANS AND METHODS.
4. SEE "M" SHEETS FOR FUEL PIPING ALIGNMENT INFORMATION.
5. RESTORE PAVEMENTS TO EXISTING ELEVATIONS.
6. PEDESTRIAN AND VEHICLE PARKING ACCESS MUST BE MAINTAINED TO
BUILDINGS 134 AND 1741 AT ALL TIMES.
2. PAVIMENTO DE ASFALTO.
1. VALLA DE SIMPLE TORSIÓN DE 2150mm CON RAÍL SUPERIOR Y CABLE
DE TENSIÓN INFERIOR MÁS 3 ALAMBRES DE ESPINO TRENZADO.
P A
N
T I N
U A
C I Ó
N
V
A
P
P
A
N
T
I
N
U
A
C
I
A
P
PLANTA DE EXTERIORES
NOTAS DE REFERENCIA:
NOTAS GENERALES:
1. INFORMACIÓN DE SONDEOS Y ENSAYOS DEL TERRENO PROVISTA EN
LOS PLANOS DE REFERENCIA.
2. PLANOS DE ESTADO ACTUAL / TOPOGRAFÍA PROVISTOS EN LOS
PLANOS DE REFERENCIA.
3. LOS LÍMITES DE REPARACIÓN DEL PAVIMENTO PARA LA RETIRADA O
COLOCACIÓN DE LAS INSTALACIONES SON APROXIMADOS Y SUJETOS A
LOS MEDIOS Y MÉTODOS DEL CONTRATISTA.
4. VER PLANOS "M" PARA INFORMACIÓN DE ALINEACIÓN DE TUBERÍAS
DE COMBUSTIBLE.
5. RESTABLECER LOS PAVIMENTOS A LAS COTAS EXISTENTES.
6. MANTENER EN TODO MOMENTO EL ACCESO PEATONAL Y PARA
ESTACIONAMIENTO DE VEHÍCULOS A LOS EDIFICIOS 134 Y 1741.
3. MARCA CONTINUA BLANCA DE 100mm EN PAVIMENTO.
LEGEND:
LEYENDA:
ASPHALT PAVEMENT
PAVIMENTO DE ASFÁLTICO
F
N
T
I
N
U
A
T
I
E
TANK-7
TANK-8
F-76
450mm JP-5
PIPELINE
D1
C-502P
2+820
2+840
2+860
2+880
2+900
2+920
2+940
2+960
2+820
2+840
2+860
2+880
2+900
2+920
2+940
2+960
2+820
2+840
2+860
2+880
2+900
2+920
2+940
2+960
2+820
2+840
2+860
2+880
2+900
2+920
2+940
2+960
ML-2
LÍNEA DE TUBERÍA
JP-5 DE 450mm
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
0 20 30 40 50
1:500
B1
1:500
SITE PLAN
C-139P
KEYED NOTES:
1. ASPHALT PAVEMENT
2. 100mm SOLID WHITE PAVEMENT MARKING
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
GENERAL NOTES:
1. SOIL BORINGS AND SOIL TEST INFORMATION PROVIDED IN REFERENCE
DRAWINGS.
2. EXISTING CONDITIONS/SURVEY DRAWINGS PROVIDED IN REFERENCE
DRAWINGS.
3. PAVEMENT RESTORATION LIMITS FOR UTILITY REMOVAL OR
INSTALLATION ARE APPROXIMATE AND SUBJECT TO CONTRACTOR
MEANS AND METHODS.
4. SEE "M" SHEETS FOR FUEL PIPING ALIGNMENT INFORMATION.
5. RESTORE PAVEMENTS TO EXISTING ELEVATIONS.
6. PEDESTRIAN AND VEHICLE PARKING ACCESS MUST BE MAINTAINED TO
BUILDINGS 134 AND 1741 AT ALL TIMES.
PLANTA DE EXTERIORES
NOTAS DE REFERENCIA:NOTAS GENERALES:
1. INFORMACIÓN DE SONDEOS Y ENSAYOS DEL TERRENO PROVISTA EN
LOS PLANOS DE REFERENCIA.
2. PLANOS DE ESTADO ACTUAL / TOPOGRAFÍA PROVISTOS EN LOS
PLANOS DE REFERENCIA.
3. LOS LÍMITES DE REPARACIÓN DEL PAVIMENTO PARA LA RETIRADA O
COLOCACIÓN DE LAS INSTALACIONES SON APROXIMADOS Y SUJETOS A
LOS MEDIOS Y MÉTODOS DEL CONTRATISTA.
4. VER PLANOS "M" PARA INFORMACIÓN DE ALINEACIÓN DE TUBERÍAS
DE COMBUSTIBLE.
5. RESTABLECER LOS PAVIMENTOS A LAS COTAS EXISTENTES.
6. MANTENER EN TODO MOMENTO EL ACCESO PEATONAL Y PARA
ESTACIONAMIENTO DE VEHÍCULOS A LOS EDIFICIOS 134 Y 1741.
1. PAVIMENTO DE ASFALTO.
P A
N
T I N
U A
C I Ó
N
V
A
P
P A
N
T I N
U A
C I Ó
N
V
A
P
2. MARCA CONTINUA BLANCA DE 100mm EN PAVIMENTO
LEGEND:
LEYENDA:
ASPHALT PAVEMENT
PAVIMENTO DE ASFÁLTICO
F O
R
C
O N
T I N
U A
T I O
N
S
E
450mm JP-5
PIPELINE
B1
M-439P
ML-4
ML-3
TK-14
JP-5
ML-4
.5
.5
.5
.5
N 4056721.512
E 742462.5194
N 4056719.497
E 742447.6873
D1
C-502P
D1
C-502P
D1
C-502P
ML-3
B1
M-439P
A4
C-502T
LÍNEA DE
TUBERÍA JP-5
DE 450mm
A1
S-526P
.7
.6
.1
A1
C-502P
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
0 20 30 40 50
1:500
B1
1:500
SITE PLAN
C-140P
KEYED NOTES:
1. ASPHALT PAVEMENT
2. PIG LAUNCHING STATION
3. BOLLARD
4. 100mm SOLID WHITE PAVEMENT MARKING
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
GENERAL NOTES:
1. SOIL BORINGS AND SOIL TEST INFORMATION PROVIDED IN REFERENCE
DRAWINGS.
2. EXISTING CONDITIONS/SURVEY DRAWINGS PROVIDED IN REFERENCE
DRAWINGS.
3. PAVEMENT RESTORATION LIMITS FOR UTILITY REMOVAL OR
INSTALLATION ARE APPROXIMATE AND SUBJECT TO CONTRACTOR
MEANS AND METHODS.
4. SEE "M" SHEETS FOR FUEL PIPING ALIGNMENT INFORMATION.
5. RESTORE PAVEMENTS TO EXISTING ELEVATIONS.
6. PEDESTRIAN AND VEHICLE PARKING ACCESS MUST BE MAINTAINED TO
BUILDINGS 134 AND 1741 AT ALL TIMES.
P
A R
A
C
O N
T I N
U A
C I Ó
N
V
A
P
1. PAVIMENTO DE ASFALTO
2. ESTACIÓN DE ENVÍO DE PIG
3. BOLARDO
PLANTA DE EXTERIORES
NOTAS DE REFERENCIA:
NOTAS GENERALES:
1. INFORMACIÓN DE SONDEOS Y ENSAYOS DEL TERRENO PROVISTA EN
LOS PLANOS DE REFERENCIA.
2. PLANOS DE ESTADO ACTUAL / TOPOGRAFÍA PROVISTOS EN LOS
PLANOS DE REFERENCIA.
3. LOS LÍMITES DE REPARACIÓN DEL PAVIMENTO PARA LA RETIRADA O
COLOCACIÓN DE LAS INSTALACIONES SON APROXIMADOS Y SUJETOS A
LOS MEDIOS Y MÉTODOS DEL CONTRATISTA.
4. VER PLANOS "M" PARA INFORMACIÓN DE ALINEACIÓN DE TUBERÍAS
DE COMBUSTIBLE.
5. RESTABLECER LOS PAVIMENTOS A LAS COTAS EXISTENTES.
6. MANTENER EN TODO MOMENTO EL ACCESO PEATONAL Y PARA
ESTACIONAMIENTO DE VEHÍCULOS A LOS EDIFICIOS 134 Y 1741.
4. MARCA CONTINUA BLANCA DE 100mm EN PAVIMENTO
LEGEND:
LEYENDA:
ASPHALT PAVEMENT
PAVIMENTO DE ASFÁLTICO
RIO SALADO
VALVE PITS
RIO SALADO
BRIDGE
m
J
F
450 JP-5
PIPELINE
WEST HDD PIT
A1
M-428P
PUENTE SOBRE EL
RÍO SALADO
LÍNEA DE TUBERÍA
JP-5 DE 450
FOSA HDD AL
OESTE
FOSAS DE VÁLVULAS
DEL RÍO SALADO
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
B1
1:200
SITE PLAN
C-141P
0 8 12 16 20
1:200
KEYED NOTES:
FOR CONTINUATION SEE SHEET C-131P
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
350mm JP-5
500mm JP-8
500mm F-76
250mm JP-8
500mm F-76
GENERAL NOTES:
1. SOIL BORINGS AND SOIL TEST INFORMATION PROVIDED IN REFERENCE
DRAWINGS.
2. EXISTING CONDITIONS/SURVEY DRAWINGS PROVIDED IN REFERENCE
DRAWINGS.
3. PAVEMENT RESTORATION LIMITS FOR UTILITY REMOVAL OR
INSTALLATION ARE APPROXIMATE AND SUBJECT TO CONTRACTOR
MEANS AND METHODS.
4. SEE "M" SHEETS FOR FUEL PIPING ALIGNMENT INFORMATION.
5. RESTORE PAVEMENTS TO EXISTING ELEVATIONS.
6. PEDESTRIAN AND VEHICLE PARKING ACCESS MUST BE MAINTAINED TO
BUILDINGS 134 AND 1741 AT ALL TIMES.
450mm JP-5
P A
N
T I N
U A
C I Ó
N
V
A
P
P A
N
T I N
U A
C I Ó
N
V
A
P
PLANTA DE EXTERIORES
NOTAS DE REFERENCIA:NOTAS GENERALES:
1. INFORMACIÓN DE SONDEOS Y ENSAYOS DEL TERRENO PROVISTA EN
LOS PLANOS DE REFERENCIA.
2. PLANOS DE ESTADO ACTUAL / TOPOGRAFÍA PROVISTOS EN LOS
PLANOS DE REFERENCIA.
3. LOS LÍMITES DE REPARACIÓN DEL PAVIMENTO PARA LA RETIRADA O
COLOCACIÓN DE LAS INSTALACIONES SON APROXIMADOS Y SUJETOS A
LOS MEDIOS Y MÉTODOS DEL CONTRATISTA.
4. VER PLANOS "M" PARA INFORMACIÓN DE ALINEACIÓN DE TUBERÍAS
DE COMBUSTIBLE.
5. RESTABLECER LOS PAVIMENTOS A LAS COTAS EXISTENTES.
6. MANTENER EN TODO MOMENTO EL ACCESO PEATONAL Y PARA
ESTACIONAMIENTO DE VEHÍCULOS A LOS EDIFICIOS 134 Y 1741.
PARA CONTINUACIÓN VER PLANO C-131P
m m F
-7 m m J
P -8 m m J
P -8 m m F
-7 m m J
P -5
RIO SALADO
BRIDGE EAST END
PUMP STATIONS
ALICANTE LANE
4+120
4+140
4+160
4+180
4+200 4+220
EXTREMO ESTE DEL
PUENTE SOBRE EL
RÍO SALADO
ESTACIONES DE BOMBEO
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
B1
1:200
SITE PLAN
C-142P
0 8 12 16 20
1:200
KEYED NOTES:
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
F
N
T I N
U
A
T I
E
E
T
C
P
350mm JP-5
500mm JP-8
GENERAL NOTES:
1. SOIL BORINGS AND SOIL TEST INFORMATION
PROVIDED IN REFERENCE DRAWINGS.
2. EXISTING CONDITIONS/SURVEY DRAWINGS PROVIDED
IN REFERENCE DRAWINGS.
3. PAVEMENT RESTORATION LIMITS FOR UTILITY
REMOVAL OR INSTALLATION ARE APPROXIMATE AND
SUBJECT TO CONTRACTOR MEANS AND METHODS.
4. SEE "M" SHEETS FOR FUEL PIPING ALIGNMENT
INFORMATION.
5. RESTORE PAVEMENTS TO EXISTING ELEVATIONS.
P A
N
T I N
U A
C I Ó
N
V
A
P
P A
N
T I N
U A
C I Ó
N
V
A
P
PLANTA DE EXTERIORES
NOTAS DE REFERENCIA:
NOTAS GENERALES:
1. INFORMACIÓN DE SONDEOS Y ENSAYOS DEL
TERRENO PROVISTA EN LOS PLANOS DE REFERENCIA.
2. PLANOS DE ESTADO ACTUAL / TOPOGRAFÍA
PROVISTOS EN LOS PLANOS DE REFERENCIA.
3. LOS LÍMITES DE REPARACIÓN DEL PAVIMENTO
PARA LA RETIRADA O COLOCACIÓN DE LAS
INSTALACIONES SON APROXIMADOS Y SUJETOS A
LOS MEDIOS Y MÉTODOS DEL CONTRATISTA.
4. VER PLANOS "M" PARA INFORMACIÓN DE
ALINEACIÓN DE TUBERÍAS DE COMBUSTIBLE.
5. RESTABLECER LOS PAVIMENTOS A LAS COTAS
EXISTENTES.
6. MANTENER EN TODO MOMENTO EL
ACCESO PEATONAL Y PARA
ESTACIONAMIENTO DE VEHÍCULOS A
LOS EDIFICIOS 134 Y 1741.
P
A
N
T I N
U
A
C
I
A
P
F
N
T
I
N
U
A
T
I
E
P
P
A
N
T
I
N
U
A
C
I
A
P
6. PEDESTRIAN AND VEHICLE PARKING
ACCESS MUST BE MAINTAINED TO
BUILDINGS 134 AND 1741 AT ALL TIMES.
150mm INACTIVE
150mm JP-8
150mm JP-5
350mm INACTIVE
350mm JP-5
500mm F-76
500mm JP-8
600mm F-76
4+260
4+280
4+300
NORTHEAST HDD PIT
A1
M-430P
FOSA HDD AL
NORESTE
N 4056849.013
E 740472.1746
N 4056851.151
E 740477.1946
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
B1
1:200
SITE PLAN
C-143P
0 8 12 16 20
1:200
KEYED NOTES:
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
350mmJP-5
500mm JP-8
GENERAL NOTES:
1. SOIL BORINGS AND SOIL TEST INFORMATION PROVIDED IN
REFERENCE DRAWINGS.
2. EXISTING CONDITIONS/SURVEY DRAWINGS PROVIDED IN
REFERENCE DRAWINGS.
3. PAVEMENT RESTORATION LIMITS FOR UTILITY REMOVAL OR
INSTALLATION ARE APPROXIMATE AND SUBJECT TO
CONTRACTOR MEANS AND METHODS.
4. SEE "M" SHEETS FOR FUEL PIPING ALIGNMENT INFORMATION.
PLANTA DE EXTERIORES
NOTAS DE REFERENCIA:
NOTAS GENERALES:
1. INFORMACIÓN DE SONDEOS Y ENSAYOS DEL TERRENO
PROVISTA EN LOS PLANOS DE REFERENCIA.
2. PLANOS DE ESTADO ACTUAL / TOPOGRAFÍA PROVISTOS EN
LOS PLANOS DE REFERENCIA.
3. LOS LÍMITES DE REPARACIÓN DEL PAVIMENTO PARA LA
RETIRADA O COLOCACIÓN DE LAS INSTALACIONES SON
APROXIMADOS Y SUJETOS A LOS MEDIOS Y MÉTODOS DEL
CONTRATISTA.
4. VER PLANOS "M" PARA INFORMACIÓN DE ALINEACIÓN DE
TUBERÍAS DE COMBUSTIBLE.
5. RESTABLECER LOS PAVIMENTOS A LAS COTAS
EXISTENTES.
6. MANTENER EN TODO MOMENTO EL ACCESO
PEATONAL Y PARA ESTACIONAMIENTO DE
VEHÍCULOS A LOS EDIFICIOS 134 Y 1741.
P A
N
T I N
U A
C I Ó
N
V
A
P
FOR CONTINUATION SEE SHEET C-144P
PARA CONTINUACIÓN VER PLANO C-144P
5. RESTORE PAVEMENTS TO EXISTING
ELEVATIONS.
6. PEDESTRIAN AND VEHICLE PARKING ACCESS
MUST BE MAINTAINED TO BUILDINGS 134 AND
1741 AT ALL TIMES.
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
B1
1:200
SITE PLAN
C-144P
0 8 12 16 20
1:200
GENERAL NOTES: KEYED NOTES:
FOR CONTINUATION SEE SHEET C-143P
1. SOIL BORINGS AND SOIL TEST INFORMATION PROVIDED IN
REFERENCE DRAWINGS.
2. EXISTING CONDITIONS/SURVEY DRAWINGS PROVIDED IN
REFERENCE DRAWINGS.
3. PAVEMENT RESTORATION LIMITS FOR UTILITY REMOVAL OR
INSTALLATION ARE APPROXIMATE AND SUBJECT TO
CONTRACTOR MEANS AND METHODS.
4. SEE "M" SHEETS FOR FUEL PIPING ALIGNMENT INFORMATION.
F
N
T
I N
U
A
T
I
E
P
PLANTA DE EXTERIORES
NOTAS DE REFERENCIA:
NOTAS GENERALES:
1. INFORMACIÓN DE SONDEOS Y ENSAYOS DEL TERRENO
PROVISTA EN LOS PLANOS DE REFERENCIA.
2. PLANOS DE ESTADO ACTUAL / TOPOGRAFÍA PROVISTOS EN
LOS PLANOS DE REFERENCIA.
3. LOS LÍMITES DE REPARACIÓN DEL PAVIMENTO PARA LA
RETIRADA O COLOCACIÓN DE LAS INSTALACIONES SON
APROXIMADOS Y SUJETOS A LOS MEDIOS Y MÉTODOS DEL
CONTRATISTA.
4. VER PLANOS "M" PARA INFORMACIÓN DE ALINEACIÓN DE
TUBERÍAS DE COMBUSTIBLE.
5. RESTABLECER LOS PAVIMENTOS A LAS COTAS
EXISTENTES.
P
A
N
T
I N
U
A
C
I
A
P
PARA CONTINUACIÓN VER PLANO C-143P
6. MANTENER EN TODO MOMENTO EL ACCESO
PEATONAL Y PARA ESTACIONAMIENTO DE V
VEHÍCULOS A LOS EDIFICIOS 134 Y 1741.
5. RESTORE PAVEMENTS TO EXISTING
ELEVATIONS.
6. PEDESTRIAN AND VEHICLE PARKING ACCESS
MUST BE MAINTAINED TO BUILDINGS 134 AND
1741 AT ALL TIMES.
0+520 0+520 0+520 0+520
D1
C-502P
A3
C-502T
TP 4.83
P ME 4.83
0+540
0+560
0+540
0+560
0+540
0+560
0+540
0+560
0+580 0+580 0+580 0+580
X
X
X
C3
C-504T
D1
C-502P
TP 5.55
P ME 4.83
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
A1
1:50
ENLARGED SITE PLAN
C-427P
KEYED NOTES:
1. ASPHALT PAVEMENT
2. PLACE CONCRETE BARRIER BACK TO ORIGINAL LOCATION
3. RE-INSTALL EXISTING GUARDRAIL AND POSTS
4. 2000mm CHAIN LINK FENCE WITH TOP AND BOTTOM TENSION WIRES
PLUS 3 STRAND BARBED WIRE
5. WHEEL STOP
6. 100mm SOLID WHITE PAVEMENT MARKING
7. 100mm YELLOW NO PARKING PAVEMENT MARKINGS
F O
R
C
O N
T I N
U A
T I O
N
S
B
L O
W
L E
F T
F O
R
C
O N
T I N
U A
T I O
N
S
L O
W
L
E F
T
F O
R
C
O N
T I N
U A
T I O
N
S
O
I G
H T
F O
R
C
O N
T I N
U A
T I O
N
S
O
G
H T
0 2 3 4 5
1:50
Y
P
76.0
PLANTA AMPLIADA DE EXTERIORES
NOTAS DE REFERENCIA:
4. 2000mm VALLA DE SIMPLE TORSIÓN CON CABLES DE TENSIÓN SUPERIOR E
INFERIOR MÁS 3 ALAMBRES DE ESPINO TRENZADO.
1. PAVIMENTO DE ASFALTO.
3. VOLVER A INSTALAR LOS GUARDARRAILES Y POSTES EXISTENTES
2. VOLVER A COLOCAR LA BARRERA DE HORMIGÓN EN SU UBICACIÓN ORIGINAL.
5. TOPE DE RUEDA
6. MARCA CONTINUA BLANCA DE 100mm EN PAVIMENTO
7. MARCA EN PAVIMENTO DE 100mm DE PROHIBIDO APARCAR EN COLOR AMARILLO
P A
N
T I N
U A
C I Ó
N
V
A
Z
Q U
I E
R D
A
P A
C
O N
T I N
U A
C I Ó
N
V
A
Q U
I E
R D
A
P A
N
T I N
U A
C I Ó
N
V
R
I B
D
R
E C
H A
P A
N
T I N
U A
C I Ó
N
V
R
I B
R
E C
H A
Y
P
Y
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
C
P
1+500
1+500
1+500
1+500
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
B1
1:50
ENLARGED SITE PLAN
C-434P
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
0 2 3 4 5
1:50
7. WHITE BICYCLE SYMBOL PAVEMENT MARKING
8. GREEN PAINT WITHIN BICYCLE LANE
9. CROSS WALK PAVEMENT MARKING
10. YELLOW NO PARKING PAVEMENT MARKING
F
N
T
I N
U
A
T
I
O
G
H
T
F O
R
C
O N
T I N
U A
T I O
N
S
L
W
F T
PLANTA AMPLIADA DE EXTERIORES
7. MARCA BLANCA EN EL PAVIMENTO CON EL SÍMBOLO DE BICICLETA
8. PINTURA VERDE PARA CARRIL BICI
9. SEÑALIZACIÓN DE PASO DE PEATONES
10. SEÑALIZACIÓN AMARILLA DE PROHIBICIÓN DE APARCAR
P A
N
T I N
U A
C I Ó
N
V
A
P
P A
N
T I N
U A
C I Ó
N
V
A
Q U
I E
R D
A
P
A
N
T
I N
U
A
C
I
R
I
R
E
C
H
A
FL 10.4
B2
C-502P
A1
C-503P
C1
C-502P
D1
C-502P
KEYED NOTES:
1. PRECAST CURB
2. ASPHALT PAVEMENT
3. PCC SIDEWALK
4. 100MM SOLID WHITE PAVEMENT MARKING
5. 100MM WHITE DASHED PAVEMENT MARKING
6. WHITE DIRECTION ARROW PAVEMENT MARKING
NOTAS DE REFERENCIA:
1. BORDILLO PREFABRICADO
2. PAVIMENTO DE ASFALTO
3. ACERADO DE HORMIGÓN
4. MARCA CONTINUA BLANCA DE 100mm EN PAVIMENTO
5. MARCA DISCONTINUA BLANCA DE 100mm EN PAVIMENTO
6. FLECHA BLANCA DE DIRECCIÓN EN PAVIMENTO
11. CULVERT AND HEADWALL. CONFIRM EXISTING SIZE
AND MATERIAL TYPE OF CULVERT IN FIELD AND
MATCH EXISTING. CULVERT IS BELIEVED TO BE 500mm CONCRETE
11. CUNETA Y PASACUNETA. CONFIRMAR EL TAMAÑO Y EL TIPO DE
MATERIAL DE LA CUNETA EN CAMPO E IGUALAR A EXISTENTES.
PARECE QUE LA CUNETA ES DE HORMIGÓN DE 500 MM.
D1
C-502P
B2
C-502P
1+520
1+520
1+520
1+520
C1
C-502P
C3
C-502P
1+540
1+540
1+540
1+540
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
A1
1:50
ENLARGED SITE PLAN
C-435P
KEYED NOTES:
1. PRECAST CURB
2. ASPHALT PAVEMENT
3. PCC SIDEWALK
4. RE-INSTALL SIGN
5. PCC DUMPSTER PAD
6. RE-INSTALL WHITE VINYL FENCING
7. WHEEL STOP
8. YELLOW NO PARKING PAVEMENT MARKING
9. 100MM WHITE DASHED PAVEMENT MARKING
10. WHITE DIRECTION ARROW PAVEMENT MARKING
11. WHITE BICYCLE SYMBOL PAVEMENT MARKING
12. GREEN PAINT WITHIN BICYCLE LANE
13. 100mm WHITE SOLID PAVEMENT MARKING. PROVIDE MARKINGS WITHIN
NEW PAVEMENT AND REPAINT EXISTING MARKINGS.
F O
R
C
O N
T I N
U A
T I O
N
S
E
G P
0 2 3 4 5
1:50
F O
R
C
O N
T I N
U A
T I O
N
S
L O
W
L
E F
T
F O
R
C
O N
T I N
U A
T I O
N
S
O
G
H T
60° (TYP)
2.16m
PLANTA AMPLIADA DE EXTERIORES
NOTAS DE REFERENCIA:
1. BORDILLO PREFABRICADO
2. PAVIMENTO DE ASFALTO
3. ACERADO DE HORMIGÓN
8. SEÑALIZACIÓN AMARILLA DE PROHIBICIÓN DE APARCAR
14.
9. MARCA DISCONTINUA BLANCA DE 100mm EN PAVIMENTO
10. FLECHA BLANCA DE DIRECCIÓN EN PAVIMENTO
11. MARCA BLANCA EN EL PAVIMENTO CON EL SÍMBOLO DE LA BICICLETA
12. PINTURA VERDE PARA CARRIL BICI
4. REINSTALAR SEÑAL
5. LOSA DE HORMIGÓN PARA CONTENEDOR DE BASURA
6. REINSTALAR VALLA DE VINILO BLANCA
7. TOPE DE RUEDA
13. MARCA CONTINUA BLANCA DE 100mm EN PAVIMENTO. PROPORCIONAR
MARCAS DENTRO DEL NUEVO PAVIMENTO Y REPINTAR LAS MARCAS
EXISTENTES.
P A
N
T I N
U A
C I Ó
N
V
A
Q U
I E
R D
A
P A
N
T I N
U A
C I Ó
N
V
R
I B
R
E C
H A
P A
N
T I N
U A
C I Ó
N
V
A
G
P
A3
C-502T
A4
C-502P
B2
2+180
2+200
2+180
2+200
2+180
2+200
2+180
2+200
CP CP
CP CP CP CP CP CP
CP CP CP CP CP CP CP
CP CP CP CP CP CP
CP CP CP CP CP CP
CP CP CP CP CP CP CP
CP CP CP CP CP CP
CP
CP CP
CP CP CP CP CP CP
CP CP CP CP CP CP CP
CP CP CP CP CP CP
CP CP CP CP CP CP
CP CP CP CP CP CP
CP CP CP CP CP CP CP
CP
C1
C-502P
B2
C-502P
B2
C-502P
A1
C-503P
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
A1
1:50
ENLARGED SITE PLAN
C-437P
KEYED NOTES:
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
1. PRECAST CURB
2. PCC SIDEWALK
3. 390mm CONCRETE CULVERT 6.0m @ 0.5% SLOPE (MIN)
4. HEADWALL
0 2 3 4 5
1:50
FL 12.8
FL 12.9
PLANTA AMPLIADA DE EXTERIORES
NOTAS DE REFERENCIA:
1. BORDILLO PREFABRICADO
2. ACERADO DE HORMIGÓN
4. PASACUNETA
3. 6.0m. DE CUNETA DE HORMIGÓN DE 390mm CON UNA
PENDIENTE MÍNIMA DE 0.5%
P A
N
T I N
U A
C I Ó
N
V
A
N 4056820.852
E 741390.3638
N 4056816.466
E 741387.7087
2+2202+2202+2202+220
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
A1
1:50
ENLARGED SITE PLAN
C-438P
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
0 2 3 4 5
1:50
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
KEYED NOTES:
1. PCC SIDEWALK
2. 300mm CONCRETE CULVERT 6.0m
3. HEADWALL
4. BUS STOP PAVING AND SHELTER.
C1
C-502P
3 3
PLANTA AMPLIADA DE EXTERIORES
NOTAS DE REFERENCIA:
1. ACERADO DE HORMIGÓN
3. PASACUNETA
2. 6.0m DE CUNETA DE HORMIGÓN DE 300mm
P A
N
T I N
U A
C I Ó
N
V
A
P
P A
N
T I N
U A
C I Ó
N
V
A
P
A1
C-503P
A1
C-503P
FL 13.6
FL 13.7
4. PAVIMENTO DE PARADA DE AUTOBÚS Y MARQUESINA.
C4
S-522P
2+240
2+260
2+240
2+260
2+240
2+260
2+240
2+260
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
A1
1:50
ENLARGED SITE PLAN
C-439P
KEYED NOTES:
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
1. ASPHALT PAVEMENT
2. 100MM WHITE SOLID PAVEMENT MARKING
3. WHITE DIRECTION ARROW PAVEMENT MARKING
0 2 3 4 5
1:50
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
D1
C-502P
NOTAS DE REFERENCIA:
1. PAVIMENTO DE ASFALTO
2. MARCA CONTINUA BLANCA DE 100mm EN PAVIMENTO
3. FLECHA BLANCA DE DIRECCIÓN EN PAVIMENTO
PLANTA AMPLIADA DE EXTERIORES
P A
N
T I N
U A
C I Ó
N
V
A
P
P A
N
T I N
U A
C I Ó
N
V
A
2+280
2+300
2+280
2+300
2+280
2+300
2+280
2+300
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
A1
1:50
ENLARGED SITE PLAN
C-440P
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
0 2 3 4 5
1:50
KEYED NOTES:
1. ASPHALT PAVEMENT
2. 100MM WHITE SOLID PAVEMENT MARKING
D1
C-502P
NOTAS DE REFERENCIA:
1. PAVIMENTO DE ASFALTO
2. MARCA CONTINUA BLANCA DE 100mm EN PAVIMENTO
PLANTA AMPLIADA DE EXTERIORES
P A
N
T I N
U A
C I Ó
N
V
A
1.2 M
M
AX. C
TO
C m m M
IN
F
L
O
W
F
L
O
W
900mm MIN. LENGTH FENCE POST DRIVEN MIN.
400mm INTO THE GROUND (TYP.)
900mm MIN. FENCE POST
WOVEN WIRE FENCE (MIN. 14 GAUGE
W/ MAX. 150mm MESH SPACING)
WITH FILTER CLOTH
COMPACTED SOIL
EMBED FILTER CLOTH A MIN.
OF 150mm INTO THE GROUND
PERSPECTIVE VIEW
UNDISTURBED GROUND
F L O
W
TYPICAL SECTION
FILTER CLOTH
1. SECURELY FASTEN WOVEN WIRE FENCE TO FENCE POSTS WITH WIRE TIES
OR STAPLES. POSTS MUST BE STEEL EITHER "T" OR "U" TYPE OR
HARDWOOD.
2. FASTEN FILTER CLOTH SECURELY TO WOVEN WIRE FENCE WITH TIES
SPACED EVERY 625mm AT TOP AND MID SECTION. FENCE MUST BE WOVEN
WIRE, 150mm MAX. MESH OPENING.
3. WHEN 2 SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER THEY MUST BE
OVERLAPPED BY 150mm AND FOLDED.
4. MAINTENANCE MUST BE PERFORMED AS NEEDED AND MATERIAL REMOVED
WHEN "BULGES" DEVELOP IN THE SILT FENCE.
CONSTRUCTION SPECIFICATIONS
WOVEN WIRE FENCE (MIN. 14 GAUGE W/MAX.
150mm MESH SPACING)
HEIGHT OF FILTER
400mm MIN.
m m
M I N m m
M I N
100mm MIN.
FILTER CLOTH
EXISTING GROUND
N
EXISTING PAVEMENT
0.91 M
MOUNTABLE BERM (OPTIONAL)
EXISTING PAVEMENT
PLAN VIEW
EXISTING GROUND
1. STONE SIZE - USE 25-100mm STONE, OR RECLAIMED OR LIMESTONE EQUIVALENT.
2. LENGTH - NOT LESS THAN 15 m.
3. THICKNESS - NOT LESS THAN 150mm.
4. WIDTH - 3.5 m MINIMUM, BUT NOT LESS THAN THE FULL WIDTH AT POINTS WHERE INGRESS OR EGRESS
OCCURS. 7.5 m IF SINGLE ENTRANCE TO SITE.
5. SURFACE WATER - ALL SURFACE WATER FLOWING OR DIVERTED TOWARD CONSTRUCTION ENTRANCES
MUST BE PIPED BENEATH THE ENTRANCE. IF PIPING IS IMPRACTICAL, A MOUNTABLE BERM WITH 5:1 SLOPES
WILL BE PERMITTED.
6. MAINTENANCE - THE ENTRANCE MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR
FLOWING OF SEDIMENT ONTO PUBLIC RIGHTS-OF-WAY. ALL SEDIMENT SPILLED, DROPPED, WASHED OR
TRACKED ONTO PUBLIC RIGHTS-OF-WAY MUST BE REMOVED IMMEDIATELY.
7. WHEN WASHING IS REQUIRED, IT MUST BE DONE ON AN AREA STABILIZED WITH STONE AND WHICH DRAINS
INTO AN APPROVED SEDIMENT TRAPPING DEVICE.
8. PERIODIC INSPECTION AND NEEDED MAINTENANCE MUST BE PROVIDED AFTER EACH RAIN.
CONSTRUCTION SPECIFICATIONS
15 m MIN.
m m
M I N
B3 m
M I N
3.5 m MIN
TYP.
15 m MIN.
m m m m
SECTION
50 TO 100 ROCK
EXISTING SWALE
m m
8000mm ±
PROFILE
WORK
AREA
FLOW
PROTECTED
AREA
TOP OF GROUND
COMPOST FILLED SILTSOCK
(300 TYP.)
SUPPLEMENTAL
COMPOST MATERIAL
BIODEGRADABLE
MESH NETTING
m
M I N
C I V
I L
D
E T
A I L S
C-501P
C4
NTS
SILT FENCE
A1
NTS
SEDIMENT FILTER SOCK (FS)
A3
NTS
STABLIZED CONSTRUCTION ENTRANCE
B1
NTS
ROCK CHECK DAM
B3
NTS
SECTION
C-501P
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
ESPECIFICACIONES DE CONSTRUCCIÓN
VALLA CONTRA EROSIÓN
2. FIJAR EL TEJIDO FILTRANTE DE FORMA SEGURA A LA VALLA DE ALAMBRE
CON ATADOS CADA 625mm EN LA PARTE SUPERIOR Y CENTRAL. LA VALLA
SERÁ DE MALLA DE ALAMBRE CON UN TAMAÑOMÁXIMO DE APERTURA DE
150mm.
3. CUANDO DOS TRAMOS DE TEJIDO FILTRANTE SE UNAN, SE SOLAPARÁN
150mm Y SE PLEGARÁN.
4. DEBE REALIZARSE EL MANTENIMIENTO SEGÚN SE NECESITE Y SE
ELIMINARÁ MATERIAL CUANDO SURJAN "ABOMBAMIENTOS" EN LA VALLA
CONTRA EROSIÓN.
LONGITUD MÍNIMA DE POSTE DE VALLA 900mm
ANCLAJDO EN EL TERRENO COMO MÍNIMO
400mm (TÍPICO)
TEJIDO FILTRANTE
POSTE DE VALLA MÍNIMO DE 900mm
TERRENO INALTERADO
VALLA DE ALAMBRE TEJIDO (GALGA MÍNIMA
14 CON ESPACIAMIENTO MÁXIMO DE MALLA
DE 150mm) CON TEJIDO FILTRANTE
TERRENO COMPACTADO
EMBEBER TEJIDO FILTRANTE UN MÍNIMO DE
150mm DENTRO DEL TERRENO
VALLA DE ALAMBRE TEJIDO (GALVA MÍNIMA 14
CON ESPACIAMIENTO MÁXIMO DE MALLA DE
150mm)
ALTURA MÍNIMA DE
FILTRO DE 400mm
F
L
U
J
O
F
L
U
J
O
1.2 M
ÁXIM
O D
E C
EN
TR
O
A C
EN
TR
O
VISTA EN PERSPECTIVA
SECCIÓN TÍPICA
F L U
J O
1. TAMAÑO DE LA PIEDRA - UTILIZAR PIEDRA DE 25-100mm, O RECUPERADA O CALIZA EQUIVALENTE.
ESPECIFICACIONES DE CONSTRUCCIÓN
2. LONGITUD - NO MENOS QUE 15 m.
3. ESPESOR - NO MENOS QUE 150mm.
4. ANCHO - COMO MÍNIMO 3.5 m, PERO NO MENOS QUE EL ANCHO COMPLETO EN LOS PUNTOS DONDE HAYA
ACCESO O SALIDA. 7.5 m SI ES ENTRADA ÚNICA AL SITIO.
5. AGUA DE ESCORRENTÍA - TODO EL AGUA DE ESCORRENTÍA QUE FLUYA O QUE SEA DIRIGIDA HACIA LAS
ENTRADAS DE OBRA SERÁ CANALIZADA DEBAJO DE LA ENTRADA. SI LA CANALIZACIÓN ES POCO PRÁCTICO, SE PERMITIRÁ UNA BERMA DESMONTABLE CON PENDIENTES 5:1.
6. MANTENIMIENTO - SE MANTENDRÁ LA ENTRADA DE MANERA QUE SE IMPIDA EL ARRASTRE O FLUJO DE
SEDIMENTOS SOBRE VÍAS PÚBLICAS. TODO SEDIMENTO DERRAMADO, CAÍDO, LAVADO O ARRASTRADO SOBRE
LA VÍA PÚBLICA SERÁ ELIMINADO INMEDIATAMENTE.
7. CUANDO SE REQUIERA EL LAVADO, SE REALIZARÁ EN UNA ZONA ESTABILIZADA CON PIEDRA Y QUE DRENE
A UN DISPOSITIVO DE RECOGIDA DE SEDIMENTOS APROBADO.
8. SE REALIZARÁ INSPECCIÓN PERIÓDICA Y EL MANTENIMIENTO NECESARIO DESPUÉS DE CADA LLUVIA.
ENTRADA A OBRA ESTABILIZADACILINDRO FILTRANTE DE SEDIMENTOS (FS)
REPRESA DE PIEDRA SECCIÓN
VISTA EN PLANTA
PERFIL
SECCIÓN
PAVIMENTO EXISTENTE
CUNETA EXISTENTE
PIEDRA DE 50 A 100
PAVIMENTO EXISTENTE
TERRENO EXISTENTE
TERRENO EXISTENTE
BERMA DESMONTABLE (OPCIONAL)
TEJIDO FILTRANTE
CILINDRO DE MALLA RELLENO
DE COMPOST (300 TÍPICO)
RED DE MALLA
BIODEGRADABLE
MATERIAL DE COMPOST
SUPLEMENTARIO
CARA SUPERIOR
DE TERRENO
ZONA DE
TRABAJO
FLUJO
ZONA PROTEGIDA
1. FIJAR DE FORMA SEGURA LA VALLA DE ALAMBRE TEJIDO A LOS POSTES
DE LA VALLA CON CABLES DE ATADO O GRAPAS. LOS POSTES DEBEN
SER DE ACERO DE TIPO "T" O "U" O DE MADERA DURA.
NOTE:
1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE NOTED.
1. TODAS LAS DIMENSIONES ESTÁN EN mm A MENOS QUE
SE INDIQUE OTRA COSA.
/ NOTA:
150mm AGGREGATE BASE COURSE
100mm CONCRETE SIDEWALK
ASPHALTIC CONCRETE SURFACE COURSE
AGGREGATE BASE COURSE
COMPACTED SUBGRADE
PRIME COAT
COMPACTED NATURAL SUBGRADE
200mm AGGREGATE SURFACE COURSE
NOTES:
1. SEE PAVEMENT SECTION TABLE.
2. USE EXISTING PAVEMENT SECTION WHERE IT EXCEEDS THIS SECTION.
3. MINIMUM PATCH WIDTH IS 600mm.
COMPACTED SUBGRADE
TERRENO NATURAL COMPACTADO
CAPA SUPERFICIAL DE ÁRIDOS DE 200mm
ACERADO DE HORMIGÓN DE 100mm
TERRENO COMPACTADO
CAPA BASE DE ÁRIDOS
CAPA SUPERFICIAL DE HORMIGÓN ASFÁLTICO
CAPA DE IMPRIMACIÓN
TERRENO COMPACTADO
CAPA BASE DE ÁRIDOS DE 150mm
1. VER TABLA DE SECCIÓN DE PAVIMENTOS.
2. UTILIZAR LA SECCIÓN DE FIRME EXISTENTE CUANDO SUPERE ESTA SECCIÓN.
3. LA ANCHURA MÍNIMA DEL PAVIMENTO ES DE 600 MM.
TOP OF PAVEMENT
100 TO 150
TOP OF PAVEMENT
DRY PACK CEMENT MORTAR
CONCRETE FOUNDATION
PCC SIDEWALK WHERE
INDICATED ON DRAWINGS
EDGE LINE MARKING
m m
T
Y P
Y
P
1000mm
T
Í P
I C
O
T
Í
P
I
C
O
SEÑALIZACIÓN
DE LÍNEA DE
BORDE
CL FUEL LINE
TRENCH WALLS SLOPED OR BRACED
AS REQUIRED BY RD 1627/97, ANNEX IV
FOR STABILITY (TYP)
PLASTIC WARNING TAPE
WITH FUEL LINE NOTED
FINISH GRADE
200 MIN
SIDEWALL CLEARANCE
P
E
ALIGNMENT AND PROFILE
CONTROL POINT
TERRENO ACABADO
CINTA DE PLÁSTICO DE
SEÑALIZACIÓN CON LÍNEA
DE COMBUSTIBLE ANOTADA
PAREDES DE LA ZANJA INCLINADAS O
ARRIOSTRADAS SEGÚN SE REQUIERA POR
EL RD 1627/97, ANEXO IV PARA LA
ESTABILIDAD (TÍPICO)
ALINEACIÓN Y PUNTO DE
CONTROL DEL PERFIL
ESPACIO LIBRE DE PARED
LATERAL
EJE DE LÍNEA DE
COMBUSTIBLE
D I Á
M E
T R
O
E X
T E
R I O
R
U B
E R
Í A
BACKFILL AND FILL MATERIAL
MATERIAL DE RELLENO DE ZANJA
V E
R
P
E R
F I L
N
G I T
U D
I N
A L
E S
A
N O
S
M
P R
O F
U N
D I D
R
I A
B L
E
FUEL LINE BEDDING MATERIAL
MATERIAL PARA ASIENTO
DE TUBERÍADE FUEL
CL FUEL LINE
TRENCH WALLS SHORED, STABILIZED
AS REQUIRED BY RD 1627/97, ANNEX IV
FOR STABILITY (TYP)
PLASTIC WARNING TAPE
WITH FUEL LINE NOTED
ALIGNMENT AND PROFILE
CONTROL POINT
FINIISH GRADE
PAREDES DE ZANJAS ENTIBADAS,
ESTABILIZADAS SEGÚN SE REQUIERA
POR EL RD 1627/97, ANEXO IV PARA
ESTABILIDAD (TÍPICO)
EJE DE LÍNEA DE
COMBUSTIBLE
PUNTO DE CONTROL DE
ALINEACIÓN Y PERFIL
TERRENO ACABADO
CINTA DE PLÁSTICO DE
SEÑALIZACIÓN CON LÍNEA DE
COMBUSTIBLE ANOTADA
FUEL LINE BEDDING MATERIAL
BACKFILL AND FILL MATERIAL
MATERIAL PARA ASIENTO
DE TUBERÍADE FUEL
MATERIAL DE RELLENO DE ZANJA
V E
R
P
E R
F I L
N
G I T
U D
I N
A L
E S
A
N O
S
M
P R
O F
U N
D I D
R
I A
B L
E
CAST IN PLACE
CONCRETE
SIGN POST
HORMIGÓN IN-SITU
POSTE DE SAÑAL
PRECAST CURB
1.2m (APPROX. MATCH EXISTING
1.5m
JOINT SEALANT
ASPHALT PAVEMENT
AGGREGATE BASE COURSE
COMPACTED SUBGRADE
Ø16 @ 300 OC EW
SELLANTE DE JUNTA
BORDILLO PREFABRICADO
1.2m (APROXIMADO IGUAL CON EXISTENTE)
TERRENO COMPACTADO
CAPA BASE DE ÁRIDOS
Ø16 CADA 300 ENTRE CENTROS
EN CADA DIRECCIÓN
C I V
I L
D
E T
A I L S
C-502P
C1
NTS
PEDESTRIAN SIDEWALK
B1
NTS
AGGREGATE SECTION
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
B2
NTS
PRECAST CONCRETE RAISED CURB
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
A2
NTS
NO PARKING HATCH MARKING
PAVEMENT SECTION TABLE
LOCATION
ASPHALT CONCRETE
mm (MIN)
AGGREGATE BASE
COURSE mm (MIN)
STA. 0+509 TO STA. 0+585 75 200
FLOW METER EQUIPMENT PAD
ROAD (C-128P) / CARRETERA
DE LOSA PARA EQUIPO
CAUDALÍMETRO (C-128P)
50 200
STA. 0+688 TO STA. 0+698 60 200
GRANADA AVENUE 60 200
ALICANTE LANE 90 200
BLDG 134 PARKING LOT /
BOLSA DE APARCAMIENTO DE
EDIFICIO 134
70 310
BLDG 1741 PARKING LOT /
BOLSA DE APARCAMIENTO DE
EDIFICIO 1741
70 290
STA. 2+329 TO STA 2+345 50 150
EL CAMINO REAL 60 200
SANTA MARIA STREET 60 200
BUENA VISTA AVENUE 60 200
VENTURA AVENUE 60 200
EL DORADO AVENUE 60 200
PIGGING STATION ACCESS
DRIVES / CARRETERAS DE
ACCESO A LA ESTACIÓN
PIGGING
50 200
B4
NTS
TYPICAL FUEL PIPE TRENCH DETAIL - GREATER THAN 1.3M DEPTH
ALL UNITS ON THIS DRAWING ARE IN
MILLIMETERS UNLESS OTHERWISE NOTED
A4
NTS
CONCRETE DUMPSTER PAD SECTION
DETALLE TÍPICO DE ZANJA PARA TUBERÍAS DE
COMBUSTIBLE - MENOR QUE 1.3M DE PROFUNDIDAD
DETALLE TÍPICO DE ZANJA PARA TUBERÍAS DE COMBUSTIBLE - MAYOR QUE 1.3M DE PROFUNDIDAD
SEÑALIZACIÓN DE PROHIBIDO APARCAR
BORDILLO ELEVADO DE HORMIGÓN PREFABRICADO
SECCIÓN DE ÁRIDOS
ACERADO PEATONAL
SECCIÓN DE PAVIMENTO DE ASFALTO
SECCIÓN DE PLATAFORMA DE HORMIGÓN
TODAS LAS UNIDADES EN ESTE PLANO
ESTÁN EN MILÍMETROS A MENOS QUE
SE INDIQUE OTRA COSA
CIMENTACIÓN DE POSTE
DE SEÑALIZACIÓN
CIMENTACIÓN DE HORMIGÓN
ACERADO DE HORMIGÓN
DONDE SE INDIQUE EN LOS
PLANOS
COTA SUPERIOR DE
PAVIMENTO
MORTERO SECO
DE 100 A 150
D1
NTS
ASPHALT PAVEMENT SECTION
C4
NTS
TYPICAL FUEL PIPE TRENCH DETAIL - LESS THAN 1.3M DEPTH
TABLA DE SECCIÓN DE PAVIMENTO
UBICACIÓN
HORMIGÓN
ASFÁLTICO mm (MÍN)
CAPA BASE GRANULAR
mm (MÍN)
EXST ASPHALT PAVEMENT
EDGE OF EXST PAVEMENT
SAWCUT (FULL DEPTH)
ASPHALT PAVEMENT
TACKCOAT
NOTES:
1. SEE PAVEMENT SECTION TABLE.
2. CUT A NEW STRAIGHT CLEAN EDGE, FULL DEPTH, ON THE EXISTING
PAVEMENT PRIOR TO PATCHING.
A1
NTS
ASPHALT KEY-IN SECTION
300mm
PAVIMENTO ASFÁLTICO
EXISTENTE
BORDE DE CORTE DE SIERRA
EN PAVIMENTO EXISTENTE
(PROFUNDIDAD COMPLETA)
PAVIMENTO ASFÁLTICO
RIEGO DE ADHERENCIA
NOTAS:
1. VER TABLA DE SECCION DE PAVIMENTOS.
2. CORTAR UN BORDE RECTO NUEVO, EN PROFUNDIDAD COMPLETA, SOBRE EL
PAVIMENTO EXISTENTE ANTES DE LAS REPARACIONES.
PAVIMENTO ASFÁLTICO
SECCIÓN EN LLAVE DE ASFALTO
C3
NTS
SIGN POST FOUNDATION
b a b
NOTES: /
1. IF EXISTING FOUNDATION MATERIAL IS CONSIDERED UNSUITABLE, CONTRACTING OFFICER WILL DIRECT THAT
SPECIAL BACKFILL, FOUNDATION MODIFICATIONS, OR EROSION PROTECTION BE PROVIDED.
2. FIELD CUT AND/OR ROTATE BARS FOR FIT.
3. ALL REINFORCING BARS Ø12 UNLESS OTHERWISE NOTED.
4. PLACE REINFORCING IN A SINGLE LAYER AT MID-DEPTH UNLESS OTHERWISE NOTED.
H1 BAR H2 BAR H3 BAR
H BAR H1 BAR H2 BAR H3 BAR V BAR V1 BAR
F
D
A
E
45°
SEE NOTE 2
V1 BAR
H1 BAR
V BAR
H BAR
T
Y
P
H2 BAR
V1 BARS @ 300 +/- CTRS
H1 BAR, 1 EACH TOP & BOTTOM
THICKENED SECTION BELOW
PIPE
I
N
S
I
D
E D
I
A
B
C
A
H BAR
V BARS @ 300 +/- CTRS
H BAR
V1 BAR
H1 BAR
H2 BAR
150 150
THICKENED SECTION BELOW PIPE, 150 MIN
PIPE
FLARE H3 BARS AT 450 MAX CTRS
PLAN
END VIEW
V A
R I E
S
B
T
O
C
H BAR
V BAR
V1 BAR
45°
DIMENSIONS
A B C D E F
0.66
0.66
0.66
0.86
0.86
1.00
1.00
1.22
1.22
0.25
0.25
0.33
0.41
0.41
0.48
0.48
0.56
0.56
0.58
0.58
0.66
0.84
0.84
0.99
0.99
1.17
1.17
0.61
0.61
0.69
0.89
0.89
1.04
1.04
1.24
1.24
2.02
2.02
2.10
2.70
2.70
3.16
3.16
3.77
3.77
1.00
1.00
1.00
1.28
1.28
1.50
1.50
1.79
1.79
REINFORCEMENT BARS COUNT
1 2 1 2
REINFORCEMENT BARS DIMENSIONS
H BAR
a(m) b(m)
0.56 0.98 1.92 0.61 0.85
0.64 2.00 0.69
0.84 1.26 2.60 0.89 1.13
0.99 1.49 3.06 1.04 1.35
1.19 1.77 3.67 1.24 1.64
1 2 1 2 4 7
1 2 1 2 4 7
1 2 1 2
1 2 1 2 5 8
51 2 1
1 2 1
1 2 1
1 2 1
6 11
0.56 0.98 1.92 0.61 0.85
0.98 0.85
0.84 1.26 2.60 0.89 1.13
0.99 1.49 3.06 1.04 1.35
1.19 1.77 3.67 1.24 1.64
BARRA V1
BARRA H1
BARRA H2
SECCIÓN REGRUESADA DEBAJO DE LA TUBERÍA, 150 MÍNIMO
BARRA H
TUBERÍA
BARRAS H3 A 450 MÁX. ENTRE CENTROS
BARRA H
BARRA V @300+/-
ENTRE CENTROS
BARRA V1 @300+/- ENTRE CENTROS
VISTA DE EXTREMO
SECCIÓN REGRUESADA DEBAJO
DE LA TUBERÍA
BARRA H
BARRA V BARRA V1
BARRA H2
BARRA H
BARRA V
VER NOTA 2
BARRA H1
BARRA V1
1. SI EL MATERIAL DE CIMENTACIÓN EXISTENTE SE CONSIDERA INADECUADO, EL OFICIAL CONTRATANTE ORDENARÁ
QUE SE PROPORCIONE UN RELLENO ESPECIAL, MODIFICACIONES EN LA CIMENTACIÓN O PROTECCIÓN CONTRA LA
EROSIÓN.
2. CORTAR Y/O GIRAR LAS BARRAS EN CAMPO PARA AJUSTARLAS.
3. TODAS LAS BARRAS DE REFUERZO SERÁN Ø12 A MENOS QUE SE INDIQUE OTRA COSA.
4. COLOCAR ARMADURA EN UNA SOLA CAPA A MEDIA PROFUNDIDAD, A MENOS QUE SE INDIQUE OTRA COSA.
/ DIMENSIONES
/ NÚMERO DE BARRAS DE REFUERZO
BARRA H2BARRA H1BARRA H BARRA H3
BARRA V BARRA V1
BARRA H
BARRA H1 BARRA H2 BARRA H3
/ DIMENSIONES DE BARRAS DE REFUERZO
A
SEE NOTE 2
VER NOTA 2
NOTAS:
C1
C-503P
NTS
SECTION
SECCIÓNC1
C-503P
PIPE SIZE
TAMAÑO
TUBERÍA
PIPE SIZE
TAMAÑO
TUBERÍA
PIPE SIZE
TAMAÑO
TUBERÍA
BARRA H1, 1 SUPERIOR Y OTRA INFERIOR
PLANTA
V A
R Í
I V
I L
D
E T
A I L S
C-503P
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
ALL UNITS ON THIS DRAWING ARE IN
MILLIMETERS UNLESS OTHERWISE NOTED
A2
NTS
HEADWALL DETAILS
TODAS LAS UNIDADES EN ESTE PLANO
ESTÁN EN MILÍMETROS A MENOS QUE
SE INDIQUE OTRA COSA
DETALLES DE PASACUNETA
A1
NTS
BENDING DIAGRAMS
DIAGRAMA DE CURVATURA
0+620 0+6400+620 0+6400+620 0+6400+620 0+640
EMH
EMH
C
O
N
C
C
O
N
C
C
O
N
C
6.116
C
6.12
FG
6.266
TC
6.116
C
6.266
TC
6.12
FG
6.266
TC
6.266
TC
6.12
FG
6.116
FL
6.266
TC
6.116
C
6.266
TC
5.919
C
5.994
FL
6.266
TC
6.12
FG
6.116
C
6.266
TC
6.12
FG
6.116
C
6.266
TC
6.052
FL
6.134
P
6.094
P
6.12
FG
6.12
FG
6.040
P
6.022
P
6.002
C
5.85
FG
5.81
FG
6.085
P
6.103
P
4:1
4:1
4:1
0.41%
1.84%
0.0%
0.0%
3.03%
3.03%
1.9%
6.116
C
6.116
C
6.116
C
6.116
FL
5.995
FL
6.007
FL
6.146
P
6.106
P
6.130
P
6.108
P
0.8%
0.5%
6.12
FG
6.12
FG
6.12
FG
6.000
6.000
6.000
1.0%
6.12
FG
6.12
FG
6.12
FG
0.5%
0.5%
N: 4,056,680.230
E: 739,935.311
6.12
FG
N: 4,056,695.051
E: 739,930.626
6.12
FG
N: 4,056,685.681
E: 739,918.913
6.12
FG
N: 4,056,679.702
E: 739,935.733
5.95
FG
N: 4,056,677.482
E: 739,937.510
5.93
FG
1.0%
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
CG428P
D1
C-502P
A1
S-527P
KEYED NOTES:
1. ASPHALT PAVEMENT.
2. FLOW METER EQUIPMENT PAD.
3. ASPHALT KEY-IN SECTION
GENERAL NOTES:
1. ELEVATIONS SHOWN ARE TO TOP OF FINISHED SURFACE UNLESS NOTED OTHERWISE.
2. SEE REFERENCE DRAWING V-003 FOR BENCHMARKS
NOTAS DE REFERENCIA:NOTAS GENERALES:
1. LAS COTAS INDICADAS SE REFIEREN A LA PARTE SUPERIOR DE LA SUPERFICIE ACABADA,
A MENOS QUE SE INDIQUE LO CONTRARIO.
1. PAVIMENTO DE ASFALTO.
2. LOSA PARA EQUIPO CAUDALÍMETRO.
3. SECCIÓN EN LLAVE DE ASFALTO
2. VER PLANO DE REFERENCIA V-003 PARA BASES DE REPLANTEO.
B1
1:50
ENLARGED GRADING PLAN
PLANTA AMPLIADA DE NIVELACIÓN
0 2 3 4 5
1:50
R1.5
R1.5
A1
M-528P
A1
.5
.5
.5
.5
ML-4
19.38
FG
19.378
C
19.528
TC
19.378
C
19.38
FG
19.528
TC
19.378
P
19.378
C
19.528
TC
19.378
C
19.378
P
19.528
TC
19.45
P
19.45
P
19.24
P
19.235
P
19.272
FL
19.260
FL
19.259
FL
19.528
TC
19.184
C
.2
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
B1
1:50
SITE PLAN
CG440P
KEYED NOTES:
1. ASPHALT PAVEMENT
2. PIGGING STATION
3. ASPHALT KEY-IN SECTION
0 2 3 4 5
1:50
GENERAL NOTES:
1. ELEVATIONS SHOWN ARE TO TOP OF FINISHED SURFACE UNLESS NOTED OTHERWISE.
2. SEE REFERENCE DRAWING V-003 FOR BENCHMARKS
PLANTA DE EXTERIORES
NOTAS DE REFERENCIA:NOTAS GENERALES:
1. LAS COTAS INDICADAS SE REFIEREN A LA PARTE SUPERIOR DE LA SUPERFICIE ACABADA,
A MENOS QUE SE INDIQUE LO CONTRARIO.
B1
M-439P
A1
S-526P
D1
C-502P
A1
C-502P
2. VER PLANO DE REFERENCIA V-003 PARA BASES DE REPLANTEO.
1. PAVIMENTO DE ASFALTO.
2. ESTACIÓN PIGGING.
3. SECCIÓN EN LLAVE DE ASFALTO
GENERAL NOTES STRUCTURAL DESIGN CRITERIA (CONT)
9. CONSTRUCTION JOINTS FOR ELEVATED SLABS, BEAMS AND GIRDERS MUST BE LOCATED WITHIN
THE MIDDLE THIRD OF THEIR SPAN. JOINTS IN GIRDERS MUST BE OFFSET A MINIMUM DISTANCE
OF TWO TIMES THE GIRDER WIDTH FROM AN INTERSECTING BEAM.
10. A SET OF SHEETS SHOWING CONCRETE PLACING SEQUENCE AND LOCATION OF JOINTS MUST
BE SUBMITTED TO THE RESIDENT OFFICE FOR APPROVAL PRIOR TO PREPARATION OF AFFECTED
REINFORCING SHOP SHEETS.
11. PROVIDE PIPE SLEEVE FOR PIPES AND CONDUITS THAT PASS THROUGH MASONRY OR
CONCRETE. MAKE SLEEVES IN WALLS FLUSH AND EXTEND SLEEVES IN FLOORS 100 ABOVE TOP
OF FLOOR UNLESS SHOWN OTHERWISE.
12. PROVIDE SETTING TEMPLATES TO POSITION ANCHOR BOLTS PRIOR TO PLACING CONCRETE.
ACCURATELY POSITION BOLTS TO ASSURE CORRECT VERTICAL AND HORIZONTAL LOCATION TO
MATCH STEEL OR EQUIPMENT BOLT PATTERN.
13. METAL FABRICATIONS EMBEDDED IN CONCRETE, OTHER THAN REINFORCING AND ANCHOR
BOLTS, MUST BE HOT-DIP GALVANIZED AFTER FABRICATION IN ACCORDANCE WITH ASTM A123
AND ASTM A386 AS APPLICABLE.
14. CONCRETE MUST NOT BE LOADED UNTIL IT HAS ATTAINED SUFFICIENT STRENGTH TO SAFELY
WITHSTAND LOADING AND UNTIL REQUIRED SHORING AND BRACING HAVE BEEN INSTALLED.
15. DO NOT PLACE LOADS WITHIN 2 m OF CONSTRUCTION JOINT IN SLABS FOR AT LEAST 7 DAYS
AFTER SLAB IS PLACED.
1. THE FOLLOWING STRUCTURAL GENERAL NOTES APPLY TO STRUCTURES WHERE FULL
STRUCTURAL DESIGN IS PROVIDED AND MUST BE USED AS A BASIS FOR STRUCTURAL DESIGN OF
PERFORMANCE SPECIFIED STRUCTURES. THE NOTES AND DETAILS FOUND IN THE S- SERIES
DRAWINGS ARE TO BE USED ALONG WITH NOTES, SCHEDULES AND DETAILS PROVIDED WITHIN
THE BUILDING SPECIFIC DRAWINGS.
2. CONTRACTOR MUST VERIFY DIMENSIONS AND CONDITIONS AFFECTING THE WORK AT THE JOB
SITE.
3. METHODS, PROCEDURES AND SEQUENCES OF CONSTRUCTION ARE THE RESPONSIBILITY OF THE
CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING AND IMPLEMENTING THE
NECESSARY PRECAUTIONS TO MAINTAIN AND ENSURE THE INTEGRITY OF THE STRUCTURE AT
EVERY STAGE OF CONSTRUCTION.
4. TEMPORARY BRACING, SHEETING, SHORING, AND OTHER MEASURES REQUIRED TO ENSURE THE
STRUCTURAL INTEGRITY/STABILITY OF THE STRUCTURES DURING CONSTRUCTION IS THE
RESPONSIBILITY OF THE CONTRACTOR AND MUST BE DESIGNED BY A REGISTERED
PROFESSIONAL ENGINEER EMPLOYED BY THE CONTRACTOR.
5.
6. FOR LOCATIONS AND DIMENSIONS OF PARTITIONS, SLAB DEPRESSIONS, EMBEDDED OR
ATTACHED ITEMS, REFER TO THE ARCHITECTURAL, MECHANICAL, ELECTRICAL, OR PLUMBING
DRAWINGS AS APPLICABLE.
7. SLEEVES OR BLOCK-OUTS REQUIRED FOR PASSAGE OF DUCTWORK, PIPING, DRAINS, CONDUIT, ETC, IN ADDITION TO ANCHORS AND HANGERS REQUIRED FOR EQUIPMENT AND PIPING AND
UNDER-SLAB UTILITIES ARE NOT SPECIFICALLY, NOR GENERALLY, INDICATED ON THE
STRUCTURAL DRAWINGS. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING SUCH
REQUIREMENTS PRIOR TO FABRICATION OR ERECTION OF THE STRUCTURE. EDGE OF SLEEVES
OR BLOCK-OUT OPENINGS MUST BE LOCATED AT LEAST 250mm FROM CONCRETE EDGE.
PENETRATIONS OF STRUCTURAL MEMBERS ARE SUBJECT TO APPROVAL BY THE RESIDENT
OFFICE.
8. DIMENSIONS AND INSTALLATION DETAILS OF PURCHASED EQUIPMENT MUST BE VERIFIED AND
COORDINATED WITH THE SUPPORTING STRUCTURE AND FOUNDATION. THE CONTRACTOR IS
RESPONSIBLE FOR DETERMINING SUCH REQUIREMENTS FROM SUBCONTRACTORS AND
EQUIPMENT SUPPLIERS ALONG WITH COORDINATING THE LOCATIONS AND DETAILS FOR THESE
ITEMS PRIOR TO FABRICATION OR ERECTION OF THE SUPPORTING STRUCTURE AND FOUNDATION.
CONFLICTS BETWEEN THESE ITEMS AND THE BUILDING STRUCTURE IS TO BE BROUGHT TO THE
ATTENTION OF THE RESIDENT OFFICE FOR RESOLUTION.
10.
11. WORK NOT INDICATED ON A PART OF THE DRAWINGS, BUT REASONABLY IMPLIED TO BE
SIMILAR TO THAT SHOWN AT CORRESPONDING LOCATIONS, IS TO BE REPEATED.
12. DETAILS DESIGNATED AS "TYPICAL DETAILS," APPLY GENERALLY TO THE DRAWINGS IN AREAS
WHERE CONDITIONS ARE SIMILAR TO THOSE DESCRIBED IN THE DETAILS.
13. DIMENSIONS ARE SHOWN USING MILLIMETERS UNLESS OTHERWISE NOTED.
14. DO NOT SCALE SHEETS.
15. STRUCTURAL WORK AND MATERIALS MUST CONFORM TO THE REQUIREMENTS OF THE
PROJECT SPECIFICATIONS.
16. EXCAVATIONS MUST BE INSPECTED AND APPROVED BY THE RESIDENT OFFICE OR ITS
APPROVED AGENT PRIOR TO PLACING CONCRETE.
12. FLOOR AND ROOF LIVE LOADS: SEE PLANS.
13. GROUND SNOW LOAD (Pg): 5 psf (0.24 kPa).
14. WIND DESIGN DATA:
A. BASIC WIND SPEED (3 SEC GUST): 110 mph (177 km/hr)
B. WIND EXPOSURE: C.
C. TOPOGRAPHIC FACTOR, (Kzt): 1.0.
D. RISK CATEGORY: III
15. EARTHQUAKE DESIGN DATA:
A. RISK CATEGORY: III
B. SEISMIC (STRUCTURE) IMPORTANCE FACTOR (I): 1.25
C. SHORT PERIOD SPECTRAL RESPONSE ACCELERATION ( S
S
): 0.76g
D. 1 SECOND SPECTRAL RESPONSE ACCELERATION ( S
): 0.35g
E. SITE CLASS: E
F. SHORT PERIOD SPECTRAL RESPONSE PARAMETER (S
DS
): 0.61g
G. 1 SECOND SPECTRAL RESPONSE PARAMETER (S
D1
): 0.46g
H. SEISMIC DESIGN CATEGORY (SDC): D
I. BASIC SEISMIC-FORCE-RESISTING SYSTEM: SEE PLANS.
J.
K.
SEISMIC RESPONSE COEFFICIENT (C
S
): SEE PLANS.
L.
RESPONSE MODIFICATION FACTOR (R): SEE PLANS.
ANALYSIS PROCEDURE USED: EQUIVALENT LATERAL FORCE.
16. DO NOT PERFORM OPERATIONS NEAR GROUND FLOOR SLAB PLACEMENT WHICH COULD
CAUSE VIBRATION OR SETTLEMENT OF THE SUPPORTING SOIL STRATA FOR AT LEAST 7 DAYS
AFTER SLAB IS PLACED.
17. CONSTRUCTION CRANE OR OTHER HEAVY ERECTION EQUIPMENT WILL NOT BE PERMITTED
ON SLABS.
18. FOUNDATION AND BUILDING WALLS MUST BE ADEQUATELY BRACED DURING CONSTRUCTION.
19. CONTRACTOR IS RESPONSIBLE FOR PREVENTION OF FLOATATION OF STRUCTURES AND
UNDERGROUND UTILITIES AND TANKS DURING CONSTRUCTION.
20. DO NOT PLACE CONCRETE UNTIL REINFORCING STEEL PLACEMENT HAS BEEN VERIFIED BY
RESIDENT OFFICE.
21. DO NOT BACKFILL WALLS UNTIL SLAB SUPPORTING TOP OF WALL HAS BEEN INSTALLED
COMPLETE AND CONCRETE HAS ATTAINED AT LEAST 70% OF DESIGN STRENGTH.
22. VAPOR RETARDER IS POLYETHYLENE SHEETING; SEE SPECS.
23. USE OF SOIL TO FORM SIDES OF CONCRETE CONSTRUCTION IS PROHIBITED.
IMPLEMENTATION OF JOB SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
9.
DIMENSIONS AND INSTALLATION DETAILS OF GOVERNMENT FURNISHED TRAINER EQUIPMENT
MUST BE VERIFIED AND COORDINATED WITH THE SUPPORTING STRUCTURE AND FOUNDATION.
THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING SUCH REQUIREMENTS FROM
SUBCONTRACTORS AND EQUIPMENT SUPPLIERS ALONG WITH COORDINATING THE LOCATIONS
AND DETAILS FOR THESE ITEMS PRIOR TO FABRICATION OR ERECTION OF THE SUPPORTING
STRUCTURE AND FOUNDATION. CONFLICTS BETWEEN THESE ITEMS AND THE BUILDING
STRUCTURE IS TO BE BROUGHT TO THE ATTENTION OF THE RESIDENT OFFICE FOR RESOLUTION.
GENERAL NOTES (CONT)
STRUCTURAL DESIGN CRITERIA
1. BUILDING CODE: INTERNATIONAL BUILDING CODE (IBC) 2018; PUBLISHED BY INTERNATIONAL
CODE COUNCIL, INC.
2.
3. STEEL DESIGN CODE: SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS, AISC 360-16,
PUBLISHED BY THE AMERICAN INSTITUTE OF STEEL CONSTRUCTION.
4. CONCRETE BUILDING DESIGN CODE: BUILDING CODE REQUIREMENTS FOR STRUCTURAL
CONCRETE, ACI 318-14; PUBLISHED BY AMERICAN CONCRETE INSTITUTE.
7. STRUCTURAL STEEL: SEE SPECIFICATION.
8. STRUCTURAL CONCRETE COMPRESSIVE STRENGTH (150 CYLINDER): 30 MPa (4350 PSI)
MINIMUM AT 28 DAYS.
9. REINFORCING STEEL: UNE 36068 DESIGNATION B 400 S (YIELD STRENGTH = 400MPa, MINIMUM), EXCEPT USE UNE 36065 DESIGNATION B 400 SD (YIELD STRENGTH = 400MPa, MINIMUM; AND RATIO
OF ULTIMATE STRENGTH/YIELD STRENGTH TO BE 1.25 OR GREATER) FOR SHEARWALLS AND
COLUMN PIERS. USE OF B 400 SD INSTEAD OF B 400 S IS PERMITTED.
10.
11. DEAD LOADS: SELF-WEIGHT OF STRUCTURE PLUS PERMANENT EQUIPMENT, PLUS 10 psf (0.48 KPa)
COLLATERAL LOAD.
5. UFC 3-301-01 STRUCTURAL ENGINEERING, 1 OCTOBER 2019.
6. UFC 4-211-01 AIRCRAFT MAINTENANCE HANGARS, WITH CHANGE 1, NOVEMBER 2017.
REQUIRED NET ALLOWABLE SOIL BEARING PRESSURE: SEE PLANS
CONCRETE NOTES
1. EMBEDDED MATERIAL:
A. BEFORE PLACING CONCRETE, VERIFY THAT EMBEDDED ITEMS ARE IN POSITION AND
SECURELY FASTENED IN PLACE.
B. ELECTRIC CONDUITS AND PIPING TO BE EMBEDDED IN CONCRETE MUST MEET THE
APPLICABLE REQUIREMENTS OF ACI 318.
2. PROVIDE 12 CHAMFER FOR EXPOSED EDGES OF COLUMNS, BEAMS, WALLS, SLABS AND
OTHER MEMBERS AS DIRECTED BY THE RESIDENT OFFICE.
3. PROVIDE APPROPRIATE DEPRESSIONS IN SLABS FOR TILE OR OTHER SIMILAR MATERIALS.
MAINTAIN FULL SLAB THICKNESS BELOW THESE DEPRESSIONS. SEE ARCHITECTURAL INTERIOR
FINISH SCHEDULES, FLOOR PLANS, AND DETAILS FOR REQUIRED DEPRESSIONS.
4. CONSTRUCTION JOINTS MUST BE LOCATED AS SHOWN ON SHEETS.
6. KEYWAY DIMENSIONS: DEPTH 40; WIDTH ONE-THIRD THAT OF MEMBER UNLESS SHOWN
OTHERWISE.
7. CONSTRUCTION JOINTS AS SHOWN MAY BE VARIED TO SUIT PLACING SEQUENCE PROVIDED
THE RELOCATION, ADDITION, OR DELETION OF CONSTRUCTION JOINTS IS APPROVED BY THE
RESIDENT OFFICE PRIOR TO PREPARATION OF REINFORCING STEEL SHOP SHEETS.
8. MAXIMUM LENGTH OF CONCRETE PLACEMENT IN EVERY DIRECTION, UNLESS
SHOWN OTHERWISE: 15 m
CONCRETE NOTES (CONT)
5.
CONSTRUCTION JOINTS MUST HAVE KEYWAYS UNLESS SHOWN OTHERWISE.
THE STRUCTURAL DRAWINGS GOVERN THE WORK FOR STRUCTURAL FEATURES, UNLESS
OTHERWISE NOTED. DIMENSIONS SHOWN ON PLANS AND DETAILS ARE TO GOVERN THE
STRUCTURAL WORK. DIMENSIONAL CONFLICTS IN THE DOCUMENTS MUST BE BROUGHT TO THE
ATTENTION OF THE RESIDENT OFFICE.
ASCE 7-16 MINIMUM DESIGN LOADS AND ASSOCIATED CRITERIA FOR BUILDINGS AND OTHER
STRUCTURES; PUBLISHED BY AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE).
1. LAS SIGUIENTES NOTAS ESTRUCTURALES GENERALES SE APLICAN A LAS ESTRUCTURAS EN
LAS QUE SE PROVEE UN DISEÑO ESTRUCTURAL COMPLETO Y DEBEN UTILIZARSE COMO
BASE PARA EL DISEÑO ESTRUCTURAL DE LAS ESTRUCTURAS CON LAS PRESTACIONES
ESPECIFICADAS. LAS NOTAS Y DETALLES QUE FIGURAN EN LOS PLANOS DE LA SERIE S
DEBEN UTILIZARSE JUNTO CON LAS NOTAS, CUADROS Y DETALLES INCLUIDOS EN LOS
PLANOS ESPECÍFICOS DEL EDIFICIO.
NOTAS GENERALES
2. EL CONTRATISTA DEBE VERIFICAR LAS DIMENSIONES Y CONDICIONES QUE AFECTEN A LOS
TRABAJOS EN LA OBRA.
3. LOS MÉTODOS, PROCEDIMIENTOS Y SECUENCIAS DE CONSTRUCCIÓN SON RESPONSABILIDAD
DEL CONTRATISTA. EL CONTRATISTA ES RESPONSABLE DE IDENTIFICAR E IMPLEMENTAR LAS
PRECAUCIONES NECESARIAS PARA MANTENER Y GARANTIZAR LA INTEGRIDAD DE LA
ESTRUCTURA EN CADA ETAPA DE CONSTRUCCIÓN.
4. EL ARRIOSTRAMIENTO, ENCOFRADO, APUNTALAMIENTO TEMPORAL Y OTRAS MEDIDAS
NECESARIAS PARA GARANTIZAR LA INTEGRIDAD ESTRUCTURAL / ESTABILIDAD DE LAS
ESTRUCTURAS DURANTE LA CONSTRUCCIÓN ES RESPONSABILIDAD DEL CONTRATISTA Y
DEBEN SER DISEÑADAS POR UN INGENIERO PROFESIONAL COLEGIADO EMPLEADO POR EL
CONTRATISTA.
5. LA APLICACIÓN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .