This document is a comprehensive set of mechanical demolition and installation plans for the replacement of a fuel pipeline system from Pier 3 to bulk storage at Naval Station Rota, Spain. The plans detail the demolition of existing 450mm, 600mm, and 400mm F-76 fuel pipelines and associated infrastructure, with replacement by new 500mm F-76 pipelines throughout the facility.

The demolition plans (MD101-MD120, MD401-MD411) specify removal of existing pipeline sections, supports, fittings, and valves across multiple locations including Pier 3, booster pump houses, metering stations, and interconnecting valve pits. Key demolition requirements include abandoning certain 450mm and 600mm pipeline sections in place with seal-welded 6mm end plates, removing below-grade piping and appurtenances, protecting or removing and reinstalling pipe support foundations, and rehabilitating concrete penetrations per specification Section 03 01 00 and ACI 562-16. The installation plans (M101-M120) show the new 500mm F-76 pipeline routing with expansion loops, high-point vents, low-point drains, pipe anchors, and free/guided supports at 90-meter intervals with exothermic welded #4 AWG cable bonding to existing ground rings. The plans cover approximately 7.8 kilometers of pipeline installation from station 5+360 to 7+880, including connections to existing metering stations, booster pump houses, and tank farm facilities. Horizontal directional drilling (HDD) sections are specified for crossing the Rio Salado, with detailed elevation profiles showing coordination with existing 300mm-600mm ballast, JP-5, JP-8, and CAMPSA pipelines. All work references Section 02 41 00 for demolition requirements and must accommodate existing utilities while maintaining one pipe diameter clearance per UFC 3-460-01.

View the file

Other files

File Type Posted
N6247026R0006 Amendment 0009.pdf PDF
N6247026R0006 Amendment 0008.pdf PDF
Amendment 0008 Revised Specifications_Section 01.pdf PDF
P919 - Amendment 0007.pdf PDF
N6247026R0006 Amendment 0007.pdf PDF
Amendment 0006_Revised Specifications P919.pdf PDF
Amendment 0006_Revised Specifications F76 Pier 3.pdf PDF
Attachment M - F76 6_PIER3_REFERENCE-DRAWINGS_SET_6-OF-6.pdf PDF
Attachment M - F76 5_PIER3-FINAL_SUBMITTAL-PGS-130-149_SET_5-OF-6.pdf PDF
Amendment 0006_Revised Tank DWGs Prime.pdf PDF
Amendment 0006_Revised F76 Pier 3 Mech Dwgs.pdf PDF
Attachment M - F76 4_PIER3-FINAL_SUBMITTAL-PGS-100-129_SET_4-OF-6.pdf PDF
Amendment 0006_Revised P-919 Dwgs_Pipeline Dwgs.pdf PDF
N6247026R0006 Amendment 0006.pdf PDF
Attachment M - F76 2_PIER3-FINAL_SUBMITTAL-PGS-35-70_SET_2-OF-6.pdf PDF
Attachment M - F76 1_PIER3-FINAL-REV1_SUBMITTAL-PGS-1-34_SET_1-OF-6.pdf PDF
Amendment 0006_Revised 01 30 00.pdf PDF
Amendment 0006_Revised F76 Pier 3 Civil Dwgs.pdf PDF
P919 - Amendment 0006.pdf PDF
Amendment 0006_Revised EC502P CATHODIC PROTECTION DETAILS.pdf PDF
Amendment 0006_Revised 01 45 00.pdf PDF
Amendment 0006_Revised 01 35 26.pdf PDF
Attachment G - Certificate of Classification Revised.pdf PDF
P-919 - Amendment 0005.pdf PDF
N6247026R0006 Amendment 0005.pdf PDF
Attachment P - Photos.pdf PDF
N6247026R0006 Amendment 0004.pdf PDF
N6247026R0006 Amendment 0003.pdf PDF
P919 Amendment 0002.pdf PDF
Site Visit Log (Attachment O).pdf PDF
N6247026R0006 Amendment 0002.pdf PDF
Attachment B - Bid Schedule Revised.pdf PDF
N6247026R0006 Amedment 0001.pdf PDF
Attachment N - Specifications -Replace Fuel Pipeline Pier 3 Rota.pdf PDF
Attachment M - F74 4_PIER3-FINAL_SUBMITTAL-PGS-100-129_SET_4-OF-6.pdf PDF
Attachment M - F74 5_PIER3-FINAL_SUBMITTAL-PGS-130-149_SET_5-OF-6.pdf PDF
Attachment M - F74 6_PIER3_REFERENCE-DRAWINGS_SET_6-OF-6.pdf PDF
Attachment M - F74 2_PIER3-FINAL_SUBMITTAL-PGS-35-70_SET_2-OF-6.pdf PDF
Attachment M - F74 3_PIER3-FINAL_SUBMITTAL-PGS-62-99_SET_3-OF-6.pdf PDF
Attachment M - F74 1_PIER3-FINAL-REV1_SUBMITTAL-PGS-1-34_SET_1-OF-6.pdf PDF
Attachment_F_P919__Volume_12_of_15.pdf PDF
Attachment_F_P919__Volume_2_of_15.pdf PDF
Attachment_F_P919__Volume_9_of_15.pdf PDF
Attachment_F_P919__Volume_1_of_15.pdf PDF
Attachment L - Certificate Insurance Form.pdf PDF
Attachment_F_P919__Volume_7_of_15.pdf PDF
Attachment G - Certificates of Classifications.pdf PDF
Attachment_F_P919__Volume_14_of_15.pdf PDF
Attachment D - Construction Experience Project Data Sheet.pdf PDF
Attachment_F_P919_REFERENCE_Volume_15_of_15.pdf PDF
Show 40 more

Latest 50 of 67 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

m

J

P

F

C

A

R

G

O

B

L

L

A

S

T

C

L

H

MD105

F O

R

C

O N

T I N

U A

T I O

N

S

E

S

H E

T

M

D

F O

R

C

O N

T I N

U A

T I O

N

S

E

C1

1:200

DEMOLITION PLAN

GENERAL NOTES:

REMOVE PIPELINE

DEMOLITION LEGEND:

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

TIMOTHY A.

SCHMITT

17386

KEYED NOTES:

1. REMOVE 450mm F-76 PIPELINE, SUPPORTS, FITTINGS AND

VALVES ON PIER 3 FOR 500mm F-76 PIPELINE.

1. SEE SECTION 02 41 00 FOR DEMOLITION REQUIREMENTS.

PLANTA DE DEMOLICIONES

NOTAS DE REFERENCIA:NOTAS GENERALES:

1. VER SECCIÓN 02 41 00 PARA LOS REQUISITOS DE

DEMOLICIÓN.

NOTAS DE DEMOLICIÓN:

RETIRAR TUBERÍA

C O

N T

I N

U A

C I Ó

N

E

N

P

L A

N O

C O

N T

I N

U A

C I Ó

N

E

N

P

L A

1. RETIRAR LA LÍNEA DE COMBUSTIBLE F-76 DE 450mm DE

DIÁMETRO, LOS SOPORTES, ACCESORIOS Y LAS VÁLVULAS EN

EL MUELLE 3 POR UNA NUEVA F-76 DE 500m DE DIÁMETRO

0 8 12 16 20

1:200

0+000

0+020

R

G

O

L

L

A

S

T

C

L

H

VP-1

MD106

0 8 12 16 20

1:200

GENERAL NOTES:

REMOVE PIPELINE

DEMOLITION LEGEND:

F O

R

C

O N

T I N

U A

T I O

N

S

E

F O

R

C

O N

T I N

U A

T I O

N

S

E

C1

1:200

DEMOLITION PLAN

B1

MD401

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

TIMOTHY A.

SCHMITT

17386

KEYED NOTES:

1. REMOVE 450mm F-76 PIPELINE, SUPPORTS, FITTINGS AND

VALVES ON PIER 3 FOR 500mm F-76 PIPELINE.

2. 450mm PIPELINE TO BE ABANDONED IN PLACE. PROVIDE

SEAL WELDED 6mm END PLATES AT ENDS OF ABANDONED

PIPE.

1. SEE SECTION 02 41 00 FOR DEMOLITION REQUIREMENTS.

PLANTA DE DEMOLICIONES

NOTAS DE REFERENCIA:NOTAS GENERALES:

1. VER SECCIÓN 02 41 00 PARA LOS REQUISITOS DE

DEMOLICIÓN.

NOTAS DE DEMOLICIÓN:

RETIRAR TUBERÍA

C O

N T

I N

U A

C I Ó

N

E

N

P

L A

2. ABANDONAR LA LINEA DE COMBUSTIBLE DE 450mm DE

DIÁMETRO EN SU LUGAR. PROVEER PLACAS DE 6mm

SOLDADAS Y SELLADAS EN LOS EXTREMOS DE LA LINEA DE

COMBUSTIBLE ABANDONADA

C O

N T

I N

U A

C I Ó

N

E

N

P

L A

1. RETIRAR LA LÍNEA DE COMBUSTIBLE F-76 DE 450mm DE

DIÁMETRO, LOS SOPORTES, ACCESORIOS Y LAS VÁLVULAS EN

EL MUELLE 3 POR UNA NUEVA F-76 DE 500m DE DIÁMETRO

WATERLINE

MD107

0 8 12 16 20

1:200

F O

R

C

O N

T I N

U A

T I O

N

S

E

F O

R

C

O N

T I N

U A

T I O

N

S

E

C1

1:200

DEMOLITION PLAN

GENERAL NOTES:

REMOVE PIPELINE

DEMOLITION LEGEND:

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

TIMOTHY A.

SCHMITT

17386

KEYED NOTES:

1. REMOVE BELOW GRADE 450mm F-76 PIPELINE AND FITTINGS

FOR 500mm F-76 PIPELINE.

1. SEE SECTION 02 41 00 FOR DEMOLITION REQUIREMENTS.

PLANTA DE DEMOLICIONES

NOTAS DE REFERENCIA:NOTAS GENERALES: NOTAS DE DEMOLICIÓN:

RETIRAR TUBERÍA

C O

N T

I N

U A

C I Ó

N

E

N

P

L A

C O

N T

I N

U A

C I Ó

N

E

N

P

L A

1. RETIRAR LA LINEA DE COMBUSTIBLE ENTERRADA F-76 DE

450mm DE DIAMETRO Y LOS ACCESORIOS POR UNA NUEVA

F-76 DE 500mm DE DIAMETRO.

1. VER SECCIÓN 02 41 00 PARA LOS REQUISITOS DE

DEMOLICIÓN.

METERING STATIONS

ESTACIONES DE MEDICIÓN

MD108

0 8 12 16 20

1:200

F O

R

C

O N

T I N

U A

T I O

N

S

E

GENERAL NOTES:

REMOVE PIPELINE

DEMOLITION LEGEND:

B1

1:200

DEMOLITION PLAN

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

TIMOTHY A.

SCHMITT

17386

KEYED NOTES:

1. SEE SECTION 02 41 00 FOR DEMOLITION REQUIREMENTS.

PLANTA DE DEMOLICIONES

NOTAS DE REFERENCIA:NOTAS GENERALES:

1. VER SECCIÓN 02 41 00 PARA LOS REQUERIMIENTOS DE

DEMOLICIÓN.

LEYENDA DE DEMOLICIÓN:

RETIRAR TUBERÍA

P A

R

N

T I N

U A

C I Ó

N

V

L A

2. ABANDONAR LA LÍNEA DE COMBUSTIBLE 450mm DE

DIÁMETRO EN SU LUGAR. PROVEER PLACAS DE 6mm

SOLDADAS Y SELLADAS EN LOS EXTREMOS DE LA LÍNEA DE

COMBUSTIBLE ABANDONADA

1. RETIRAR LA LINEA DE COMBUSTIBLE ENTERRADA F-76 DE

450mm DE DIÁMETRO Y LOS ACCESORIOS POR UNA NUEVA

F-76 DE 500mm DE DIÁMETRO.

F O

R

C

O N

T I N

U A

T I O

N

S

E

P A

N

T I N

U A

C I Ó

N

V

A

3. PROTEGER O RETIRAR Y REINSTALAR CIMENTACIÓN DE

SOPORTE DE TUBERÍA.

4. TUBERÍA DE COMBUSTIBLE ENTERRADA A ABANDONAR EN EL

SITIO

1. REMOVE BELOW GRADE 450mm F-76 PIPELINE AND FITTINGS

FOR 500mm F-76 PIPELINE.

2. 450mm PIPELINE TO BE ABANDONED IN PLACE. PROVIDE SEAL

WELDED 6mm END PLATES AT ENDS OF ABANDONED PIPE.

3. PROTECT OR REMOVE AND REINSTALL PIPE SUPPORT

FOUNDATION.

4. BELOW GRADE FUEL PIPING TO BE ABANDONED IN PLACE.

L

L

A

S

T

I

S

U

E

R

G

O

A

C

T

I

V

E

JP8

F76

JP8

BOOSTER

PUMP HOUSE

BPH-VP-1

P

F76

BPH-VP-3

AND 3.5

BPH-VP-1.5

MD109

0 8 12 16 20

1:200

B1

1:200

DEMOLITION PLAN

GENERAL NOTES:

REMOVE PIPELINE

DEMOLITION LEGEND:

A1

MD404

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

TIMOTHY A.

SCHMITT

17386

KEYED NOTES:

1. REMOVE BELOW GRADE 450mm F-76 PIPELINE AND FITTINGS

FOR 500mm F-76 PIPELINE.

2. REMOVE BELOW GRADE 600mm F-76 PIPELINE AND FITTINGS

FOR 500mm F-76 PIPELINE.

3. REMOVE BELOW GRADE 400mm F-76 PIPELINE AND FITTINGS

1. SEE SECTION 02 41 00 FOR DEMOLITION REQUIREMENTS.

PLANTA DE DEMOLICIONES

NOTAS DE REFERENCIA:NOTAS GENERALES:

1. VER SECCIÓN 02 41 00 PARA LOS REQUISITOS DE

DEMOLICIÓN.

NOTAS DE DEMOLICIÓN:

RETIRAR TUBERÍA

2. RETIRAR LA LÍNEA DE COMBUSTIBLE ENTERRADA F-76 DE

600mm DE DIÁMETRO Y LOS ACCESORIOS POR UNA NUEVA

F-76 DE 500mm DE DIÁMETRO

1. RETIRAR LA LINEA DE COMBUSTIBLE ENTERRADA F-76 DE

450mm DE DIAMETRO Y LOS ACCESORIOS POR UNA NUEVA

F-76 DE 500mm DE DIAMETRO.

F

N

T I N

U

A

T I

E

P

A

N

T I N

U

A

C

I Ó

V

A

F

N

T

I N

U

A

T

I

E

P

A

N

T

I N

U

A

C

I

A

3. RETIRAR LA LINEA DE COMBUSTIBLE ENTERRADA F-76 DE

400mm DE DIÁMETRO Y LOS ACCESORIOS

B1

MD403

B1

MD402

MD110

0 8 12 16 20

1:200

B1

1:200

DEMOLITION PLAN

GENERAL NOTES:

REMOVE PIPELINE

DEMOLITION LEGEND:

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

TIMOTHY A.

SCHMITT

17386

KEYED NOTES:

1. REMOVE BELOW GRADE 600mm F-76 PIPELINE AND FITTINGS

FOR 500mm F-76 PIPELINE.

PLANTA DE DEMOLICIONES

NOTAS DE REFERENCIA:NOTAS GENERALES: NOTAS DE DEMOLICIÓN:

RETIRAR TUBERÍA

1. RETIRAR LA LÍNEA DE COMBUSTIBLE ENTERRADA F-76 DE

600mm DE DIÁMETRO Y LOS ACCESORIOS POR UNA NUEVA

F-76 DE 500m DE DIÁMETRO.

1. SEE SECTION 02 41 00 FOR DEMOLITION REQUIREMENTS.

1. VER SECCIÓN 02 41 00 PARA LOS REQUISITOS DE

DEMOLICIÓN.

F

N

T

I

N

U

A

T

I

E

F O

R

C

O N

T I N

U A

T I O

N

S

E

P

A

N

T

I

N

U

A

C

I

A

P A

N

T I N

U A

C I Ó

N

V

A

RIO SALADO BRIDGE

RIO SALADO

VALVE PIT WEST/

SPAGHETTI PIT

MD111

0 8 12 16 20

1:200

B1

1:200

DEMOLITION PLAN

GENERAL NOTES:

REMOVE PIPELINE

DEMOLITION LEGEND:

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

TIMOTHY A.

SCHMITT

17386

PLANTA DE DEMOLICIONES

NOTAS GENERALES: NOTAS DE DEMOLICIÓN:

RETIRAR TUBERÍA

1. SEE SECTION 02 41 00 FOR DEMOLITION REQUIREMENTS.

1. VER SECCIÓN 02 41 00 PARA LOS REQUISITOS DE

DEMOLICIÓN.

RÍO SALADO PUENTE

F

N

T

I

N

U

A

T

I

E

P

A

N

T

I

N

U

A

C

I

A

RIO SALADO

POZO DE VÁLVULAS OESTE/

POZO DE ESPAGHETTI

KEYED NOTES:

1. REMOVE BELOW GRADE 600mm F-76 PIPELINE AND FITTINGS

FOR 500mm F-76 PIPELINE.

2. 600mm F-76 TO BE ABANDONED IN PLACE. SEAL WELD 6mm

PLATE TO END OF ABANDONED PIPE.

NOTAS DE REFERENCIA:

1. RETIRAR LA LÍNEA DE COMBUSTIBLE ENTERRADA F-76 DE

600mm DE DIÁMETRO Y LOS ACCESORIOS POR UNA NUEVA

F-76 DE 500m DE DIÁMETRO.

2. ABANDONA TUBERÍA F-76 DE 600mm EN SITIO. SELLAR

MEDIANTE SOLDADURA UNA PLACA DE 6mm EN EL

EXTREMO DE LA TUBERIA ABANDONADA.

ML-1

V-BRDG-OTLN

FH #14

PIT #1

600mm F-76

500mm JP-8

500mm F-76

350mm JP-5

350mm INACTIVE

150mm JP-5

150mm JP-8

150mm INACTIVE

ML-1

B1

MD410

0 20 30 40 50

1:500

B1

1:500

DEMOLITION PLAN

MD119

KEYED NOTES:GENERAL NOTES:

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

TIMOTHY A.

SCHMITT

17386

1. REMOVE BELOW GRADE 500mm F-76 PIPELINE AND

FITTINGS FOR 500mm F-76 PIPELINE.

2. REMOVE BELOW GRADE 600mm F-76 PIPELINE AND

FITTINGS FOR 500mm F-76 PIPELINE.

3. SEAL WELD 6mm PLATE AT END OF ABANDONED PIPE.

4. BELOW GRADE 600mm F-76 PIPING TO BE ABANDONED

IN PLACE.

NOTAS GENERALES: NOTAS DE REFERENCIA:

PLANTA DE DEMOLICIÓN

F O

R

C

O N

T I N

U A

T I O

N

S

E

P A

N

T I N

U A

C I Ó

N

V

A

REMOVE PIPELINE

DEMOLITION LEGEND:

NOTAS DE DEMOLICIÓN:

RETIRAR TUBERÍA

1. RETIRAR LA LÍNEA DE COMBUSTIBLE ENTERRADA F-76 DE

500mm DE DIÁMETRO Y LOS ACCESORIOS POR UNA NUEVA

F-76 DE 500mm DE DIÁMETRO

2. RETIRAR LA LÍNEA DE COMBUSTIBLE ENTERRADA F-76 DE

600mm DE DIÁMETRO Y SUS ACCESORIOS POR UNA NUEVA

F-76 DE 500mm DE DIÁMETRO

3. PLACAS DE 6mm SOLDADAS Y SELLADAS IN LOS EXTREMOS

DE LA LÍNEA DE COMBUSTIBLE ABANDONADA

4. LA LÍNEA DE COMBUSTIBLE ENTERRADA F-76 DE 600mm DE

DIÁMETRO SE ABANDONA EN SU SITIO

1. SEE SECTION 02 41 00 FOR DEMOLITION REQUIREMENTS.

1. VER SECCIÓN 02 41 00 PARA LOS REQUISITOS DE

DEMOLICIÓN.

TANK-7

F-76

ML-2

0 20 30 40 50

1:500

MD120

B1

1:500

DEMOLITION PLAN

GENERAL NOTES:

REMOVE PIPELINE

DEMOLITION LEGEND:

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

TIMOTHY A.

SCHMITT

17386

KEYED NOTES:

1. REMOVE BELOW GRADE 500mm F-76 PIPELINE AND FITTINGS

FOR 500mm F-76 PIPELINE.

2. REMOVE BELOW GRADE 200mm F-76 PIPELINE AND FITTINGS

FOR 500mm F-76 PIPELINE.

3. SEAL WELD 6mm PLATE AT END OF ABANDONED PIPE.

1. SEE SECTION 02 41 00 FOR DEMOLITION REQUIREMENTS.

PLANTA DE DEMOLICIONES

NOTAS DE REFERENCIA:

NOTAS GENERALES:

1. VER SECCIÓN 02 41 00 PARA LOS REQUISITOS DE

DEMOLICIÓN.

NOTAS DE DEMOLICIÓN:

RETIRAR TUBERÍA

3. PLACAS DE 6mm SOLDADAS Y SELLADAS EN LOS EXTREMOS

DE LA LÍNEA DE COMBUSTIBLE ABANDONADA

2. RETIRAR LA LINEA DE COMBUSTIBLE ENTERRADA F-76 DE

200mm DE DIAMETRO Y LOS ACCESORIOS POR UNA NUEVA F-76

DE 500mm DE DIAMETRO.

1. RETIRAR LA LÍNEA DE COMBUSTIBLE ENTERRADA F-76 DE

500mm DE DIÁMETRO Y LOS ACCESORIOS POR UNA NUEVA

F-76 DE 500mm DE DIÁMETRO

F O

R

C

O N

T I N

U A

T I O

N

S

E

P A

N

T I N

U A

C I Ó

N

V

A

2 3

B1

MD411

CONTROL ACCESO

AHFE COMM

AHFE POWER

M

M

M

M

MD401

0 2 3 4 5

1:50

B1

1:50

DEMOLITION PLAN PIT VP-1

S

U

KEYED NOTES:

L

L

A

A

C

T

I

R

G

M

P

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

TIMOTHY A.

SCHMITT

17386

GENERAL NOTES:

REMOVE PIPELINE

DEMOLITION LEGEND:

1. REMOVE 450mm F-76 PIPELINE, SUPPORTS, FITTINGS AND

VALVE.

1. SEE SECTION 02 41 00 FOR DEMOLITION REQUIREMENTS.

PLANTA DE DEMOLICIONES ARQUETA DE VÁLVULAS VP-1

NOTAS GENERALES:

1. VER SECCIÓN 02 41 00 PARA LOS REQUISITOS DE

DEMOLICIÓN.

NOTAS DE DEMOLICIÓN:

RETIRAR TUBERÍA

NOTAS DE REFERENCIA:

1. RETIRAR LA LÍNEA DE COMBUSTIBLE F-76 DE450mm DE

DIÁMETRO, LOS SOPORTES, LOS ACCESORIOS Y LA VÁLVULA

JP-5

SSUE

TOP.+3.40

TOP.+3.67

TOP.+3.66

TOP.+4.32

INV.+2.68

INV.+2.63

TOP.+3.51

INV.+2.70

TOP.+5.31

TOP.+5.40

TOP.+5.33

TOW+5.82

+5.52

TOW+5.77

+5.44

+5.51

TOW+5.77

TOW+5.79

+5.59

TOW+5.76

+5.47

L

L

A

S

T

F

J

P

I

N

A

C

T

I

V

E

B

A

L

L

A

S

T

J

P

S

U

E

F

MD402

J

P

F

TOP.+3.75

TOP.+3.76

TOP.+3.53

B

A

L

L

A

S

T

I

N

A

C

T

I

V

E

J

P

R

G

O

F

J

P

F

A

C

T

I

V

E

R

G

O m m

B

U

I

L

D

I

N

G

0 2 3 4 5

1:50

B1

1:50

DEMOLITION PLAN - BPH-VP-1.5 MANHOLE

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

TIMOTHY A.

SCHMITT

17386

KEYED NOTES:

1. REMOVE 450mm F-76 PIPELINE, SUPPORTS AND FITTINGS.

GENERAL NOTES:

DEMOLITION LEGEND:

1. SEE SECTION 02 41 00 FOR DEMOLITION REQUIREMENTS.

PLANTA DE DEMOLICIONES POZO - BPH- VP-1.5

NOTAS GENERALES:

1. VER SECCIÓN 02 41 00 PARA LOS REQUISITOS

DE DEMOLICIÓN.

NOTAS DE DEMOLICIÓN:

NOTAS DE REFERENCIA:

1. RETIRAR LA LÍNEA DE COMBUSTIBLE F-76 DE450mm DE

DIÁMETRO, LOS SOPORTES Y LOS ACCESORIOS

RETIRAR TUBERÍA

REMOVE PIPELINE

MD403

0 2 3 4 5

1:50

B1

1:50

DEMOLITION PLAN - BPH-VP-1 MANHOLE

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

TIMOTHY A.

SCHMITT

17386

GENERAL NOTES:

DEMOLITION LEGEND:

1. SEE SECTION 02 41 00 FOR DEMOLITION

REQUIREMENTS.

1. REMOVE 400mm F-76 PIPELINE.

PLANTA DE DEMOLICIONES POZO - BPH- VP-1

NOTAS GENERALES:

1. VER SECCIÓN 02 41 00 PARA LOS REQUISITOS

DE DEMOLICIÓN.

NOTAS DE DEMOLICIÓN:

NOTAS DE REFERENCIA:

1. RETIRAR LA LÍNEA DE COMBUSTIBLE F-76 DE 400mm

DE DIÁMETRO.

RETIRAR TUBERÍA

REMOVE PIPELINE

F

INACTIVE

TOW+5.87

+5.63

+5.68

TOW+5.85

TOW+5.88

+5.77

TOW+5.86

+5.59

+5.57

TOW+5.90

+5.74

TOP+3.31

TOP+3.75

TOP+3.85

TOP+3.91

TOP+3.75

TOP+3.76

TOP+3.48

TOP+3.39

TOP+3.84

TOP+3.98

TOP+3.75

MD404

0 2 3 4 5

1:50

A1

1:50

DEMOLITION PLAN - BPH-VP-3 & 3.5 MANHOLE

TOW+5.88

L

L

A

A

C

T

I

R

G

O

JP-5 C

AR

G O

F-76

JP-8

600m m

F-76

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

TIMOTHY A.

SCHMITT

17386

KEYED NOTES:

GENERAL NOTES:

DEMOLITION LEGEND:

1. REMOVE 450mm F-76 PIPELINE, SUPPORTS, FITTINGS AND

VALVES.

2. EXISTING VALVE TO REMAIN

3. 200mm F-76 TO REMAIN

4. 100mm F-76 TO REMAIN

5. REMOVE 400mm F-76

6. REMOVE 100mm F-76

1. SEE SECTION 02 41 00 FOR DEMOLITION

REQUIREMENTS.

PLANTA DE DEMOLICIONES POZO - BPH- VP-3 & 3.5

NOTAS GENERALES:

1. VER SECCIÓN 02 41 00 PARA LOS REQUISITOS

DE DEMOLICIÓN.

NOTAS DE DEMOLICIÓN:

NOTAS DE REFERENCIA:

2. VÁLVULA EXISTENTE A PERMANECER

3. TUBERÍA DE COMBUSTIBLE F-76 DE 200mm A PERMANECER

4. TUBERÍA DE COMBUSTIBLE F-76 DE 100mm A PERMANECER

5. RETIRAR TUBERÍA DE COMBUSTIBLE F-76 DE 400mm

RETIRAR TUBERÍA

REMOVE PIPELINE

1. RETIRAR TUBERÍA DE COMBUSTIBLE F-76 DE 450mm, INCLUSO SOPORTES, ACCESORIOS Y LA VÁLVULAS

6. RETIRAR TUBERÍA DE COMBUSTIBLE F-76 DE 100mm

400mm

500mm F-76

MD410

KEYED NOTES:

0 2 3 4 5

1:50

B1

1:50

DEMOLITION PLAN - ML-1 MANHOLE

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

TIMOTHY A.

SCHMITT

17386

TO V-432

DIESEL

F-76

GENERAL NOTES:

DEMOLITION LEGEND:

1. SEE SECTION 02 41 00 FOR DEMOLITION REQUIREMENTS.

PLANTA DE DEMOLICIONES POZO - ML-1

NOTAS GENERALES:

1. VER SECCIÓN 02 41 00 PARA LOS REQUISITOS

DE DEMOLICIÓN.

NOTAS DE DEMOLICIÓN:

NOTAS DE REFERENCIA:

1. REMOVE BELOW GRADE 600mm F-76 PIPELINE.

2. REMOVE BELOW GRADE 500mm F-76 PIPELINE.

1. RETIRAR LA LINEA DE COMBUSTIBLE

ENTERRADA F-76 DE 600mm DE DIAMETRO.

RETIRAR TUBERÍA

REMOVE PIPELINE

2. RETIRAR LA LINEA DE COMBUSTIBLE

ENTERRADA F-76 DE 500mm DE DIAMETRO.

500mm F-76

MD411

KEYED NOTES:

1. 350mm PIPE

2. REMOVE BELOW GRADE 500mm F-76 PIPELINE.

3. BELOW GRADE 200mm F-76 PIPING TO BE ABANDONED IN PLACE. SEAL

WELD 6mm STEEL PLATE TO OPEN END OF PIPING.

0 2 3 4 5

1:50

B1

1:50

DEMOLITION PLAN - ML-2 MANHOLE

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

TIMOTHY A.

SCHMITT

17386

INACTIVE 20"

JP-8 20"

F-76 20"

PLANTA DE DEMOLICIONES POZO - ML-2

NOTAS DE REFERENCIA:

1. TUBERÍA DE 350mm DE DIÁMETRO

3. ABANDONAR LA TUBERÍA ENTERRADA F-76 DE 200mm DE DIÁMETRO

EN SU SITIO. SOLDAR Y SELLAR EL EXTREMO DE LA MISMA CON

PLACA DE ACERO DE 6mm.

DEMOLITION LEGEND:

NOTAS DE DEMOLICIÓN:

RETIRAR TUBERÍA

REMOVE PIPELINE

2. RETIRAR LA LINEA DE COMBUSTIBLE

ENTERRADA F-76 DE 500mm DE DIAMETRO.

GENERAL NOTES:

1. SEE SECTION 02 41 00 FOR DEMOLITION

REQUIREMENTS.

NOTAS GENERALES:

1. VER SECCIÓN 02 41 00 PARA LOS REQUISITOS

DE DEMOLICIÓN.

PIER III

ML-1

ML-4

TE-A

TE-B,C,D

ML-3

V-BRDG-OTLN

A2003

DRYER FOR POOL

FH #14

VALVE PIT #44

(OUTSIDE OF BASE)

TO BULK STORAGE

TO BOOSTER PUMP HOUSE

PIT #1

TANK-2

F-76

TANK-3

F-76

TANK-5

F-76

TANK-4

F-76

TANK-6

F-76

TANK-7

F-76

TANK-8

F-76

TANK-1

F-76

TANK-13

JP-8

TK-17

JP-5

TANK-11

JP-8

TANK-10

JP-8

TK-15

JP-5

TANK-9

JP-8

TK-14

JP-5

TANK-122

JP-8

TANK-120

JP-8

TANK-121

JP-8

TK-16

JP-5

3194B

PIER 3

PIER 3

TANK FARM

PUERTO GATE

RIO SALADO

BRIDGE

ML-2

A

L

I

C

A

N

N

E

A

L

I C

A

N

N

E

S

A

N

R

R

E

E

T

M

I

A

L

A

L

I C

A

N

N

E

M-102

M-103

M-104

M-105

M-106

M-107

M-108

M-109

M-110

M-111 M-112

M-113

M

M

M-118

M-119

M-120

M-114

M-115

M-401

M-402

M-410

M-411

M-403

M-404

0 200

400 500

1:5000

M-101

B1

1:5000

OVERALL MECHANICAL SITE AND KEY PLAN FOR PIER 3 PIPELINE

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

TIMOTHY A.

SCHMITT

17386

PLANTA EXTERIOR GENERAL Y DE REFERENCIA DE MECÁNICA PARA LA LÍNEA DE TUBERÍA DEL MUELLE 3

PIER 3

4+000 4+020 4+040 4+060 4+080 4+100 4+120

C1

1:200

SITE PLAN

M-102

0 8 12 16 20

1:200

F O

R

C

O N

T I N

U A

T I O

N

S

E

KEYED NOTES:

1. PROVIDE 500mm F-76 PIPELINE.

2. PROVIDE LOADING ARM CONNECTION

3. PROVIDE 250mm PIPE WITH DB&B PLUG VALVE AND HOSE

CONNECTION AT END OF EACH LINE

4. 450mm JP-5 PIPELINE, BY OTHERS.

5. EXISTING FUEL LINES, REMOVED BY OTHERS.

6. FREE PIPE SUPPORT

7. GUIDED PIPE SUPPORT

GENERAL NOTES:

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

TIMOTHY A.

SCHMITT

17386

B1

M-502

B3

M-502

PLANTA EXTERIOR

NOTAS DE REFERENCIA:NOTAS GENERALES:

P A

N

T I N

U A

C I Ó

N

V

A

1. PROVEER TUBERÍA F-76 DE 500mm

2. PROVEER CONEXIÓN PARA BRAZO DE CARGA

3. PROVEER TUBERÍA DE 250mm CON VÁLVULA DE

DOBLE DESCARGA Y BLOQUEO Y CONEXIÓN PARA

MANGUERA EN EL EXTREMO DE CADA LÍNEA

4. TUBERÍA JP-5 DE 450mm, POR OTROS.

5. LÍNEAS DE COMBUSTIBLE EXISTENTES, RETIRADA

POR OTROS.

6. SOPORTE DE TUBERÍA LIBRE

7. SOPORTE DE TUBERÍA GUIADA

A1

M-505

1. SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.

2. BOND (EXOTHERMIC WELD) AN INSULATED #4 AWG CABLE TO

THE ABOVEGROUND 500mm F-76 PIPELINE AT 90m INTERVALS

MAXIMUM. EXTEND EACH CABLE TO THE EXISTING GROUND

RING.

1. VER HOJA M-001 PARA LEYENDA Y NOTAS

GENERALES.

TYP

TYP

2. UNIR (SOLDADURA EXOTÉRMICA) UN CABLE AISLADO #4 AWG

A LA TUBERÍA SOBRE EL TERRENO F-76 DE 500mm EN

INTERVALOS MÁXIMOS DE 90m. PROLONGAR CADA CABLE

HASTA EL ANILLO DE TIERRA EXISTENTE.

PIER 3

4+200 4+220 4+240 4+260 4+280 4+300 4+306

C1

1:200

SITE PLAN

M-103

0 8 12 16 20

1:200

F O

R

C

O N

T I N

U A

T I O

N

S

E

GENERAL NOTES:

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

TIMOTHY A.

SCHMITT

17386

KEYED NOTES:

A1

M-505

1. PROVIDE 500mm F-76 PIPELINE.

2. PROVIDE LOADING ARM CONNECTION

3. PROVIDE 250mm PIPE WITH DB&B PLUG VALVE AND HOSE

CONNECTION AT END OF EACH LINE

4. 450mm JP-5 PIPELINE, BY OTHERS.

5. EXISTING FUEL LINES, REMOVED BY OTHERS

6. FREE PIPE SUPPORT

7. GUIDED PIPE SUPPORT

B1

M-502

B3

M-502

NOTAS DE REFERENCIA:NOTAS GENERALES:

1. PROVEER TUBERÍA F-76 DE 500mm

2. PROVEER CONEXIÓN PARA BRAZO DE CARGA

3. PROVEER TUBERÍA DE 250mm CON VÁLVULA DE

DOBLE DESCARGA Y BLOQUEO Y CONEXIÓN

PARA MANGUERA EN EL EXTREMO DE CADA

LÍNEA

4. TUBERÍA JP-5 DE 450mm, POR OTROS.

5. LÍNEAS DE COMBUSTIBLE EXISTENTES, RETIRADA

POR OTROS.

6. SOPORTE DE TUBERÍA LIBRE

7. SOPORTE DE TUBERÍA GUIADA

PLANTA EXTERIOR

P A

N

T I N

U A

C I Ó

N

V

A

TYP

TYP

1. SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.

2. BOND (EXOTHERMIC WELD) AN INSULATED #4 AWG CABLE TO

THE ABOVEGROUND 500mm F-76 PIPELINE AT 90m INTERVALS

MAXIMUM. EXTEND EACH CABLE TO THE EXISTING GROUND

RING.

1. VER HOJA M-001 PARA LEYENDA Y NOTAS

GENERALES.

2. UNIR (SOLDADURA EXOTÉRMICA) UN CABLE AISLADO #4 AWG

A LA TUBERÍA SOBRE EL TERRENO F-76 DE 500mm EN

R

G

O

L

L

A

S

T

C

L

H

PIER 3

5+000 5+020

5+040 5+060

5+080 5+100

5+120

A1

1:200

SITE PLAN

M-104

0 8 12 16 20

1:200

FOR CONTINUATION SEE SHEET M-102

FOR CONTINUATION SEE SHEET M-103

F O

R

C

O N

T I N

U A

T I O

N

S

E

GENERAL NOTES:

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

TIMOTHY A.

SCHMITT

17386

KEYED NOTES:

1. PROVIDE 500mm F-76 PIPELINE.

2. PROVIDE PIPELINE EXPANSION LOOP, HP VENT AND LP

DRAINS

3. PROVIDE 300mm DB&B PLUG VALVE WITH THERMAL RELIEF

4. 450mm JP-5 PIPELINE, BY OTHERS.

5. EXISTING FUEL LINES, REMOVED BY OTHERS

6. PIPE ANCHOR

7. FREE PIPE SUPPORT

8. GUIDED PIPE SUPPORT

A4

M-501

A3

M-502

B1

M-502

B3

M-502

PARA CONTINUACIÓN VER PLANO M-102

PARA CONTINUACIÓN VER PLANO M-103

P A

N

T I N

U A

C I Ó

N

V

A

PLANTA EXTERIOR

NOTAS DE REFERENCIA:NOTAS GENERALES:

1. PROVEER TUBERÍA F-76 DE 500mm

2. PROVEER LIRA DE EXPANSIÓN, VENTEO EN PUNTO

ALTO Y DRENAJES EN PUNTO BAJO

3. PROVEER VÁLVULA DE DOBLE BLOQUEO Y PURGA

CON ALIVIO TÉRMICODE 300mm.

4. TUBERÍA JP-5 DE 450mm, POR OTROS.

5. LÍNEAS DE COMBUSTIBLE EXISTENTES, RETIRADA

POR OTROS.

6. ANCLAJE DE TUBERÍA

7. SOPORTE DE TUBERÍA LIBRE

8. SOPORTE DE TUBERÍA GUIADA

TYP

TYP

TYP

1. SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.

2. BOND (EXOTHERMIC WELD) AN INSULATED #4 AWG CABLE TO

THE ABOVEGROUND 500mm F-76 PIPELINE AT 90m INTERVALS

MAXIMUM. EXTEND EACH CABLE TO THE EXISTING GROUND

RING.

1. VER HOJA M-001 PARA LEYENDA Y NOTAS

GENERALES.

2. UNIR (SOLDADURA EXOTÉRMICA) UN CABLE AISLADO #4 AWG

A LA TUBERÍA SOBRE EL TERRENO F-76 DE 500mm EN

R

G

O

L

L

A

S

T

C

L

H

5+140 5+160

5+180 5+200

5+220 5+240

5+260

B1

1:200

SITE PLAN

M-105

F O

R

C

O N

T I N

U A

T I O

N

S

E

F O

R

C

O N

T I N

U A

T I O

N

S

E

GENERAL NOTES:

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

TIMOTHY A.

SCHMITT

17386

0 8 12 16 20

1:200

KEYED NOTES:

1. PROVIDE 500mm F-76 PIPELINE.

2. 450mm JP-5 PIPELINE, BY OTHERS.

3. EXISTING FUEL LINES, REMOVED BY OTHERS

4. PIPE ANCHOR

5. FREE PIPE SUPPORT

6. GUIDED PIPE SUPPORT

A3

M-502

B1

M-502

B3

M-502

P A

N

T I N

U A

C I Ó

N

V

A

P A

N

T I N

U A

C I Ó

N

V

A

PLANTA EXTERIOR

NOTAS DE REFERENCIA:NOTAS GENERALES:

1. PROVEER TUBERÍA F-76 DE 500mm

2. TUBERÍA JP-5 DE 450mm, POR OTROS.

3. LÍNEAS DE COMBUSTIBLE EXISTENTES,

RETIRADA POR OTROS.

4. ANCLAJE DE TUBERÍA

5. SOPORTE DE TUBERÍA LIBRE

6. SOPORTE DE TUBERÍA GUIADA

TYP

TYP

1. SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.

2. BOND (EXOTHERMIC WELD) AN INSULATED #4 AWG CABLE TO

THE ABOVEGROUND 500mm F-76 PIPELINE AT 90m INTERVALS

MAXIMUM. EXTEND EACH CABLE TO THE EXISTING GROUND

RING.

1. VER HOJA M-001 PARA LEYENDA Y NOTAS

GENERALES.

2. UNIR (SOLDADURA EXOTÉRMICA) UN CABLE AISLADO #4 AWG

A LA TUBERÍA SOBRE EL TERRENO F-76 DE 500mm EN

VP-1

R

G

O

L

L

A

S

T

C

L

H

DRN-100-DI

PUMP HOUSE

5+280 5+300

5+320 5+340

5+360 5+380

5+400

E L E

V A

T I O

N

E L E

V A

T I O

N

STATION

STATION

F-76_PIER 3 PROFILE - STA 5+360 TO 5+400

5+360 5+380 5+400

5+360 5+380 5+400

VAULT PIT 1

EXISTING GROUND

P3-001, 3.43m OF 500mm F-76

P3-002, 2.73m OF 500mm F-76

P3-003, 7.25m OF 500mm F-76

P

HORIZ

BH01

S T

A

HORIZ

BH02

S T

A

VERT

BV01

S T

A m m

S

A N m m

J P m m

F m m

J P m m

J P

C

A R

G O

U G

E

C O

M M

U E

L

B

Y

O

T H

E R

S m m

B

A L

L A

S T m m

C

A M

P S

A

DEPTH UNKNOWN

DOES NOT CONFLICT

WITH EXISTING PIPES

DEPTH UNKNOWN

B1

M-401

A3

1:200

PROFILE 1 STA -2+00 TO STA 0+25

M-106

0 8 12 16 20

1:200

0 8 12 16 20

1:200

GENERAL NOTES:

1. HORIZONTAL LOCATIONS OF UTILITY CROSSINGS SHOWN

FOR REFERENCE ONLY. CONTRACTOR RESPONSIBLE FOR

LOCATING AND PROTECTING EXISTING UTILITIES . DAMAGE

TO EXISTING INFRASTRUCTURE MUST BE REPAIRED AT NO

COST TO GOVERNMENT.

2. FOR PIPE APPURTENANCES, ELEVATION AND ALIGNMENT SEE

TABLES ON SHEETS M-601 AND M-602.

3. SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.

4. BOND (EXOTHERMIC WELD) AN INSULATED #4 AWG CABLE TO

THE ABOVEGROUND 500mm F-76 PIPELINE AT 90m INTERVALS

MAXIMUM. EXTEND EACH CABLE TO THE EXISTING GROUND

RING.

F O

R

C

O N

T I N

U A

T I O

N

S

E

F O

R

C

O N

T I N

U A

T I O

N

S

E

0 1 2 3 4

1:40

HORIZONTAL

VERTICAL

C1

1:200

SITE PLAN

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

TIMOTHY A.

SCHMITT

17386

KEYED NOTES:

1. PROVIDE 500mm F-76 PIPELINE.

2. PROVIDE PIPELINE EXPANSION LOOP, HP VENT AND LP

DRAINS

3. 450 mm JP-5 LINE TO BE INSTALLED UNDER ANOTHER CONTRACT.

CONTACT ROTA PUBLIC WORKS FOR THE CONSTRUCTION

SCHEDULE

4. EXISTING FUEL LINES, REMOVED BY OTHERS

5. FREE PIPE SUPPORT

6. GUIDED PIPE SUPPORT

A4

M-501

B1

M-502

B3

M-502

P A

N

T I N

U A

C I Ó

N

V

A

P A

N

T I N

U A

C I Ó

N

V

A

PLANTA EXTERIOR

PERFIL 1 STA -2+00 A STA 0+25

NOTAS DE REFERENCIA:NOTAS GENERALES:

1. PROVEER TUBERÍA F-76 DE 500mm

3. TUBERÍA JP-5 DE 450mm A SER INSTALADA BAJO

OTRO CONTRATO. CONTACTAR CON OBRAS

PÚBLICAS EN ROTA PARA LA CONSTRUCCIÓN.

4. LÍNEAS DE COMBUSTIBLE EXISTENTES,

RETIRADA POR OTROS.

5. SOPORTE DE TUBERÍA LIBRE

6. SOPORTE DE TUBERÍA GUIADA

2. PROVEER LIRA DE EXPANSIÓN, VENTEO EN PUNTO

ALTO Y DRENAJES EN PUNTO BAJO

1. LAS POSICIONES HORIZONTALES DE LOS CRUCES

DE INSTALACIONES SE MUESTRAN SÓLO COMO

REFERENCIA. EL CONTRATISTA SERÁ

RESPONSABLE DE LA POSICIÓN Y PROTECCIÓN

DE LAS INSTALACIONES EXISTENTES. LOS DAÑOS

SOBRE LA INFRAESTRUCTURA EXISTENTE

DEBERÁN SER REPARADOS SIN COSTE PARA EL

GOBIERNO.

2. PARA LOS ACCESORIOS, ELEVACIONES Y

ALINEACIONES DE TUBERÍAS, VER TABLAS EN

PLANOS M-601 Y M-602.

3. VER HOJA M-001 PARA LEYENDA Y NOTAS GENERALES.

5 6

TYP

TYP

4. UNIR (SOLDADURA EXOTÉRMICA) UN CABLE AISLADO

#4 AWG A LA TUBERÍA SOBRE EL TERRENO F-76 DE

500mm EN INTERVALOS MÁXIMOS DE 90m.

PROLONGAR CADA CABLE HASTA EL ANILLO DE

TIERRA EXISTENTE.

WATERLINE

5+400

5+440

5+460

5+480

5+500

E L E

V A

T I O

N

E L E

V A

T I O

N

STATION

5+400 5+420 5+440 5+460 5+480 5+500 5+510

5+400 5+420 5+440 5+460 5+480 5+500 5+510

EXISTING GROUND

P3-008, 1.00m OF 500mm F-76

B2

M-503

P3-004, 12.86m OF 500mm F-76

BEND

BH03

S T

A

H O

R I Z

O N

T A

L

BEND

BH04

S T

A

H O

R I Z

O N

T A

L

VERT

BV02

S T

A

P3-007, 1.09m OF 500mm F-76 m m

S

A N m m

J P m m

F m m

C

A M

P S

A m m

J P

E

L

B

Y

O

T H

E R

S m m

B

A L

L E

S T

HPV01

S T

A

R

P3-009, 92.66m OF 500mm F-76

P3-004C, 3.90m OF 500mm F-76

VERT

BV35

S T

A

LPD03

S T

A

R

P3-004B, 7.31m OF 500mm F-76

P3-006, 7.16m OF 500mm F-76

VERT

BV36

S T

A

A2

M-503

C1

1:200

SITE PLAN

M-107

F O

R

C

O N

T I N

U A

T I O

N

S

E

F O

R

C

O N

T I N

U A

T I O

N

S

E

0 8 12 16 20

1:200

A1

1:200

PROFILE

GENERAL NOTES:

1. HORIZONTAL LOCATIONS OF UTILITY CROSSINGS SHOWN

FOR REFERENCE ONLY. CONTRACTOR RESPONSIBLE FOR

LOCATING AND PROTECTING EXISTING UTILITIES . DAMAGE

TO EXISTING INFRASTRUCTURE MUST BE REPAIRED AT NO

COST TO GOVERNMENT.

2. FOR PIPE APPURTENANCES, ELEVATION AND ALIGNMENT

SEE TABLES ON SHEETS M-601 AND M-602.

3. SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.

0 8 12 16 20

1:200

0 1 2

1:40

HORIZONTAL

VERTICAL

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

TIMOTHY A.

SCHMITT

17386

KEYED NOTES:

1. PROVIDE 500mm F-76 PIPELINE.

2. 450 mm JP-5 LINE TO BE INSTALLED UNDER ANOTHER

CONTRACT. CONTACT ROTA PUBLIC WORKS FOR THE

CONSTRUCTION SCHEDULE.

3. EXISTING FUEL LINES, REMOVED BY OTHERS.

4. LOW-POINT DRAIN

5. HIGH-POINT VENT

NOTAS GENERALES:

1. LAS POSICIONES HORIZONTALES DE LOS CRUCES DE

INSTALACIONES SE MUESTRAN SÓLO COMO REFERENCIA.

EL CONTRATISTA SERÁ RESPONSABLE DE LA POSICIÓN

Y PROTECCIÓN DE LAS INSTALACIONES EXISTENTES. LOS

DAÑOS SOBRE LA INFRAESTRUCTURA EXISTENTE

DEBERÁN SER REPARADOS SIN COSTE PARA EL

GOBIERNO.

2. PARA LOS ACCESORIOS, ELEVACIONES Y

ALINEACIONES DE TUBERÍAS, VER TABLAS EN

PLANOS M-601 Y M-602.

PERFIL

PLANTA EXTERIOR

P A

N

T I N

U A

C I Ó

N

V

A

P A

N

T I N

U A

C I Ó

N

V

A

LÍNEA DE AGUA

NOTAS DE REFERENCIA:

1. PROVEER TUBERÍA F-76 DE 500mm

2. TUBERÍA JP-5 DE 450mm A SER INSTALADA BAJO

OTRO CONTRATO. CONTACTAR CON OBRAS

PÚBLICAS EN ROTA PARA LA CONSTRUCCIÓN.

3. LÍNEAS DE COMBUSTIBLE EXISTENTES, RETIRADA

POR OTROS.

3. VER HOJA M-001 PARA LEYENDA Y NOTAS GENERALES.

4. DRENAJE EN PUNTO BAJO

5. VENTEO EN PUNTO ALTO

5+520

5+540

5+580

5+600

BPH-VP-1

E L

E V

A T

I O

N

E L

E V

A T

I O

N

STATION

5+510 5+520 5+540 5+560 5+580 5+600 5+620

5+510 5+520 5+540 5+560 5+580 5+600 5+620

EXISTING GROUND

X

M

HORIZ

BV04

S T

A m m

E

X

W m m

E

X

W

BEND

BV05

S T

A

V E

R T

I C

A L

VERT

BV06

S T

A

VERT

BH05

S T

A

HORIZ

BH06

S T

A

A

N D

O N

W

P3-012, 5.18m OF 500mm F-76

P3-015, 12.04m OF 500mm F-76

P3-013A, 0.04m OF 500mm F-76

P3-016, 35.40m OF 500mm F-76

P3-018, 4.19m OF 500mm F-76

HORIZ

BH07

S T

A

BEND

BV07

S T

A

V E

R T

I C

A L

BEND

BH10

S T

A

H O

R I Z

O N

T A

L

P3-023, 3.81m OF 500mm F-76

P3-021, 0.81m OF 500mm F-76

P3-022, 1.37m OF 500mm F-76

HORIZ

BH09

S T

A

BEND

BH08

S T

A

H O

R I Z

O N

T A

L

P3-020, 1.43m OF 500mm F-76

P3-019, 1.63m OF 500mm F-76

P3-013, 0.53m OF 500mm F-76

TEE

T01

S T

A

P3-017, 2.10m OF 500mm F-76

BEND

BV08

S T

A

V E

R T

I C

A L

LPD02

S T

A

R

P3-009, 92.66m OF 500mm F-76

P3-011, 7.37m OF 500mm F-76

LPD07

S T

A

R

P3-009A, 25.79m OF 500mm F-76

B2

M-503

B2

M-503

C1

1:200

SITE PLAN

M-108

0 8 12 16 20

1:200

A2

1:200

PROFILE

F

N

T

I

N

U

A

T

I

E

F O

R

C

O N

T I N

U A

T I O

N

S

E

GENERAL NOTES:

0 8 12 16 20

1:200

0 1 2

1:40

HORIZONTAL

VERTICAL

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

TIMOTHY A.

SCHMITT

17386

KEYED NOTES:

1. PROVIDE 500mm F-76 PIPELINE.

2. CONNECT TO EXISTING METERING STATION 400mm

MOTOR-OPERATED VALVE (TYP OF 4) SEE SHEET M-613.

3. 450 mm JP-5 LINE TO BE INSTALLED UNDER ANOTHER

CONTRACT. CONTACT ROTA PUBLIC WORKS FOR THE

CONSTRUCTION SCHEDULE.

4. EXISTING FUEL LINES, REMOVED BY OTHERS

5. PIG RECEIVER

6. 200mm PIG RECEIVER BYPASS LINE

7. LOW-POINT DRAIN

PERFIL

PLANTA EXTERIOR

NOTAS GENERALES:

1. LAS POSICIONES HORIZONTALES DE LOS CRUCES DE

INSTALACIONES SE MUESTRAN SÓLO COMO REFERENCIA.

EL CONTRATISTA SERÁ RESPONSABLE DE LA POSICIÓN

Y PROTECCIÓN DE LAS INSTALACIONES EXISTENTES. LOS

DAÑOS SOBRE LA INFRAESTRUCTURA EXISTENTE

DEBERÁN SER REPARADOS SIN COSTE PARA EL

GOBIERNO.

2. PARA LOS ACCESORIOS, ELEVACIONES Y

ALINEACIONES DE TUBERÍAS, VER TABLAS EN

PLANOS M-601 Y M-602.

P

A

N

T

I

N

U

A

C

I

A

P A

N

T I N

U A

C I Ó

N

V

A

NOTAS DE REFERENCIA:

1. PROVEER TUBERÍA F-76 DE 500mm

3. TUBERÍA JP-5 DE 450mm A SER INSTALADA BAJO

OTRO CONTRATO. CONTACTAR CON OBRAS PÚBLICAS

EN ROTA PARA LA CONSTRUCCIÓN.

4. LÍNEAS DE COMBUSTIBLE EXISTENTES, RETIRADA

POR OTROS.

2. CONECTAR A LA VÁLVULA MOTORIZADA DE 400mm DE

LA ESTACIÓN DE MEDICIÓN EXISTENTE (TIP PARA 4)

VER HOJA M-613.

5. PIG RECEPTOR

6. LÍNEA BYPASS DEL PIG RECEPTOR DE 200mm

7. DRENAJE EN PUNTO BAJO

1. HORIZONTAL LOCATIONS OF UTILITY CROSSINGS SHOWN

FOR REFERENCE ONLY. CONTRACTOR RESPONSIBLE FOR

LOCATING AND PROTECTING EXISTING UTILITIES . DAMAGE

TO EXISTING INFRASTRUCTURE MUST BE REPAIRED AT NO

COST TO GOVERNMENT.

2. FOR PIPE APPURTENANCES, ELEVATION AND ALIGNMENT SEE

TABLES ON SHEETS M-601 AND M-602.

3. SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.

3. VER HOJA M-001 PARA LEYENDA Y NOTAS

GENERALES.

B1

M-403

L

L

A

S

T

S

U

E

R

G

O

A

C

T

I

V

E

JP8

F76

BOOSTER

PUMP HOUSE

BPH-VP-3 AND 3.5

F76

JP8

BPH-VP-1.5

E L

E V

A T

I O

N

E L

E V

A T

I O

N

STATION

5+620 5+640 5+660 5+680 5+700 5+720 5+740

5+620 5+640 5+660 5+680 5+700 5+720 5+740

EXISTING GROUND

VAULT PIT 1.5

CONNECTION POINT

VAULT PIT 1.5

CONNECTION POINT

CP09

S T

A

I N

V

BPH-VP-3

CONNECTION POINT

P3-026, 6.51m OF 500mm F-76

BPH-VP-3

CONNECTION POINT

P3-027, 1.09m OF 500mm F-76

P3-028, 86.48m OF 500mm F-76 m m

B

A L

L A

P

E

D E

P T

H

U

N K

N O

W N

CP10

S T

A

I N

V

CP02

S T

A

I N

V

CP03

S T

A

I N

V

BPH-VP-3

PUNTO DE CONEXIÓN

POZO DE BÓVEDA 1.5

PUNTO DE CONEXIÓN

VER FICHA M-404

PARA TUBERÍA A TRAVÉS DE

POZO DE VÁLVULA VP-3

BPH-VP-3

PUNTO DE CONEXIÓN

POZO DE BÓVEDA 1.5

PUNTO DE CONEXIÓN

P3-024A, 16.84m OF 500mm F-76

BEND

BH12

S T

A

H O

R I Z

O N

T A

L

P3-026A, 4.42m OF 500mm F-76

P3-026B, 30.27m OF 500mm F-76

P3-026C, 2.94m OF 500mm F-76

P3-026D, 2.72m OF 500mm F-76

HORIZ

BH47

S T

A

HORIZ

BH48

S T

A

HORIZ

BH45

S T

A

HORIZ

BH46

S T

A

B1

1:200

SITE PLAN

M-109 A1

1:200

PROFILE

F

N

T

I

N

U

A

T

I

E

F

N

T

I N

U

A

T

I

E

B1

M-402

GENERAL NOTES:

0 8 12 16 20

1:200

0 8 12 16 20

1:200

0 1 2

1:40

HORIZONTAL

VERTICAL

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

TIMOTHY A.

SCHMITT

17386

1. PROVIDE 500mm F-76 PIPELINE.

2. MODIFY BALLAST PIPING PROFILE AS NEEDED TO

ALLOW CONSTRUCTION OF F76 PIPELINE

3. 450 mm JP-5 LINE TO BE INSTALLED UNDER

ANOTHER CONTRACT. CONTACT ROTA PUBLIC

WORKS FOR THE CONSTRUCTION SCHEDULE.

4. EXISTING FUEL LINES, REMOVED BY OTHERS

KEYED NOTES:

A1

M-404

NOTAS GENERALES:

PERFIL

PLANTA EXTERIOR

P

A

N

T

I N

U

A

C

I

A

P

A

N

T

I

N

U

A

C

I

A

NOTAS DE REFERENCIA:

1. PROVEER TUBERÍA F-76 DE 500mm

3. TUBERÍA JP-5 DE 450mm A SER INSTALADA BAJO

OTRO CONTRATO. CONTACTAR CON OBRAS

PÚBLICAS EN ROTA PARA LA CONSTRUCCIÓN.

4. LÍNEAS DE COMBUSTIBLE EXISTENTES,

RETIRADA POR OTROS.

1. LAS POSICIONES HORIZONTALES DE LOS CRUCES

DE INSTALACIONES SE MUESTRAN SÓLO COMO

REFERENCIA. EL CONTRATISTA SERÁ

RESPONSABLE DE LA POSICIÓN Y PROTECCIÓN

DE LAS INSTALACIONES EXISTENTES. LOS DAÑOS

SOBRE LA INFRAESTRUCTURA EXISTENTE

DEBERÁN SER REPARADOS SIN COSTE PARA EL

GOBIERNO.

2. PARA LOS ACCESORIOS, ELEVACIONES Y

ALINEACIONES DE TUBERÍAS, VER TABLAS EN

PLANOS M-601 Y M-602.

1. HORIZONTAL LOCATIONS OF UTILITY CROSSINGS

SHOWN FOR REFERENCE ONLY. CONTRACTOR

RESPONSIBLE FOR LOCATING AND PROTECTING

EXISTING UTILITIES . DAMAGE TO EXISTING

INFRASTRUCTURE MUST BE REPAIRED AT NO COST

TO GOVERNMENT.

2. FOR PIPE APPURTENANCES, ELEVATION AND

ALIGNMENT SEE TABLES ON SHEETS M-601 AND

M-602.

3. SEE SHEET M-001 FOR LEGEND AND GENERAL

NOTES.

3. VER HOJA M-001 PARA LEYENDA Y NOTAS

GENERALES.

2. MODIFICAR EL PERFIL DE LA TUBERÍA DEL

SISTEMA DE LASTRE SEGÚN SE NECESITE PARA

PERMITIR LA CONSTRUCCIÓN DE LA TUBERÍA F76.

E L E

V A

T I O

N

E L E

V A

T I O

N

STATION

5+740 5+760 5+780 5+800 5+820 5+840 5+855

5+740 5+760 5+780 5+800 5+820 5+840 5+855

EXISTING GROUND

P3-028, 86.48m OF 500mm F-76

P3-029, 21.11m OF 500mm F-76

P -0

, 3

.9 m

O F m m F

-7

HORIZ

BH13

S T

A

HORIZ

BH14

S T

A

C1

1:200

SITE PLAN

M-110

F

N

T

I

N

U

A

T

I

E

F O

R

C

O N

T I N

U A

T I O

N

S

E

GENERAL NOTES:

0 8 12 16 20

1:200

A1

1:200

PROFILE

1. HORIZONTAL LOCATIONS OF UTILITY CROSSINGS SHOWN

FOR REFERENCE ONLY. CONTRACTOR RESPONSIBLE FOR

LOCATING AND PROTECTING EXISTING UTILITIES . DAMAGE

TO EXISTING INFRASTRUCTURE MUST BE REPAIRED AT NO

COST TO GOVERNMENT.

2. FOR PIPE APPURTENANCES, ELEVATION AND ALIGNMENT SEE

TABLES ON SHEET M-620P.

3. SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.

0 8 12 16 20

1:200

0 1 2

1:40

HORIZONTAL

VERTICAL

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

TIMOTHY A.

SCHMITT

17386

KEYED NOTES:

1. PROVIDE 500mm F-76 PIPELINE

2. 450 mm JP-5 LINE TO BE INSTALLED UNDER ANOTHER

CONTRACT. CONTACT ROTA PUBLIC WORKS FOR THE

CONSTRUCTION SCHEDULE.

3. EXISTING FUEL LINES, REMOVED BY OTHERS

NOTAS GENERALES:

1. LAS POSICIONES HORIZONTALES DE LOS CRUCES

DE INSTALACIONES SE MUESTRAN SÓLO COMO

REFERENCIA. EL CONTRATISTA SERÁ RESPONSABLE

DE LA POSICIÓN Y PROTECCIÓN DE LAS

INSTALACIONES EXISTENTES. LOS DAÑOS SOBRE LA

INFRAESTRUCTURA EXISTENTE DEBERÁN SER

REPARADOS SIN COSTE PARA EL GOBIERNO.

2. PARA LOS ACCESORIOS, ELEVACIONES Y

ALINEACIONES DE TUBERÍAS, VER TABLAS EN PLANO

M-620P.

NOTAS DE REFERENCIA:

1. PROVEER TUBERÍA F-76 DE 500mm

2. TUBERÍA JP-5 DE 450mm A SER INSTALADA BAJO

OTRO CONTRATO. CONTACTAR CON OBRAS

PÚBLICAS EN ROTA PARA LA CONSTRUCCIÓN.

3. LÍNEAS DE COMBUSTIBLE EXISTENTES, RETIRADA

POR OTROS.

P

A

N

T

I

N

U

A

C

I

A

P A

N

T I N

U A

C I Ó

N

V

A

PLANTA EXTERIOR

PERFIL

3. VER HOJA M-001 PARA LEYENDA Y NOTAS GENERALES.

5+880 5+900

5+920

5+940

WEST HDD PIT

E L E

V A

T I O

N

E L E

V A

T I O

N

STATION

-20

-18

-16

-14

-12

-10

-8

-6

-4

-2

-20

-18

-16

-14

-12

-10

-8

-6

-4

-2

5+855 5+860 5+880 5+900 5+920 5+940 5+960 5+970

5+855 5+860 5+880 5+900 5+920 5+940 5+960 5+970

WEST HDD PIT

CONNECTION POINT

WEST HDD PIT

CONNECTION POINT

P3-030, 36.98m OF 500mm F-76

PUNTO DE CONEXIÓN

PUNTO DE CONEXIÓN

P3-091, 7.06m OF 500mm F-76

HD00

S T

A

HD01

S T

A

P

P

P

P , 1

.7 m

O

F m m

F

P -0

, 1

.0 m

O F m m F

-7

P3-097, 15.05m OF 500mm F-76

HD02

S T

A

HD04

S T

A

HD22

S T

A

HD05

S T

A

B1

1:200

SITE PLAN

M-111

0 8 12 16 20

1:200

F O

R

C

O N

T I N

U A

T I O

N

S

E

KEYED NOTES:

GENERAL NOTES:

0 8 12 16 20

1:200

0 1

1:40

HORIZONTAL

VERTICAL

A1

1:200

PROFILE STA 0+480 TO STA 0+520

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

TIMOTHY A.

SCHMITT

17386

1. PROVIDE 500mm F-76 PIPELINE.

2. 450mm JP-5 LINE TO BE INSTALLED UNDER

ANOTHER CONTRACT. CONTACT ROTA PUBLIC

WORKS FOR THE CONSTRUCTION SCHEDULE.

3. 500mm F-76 BY OTHERS.

4. 250mm JP-8 BY OTHERS.

5. 500mm JP-8 BY OTHERS.

6. 350mm JP-5 BY OTHERS.

NOTAS DE REFERENCIA:

1. PROVEER TUBERÍA F-76 DE 500mm

2. TUBERÍA JP-5 DE 450mm A SER INSTALADA BAJO

OTRO CONTRATO. CONTACTAR CON OBRAS PÚBLICAS

EN ROTA PARA EL PROGRAMA DE CONSTRUCCIÓN.

P A

N

T I N

U A

C I Ó

N

V

A

PLANTA EXTERIOR

PERFIL STA 0+480 A STA 0+520

NOTAS GENERALES:

1. LAS POSICIONES HORIZONTALES DE LOS CRUCES DE

INSTALACIONES SE MUESTRAN SÓLO COMO

REFERENCIA. EL CONTRATISTA SERÁ RESPONSABLE DE

LA POSICIÓN Y PROTECCIÓN DE LAS INSTALACIONES

EXISTENTES. LOS DAÑOS SOBRE LA INFRAESTRUCTURA

EXISTENTE DEBERÁN SER REPARADOS SIN COSTE

PARA EL GOBIERNO.

2. PARA LOS ACCESORIOS, ELEVACIONES Y

ALINEACIONES DE TUBERÍAS, VER TABLAS EN

PLANOS M-601 Y M-602.

1. HORIZONTAL LOCATIONS OF UTILITY CROSSINGS

SHOWN FOR REFERENCE ONLY. CONTRACTOR

RESPONSIBLE FOR LOCATING AND PROTECTING

EXISTING UTILITIES . DAMAGE TO EXISTING

INFRASTRUCTURE MUST BE REPAIRED AT NO COST TO

GOVERNMENT.

2. FOR PIPE APPURTENANCES, ELEVATION AND

ALIGNMENT SEE TABLES ON SHEETS M-601 AND M-602.

3. SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.

3. VER HOJA M-001 PARA LEYENDA Y NOTAS GENERALES.

3. F-76 DE 500mm POR OTROS.

RIO SALADO

POZO DE VÁLVULAS OESTE/

POZO DE ESPAGHETTI

4. JP-8 DE 250mm POR OTROS.

5. JP-8 DE 500mm POR OTROS.

6. JP-5 DE 350mm POR OTROS.

POZO DE HDD

OESTE

-TP

F

N

T

I

N

U

A

T

I

E

P

A

N

T

I

N

U

A

C

I

A

RIO SALADO

VALVE PIT WEST/

SPAGHETTI PIT

E

V A

T I O

N

E L E

V A

T I O

N

STATION

-30

-28

-26

-24

-22

-20

-18

-16

-14

-12

-10

-8

-6

-4

-2

-30

-28

-26

-24

-22

-20

-18

-16

-14

-12

-10

-8

-6

-4

-2

5+970 5+980 6+000 6+020 6+040 6+060 6+080

5+970 5+980 6+000 6+020 6+040 6+060 6+080

P3-097, 15.05m OF 500mm F-76

P -0

, 1

.8 m

O F m m F

-7

P3-099, 15.02m OF 500mm F-76

P3-100, 14.85m OF 500mm F-76 P3-101, 14.93m OF 500mm F-76

P3-102, 15.13m OF 500mm F-76

P3-103, 1 4.93m O

F 500mm F-76

P3-104, 15.21m OF 500mm F-76

HD12

S T

A

HD11

S T

A

HD10

S T

A

HD09

S T

A

HD08

S T

A

HD07

S T

A

HD06

S T

A

B1

1:200

SITE PLAN

M-112 A1

1:200

PROFILE

GENERAL NOTES:

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

TIMOTHY A.

SCHMITT

17386

KEYED NOTES:

1. 500mm F-76 BY OTHERS.

2. 450mm JP-5 LINE TO BE INSTALLED UNDER

ANOTHER CONTRACT. CONTACT ROTA PUBLIC

WORKS FOR THE CONSTRUCTION SCHEDULE.

3. 250mm JP-8 BY OTHERS.

NOTAS GENERALES:

NOTAS DE REFERENCIA:

1. TUBERÍA F-76 DE 500mm POR OTROS.

2. TUBERÍA JP-5 DE 450mm A SER INSTALADA

BAJO OTRO CONTRATO. CONTACTAR CON

OBRAS PÚBLICAS EN ROTA PARA EL

PROGRAMA DE CONSTRUCCIÓN.

PLANTA EXTERIOR

PERFIL

1. LAS POSICIONES HORIZONTALES DE LOS

CRUCES DE INSTALACIONES SE MUESTRAN

SÓLO COMO REFERENCIA. EL CONTRATISTA

SERÁ RESPONSABLE DE LA POSICIÓN Y

PROTECCIÓN DE LAS INSTALACIONES

EXISTENTES. LOS DAÑOS SOBRE LA

INFRAESTRUCTURA EXISTENTE DEBERÁN SER

REPARADOS SIN COSTE PARA EL GOBIERNO.

2. PARA LOS ACCESORIOS, ELEVACIONES Y

ALINEACIONES DE TUBERÍAS, VER TABLAS EN

PLANOS M-601 Y M-602.

1. HORIZONTAL LOCATIONS OF UTILITY CROSSINGS

SHOWN FOR REFERENCE ONLY. CONTRACTOR

RESPONSIBLE FOR LOCATING AND PROTECTING

EXISTING UTILITIES . DAMAGE TO EXISTING

INFRASTRUCTURE MUST BE REPAIRED AT NO COST

TO GOVERNMENT.

2. FOR PIPE APPURTENANCES, ELEVATION AND

ALIGNMENT SEE TABLES ON SHEETS M-601 AND

M-602.

3. SEE SHEET M-001 FOR LEGEND AND GENERAL

NOTES.

3. VER HOJA M-001 PARA LEYENDA Y NOTAS

GENERALES.

3. TUBERÍA JP-8 DE 250mm POR OTROS.

0 8 12 16 20

1:200

F O

R

C

O N

T I N

U A

T I O

N

S

E

P A

N

T I N

U A

C I Ó

N

V

A

F O

R

C

O N

T I N

U A

T I O

N

S

E

P A

N

T I N

U A

C I Ó

N

V

A

0 8 12 16 20

1:200

0 1

1:40

HORIZONTAL

VERTICAL

E V

A T

I O

N

E L

E V

A T

I O

N

STATION

-30

-28

-26

-24

-22

-20

-18

-16

-14

-12

-10

-8

-6

-4

-2

-30

-28

-26

-24

-22

-20

-18

-16

-14

-12

-10

-8

-6

-4

-2

6+080 6+100 6+120 6+140 6+160 6+180 6+190

6+080 6+100 6+120 6+140 6+160 6+180 6+190

P3-104, 15.21m OF 500mm F-76

HD13

S T

A

P -1

.6 m

O F m m F

-7

HD14

S T

A

P -1

.0 m

O F m m F

-7

HD15

S T

A

P .0 m

O

F m m

F

HD16

S T

A

P

HD17

S T

A

P

HD18

S T

A

P

HD19

S T

A

P

HD20

S T

A

M-113

A1

1:500

PROFILE

KEYED NOTES:

F O

R

C

O N

T I N

U A

T I O

N

S

E

F O

R

C

O N

T I N

U A

T I O

N

S

E

1. 500mm F-76 PIPELINE BY OTHERS.

2. 450mm JP-5 LINE TO BE INSTALLED UNDER ANOTHER

CONTRACT. CONTACT ROTA PUBLIC WORKS FOR

THE CONSTRUCTION SCHEDULE.

3. 250mm JP-8 BY OTHERS.

GENERAL NOTES:

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

TIMOTHY A.

SCHMITT

17386

PERFIL

P A

N

T I N

U A

C I Ó

N

V

A

P A

N

T I N

U A

C I Ó

N

V

A

NOTAS DE REFERENCIA:

1. TUBERÍA F-76 DE 500mm POR OTROS.

2. TUBERÍA JP-5 DE 450mm A SER INSTALADA BAJO

OTRO CONTRATO. CONTACTAR CON OBRAS

PÚBLICAS EN ROTA PARA EL PROGRAMA DE

CONSTRUCCIÓN.

NOTAS GENERALES:

1. LAS POSICIONES HORIZONTALES DE LOS CRUCES

DE INSTALACIONES SE MUESTRAN SÓLO COMO

REFERENCIA. EL CONTRATISTA SERÁ

RESPONSABLE DE LA POSICIÓN Y PROTECCIÓN DE

LAS INSTALACIONES EXISTENTES. LOS DAÑOS

SOBRE LA INFRAESTRUCTURA EXISTENTE

DEBERÁN SER REPARADOS SIN COSTE PARA EL

GOBIERNO.

2. PARA LOS ACCESORIOS, ELEVACIONES Y

ALINEACIONES DE TUBERÍAS, VER TABLAS

EN PLANOS M-601 Y M-602.

1. HORIZONTAL LOCATIONS OF UTILITY CROSSINGS

SHOWN FOR REFERENCE ONLY. CONTRACTOR

RESPONSIBLE FOR LOCATING AND PROTECTING

EXISTING UTILITIES . DAMAGE TO EXISTING

INFRASTRUCTURE MUST BE REPAIRED AT NO

COST TO GOVERNMENT.

2. FOR PIPE APPURTENANCES, ELEVATION AND

ALIGNMENT SEE TABLES ON SHEETS M-601 AND

M-602.

3. SEE SHEET M-001 FOR LEGEND AND GENERAL

NOTES.

3. VER HOJA M-001 PARA LEYENDA Y NOTAS

GENERALES.

B1

1:200

SITE PLAN

PLANTA EXTERIOR 0 8 12 16 20

1:200

0 8 12 16 20

1:200

0 1

1:40

HORIZONTAL

VERTICAL

3. TUBERÍA JP-8 DE 250mm POR OTROS.

E

V A

T I O

N

E L

E V

A T

I O

N

STATION

-6

-4

-2

-6

-4

-2

6+190 6+200 6+220 6+240 6+260 6+280 6+300

6+190 6+200 6+220 6+240 6+260 6+280 6+300

P

HD21

S T

A

P -1

.8 m

O F m m F

-7

BH42

S T

A

P3-114, 2.59m OF 500mm F-76

CP11

S T

A

CP12

S T

A

P3-043, 4.60m OF 500mm F-76

BH43

S T

A

P3-043A, 54.33m OF 500mm F-76

BV12

S T

A

P3-044, 14.94m OF 500mm F-76

6+260

6+280

6+300

M-114

F O

R

C

O N

T I N

U A

T I O

N

S

E

F

N

T

I N

U

A

T

I

E

A1

1:200

PIER 3 STA 6+530 TO 6+830

KEYED NOTES:

GENERAL NOTES:

1. HORIZONTAL LOCATIONS OF UTILITY

CROSSINGS SHOWN FOR REFERENCE ONLY.

CONTRACTOR RESPONSIBLE FOR LOCATING

AND PROTECTING EXISTING UTILITIES .

DAMAGE TO EXISTING INFRASTRUCTURE MUST

BE REPAIRED AT NO COST TO GOVERNMENT

2. FOR PIPE APPURTENANCES, ELEVATION AND

ALIGNMENT SEE TABLES ON SHEETS M-601 AND

M-602.

3. SEE SHEET M-001 FOR LEGEND AND GENERAL

NOTES.

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

TIMOTHY A.

SCHMITT

17386

1. PROVIDE 500mm F-76 PIPELINE.

2. 450mm JP-5 LINE TO BE INSTALLED UNDER

ANOTHER CONTRACT. CONTACT ROTA PUBLIC

WORKS FOR THE CONSTRUCTION SCHEDULE.

3. 250mm JP-8 BY OTHERS.

4. 500mm F-76 BY OTHERS.

MUELLE 3 STA 6+530 A 6+830

NOTAS GENERALES:

1. LAS POSICIONES HORIZONTALES DE LOS CRUCES

DE INSTALACIONES SE MUESTRAN SÓLO COMO

REFERENCIA. EL CONTRATISTA SERÁ

RESPONSABLE DE LA POSICIÓN Y PROTECCIÓN

DE LAS INSTALACIONES EXISTENTES. LOS DAÑOS

SOBRE LA INFRAESTRUCTURA EXISTENTE

DEBERÁN SER REPARADOS SIN COSTE PARA EL

GOBIERNO.

2. PARA LOS ACCESORIOS, ELEVACIONES Y

ALINEACIONES DE TUBERÍAS, VER TABLAS

EN PLANOS M-601 Y M-602.

NOTAS DE REFERENCIA:

1. PROVEER TUBERÍA F-76 DE 500mm

2. TUBERÍA JP-5 DE 450mm A SER INSTALADA

BAJO OTRO CONTRATO. CONTACTAR CON

OBRAS PÚBLICAS EN ROTA PARA EL

PROGRAMA DE CONSTRUCCIÓN.

3. TUBERÍA DE 250mm JP-8 POR OTROS.

4. TUBERÍA DE 500mm F-76 POR OTROS.

P A

N

T I N

U A

C I Ó

N

V

A

P

A

N

T

I N

U

A

C

I

A

3. VER HOJA M-001 PARA LEYENDA Y NOTAS

GENERALES.

0 8 12 16 20

1:200

B1

1:200

SITE PLAN

PLANTA EXTERIOR

0 8 12 16 20

1:200

0 1

1:40

HORIZONTAL

VERTICAL

1 2

-TP

SOUTHEAST HDD PIT

E

V A

T I O

N

E L E

V A

T I O

N

F-76_PIER 3 PROFILE - STA 6+300 TO 6+580

6+300 6+320 6+340 6+360 6+380 6+400 6+420 6+440 6+460 6+480 6+500 6+520 6+540 6+560 6+580

P3-044, 14.94m OF 500mm F-76

BEND

BH18

S T

A

H O

R I Z

O N

T A

L m m

E

X

S

A N

BEND

BV13

S T

A

V E

R T

I C

A L

P3-046, 1.71m OF 500mm F-76

P3-047, 21.63m OF 500mm F-76

EXISTING GROUND

BEND

BH19

S T

A

H O

R I Z

O N

T A

L

BEND

BH20

S T

A

V E

R T

I C

A L

P3-048, 32.61m OF 500mm F-76

P3-050, 8.91m OF 500mm F-76 m m

E

X

S

A N

BEND

BH22

S T

A

V E

R T

I C

C

O M

P3-051, 38.10m OF 500mm F-76

P3-052, 3.79m OF 500mm F-76

BEND

BH23

S T

A

V E

R T

I C

A L

BEND

BV14

S T

A

V E

R T

I C

A L m m

E

X

S

A N

P3-053, 13.71m OF 500mm F-76

P3-054, 32.23m OF 500mm F-76

P3-057, 34.09m OF 500mm F-76

BEND

BH24

S T

A

H O

R I Z

O N

T A

L

P3-051, 38.10m OF 500mm F-76

P3-045, 30.75m OF 500mm F-76

BEND

BV10

S T

A

H O

R I Z

O N

T A

L m m

S

T

C U

L V

E R

T

P3-049, 23.38m OF 500mm F-76

BEND

BH21

S T

A

H O

R I Z

O N

T A

L

P3-047A, 39.81m OF 500mm F-76

6+420 6

KEYED NOTES:

M-115 A1

1:500

PROFILE

0 20 30 40 50

1:500

GENERAL NOTES:

0 4 6 8 10

1:100

HORIZONTAL

VERTICAL

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

TIMOTHY A.

SCHMITT

17386

1. PROVIDE 500mm F-76 PIPELINE.

2. 450 mm JP-5 LINE TO BE INSTALLED UNDER ANOTHER

CONTRACT. CONTACT ROTA PUBLIC WORKS FOR THE

CONSTRUCTION SCHEDULE.

PERFIL

NOTAS DE REFERENCIA:

1. PROVEER TUBERÍA F-76 DE 500mm

2. TUBERÍA JP-5 DE 450mm A SER INSTALADA BAJO

OTRO CONTRATO. CONTACTAR CON OBRAS

PÚBLICAS EN ROTA PARA EL PROGRAMA DE

CONSTRUCCIÓN.

NOTAS GENERALES:

1. LAS POSICIONES HORIZONTALES DE LOS

CRUCES DE INSTALACIONES SE MUESTRAN

SÓLO COMO REFERENCIA. EL CONTRATISTA

SERÁ RESPONSABLE DE LA POSICIÓN Y

PROTECCIÓN DE LAS INSTALACIONES

EXISTENTES. LOS DAÑOS SOBRE LA

INFRAESTRUCTURA EXISTENTE DEBERÁN SER

REPARADOS SIN COSTE PARA EL GOBIERNO.

2. PARA LOS ACCESORIOS, ELEVACIONES Y

ALINEACIONES DE TUBERÍAS, VER TABLAS

EN PLANOS M-601 Y M-602.

1. HORIZONTAL LOCATIONS OF UTILITY CROSSINGS

SHOWN FOR REFERENCE ONLY. CONTRACTOR

RESPONSIBLE FOR LOCATING AND PROTECTING

EXISTING UTILITIES . DAMAGE TO EXISTING

INFRASTRUCTURE MUST BE REPAIRED AT NO

COST TO GOVERNMENT.

2. FOR PIPE APPURTENANCES, ELEVATION AND

ALIGNMENT SEE TABLES ON SHEETS M-601 AND

M-602.

3. SEE SHEET M-001 FOR LEGEND AND GENERAL

NOTES.

3. VER HOJA M-001 PARA LEYENDA Y

NOTAS GENERALES.

B1

1:500

SITE PLAN

F

N

T

I N

U

A

T

I

E

0 20 30 40 50

1:500

PLANTA EXTERIOR

P

A

N

T

I N

U

A

C

I

A

F

N

T

I

N

U

A

T

I

E

P

A

N

T

I

N

U

A

C

I

A

E

V A

T I O

N

E L E

V A

T I O

N

F-76_PIER 3 PROFILE - STA 6+580 TO 6+870

6+580 6+600 6+620 6+640 6+660 6+680 6+700 6+720 6+740 6+760 6+780 6+800 6+820 6+840 6+860 6+870

EXISTING GROUND

VAULT IE: 8.802

IE IN: 8.902, 500mm, W

OUT: 8.902, 500mm, E

HPV06

S T

A

R

P3-058, 59.73m OF 500m m F-76 m m

E

X

S

A N

E

M

BEND

BV15

S T

A

H O

R I Z

O N

T A

L

BEND

BH28

S T

A

H O

R I Z

O N

T A

L

BEND

BH29

S T

A

H O

R I Z

O N

T A

L

P3-059, 34.45m OF 500mm F-76 P3-060, 35.05m OF 500mm F-76

P3-061, 20.12m OF 500mm F-76

VAULT IE: 7.603

IE IN: 7.703, 500mm, W

OUT: 7.703, 500mm, E

LPD05

S T

A

R

P -0

.3 m

O F m m F

-7

P3-063, 19.31m OF 500mm F-76

P3-064, 85.49m OF 500mm F-76 m m

E

X

S

A N m m

E

X

S

A N

BEND

BH30

S T

A

H O

R I Z

O N

T A

L m m

E

X

W m m

E

X

S

A N m m

E

X

F

U E

L m m

E

X

F

F

U E

L m m

E

X

J P

E

L m m

E

X

F

F

U E

L m m

E

X

J P

E

L m m

I N

A C

T I V

E

F

U E

L m m

E

X

J P

E

L m m

E

X

J P

E

L

A2

M-503

B2

M-503

P3-058A, 13.89m OF 500mm F-76

P3-061A, 2.78m OF 500mm F-76

P3-061B, 19.33m OF 500mm F-76

B

6+580

6+600

6+620

6+640

6+660

6+700

6+720

6+740

6+760 6+780

6+800

6+840

6+860

6+880

M-116

B1

1:500

PROFILE

KEYED NOTES:

0 20 30 40 50

1:500

GENERAL NOTES:

0 4 6 8 10

1:100

HORIZONTAL

VERTICAL

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

TIMOTHY A.

SCHMITT

17386

1. PROVIDE 500mm F-76 PIPELINE.

2. 450 mm JP-5 LINE TO BE INSTALLED UNDER ANOTHER

CONTRACT. CONTACT ROTA PUBLIC WORKS FOR THE

CONSTRUCTION SCHEDULE.

3. LOW-POINT DRAIN

4. HIGH-POINT VENT

NOTAS GENERALES:

NOTAS DE REFERENCIA:

1. PROVEER TUBERÍA F-76 DE 500mm

2. TUBERÍA JP-5 DE 450mm A SER INSTALADA

BAJO OTRO CONTRATO. CONTACTAR CON

OBRAS PÚBLICAS EN ROTA PARA EL

PROGRAMA DE CONSTRUCCIÓN.

3. DRENAJE EN PUNTO BAJO

PERFIL

1. LAS POSICIONES HORIZONTALES DE LOS CRUCES DE

INSTALACIONES SE MUESTRAN SÓLO COMO

REFERENCIA. EL CONTRATISTA SERÁ RESPONSABLE

DE LA POSICIÓN Y PROTECCIÓN DE LAS

INSTALACIONES EXISTENTES. LOS DAÑOS SOBRE LA

INFRAESTRUCTURA EXISTENTE DEBERÁN SER

REPARADOS SIN COSTE PARA EL GOBIERNO.

2. PARA LOS ACCESORIOS, ELEVACIONES Y

ALINEACIONES DE TUBERÍAS, VER TABLAS EN

PLANOS M-601 Y M-602.

1. HORIZONTAL LOCATIONS OF UTILITY CROSSINGS

SHOWN FOR REFERENCE ONLY. CONTRACTOR

RESPONSIBLE FOR LOCATING AND PROTECTING

EXISTING UTILITIES . DAMAGE TO EXISTING

INFRASTRUCTURE MUST BE REPAIRED AT NO COST

TO GOVERNMENT.

2. FOR PIPE APPURTENANCES, ELEVATION AND

ALIGNMENT SEE TABLES ON SHEETS M-601 AND M-602.

3. SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.

3. VER HOJA M-001 PARA LEYENDA Y NOTAS GENERALES.

4. VENTEO EN PUNTO ALTO

P A

N

T I N

U A

C I Ó

N

V

A

B1

1:500

SITE PLAN

0 20 30 40 50

1:500

PLANTA EXTERIOR

F O

R

C

O N

T I N

U A

T I O

N

S

E

P A

N

T I N

U A

C I Ó

N

V

A

F O

R

C

O N

T I N

U A

T I O

N

S

E

E V

A T

I O

N

6+870 6+880 6+900 6+920 6+940 6+960 6+980 7+000 7+020 7+040 7+060 7+080 7+100 7+120 7+140 7+150

EXISTING GROUND

P3-0 64, 8

5.4 9m O

F 5 00mm F

-7

BEND

BH32

S T

A

H O

R I Z

O N

T A

L

P3-065, 35.31m OF 500mm F-76

BEND

BH39

S T

A

H O

R I Z

O N

T A

L m m

E

X

S

A N

P3-067, 37.53m O

F 500m m

F-76 m m

E

X

S

A N

HPV02

S T

A

R

P3-066, 7.52m OF 500mm F-76

A2

M-503

P3-064A, 19.01m OF 500mm F-76

P3-0 64B, 1

29.7 0m

O F 5

00m m

F -7

BEND

BH55

S T

A

H O

R I Z

O N

T A

L

BEND

BH54

S T

A

H O

R I Z

O N

T A

L

A

C

T

I V

E

A

C

T

I V

E

6+880

6+900

6+940 6+960

6+980 7+000

7+020 7+040

7+060

7+120 7+140 7+160

M-117

KEYED NOTES:

A1

1:500

PROFILE

0 20 30 40 50

1:500

GENERAL NOTES:

0 4 6 8 10

1:100

HORIZONTAL

VERTICAL

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

TIMOTHY A.

SCHMITT

17386

1. PROVIDE 500mm F-76 PIPELINE.

2. 450 mm JP-5 LINE TO BE INSTALLED UNDER

ANOTHER CONTRACT. CONTACT ROTA PUBLIC

WORKS FOR THE CONSTRUCTION SCHEDULE

3. HIGH-POINT VENT.

PERFIL

NOTAS DE REFERENCIA:

1. PROVEER TUBERÍA F-76 DE 500mm

2. TUBERÍA JP-5 DE 450mm A SER INSTALADA BAJO

OTRO CONTRATO. CONTACTAR CON OBRAS PÚBLICAS

EN ROTA PARA EL PROGRAMA DE CONSTRUCCIÓN.

3. VENTEO EN PUNTO ALTO.

NOTAS GENERALES:

1. LAS POSICIONES HORIZONTALES DE LOS CRUCES DE

INSTALACIONES SE MUESTRAN SÓLO COMO REFERENCIA.

EL CONTRATISTA SERÁ RESPONSABLE DE LA POSICIÓN Y

PROTECCIÓN DE LAS INSTALACIONES EXISTENTES. LOS

DAÑOS SOBRE LA INFRAESTRUCTURA EXISTENTE

DEBERÁN SER REPARADOS SIN COSTE PARA EL

GOBIERNO.

2. PARA LOS ACCESORIOS, ELEVACIONES Y

ALINEACIONES DE TUBERÍAS, VER TABLAS EN

PLANOS M-601 Y M-602.

1. HORIZONTAL LOCATIONS OF UTILITY CROSSINGS SHOWN

FOR REFERENCE ONLY. CONTRACTOR RESPONSIBLE

FOR LOCATING AND PROTECTING EXISTING UTILITIES .

DAMAGE TO EXISTING INFRASTRUCTURE MUST BE

REPAIRED AT NO COST TO GOVERNMENT.

2. FOR PIPE APPURTENANCES, ELEVATION AND ALIGNMENT

SEE TABLES ON SHEETS M-601 AND M-602.

3. SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.

3. VER HOJA M-001 PARA LEYENDA Y NOTAS GENERALES.

F O

R

C

O N

T I N

U A

T I O

N

S

E

F O

R

C

O N

T I N

U A

T I O

N

S

E

P A

N

T I N

U A

C I Ó

N

V

A

P A

N

T I N

U A

C I Ó

N

V

A

B1

1:500

SITE PLAN

0 20 30 40 50

1:500

PLANTA EXTERIOR

E

V A

T I O

N

E L E

V A

T I O

N

7+150 7+160 7+180 7+200 7+220 7+240 7+260 7+280 7+300 7+320 7+340 7+360 7+380 7+400 7+420 7+440

EXISTING GROUND

M

M

P3-070, 24.58m OF 500mm F-76

P3-073, 4.35m OF 500mm F-76 m m

E

X

S

A N

P3-075, 101.48m OF 500mm F-76

BEND

BH33

S T

A

H O

R I Z

O N

T A

L

BEND

BH34

S T

A

H O

R I Z

O N

T A

L

P3-076, 25.16m OF 500mm F-76

P3-077, 34.93m OF 500mm F-76 m m

E

X

S

A N m m

E

X

W

M m m

E

X

S

A N

B2

M-503

P3-068, 47.81m OF 500mm F-76

BEND

BH40

S T

A

H O

R I Z

O N

T A

L

BEND

BV23

S T

A

V E

R T

I C

A L

LPD04

S T

A

R

P3-073A, 2.22m OF 500mm F-76

BEND

BH41

S T

A

H O

R I Z

O N

T A

L

P3-075A, 37.12m OF 500mm F-76

BEND

BH44

S T

A

H O

R I Z

O N

T A

L

600mm F-76

500mm JP-8

500mm F-76

350mm JP-5

350mm INACTIVE

150mm JP-5

150mm JP-8

150mm INACTIVE

KEYED NOTES:

M-118 A1

1:500

PROFILE

0 20 30 40 50

1:500

GENERAL NOTES:

0 4 6 8 10

1:100

HORIZONTAL

VERTICAL

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

TIMOTHY A.

SCHMITT

17386

1. PROVIDE 500mm F-76 PIPELINE.

2. 450 mm JP-5 LINE TO BE INSTALLED UNDER

ANOTHER CONTRACT. CONTACT ROTA PUBLIC

WORKS FOR THE CONSTRUCTION SCHEDULE.

3. LOW-POINT DRAIN.

PERFIL

NOTAS DE REFERENCIA:

1. PROVEER TUBERÍA F-76 DE 500mm.

2. TUBERÍA JP-5 DE 450mm A SER INSTALADA BAJO

OTRO CONTRATO. CONTACTAR CON OBRAS

PÚBLICAS EN ROTA PARA EL PROGRAMA DE

CONSTRUCCIÓN.

3. DRENAJE EN PUNTO BAJO

NOTAS GENERALES:

1. LAS POSICIONES HORIZONTALES DE LOS

CRUCES DE INSTALACIONES SE MUESTRAN

SÓLO COMO REFERENCIA. EL CONTRATISTA

SERÁ RESPONSABLE DE LA POSICIÓN Y

PROTECCIÓN DE LAS INSTALACIONES

EXISTENTES. LOS DAÑOS SOBRE LA

INFRAESTRUCTURA EXISTENTE DEBERÁN SER

REPARADOS SIN COSTE PARA EL GOBIERNO.

2. PARA LOS ACCESORIOS, ELEVACIONES Y

ALINEACIONES DE TUBERÍAS, VER TABLAS

EN PLANOS M-601 Y M-602.

1. HORIZONTAL LOCATIONS OF UTILITY CROSSINGS

SHOWN FOR REFERENCE ONLY. CONTRACTOR

RESPONSIBLE FOR LOCATING AND PROTECTING

EXISTING UTILITIES . DAMAGE TO EXISTING

INFRASTRUCTURE MUST BE REPAIRED AT NO

COST TO GOVERNMENT.

2. FOR PIPE APPURTENANCES, ELEVATION AND

ALIGNMENT SEE TABLES ON SHEETS M-601 AND

M-602.

3. SEE SHEET M-001 FOR LEGEND AND GENERAL

NOTES.

3. VER HOJA M-001 PARA LEYENDA Y NOTAS

GENERALES.

0 20 30 40 50

1:500

B1

1:500

SITE PLAN

F

N

T

I N

U

A

T

I

E

PLANTA EXTERIOR

P

A

N

T

I N

U

A

C

I

A

P

A

N

T

I

N

U

A

C

I

A

F

N

T

I

N

U

A

T

I

E

600mm F-76

500mm JP-8

500mm F-76

350mm JP-5

350mm INACTIVE

150mm JP-5

150mm JP-8

150mm INACTIVE

ML-1

V-BRDG-OTLN

FH #14

PIT #1

ML-1

B1

M-410

7+540

7+580

7+600

7+620

7+640

7+660

7+680

7+700

7+720

7+740

E L

E V

A T

I O

N

E L

E V

A T

I O

N

F-76_PIER 3 PROFILE - STA 7+440 TO 7+720

7+440 7+460 7+480 7+500 7+520 7+540 7+560 7+580 7+600 7+620 7+640 7+660 7+680 7+700 7+720

EXISTING GROUND

BEND

B48

S T

A

H O

R I Z

O N

T A

L

P -0

.4 m

O F m m F

-7

P3-085, 118.15m OF 500mm F-76

CP06

S T

A

I N

V

CP07

S T

A

I N

V

BEND

BH35

S T

A

H O

R I Z

O N

T A

L

BEND

BH36

S T

A

H O

R I Z

O N

T A

L

BEND

BH37

S T

A

H O

R I Z

O N

T A

L m m

I N

A C

T I V

E

F

U E

L m m

E

X

J P

E

L m m

E

X

J P

E

L m m

E

X

J P

E

L m m

E

X

J P

E

L m m

E

X

F

F

U E

L m m

E

X

J P

E

L m m

E

X

F

F

U E

L m m

E

X

S

A N m m

E

X

W m m

E

X

W

E

L m m

E

X

S

A N

P3-079, 28.54m OF 500mm F-76

P3-081, 17.47m OF 500mm F-76

P3-082, 22.57m OF 500mm F-76

P3-083, 3.19m OF 500mm F-76

BEND

BH38

S T

A

V E

R T

I C

A L

P3-084, 17.99m OF 500mm F-76

LDP-9

S T

A

R

ML-1

P3-085, 118.15m OF 500mm F-76 m m

E

X

W

B1

1:500

SITE PLAN

M-119

F O

R

C

O N

T I N

U A

T I O

N

S

E

F

N

T

I

N

U

A

T

I

E

KEYED NOTES:

A1

1:500

PROFILE

0 20 30 40 50

1:500

0 20 30 40 50

1:500

GENERAL NOTES:

0 4 6 8 10

1:100

HORIZONTAL

VERTICAL

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .