This document is a comprehensive set of mechanical demolition and installation plans for the replacement of a fuel pipeline system from Pier 3 to bulk storage at Naval Station Rota, Spain. The plans detail the demolition of existing 450mm, 600mm, and 400mm F-76 fuel pipelines and associated infrastructure, with replacement by new 500mm F-76 pipelines throughout the facility.
The demolition plans (MD101-MD120, MD401-MD411) specify removal of existing pipeline sections, supports, fittings, and valves across multiple locations including Pier 3, booster pump houses, metering stations, and interconnecting valve pits. Key demolition requirements include abandoning certain 450mm and 600mm pipeline sections in place with seal-welded 6mm end plates, removing below-grade piping and appurtenances, protecting or removing and reinstalling pipe support foundations, and rehabilitating concrete penetrations per specification Section 03 01 00 and ACI 562-16. The installation plans (M101-M120) show the new 500mm F-76 pipeline routing with expansion loops, high-point vents, low-point drains, pipe anchors, and free/guided supports at 90-meter intervals with exothermic welded #4 AWG cable bonding to existing ground rings. The plans cover approximately 7.8 kilometers of pipeline installation from station 5+360 to 7+880, including connections to existing metering stations, booster pump houses, and tank farm facilities. Horizontal directional drilling (HDD) sections are specified for crossing the Rio Salado, with detailed elevation profiles showing coordination with existing 300mm-600mm ballast, JP-5, JP-8, and CAMPSA pipelines. All work references Section 02 41 00 for demolition requirements and must accommodate existing utilities while maintaining one pipe diameter clearance per UFC 3-460-01.
View the file
Other files
Show 40 more
Latest 50 of 67 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
m
J
P
F
C
A
R
G
O
B
L
L
A
S
T
C
L
H
MD105
F O
R
C
O N
T I N
U A
T I O
N
S
E
S
H E
T
M
D
F O
R
C
O N
T I N
U A
T I O
N
S
E
C1
1:200
DEMOLITION PLAN
GENERAL NOTES:
REMOVE PIPELINE
DEMOLITION LEGEND:
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
TIMOTHY A.
SCHMITT
17386
KEYED NOTES:
1. REMOVE 450mm F-76 PIPELINE, SUPPORTS, FITTINGS AND
VALVES ON PIER 3 FOR 500mm F-76 PIPELINE.
1. SEE SECTION 02 41 00 FOR DEMOLITION REQUIREMENTS.
PLANTA DE DEMOLICIONES
NOTAS DE REFERENCIA:NOTAS GENERALES:
1. VER SECCIÓN 02 41 00 PARA LOS REQUISITOS DE
DEMOLICIÓN.
NOTAS DE DEMOLICIÓN:
RETIRAR TUBERÍA
C O
N T
I N
U A
C I Ó
N
E
N
P
L A
N O
C O
N T
I N
U A
C I Ó
N
E
N
P
L A
1. RETIRAR LA LÍNEA DE COMBUSTIBLE F-76 DE 450mm DE
DIÁMETRO, LOS SOPORTES, ACCESORIOS Y LAS VÁLVULAS EN
EL MUELLE 3 POR UNA NUEVA F-76 DE 500m DE DIÁMETRO
0 8 12 16 20
1:200
0+000
0+020
R
G
O
L
L
A
S
T
C
L
H
VP-1
MD106
0 8 12 16 20
1:200
GENERAL NOTES:
REMOVE PIPELINE
DEMOLITION LEGEND:
F O
R
C
O N
T I N
U A
T I O
N
S
E
F O
R
C
O N
T I N
U A
T I O
N
S
E
C1
1:200
DEMOLITION PLAN
B1
MD401
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
TIMOTHY A.
SCHMITT
17386
KEYED NOTES:
1. REMOVE 450mm F-76 PIPELINE, SUPPORTS, FITTINGS AND
VALVES ON PIER 3 FOR 500mm F-76 PIPELINE.
2. 450mm PIPELINE TO BE ABANDONED IN PLACE. PROVIDE
SEAL WELDED 6mm END PLATES AT ENDS OF ABANDONED
PIPE.
1. SEE SECTION 02 41 00 FOR DEMOLITION REQUIREMENTS.
PLANTA DE DEMOLICIONES
NOTAS DE REFERENCIA:NOTAS GENERALES:
1. VER SECCIÓN 02 41 00 PARA LOS REQUISITOS DE
DEMOLICIÓN.
NOTAS DE DEMOLICIÓN:
RETIRAR TUBERÍA
C O
N T
I N
U A
C I Ó
N
E
N
P
L A
2. ABANDONAR LA LINEA DE COMBUSTIBLE DE 450mm DE
DIÁMETRO EN SU LUGAR. PROVEER PLACAS DE 6mm
SOLDADAS Y SELLADAS EN LOS EXTREMOS DE LA LINEA DE
COMBUSTIBLE ABANDONADA
C O
N T
I N
U A
C I Ó
N
E
N
P
L A
1. RETIRAR LA LÍNEA DE COMBUSTIBLE F-76 DE 450mm DE
DIÁMETRO, LOS SOPORTES, ACCESORIOS Y LAS VÁLVULAS EN
EL MUELLE 3 POR UNA NUEVA F-76 DE 500m DE DIÁMETRO
WATERLINE
MD107
0 8 12 16 20
1:200
F O
R
C
O N
T I N
U A
T I O
N
S
E
F O
R
C
O N
T I N
U A
T I O
N
S
E
C1
1:200
DEMOLITION PLAN
GENERAL NOTES:
REMOVE PIPELINE
DEMOLITION LEGEND:
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
TIMOTHY A.
SCHMITT
17386
KEYED NOTES:
1. REMOVE BELOW GRADE 450mm F-76 PIPELINE AND FITTINGS
FOR 500mm F-76 PIPELINE.
1. SEE SECTION 02 41 00 FOR DEMOLITION REQUIREMENTS.
PLANTA DE DEMOLICIONES
NOTAS DE REFERENCIA:NOTAS GENERALES: NOTAS DE DEMOLICIÓN:
RETIRAR TUBERÍA
C O
N T
I N
U A
C I Ó
N
E
N
P
L A
C O
N T
I N
U A
C I Ó
N
E
N
P
L A
1. RETIRAR LA LINEA DE COMBUSTIBLE ENTERRADA F-76 DE
450mm DE DIAMETRO Y LOS ACCESORIOS POR UNA NUEVA
F-76 DE 500mm DE DIAMETRO.
1. VER SECCIÓN 02 41 00 PARA LOS REQUISITOS DE
DEMOLICIÓN.
METERING STATIONS
ESTACIONES DE MEDICIÓN
MD108
0 8 12 16 20
1:200
F O
R
C
O N
T I N
U A
T I O
N
S
E
GENERAL NOTES:
REMOVE PIPELINE
DEMOLITION LEGEND:
B1
1:200
DEMOLITION PLAN
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
TIMOTHY A.
SCHMITT
17386
KEYED NOTES:
1. SEE SECTION 02 41 00 FOR DEMOLITION REQUIREMENTS.
PLANTA DE DEMOLICIONES
NOTAS DE REFERENCIA:NOTAS GENERALES:
1. VER SECCIÓN 02 41 00 PARA LOS REQUERIMIENTOS DE
DEMOLICIÓN.
LEYENDA DE DEMOLICIÓN:
RETIRAR TUBERÍA
P A
R
N
T I N
U A
C I Ó
N
V
L A
2. ABANDONAR LA LÍNEA DE COMBUSTIBLE 450mm DE
DIÁMETRO EN SU LUGAR. PROVEER PLACAS DE 6mm
SOLDADAS Y SELLADAS EN LOS EXTREMOS DE LA LÍNEA DE
COMBUSTIBLE ABANDONADA
1. RETIRAR LA LINEA DE COMBUSTIBLE ENTERRADA F-76 DE
450mm DE DIÁMETRO Y LOS ACCESORIOS POR UNA NUEVA
F-76 DE 500mm DE DIÁMETRO.
F O
R
C
O N
T I N
U A
T I O
N
S
E
P A
N
T I N
U A
C I Ó
N
V
A
3. PROTEGER O RETIRAR Y REINSTALAR CIMENTACIÓN DE
SOPORTE DE TUBERÍA.
4. TUBERÍA DE COMBUSTIBLE ENTERRADA A ABANDONAR EN EL
SITIO
1. REMOVE BELOW GRADE 450mm F-76 PIPELINE AND FITTINGS
FOR 500mm F-76 PIPELINE.
2. 450mm PIPELINE TO BE ABANDONED IN PLACE. PROVIDE SEAL
WELDED 6mm END PLATES AT ENDS OF ABANDONED PIPE.
3. PROTECT OR REMOVE AND REINSTALL PIPE SUPPORT
FOUNDATION.
4. BELOW GRADE FUEL PIPING TO BE ABANDONED IN PLACE.
L
L
A
S
T
I
S
U
E
R
G
O
A
C
T
I
V
E
JP8
F76
JP8
BOOSTER
PUMP HOUSE
BPH-VP-1
P
F76
BPH-VP-3
AND 3.5
BPH-VP-1.5
MD109
0 8 12 16 20
1:200
B1
1:200
DEMOLITION PLAN
GENERAL NOTES:
REMOVE PIPELINE
DEMOLITION LEGEND:
A1
MD404
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
TIMOTHY A.
SCHMITT
17386
KEYED NOTES:
1. REMOVE BELOW GRADE 450mm F-76 PIPELINE AND FITTINGS
FOR 500mm F-76 PIPELINE.
2. REMOVE BELOW GRADE 600mm F-76 PIPELINE AND FITTINGS
FOR 500mm F-76 PIPELINE.
3. REMOVE BELOW GRADE 400mm F-76 PIPELINE AND FITTINGS
1. SEE SECTION 02 41 00 FOR DEMOLITION REQUIREMENTS.
PLANTA DE DEMOLICIONES
NOTAS DE REFERENCIA:NOTAS GENERALES:
1. VER SECCIÓN 02 41 00 PARA LOS REQUISITOS DE
DEMOLICIÓN.
NOTAS DE DEMOLICIÓN:
RETIRAR TUBERÍA
2. RETIRAR LA LÍNEA DE COMBUSTIBLE ENTERRADA F-76 DE
600mm DE DIÁMETRO Y LOS ACCESORIOS POR UNA NUEVA
F-76 DE 500mm DE DIÁMETRO
1. RETIRAR LA LINEA DE COMBUSTIBLE ENTERRADA F-76 DE
450mm DE DIAMETRO Y LOS ACCESORIOS POR UNA NUEVA
F-76 DE 500mm DE DIAMETRO.
F
N
T I N
U
A
T I
E
P
A
N
T I N
U
A
C
I Ó
V
A
F
N
T
I N
U
A
T
I
E
P
A
N
T
I N
U
A
C
I
A
3. RETIRAR LA LINEA DE COMBUSTIBLE ENTERRADA F-76 DE
400mm DE DIÁMETRO Y LOS ACCESORIOS
B1
MD403
B1
MD402
MD110
0 8 12 16 20
1:200
B1
1:200
DEMOLITION PLAN
GENERAL NOTES:
REMOVE PIPELINE
DEMOLITION LEGEND:
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
TIMOTHY A.
SCHMITT
17386
KEYED NOTES:
1. REMOVE BELOW GRADE 600mm F-76 PIPELINE AND FITTINGS
FOR 500mm F-76 PIPELINE.
PLANTA DE DEMOLICIONES
NOTAS DE REFERENCIA:NOTAS GENERALES: NOTAS DE DEMOLICIÓN:
RETIRAR TUBERÍA
1. RETIRAR LA LÍNEA DE COMBUSTIBLE ENTERRADA F-76 DE
600mm DE DIÁMETRO Y LOS ACCESORIOS POR UNA NUEVA
F-76 DE 500m DE DIÁMETRO.
1. SEE SECTION 02 41 00 FOR DEMOLITION REQUIREMENTS.
1. VER SECCIÓN 02 41 00 PARA LOS REQUISITOS DE
DEMOLICIÓN.
F
N
T
I
N
U
A
T
I
E
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
A
N
T
I
N
U
A
C
I
A
P A
N
T I N
U A
C I Ó
N
V
A
RIO SALADO BRIDGE
RIO SALADO
VALVE PIT WEST/
SPAGHETTI PIT
MD111
0 8 12 16 20
1:200
B1
1:200
DEMOLITION PLAN
GENERAL NOTES:
REMOVE PIPELINE
DEMOLITION LEGEND:
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
TIMOTHY A.
SCHMITT
17386
PLANTA DE DEMOLICIONES
NOTAS GENERALES: NOTAS DE DEMOLICIÓN:
RETIRAR TUBERÍA
1. SEE SECTION 02 41 00 FOR DEMOLITION REQUIREMENTS.
1. VER SECCIÓN 02 41 00 PARA LOS REQUISITOS DE
DEMOLICIÓN.
RÍO SALADO PUENTE
F
N
T
I
N
U
A
T
I
E
P
A
N
T
I
N
U
A
C
I
A
RIO SALADO
POZO DE VÁLVULAS OESTE/
POZO DE ESPAGHETTI
KEYED NOTES:
1. REMOVE BELOW GRADE 600mm F-76 PIPELINE AND FITTINGS
FOR 500mm F-76 PIPELINE.
2. 600mm F-76 TO BE ABANDONED IN PLACE. SEAL WELD 6mm
PLATE TO END OF ABANDONED PIPE.
NOTAS DE REFERENCIA:
1. RETIRAR LA LÍNEA DE COMBUSTIBLE ENTERRADA F-76 DE
600mm DE DIÁMETRO Y LOS ACCESORIOS POR UNA NUEVA
F-76 DE 500m DE DIÁMETRO.
2. ABANDONA TUBERÍA F-76 DE 600mm EN SITIO. SELLAR
MEDIANTE SOLDADURA UNA PLACA DE 6mm EN EL
EXTREMO DE LA TUBERIA ABANDONADA.
ML-1
V-BRDG-OTLN
FH #14
PIT #1
600mm F-76
500mm JP-8
500mm F-76
350mm JP-5
350mm INACTIVE
150mm JP-5
150mm JP-8
150mm INACTIVE
ML-1
B1
MD410
0 20 30 40 50
1:500
B1
1:500
DEMOLITION PLAN
MD119
KEYED NOTES:GENERAL NOTES:
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
TIMOTHY A.
SCHMITT
17386
1. REMOVE BELOW GRADE 500mm F-76 PIPELINE AND
FITTINGS FOR 500mm F-76 PIPELINE.
2. REMOVE BELOW GRADE 600mm F-76 PIPELINE AND
FITTINGS FOR 500mm F-76 PIPELINE.
3. SEAL WELD 6mm PLATE AT END OF ABANDONED PIPE.
4. BELOW GRADE 600mm F-76 PIPING TO BE ABANDONED
IN PLACE.
NOTAS GENERALES: NOTAS DE REFERENCIA:
PLANTA DE DEMOLICIÓN
F O
R
C
O N
T I N
U A
T I O
N
S
E
P A
N
T I N
U A
C I Ó
N
V
A
REMOVE PIPELINE
DEMOLITION LEGEND:
NOTAS DE DEMOLICIÓN:
RETIRAR TUBERÍA
1. RETIRAR LA LÍNEA DE COMBUSTIBLE ENTERRADA F-76 DE
500mm DE DIÁMETRO Y LOS ACCESORIOS POR UNA NUEVA
F-76 DE 500mm DE DIÁMETRO
2. RETIRAR LA LÍNEA DE COMBUSTIBLE ENTERRADA F-76 DE
600mm DE DIÁMETRO Y SUS ACCESORIOS POR UNA NUEVA
F-76 DE 500mm DE DIÁMETRO
3. PLACAS DE 6mm SOLDADAS Y SELLADAS IN LOS EXTREMOS
DE LA LÍNEA DE COMBUSTIBLE ABANDONADA
4. LA LÍNEA DE COMBUSTIBLE ENTERRADA F-76 DE 600mm DE
DIÁMETRO SE ABANDONA EN SU SITIO
1. SEE SECTION 02 41 00 FOR DEMOLITION REQUIREMENTS.
1. VER SECCIÓN 02 41 00 PARA LOS REQUISITOS DE
DEMOLICIÓN.
TANK-7
F-76
ML-2
0 20 30 40 50
1:500
MD120
B1
1:500
DEMOLITION PLAN
GENERAL NOTES:
REMOVE PIPELINE
DEMOLITION LEGEND:
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
TIMOTHY A.
SCHMITT
17386
KEYED NOTES:
1. REMOVE BELOW GRADE 500mm F-76 PIPELINE AND FITTINGS
FOR 500mm F-76 PIPELINE.
2. REMOVE BELOW GRADE 200mm F-76 PIPELINE AND FITTINGS
FOR 500mm F-76 PIPELINE.
3. SEAL WELD 6mm PLATE AT END OF ABANDONED PIPE.
1. SEE SECTION 02 41 00 FOR DEMOLITION REQUIREMENTS.
PLANTA DE DEMOLICIONES
NOTAS DE REFERENCIA:
NOTAS GENERALES:
1. VER SECCIÓN 02 41 00 PARA LOS REQUISITOS DE
DEMOLICIÓN.
NOTAS DE DEMOLICIÓN:
RETIRAR TUBERÍA
3. PLACAS DE 6mm SOLDADAS Y SELLADAS EN LOS EXTREMOS
DE LA LÍNEA DE COMBUSTIBLE ABANDONADA
2. RETIRAR LA LINEA DE COMBUSTIBLE ENTERRADA F-76 DE
200mm DE DIAMETRO Y LOS ACCESORIOS POR UNA NUEVA F-76
DE 500mm DE DIAMETRO.
1. RETIRAR LA LÍNEA DE COMBUSTIBLE ENTERRADA F-76 DE
500mm DE DIÁMETRO Y LOS ACCESORIOS POR UNA NUEVA
F-76 DE 500mm DE DIÁMETRO
F O
R
C
O N
T I N
U A
T I O
N
S
E
P A
N
T I N
U A
C I Ó
N
V
A
2 3
B1
MD411
CONTROL ACCESO
AHFE COMM
AHFE POWER
M
M
M
M
MD401
0 2 3 4 5
1:50
B1
1:50
DEMOLITION PLAN PIT VP-1
S
U
KEYED NOTES:
L
L
A
A
C
T
I
R
G
M
P
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
TIMOTHY A.
SCHMITT
17386
GENERAL NOTES:
REMOVE PIPELINE
DEMOLITION LEGEND:
1. REMOVE 450mm F-76 PIPELINE, SUPPORTS, FITTINGS AND
VALVE.
1. SEE SECTION 02 41 00 FOR DEMOLITION REQUIREMENTS.
PLANTA DE DEMOLICIONES ARQUETA DE VÁLVULAS VP-1
NOTAS GENERALES:
1. VER SECCIÓN 02 41 00 PARA LOS REQUISITOS DE
DEMOLICIÓN.
NOTAS DE DEMOLICIÓN:
RETIRAR TUBERÍA
NOTAS DE REFERENCIA:
1. RETIRAR LA LÍNEA DE COMBUSTIBLE F-76 DE450mm DE
DIÁMETRO, LOS SOPORTES, LOS ACCESORIOS Y LA VÁLVULA
JP-5
SSUE
TOP.+3.40
TOP.+3.67
TOP.+3.66
TOP.+4.32
INV.+2.68
INV.+2.63
TOP.+3.51
INV.+2.70
TOP.+5.31
TOP.+5.40
TOP.+5.33
TOW+5.82
+5.52
TOW+5.77
+5.44
+5.51
TOW+5.77
TOW+5.79
+5.59
TOW+5.76
+5.47
L
L
A
S
T
F
J
P
I
N
A
C
T
I
V
E
B
A
L
L
A
S
T
J
P
S
U
E
F
MD402
J
P
F
TOP.+3.75
TOP.+3.76
TOP.+3.53
B
A
L
L
A
S
T
I
N
A
C
T
I
V
E
J
P
R
G
O
F
J
P
F
A
C
T
I
V
E
R
G
O m m
B
U
I
L
D
I
N
G
0 2 3 4 5
1:50
B1
1:50
DEMOLITION PLAN - BPH-VP-1.5 MANHOLE
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
TIMOTHY A.
SCHMITT
17386
KEYED NOTES:
1. REMOVE 450mm F-76 PIPELINE, SUPPORTS AND FITTINGS.
GENERAL NOTES:
DEMOLITION LEGEND:
1. SEE SECTION 02 41 00 FOR DEMOLITION REQUIREMENTS.
PLANTA DE DEMOLICIONES POZO - BPH- VP-1.5
NOTAS GENERALES:
1. VER SECCIÓN 02 41 00 PARA LOS REQUISITOS
DE DEMOLICIÓN.
NOTAS DE DEMOLICIÓN:
NOTAS DE REFERENCIA:
1. RETIRAR LA LÍNEA DE COMBUSTIBLE F-76 DE450mm DE
DIÁMETRO, LOS SOPORTES Y LOS ACCESORIOS
RETIRAR TUBERÍA
REMOVE PIPELINE
MD403
0 2 3 4 5
1:50
B1
1:50
DEMOLITION PLAN - BPH-VP-1 MANHOLE
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
TIMOTHY A.
SCHMITT
17386
GENERAL NOTES:
DEMOLITION LEGEND:
1. SEE SECTION 02 41 00 FOR DEMOLITION
REQUIREMENTS.
1. REMOVE 400mm F-76 PIPELINE.
PLANTA DE DEMOLICIONES POZO - BPH- VP-1
NOTAS GENERALES:
1. VER SECCIÓN 02 41 00 PARA LOS REQUISITOS
DE DEMOLICIÓN.
NOTAS DE DEMOLICIÓN:
NOTAS DE REFERENCIA:
1. RETIRAR LA LÍNEA DE COMBUSTIBLE F-76 DE 400mm
DE DIÁMETRO.
RETIRAR TUBERÍA
REMOVE PIPELINE
F
INACTIVE
TOW+5.87
+5.63
+5.68
TOW+5.85
TOW+5.88
+5.77
TOW+5.86
+5.59
+5.57
TOW+5.90
+5.74
TOP+3.31
TOP+3.75
TOP+3.85
TOP+3.91
TOP+3.75
TOP+3.76
TOP+3.48
TOP+3.39
TOP+3.84
TOP+3.98
TOP+3.75
MD404
0 2 3 4 5
1:50
A1
1:50
DEMOLITION PLAN - BPH-VP-3 & 3.5 MANHOLE
TOW+5.88
L
L
A
A
C
T
I
R
G
O
JP-5 C
AR
G O
F-76
JP-8
600m m
F-76
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
TIMOTHY A.
SCHMITT
17386
KEYED NOTES:
GENERAL NOTES:
DEMOLITION LEGEND:
1. REMOVE 450mm F-76 PIPELINE, SUPPORTS, FITTINGS AND
VALVES.
2. EXISTING VALVE TO REMAIN
3. 200mm F-76 TO REMAIN
4. 100mm F-76 TO REMAIN
5. REMOVE 400mm F-76
6. REMOVE 100mm F-76
1. SEE SECTION 02 41 00 FOR DEMOLITION
REQUIREMENTS.
PLANTA DE DEMOLICIONES POZO - BPH- VP-3 & 3.5
NOTAS GENERALES:
1. VER SECCIÓN 02 41 00 PARA LOS REQUISITOS
DE DEMOLICIÓN.
NOTAS DE DEMOLICIÓN:
NOTAS DE REFERENCIA:
2. VÁLVULA EXISTENTE A PERMANECER
3. TUBERÍA DE COMBUSTIBLE F-76 DE 200mm A PERMANECER
4. TUBERÍA DE COMBUSTIBLE F-76 DE 100mm A PERMANECER
5. RETIRAR TUBERÍA DE COMBUSTIBLE F-76 DE 400mm
RETIRAR TUBERÍA
REMOVE PIPELINE
1. RETIRAR TUBERÍA DE COMBUSTIBLE F-76 DE 450mm, INCLUSO SOPORTES, ACCESORIOS Y LA VÁLVULAS
6. RETIRAR TUBERÍA DE COMBUSTIBLE F-76 DE 100mm
400mm
500mm F-76
MD410
KEYED NOTES:
0 2 3 4 5
1:50
B1
1:50
DEMOLITION PLAN - ML-1 MANHOLE
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
TIMOTHY A.
SCHMITT
17386
TO V-432
DIESEL
F-76
GENERAL NOTES:
DEMOLITION LEGEND:
1. SEE SECTION 02 41 00 FOR DEMOLITION REQUIREMENTS.
PLANTA DE DEMOLICIONES POZO - ML-1
NOTAS GENERALES:
1. VER SECCIÓN 02 41 00 PARA LOS REQUISITOS
DE DEMOLICIÓN.
NOTAS DE DEMOLICIÓN:
NOTAS DE REFERENCIA:
1. REMOVE BELOW GRADE 600mm F-76 PIPELINE.
2. REMOVE BELOW GRADE 500mm F-76 PIPELINE.
1. RETIRAR LA LINEA DE COMBUSTIBLE
ENTERRADA F-76 DE 600mm DE DIAMETRO.
RETIRAR TUBERÍA
REMOVE PIPELINE
2. RETIRAR LA LINEA DE COMBUSTIBLE
ENTERRADA F-76 DE 500mm DE DIAMETRO.
500mm F-76
MD411
KEYED NOTES:
1. 350mm PIPE
2. REMOVE BELOW GRADE 500mm F-76 PIPELINE.
3. BELOW GRADE 200mm F-76 PIPING TO BE ABANDONED IN PLACE. SEAL
WELD 6mm STEEL PLATE TO OPEN END OF PIPING.
0 2 3 4 5
1:50
B1
1:50
DEMOLITION PLAN - ML-2 MANHOLE
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
TIMOTHY A.
SCHMITT
17386
INACTIVE 20"
JP-8 20"
F-76 20"
PLANTA DE DEMOLICIONES POZO - ML-2
NOTAS DE REFERENCIA:
1. TUBERÍA DE 350mm DE DIÁMETRO
3. ABANDONAR LA TUBERÍA ENTERRADA F-76 DE 200mm DE DIÁMETRO
EN SU SITIO. SOLDAR Y SELLAR EL EXTREMO DE LA MISMA CON
PLACA DE ACERO DE 6mm.
DEMOLITION LEGEND:
NOTAS DE DEMOLICIÓN:
RETIRAR TUBERÍA
REMOVE PIPELINE
2. RETIRAR LA LINEA DE COMBUSTIBLE
ENTERRADA F-76 DE 500mm DE DIAMETRO.
GENERAL NOTES:
1. SEE SECTION 02 41 00 FOR DEMOLITION
REQUIREMENTS.
NOTAS GENERALES:
1. VER SECCIÓN 02 41 00 PARA LOS REQUISITOS
DE DEMOLICIÓN.
PIER III
ML-1
ML-4
TE-A
TE-B,C,D
ML-3
V-BRDG-OTLN
A2003
DRYER FOR POOL
FH #14
VALVE PIT #44
(OUTSIDE OF BASE)
TO BULK STORAGE
TO BOOSTER PUMP HOUSE
PIT #1
TANK-2
F-76
TANK-3
F-76
TANK-5
F-76
TANK-4
F-76
TANK-6
F-76
TANK-7
F-76
TANK-8
F-76
TANK-1
F-76
TANK-13
JP-8
TK-17
JP-5
TANK-11
JP-8
TANK-10
JP-8
TK-15
JP-5
TANK-9
JP-8
TK-14
JP-5
TANK-122
JP-8
TANK-120
JP-8
TANK-121
JP-8
TK-16
JP-5
3194B
PIER 3
PIER 3
TANK FARM
PUERTO GATE
RIO SALADO
BRIDGE
ML-2
A
L
I
C
A
N
N
E
A
L
I C
A
N
N
E
S
A
N
R
R
E
E
T
M
I
A
L
A
L
I C
A
N
N
E
M-102
M-103
M-104
M-105
M-106
M-107
M-108
M-109
M-110
M-111 M-112
M-113
M
M
M-118
M-119
M-120
M-114
M-115
M-401
M-402
M-410
M-411
M-403
M-404
0 200
400 500
1:5000
M-101
B1
1:5000
OVERALL MECHANICAL SITE AND KEY PLAN FOR PIER 3 PIPELINE
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
TIMOTHY A.
SCHMITT
17386
PLANTA EXTERIOR GENERAL Y DE REFERENCIA DE MECÁNICA PARA LA LÍNEA DE TUBERÍA DEL MUELLE 3
PIER 3
4+000 4+020 4+040 4+060 4+080 4+100 4+120
C1
1:200
SITE PLAN
M-102
0 8 12 16 20
1:200
F O
R
C
O N
T I N
U A
T I O
N
S
E
KEYED NOTES:
1. PROVIDE 500mm F-76 PIPELINE.
2. PROVIDE LOADING ARM CONNECTION
3. PROVIDE 250mm PIPE WITH DB&B PLUG VALVE AND HOSE
CONNECTION AT END OF EACH LINE
4. 450mm JP-5 PIPELINE, BY OTHERS.
5. EXISTING FUEL LINES, REMOVED BY OTHERS.
6. FREE PIPE SUPPORT
7. GUIDED PIPE SUPPORT
GENERAL NOTES:
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
TIMOTHY A.
SCHMITT
17386
B1
M-502
B3
M-502
PLANTA EXTERIOR
NOTAS DE REFERENCIA:NOTAS GENERALES:
P A
N
T I N
U A
C I Ó
N
V
A
1. PROVEER TUBERÍA F-76 DE 500mm
2. PROVEER CONEXIÓN PARA BRAZO DE CARGA
3. PROVEER TUBERÍA DE 250mm CON VÁLVULA DE
DOBLE DESCARGA Y BLOQUEO Y CONEXIÓN PARA
MANGUERA EN EL EXTREMO DE CADA LÍNEA
4. TUBERÍA JP-5 DE 450mm, POR OTROS.
5. LÍNEAS DE COMBUSTIBLE EXISTENTES, RETIRADA
POR OTROS.
6. SOPORTE DE TUBERÍA LIBRE
7. SOPORTE DE TUBERÍA GUIADA
A1
M-505
1. SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.
2. BOND (EXOTHERMIC WELD) AN INSULATED #4 AWG CABLE TO
THE ABOVEGROUND 500mm F-76 PIPELINE AT 90m INTERVALS
MAXIMUM. EXTEND EACH CABLE TO THE EXISTING GROUND
RING.
1. VER HOJA M-001 PARA LEYENDA Y NOTAS
GENERALES.
TYP
TYP
2. UNIR (SOLDADURA EXOTÉRMICA) UN CABLE AISLADO #4 AWG
A LA TUBERÍA SOBRE EL TERRENO F-76 DE 500mm EN
INTERVALOS MÁXIMOS DE 90m. PROLONGAR CADA CABLE
HASTA EL ANILLO DE TIERRA EXISTENTE.
PIER 3
4+200 4+220 4+240 4+260 4+280 4+300 4+306
C1
1:200
SITE PLAN
M-103
0 8 12 16 20
1:200
F O
R
C
O N
T I N
U A
T I O
N
S
E
GENERAL NOTES:
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
TIMOTHY A.
SCHMITT
17386
KEYED NOTES:
A1
M-505
1. PROVIDE 500mm F-76 PIPELINE.
2. PROVIDE LOADING ARM CONNECTION
3. PROVIDE 250mm PIPE WITH DB&B PLUG VALVE AND HOSE
CONNECTION AT END OF EACH LINE
4. 450mm JP-5 PIPELINE, BY OTHERS.
5. EXISTING FUEL LINES, REMOVED BY OTHERS
6. FREE PIPE SUPPORT
7. GUIDED PIPE SUPPORT
B1
M-502
B3
M-502
NOTAS DE REFERENCIA:NOTAS GENERALES:
1. PROVEER TUBERÍA F-76 DE 500mm
2. PROVEER CONEXIÓN PARA BRAZO DE CARGA
3. PROVEER TUBERÍA DE 250mm CON VÁLVULA DE
DOBLE DESCARGA Y BLOQUEO Y CONEXIÓN
PARA MANGUERA EN EL EXTREMO DE CADA
LÍNEA
4. TUBERÍA JP-5 DE 450mm, POR OTROS.
5. LÍNEAS DE COMBUSTIBLE EXISTENTES, RETIRADA
POR OTROS.
6. SOPORTE DE TUBERÍA LIBRE
7. SOPORTE DE TUBERÍA GUIADA
PLANTA EXTERIOR
P A
N
T I N
U A
C I Ó
N
V
A
TYP
TYP
1. SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.
2. BOND (EXOTHERMIC WELD) AN INSULATED #4 AWG CABLE TO
THE ABOVEGROUND 500mm F-76 PIPELINE AT 90m INTERVALS
MAXIMUM. EXTEND EACH CABLE TO THE EXISTING GROUND
RING.
1. VER HOJA M-001 PARA LEYENDA Y NOTAS
GENERALES.
2. UNIR (SOLDADURA EXOTÉRMICA) UN CABLE AISLADO #4 AWG
A LA TUBERÍA SOBRE EL TERRENO F-76 DE 500mm EN
R
G
O
L
L
A
S
T
C
L
H
PIER 3
5+000 5+020
5+040 5+060
5+080 5+100
5+120
A1
1:200
SITE PLAN
M-104
0 8 12 16 20
1:200
FOR CONTINUATION SEE SHEET M-102
FOR CONTINUATION SEE SHEET M-103
F O
R
C
O N
T I N
U A
T I O
N
S
E
GENERAL NOTES:
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
TIMOTHY A.
SCHMITT
17386
KEYED NOTES:
1. PROVIDE 500mm F-76 PIPELINE.
2. PROVIDE PIPELINE EXPANSION LOOP, HP VENT AND LP
DRAINS
3. PROVIDE 300mm DB&B PLUG VALVE WITH THERMAL RELIEF
4. 450mm JP-5 PIPELINE, BY OTHERS.
5. EXISTING FUEL LINES, REMOVED BY OTHERS
6. PIPE ANCHOR
7. FREE PIPE SUPPORT
8. GUIDED PIPE SUPPORT
A4
M-501
A3
M-502
B1
M-502
B3
M-502
PARA CONTINUACIÓN VER PLANO M-102
PARA CONTINUACIÓN VER PLANO M-103
P A
N
T I N
U A
C I Ó
N
V
A
PLANTA EXTERIOR
NOTAS DE REFERENCIA:NOTAS GENERALES:
1. PROVEER TUBERÍA F-76 DE 500mm
2. PROVEER LIRA DE EXPANSIÓN, VENTEO EN PUNTO
ALTO Y DRENAJES EN PUNTO BAJO
3. PROVEER VÁLVULA DE DOBLE BLOQUEO Y PURGA
CON ALIVIO TÉRMICODE 300mm.
4. TUBERÍA JP-5 DE 450mm, POR OTROS.
5. LÍNEAS DE COMBUSTIBLE EXISTENTES, RETIRADA
POR OTROS.
6. ANCLAJE DE TUBERÍA
7. SOPORTE DE TUBERÍA LIBRE
8. SOPORTE DE TUBERÍA GUIADA
TYP
TYP
TYP
1. SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.
2. BOND (EXOTHERMIC WELD) AN INSULATED #4 AWG CABLE TO
THE ABOVEGROUND 500mm F-76 PIPELINE AT 90m INTERVALS
MAXIMUM. EXTEND EACH CABLE TO THE EXISTING GROUND
RING.
1. VER HOJA M-001 PARA LEYENDA Y NOTAS
GENERALES.
2. UNIR (SOLDADURA EXOTÉRMICA) UN CABLE AISLADO #4 AWG
A LA TUBERÍA SOBRE EL TERRENO F-76 DE 500mm EN
R
G
O
L
L
A
S
T
C
L
H
5+140 5+160
5+180 5+200
5+220 5+240
5+260
B1
1:200
SITE PLAN
M-105
F O
R
C
O N
T I N
U A
T I O
N
S
E
F O
R
C
O N
T I N
U A
T I O
N
S
E
GENERAL NOTES:
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
TIMOTHY A.
SCHMITT
17386
0 8 12 16 20
1:200
KEYED NOTES:
1. PROVIDE 500mm F-76 PIPELINE.
2. 450mm JP-5 PIPELINE, BY OTHERS.
3. EXISTING FUEL LINES, REMOVED BY OTHERS
4. PIPE ANCHOR
5. FREE PIPE SUPPORT
6. GUIDED PIPE SUPPORT
A3
M-502
B1
M-502
B3
M-502
P A
N
T I N
U A
C I Ó
N
V
A
P A
N
T I N
U A
C I Ó
N
V
A
PLANTA EXTERIOR
NOTAS DE REFERENCIA:NOTAS GENERALES:
1. PROVEER TUBERÍA F-76 DE 500mm
2. TUBERÍA JP-5 DE 450mm, POR OTROS.
3. LÍNEAS DE COMBUSTIBLE EXISTENTES,
RETIRADA POR OTROS.
4. ANCLAJE DE TUBERÍA
5. SOPORTE DE TUBERÍA LIBRE
6. SOPORTE DE TUBERÍA GUIADA
TYP
TYP
1. SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.
2. BOND (EXOTHERMIC WELD) AN INSULATED #4 AWG CABLE TO
THE ABOVEGROUND 500mm F-76 PIPELINE AT 90m INTERVALS
MAXIMUM. EXTEND EACH CABLE TO THE EXISTING GROUND
RING.
1. VER HOJA M-001 PARA LEYENDA Y NOTAS
GENERALES.
2. UNIR (SOLDADURA EXOTÉRMICA) UN CABLE AISLADO #4 AWG
A LA TUBERÍA SOBRE EL TERRENO F-76 DE 500mm EN
VP-1
R
G
O
L
L
A
S
T
C
L
H
DRN-100-DI
PUMP HOUSE
5+280 5+300
5+320 5+340
5+360 5+380
5+400
E L E
V A
T I O
N
E L E
V A
T I O
N
STATION
STATION
F-76_PIER 3 PROFILE - STA 5+360 TO 5+400
5+360 5+380 5+400
5+360 5+380 5+400
VAULT PIT 1
EXISTING GROUND
P3-001, 3.43m OF 500mm F-76
P3-002, 2.73m OF 500mm F-76
P3-003, 7.25m OF 500mm F-76
P
HORIZ
BH01
S T
A
HORIZ
BH02
S T
A
VERT
BV01
S T
A m m
S
A N m m
J P m m
F m m
J P m m
J P
C
A R
G O
U G
E
C O
M M
U E
L
B
Y
O
T H
E R
S m m
B
A L
L A
S T m m
C
A M
P S
A
DEPTH UNKNOWN
DOES NOT CONFLICT
WITH EXISTING PIPES
DEPTH UNKNOWN
B1
M-401
A3
1:200
PROFILE 1 STA -2+00 TO STA 0+25
M-106
0 8 12 16 20
1:200
0 8 12 16 20
1:200
GENERAL NOTES:
1. HORIZONTAL LOCATIONS OF UTILITY CROSSINGS SHOWN
FOR REFERENCE ONLY. CONTRACTOR RESPONSIBLE FOR
LOCATING AND PROTECTING EXISTING UTILITIES . DAMAGE
TO EXISTING INFRASTRUCTURE MUST BE REPAIRED AT NO
COST TO GOVERNMENT.
2. FOR PIPE APPURTENANCES, ELEVATION AND ALIGNMENT SEE
TABLES ON SHEETS M-601 AND M-602.
3. SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.
4. BOND (EXOTHERMIC WELD) AN INSULATED #4 AWG CABLE TO
THE ABOVEGROUND 500mm F-76 PIPELINE AT 90m INTERVALS
MAXIMUM. EXTEND EACH CABLE TO THE EXISTING GROUND
RING.
F O
R
C
O N
T I N
U A
T I O
N
S
E
F O
R
C
O N
T I N
U A
T I O
N
S
E
0 1 2 3 4
1:40
HORIZONTAL
VERTICAL
C1
1:200
SITE PLAN
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
TIMOTHY A.
SCHMITT
17386
KEYED NOTES:
1. PROVIDE 500mm F-76 PIPELINE.
2. PROVIDE PIPELINE EXPANSION LOOP, HP VENT AND LP
DRAINS
3. 450 mm JP-5 LINE TO BE INSTALLED UNDER ANOTHER CONTRACT.
CONTACT ROTA PUBLIC WORKS FOR THE CONSTRUCTION
SCHEDULE
4. EXISTING FUEL LINES, REMOVED BY OTHERS
5. FREE PIPE SUPPORT
6. GUIDED PIPE SUPPORT
A4
M-501
B1
M-502
B3
M-502
P A
N
T I N
U A
C I Ó
N
V
A
P A
N
T I N
U A
C I Ó
N
V
A
PLANTA EXTERIOR
PERFIL 1 STA -2+00 A STA 0+25
NOTAS DE REFERENCIA:NOTAS GENERALES:
1. PROVEER TUBERÍA F-76 DE 500mm
3. TUBERÍA JP-5 DE 450mm A SER INSTALADA BAJO
OTRO CONTRATO. CONTACTAR CON OBRAS
PÚBLICAS EN ROTA PARA LA CONSTRUCCIÓN.
4. LÍNEAS DE COMBUSTIBLE EXISTENTES,
RETIRADA POR OTROS.
5. SOPORTE DE TUBERÍA LIBRE
6. SOPORTE DE TUBERÍA GUIADA
2. PROVEER LIRA DE EXPANSIÓN, VENTEO EN PUNTO
ALTO Y DRENAJES EN PUNTO BAJO
1. LAS POSICIONES HORIZONTALES DE LOS CRUCES
DE INSTALACIONES SE MUESTRAN SÓLO COMO
REFERENCIA. EL CONTRATISTA SERÁ
RESPONSABLE DE LA POSICIÓN Y PROTECCIÓN
DE LAS INSTALACIONES EXISTENTES. LOS DAÑOS
SOBRE LA INFRAESTRUCTURA EXISTENTE
DEBERÁN SER REPARADOS SIN COSTE PARA EL
GOBIERNO.
2. PARA LOS ACCESORIOS, ELEVACIONES Y
ALINEACIONES DE TUBERÍAS, VER TABLAS EN
PLANOS M-601 Y M-602.
3. VER HOJA M-001 PARA LEYENDA Y NOTAS GENERALES.
5 6
TYP
TYP
4. UNIR (SOLDADURA EXOTÉRMICA) UN CABLE AISLADO
#4 AWG A LA TUBERÍA SOBRE EL TERRENO F-76 DE
500mm EN INTERVALOS MÁXIMOS DE 90m.
PROLONGAR CADA CABLE HASTA EL ANILLO DE
TIERRA EXISTENTE.
WATERLINE
5+400
5+440
5+460
5+480
5+500
E L E
V A
T I O
N
E L E
V A
T I O
N
STATION
5+400 5+420 5+440 5+460 5+480 5+500 5+510
5+400 5+420 5+440 5+460 5+480 5+500 5+510
EXISTING GROUND
P3-008, 1.00m OF 500mm F-76
B2
M-503
P3-004, 12.86m OF 500mm F-76
BEND
BH03
S T
A
H O
R I Z
O N
T A
L
BEND
BH04
S T
A
H O
R I Z
O N
T A
L
VERT
BV02
S T
A
P3-007, 1.09m OF 500mm F-76 m m
S
A N m m
J P m m
F m m
C
A M
P S
A m m
J P
E
L
B
Y
O
T H
E R
S m m
B
A L
L E
S T
HPV01
S T
A
R
P3-009, 92.66m OF 500mm F-76
P3-004C, 3.90m OF 500mm F-76
VERT
BV35
S T
A
LPD03
S T
A
R
P3-004B, 7.31m OF 500mm F-76
P3-006, 7.16m OF 500mm F-76
VERT
BV36
S T
A
A2
M-503
C1
1:200
SITE PLAN
M-107
F O
R
C
O N
T I N
U A
T I O
N
S
E
F O
R
C
O N
T I N
U A
T I O
N
S
E
0 8 12 16 20
1:200
A1
1:200
PROFILE
GENERAL NOTES:
1. HORIZONTAL LOCATIONS OF UTILITY CROSSINGS SHOWN
FOR REFERENCE ONLY. CONTRACTOR RESPONSIBLE FOR
LOCATING AND PROTECTING EXISTING UTILITIES . DAMAGE
TO EXISTING INFRASTRUCTURE MUST BE REPAIRED AT NO
COST TO GOVERNMENT.
2. FOR PIPE APPURTENANCES, ELEVATION AND ALIGNMENT
SEE TABLES ON SHEETS M-601 AND M-602.
3. SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.
0 8 12 16 20
1:200
0 1 2
1:40
HORIZONTAL
VERTICAL
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
TIMOTHY A.
SCHMITT
17386
KEYED NOTES:
1. PROVIDE 500mm F-76 PIPELINE.
2. 450 mm JP-5 LINE TO BE INSTALLED UNDER ANOTHER
CONTRACT. CONTACT ROTA PUBLIC WORKS FOR THE
CONSTRUCTION SCHEDULE.
3. EXISTING FUEL LINES, REMOVED BY OTHERS.
4. LOW-POINT DRAIN
5. HIGH-POINT VENT
NOTAS GENERALES:
1. LAS POSICIONES HORIZONTALES DE LOS CRUCES DE
INSTALACIONES SE MUESTRAN SÓLO COMO REFERENCIA.
EL CONTRATISTA SERÁ RESPONSABLE DE LA POSICIÓN
Y PROTECCIÓN DE LAS INSTALACIONES EXISTENTES. LOS
DAÑOS SOBRE LA INFRAESTRUCTURA EXISTENTE
DEBERÁN SER REPARADOS SIN COSTE PARA EL
GOBIERNO.
2. PARA LOS ACCESORIOS, ELEVACIONES Y
ALINEACIONES DE TUBERÍAS, VER TABLAS EN
PLANOS M-601 Y M-602.
PERFIL
PLANTA EXTERIOR
P A
N
T I N
U A
C I Ó
N
V
A
P A
N
T I N
U A
C I Ó
N
V
A
LÍNEA DE AGUA
NOTAS DE REFERENCIA:
1. PROVEER TUBERÍA F-76 DE 500mm
2. TUBERÍA JP-5 DE 450mm A SER INSTALADA BAJO
OTRO CONTRATO. CONTACTAR CON OBRAS
PÚBLICAS EN ROTA PARA LA CONSTRUCCIÓN.
3. LÍNEAS DE COMBUSTIBLE EXISTENTES, RETIRADA
POR OTROS.
3. VER HOJA M-001 PARA LEYENDA Y NOTAS GENERALES.
4. DRENAJE EN PUNTO BAJO
5. VENTEO EN PUNTO ALTO
5+520
5+540
5+580
5+600
BPH-VP-1
E L
E V
A T
I O
N
E L
E V
A T
I O
N
STATION
5+510 5+520 5+540 5+560 5+580 5+600 5+620
5+510 5+520 5+540 5+560 5+580 5+600 5+620
EXISTING GROUND
X
M
HORIZ
BV04
S T
A m m
E
X
W m m
E
X
W
BEND
BV05
S T
A
V E
R T
I C
A L
VERT
BV06
S T
A
VERT
BH05
S T
A
HORIZ
BH06
S T
A
A
N D
O N
W
P3-012, 5.18m OF 500mm F-76
P3-015, 12.04m OF 500mm F-76
P3-013A, 0.04m OF 500mm F-76
P3-016, 35.40m OF 500mm F-76
P3-018, 4.19m OF 500mm F-76
HORIZ
BH07
S T
A
BEND
BV07
S T
A
V E
R T
I C
A L
BEND
BH10
S T
A
H O
R I Z
O N
T A
L
P3-023, 3.81m OF 500mm F-76
P3-021, 0.81m OF 500mm F-76
P3-022, 1.37m OF 500mm F-76
HORIZ
BH09
S T
A
BEND
BH08
S T
A
H O
R I Z
O N
T A
L
P3-020, 1.43m OF 500mm F-76
P3-019, 1.63m OF 500mm F-76
P3-013, 0.53m OF 500mm F-76
TEE
T01
S T
A
P3-017, 2.10m OF 500mm F-76
BEND
BV08
S T
A
V E
R T
I C
A L
LPD02
S T
A
R
P3-009, 92.66m OF 500mm F-76
P3-011, 7.37m OF 500mm F-76
LPD07
S T
A
R
P3-009A, 25.79m OF 500mm F-76
B2
M-503
B2
M-503
C1
1:200
SITE PLAN
M-108
0 8 12 16 20
1:200
A2
1:200
PROFILE
F
N
T
I
N
U
A
T
I
E
F O
R
C
O N
T I N
U A
T I O
N
S
E
GENERAL NOTES:
0 8 12 16 20
1:200
0 1 2
1:40
HORIZONTAL
VERTICAL
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
TIMOTHY A.
SCHMITT
17386
KEYED NOTES:
1. PROVIDE 500mm F-76 PIPELINE.
2. CONNECT TO EXISTING METERING STATION 400mm
MOTOR-OPERATED VALVE (TYP OF 4) SEE SHEET M-613.
3. 450 mm JP-5 LINE TO BE INSTALLED UNDER ANOTHER
CONTRACT. CONTACT ROTA PUBLIC WORKS FOR THE
CONSTRUCTION SCHEDULE.
4. EXISTING FUEL LINES, REMOVED BY OTHERS
5. PIG RECEIVER
6. 200mm PIG RECEIVER BYPASS LINE
7. LOW-POINT DRAIN
PERFIL
PLANTA EXTERIOR
NOTAS GENERALES:
1. LAS POSICIONES HORIZONTALES DE LOS CRUCES DE
INSTALACIONES SE MUESTRAN SÓLO COMO REFERENCIA.
EL CONTRATISTA SERÁ RESPONSABLE DE LA POSICIÓN
Y PROTECCIÓN DE LAS INSTALACIONES EXISTENTES. LOS
DAÑOS SOBRE LA INFRAESTRUCTURA EXISTENTE
DEBERÁN SER REPARADOS SIN COSTE PARA EL
GOBIERNO.
2. PARA LOS ACCESORIOS, ELEVACIONES Y
ALINEACIONES DE TUBERÍAS, VER TABLAS EN
PLANOS M-601 Y M-602.
P
A
N
T
I
N
U
A
C
I
A
P A
N
T I N
U A
C I Ó
N
V
A
NOTAS DE REFERENCIA:
1. PROVEER TUBERÍA F-76 DE 500mm
3. TUBERÍA JP-5 DE 450mm A SER INSTALADA BAJO
OTRO CONTRATO. CONTACTAR CON OBRAS PÚBLICAS
EN ROTA PARA LA CONSTRUCCIÓN.
4. LÍNEAS DE COMBUSTIBLE EXISTENTES, RETIRADA
POR OTROS.
2. CONECTAR A LA VÁLVULA MOTORIZADA DE 400mm DE
LA ESTACIÓN DE MEDICIÓN EXISTENTE (TIP PARA 4)
VER HOJA M-613.
5. PIG RECEPTOR
6. LÍNEA BYPASS DEL PIG RECEPTOR DE 200mm
7. DRENAJE EN PUNTO BAJO
1. HORIZONTAL LOCATIONS OF UTILITY CROSSINGS SHOWN
FOR REFERENCE ONLY. CONTRACTOR RESPONSIBLE FOR
LOCATING AND PROTECTING EXISTING UTILITIES . DAMAGE
TO EXISTING INFRASTRUCTURE MUST BE REPAIRED AT NO
COST TO GOVERNMENT.
2. FOR PIPE APPURTENANCES, ELEVATION AND ALIGNMENT SEE
TABLES ON SHEETS M-601 AND M-602.
3. SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.
3. VER HOJA M-001 PARA LEYENDA Y NOTAS
GENERALES.
B1
M-403
L
L
A
S
T
S
U
E
R
G
O
A
C
T
I
V
E
JP8
F76
BOOSTER
PUMP HOUSE
BPH-VP-3 AND 3.5
F76
JP8
BPH-VP-1.5
E L
E V
A T
I O
N
E L
E V
A T
I O
N
STATION
5+620 5+640 5+660 5+680 5+700 5+720 5+740
5+620 5+640 5+660 5+680 5+700 5+720 5+740
EXISTING GROUND
VAULT PIT 1.5
CONNECTION POINT
VAULT PIT 1.5
CONNECTION POINT
CP09
S T
A
I N
V
BPH-VP-3
CONNECTION POINT
P3-026, 6.51m OF 500mm F-76
BPH-VP-3
CONNECTION POINT
P3-027, 1.09m OF 500mm F-76
P3-028, 86.48m OF 500mm F-76 m m
B
A L
L A
P
E
D E
P T
H
U
N K
N O
W N
CP10
S T
A
I N
V
CP02
S T
A
I N
V
CP03
S T
A
I N
V
BPH-VP-3
PUNTO DE CONEXIÓN
POZO DE BÓVEDA 1.5
PUNTO DE CONEXIÓN
VER FICHA M-404
PARA TUBERÍA A TRAVÉS DE
POZO DE VÁLVULA VP-3
BPH-VP-3
PUNTO DE CONEXIÓN
POZO DE BÓVEDA 1.5
PUNTO DE CONEXIÓN
P3-024A, 16.84m OF 500mm F-76
BEND
BH12
S T
A
H O
R I Z
O N
T A
L
P3-026A, 4.42m OF 500mm F-76
P3-026B, 30.27m OF 500mm F-76
P3-026C, 2.94m OF 500mm F-76
P3-026D, 2.72m OF 500mm F-76
HORIZ
BH47
S T
A
HORIZ
BH48
S T
A
HORIZ
BH45
S T
A
HORIZ
BH46
S T
A
B1
1:200
SITE PLAN
M-109 A1
1:200
PROFILE
F
N
T
I
N
U
A
T
I
E
F
N
T
I N
U
A
T
I
E
B1
M-402
GENERAL NOTES:
0 8 12 16 20
1:200
0 8 12 16 20
1:200
0 1 2
1:40
HORIZONTAL
VERTICAL
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
TIMOTHY A.
SCHMITT
17386
1. PROVIDE 500mm F-76 PIPELINE.
2. MODIFY BALLAST PIPING PROFILE AS NEEDED TO
ALLOW CONSTRUCTION OF F76 PIPELINE
3. 450 mm JP-5 LINE TO BE INSTALLED UNDER
ANOTHER CONTRACT. CONTACT ROTA PUBLIC
WORKS FOR THE CONSTRUCTION SCHEDULE.
4. EXISTING FUEL LINES, REMOVED BY OTHERS
KEYED NOTES:
A1
M-404
NOTAS GENERALES:
PERFIL
PLANTA EXTERIOR
P
A
N
T
I N
U
A
C
I
A
P
A
N
T
I
N
U
A
C
I
A
NOTAS DE REFERENCIA:
1. PROVEER TUBERÍA F-76 DE 500mm
3. TUBERÍA JP-5 DE 450mm A SER INSTALADA BAJO
OTRO CONTRATO. CONTACTAR CON OBRAS
PÚBLICAS EN ROTA PARA LA CONSTRUCCIÓN.
4. LÍNEAS DE COMBUSTIBLE EXISTENTES,
RETIRADA POR OTROS.
1. LAS POSICIONES HORIZONTALES DE LOS CRUCES
DE INSTALACIONES SE MUESTRAN SÓLO COMO
REFERENCIA. EL CONTRATISTA SERÁ
RESPONSABLE DE LA POSICIÓN Y PROTECCIÓN
DE LAS INSTALACIONES EXISTENTES. LOS DAÑOS
SOBRE LA INFRAESTRUCTURA EXISTENTE
DEBERÁN SER REPARADOS SIN COSTE PARA EL
GOBIERNO.
2. PARA LOS ACCESORIOS, ELEVACIONES Y
ALINEACIONES DE TUBERÍAS, VER TABLAS EN
PLANOS M-601 Y M-602.
1. HORIZONTAL LOCATIONS OF UTILITY CROSSINGS
SHOWN FOR REFERENCE ONLY. CONTRACTOR
RESPONSIBLE FOR LOCATING AND PROTECTING
EXISTING UTILITIES . DAMAGE TO EXISTING
INFRASTRUCTURE MUST BE REPAIRED AT NO COST
TO GOVERNMENT.
2. FOR PIPE APPURTENANCES, ELEVATION AND
ALIGNMENT SEE TABLES ON SHEETS M-601 AND
M-602.
3. SEE SHEET M-001 FOR LEGEND AND GENERAL
NOTES.
3. VER HOJA M-001 PARA LEYENDA Y NOTAS
GENERALES.
2. MODIFICAR EL PERFIL DE LA TUBERÍA DEL
SISTEMA DE LASTRE SEGÚN SE NECESITE PARA
PERMITIR LA CONSTRUCCIÓN DE LA TUBERÍA F76.
E L E
V A
T I O
N
E L E
V A
T I O
N
STATION
5+740 5+760 5+780 5+800 5+820 5+840 5+855
5+740 5+760 5+780 5+800 5+820 5+840 5+855
EXISTING GROUND
P3-028, 86.48m OF 500mm F-76
P3-029, 21.11m OF 500mm F-76
P -0
, 3
.9 m
O F m m F
-7
HORIZ
BH13
S T
A
HORIZ
BH14
S T
A
C1
1:200
SITE PLAN
M-110
F
N
T
I
N
U
A
T
I
E
F O
R
C
O N
T I N
U A
T I O
N
S
E
GENERAL NOTES:
0 8 12 16 20
1:200
A1
1:200
PROFILE
1. HORIZONTAL LOCATIONS OF UTILITY CROSSINGS SHOWN
FOR REFERENCE ONLY. CONTRACTOR RESPONSIBLE FOR
LOCATING AND PROTECTING EXISTING UTILITIES . DAMAGE
TO EXISTING INFRASTRUCTURE MUST BE REPAIRED AT NO
COST TO GOVERNMENT.
2. FOR PIPE APPURTENANCES, ELEVATION AND ALIGNMENT SEE
TABLES ON SHEET M-620P.
3. SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.
0 8 12 16 20
1:200
0 1 2
1:40
HORIZONTAL
VERTICAL
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
TIMOTHY A.
SCHMITT
17386
KEYED NOTES:
1. PROVIDE 500mm F-76 PIPELINE
2. 450 mm JP-5 LINE TO BE INSTALLED UNDER ANOTHER
CONTRACT. CONTACT ROTA PUBLIC WORKS FOR THE
CONSTRUCTION SCHEDULE.
3. EXISTING FUEL LINES, REMOVED BY OTHERS
NOTAS GENERALES:
1. LAS POSICIONES HORIZONTALES DE LOS CRUCES
DE INSTALACIONES SE MUESTRAN SÓLO COMO
REFERENCIA. EL CONTRATISTA SERÁ RESPONSABLE
DE LA POSICIÓN Y PROTECCIÓN DE LAS
INSTALACIONES EXISTENTES. LOS DAÑOS SOBRE LA
INFRAESTRUCTURA EXISTENTE DEBERÁN SER
REPARADOS SIN COSTE PARA EL GOBIERNO.
2. PARA LOS ACCESORIOS, ELEVACIONES Y
ALINEACIONES DE TUBERÍAS, VER TABLAS EN PLANO
M-620P.
NOTAS DE REFERENCIA:
1. PROVEER TUBERÍA F-76 DE 500mm
2. TUBERÍA JP-5 DE 450mm A SER INSTALADA BAJO
OTRO CONTRATO. CONTACTAR CON OBRAS
PÚBLICAS EN ROTA PARA LA CONSTRUCCIÓN.
3. LÍNEAS DE COMBUSTIBLE EXISTENTES, RETIRADA
POR OTROS.
P
A
N
T
I
N
U
A
C
I
A
P A
N
T I N
U A
C I Ó
N
V
A
PLANTA EXTERIOR
PERFIL
3. VER HOJA M-001 PARA LEYENDA Y NOTAS GENERALES.
5+880 5+900
5+920
5+940
WEST HDD PIT
E L E
V A
T I O
N
E L E
V A
T I O
N
STATION
-20
-18
-16
-14
-12
-10
-8
-6
-4
-2
-20
-18
-16
-14
-12
-10
-8
-6
-4
-2
5+855 5+860 5+880 5+900 5+920 5+940 5+960 5+970
5+855 5+860 5+880 5+900 5+920 5+940 5+960 5+970
WEST HDD PIT
CONNECTION POINT
WEST HDD PIT
CONNECTION POINT
P3-030, 36.98m OF 500mm F-76
PUNTO DE CONEXIÓN
PUNTO DE CONEXIÓN
P3-091, 7.06m OF 500mm F-76
HD00
S T
A
HD01
S T
A
P
P
P
P , 1
.7 m
O
F m m
F
P -0
, 1
.0 m
O F m m F
-7
P3-097, 15.05m OF 500mm F-76
HD02
S T
A
HD04
S T
A
HD22
S T
A
HD05
S T
A
B1
1:200
SITE PLAN
M-111
0 8 12 16 20
1:200
F O
R
C
O N
T I N
U A
T I O
N
S
E
KEYED NOTES:
GENERAL NOTES:
0 8 12 16 20
1:200
0 1
1:40
HORIZONTAL
VERTICAL
A1
1:200
PROFILE STA 0+480 TO STA 0+520
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
TIMOTHY A.
SCHMITT
17386
1. PROVIDE 500mm F-76 PIPELINE.
2. 450mm JP-5 LINE TO BE INSTALLED UNDER
ANOTHER CONTRACT. CONTACT ROTA PUBLIC
WORKS FOR THE CONSTRUCTION SCHEDULE.
3. 500mm F-76 BY OTHERS.
4. 250mm JP-8 BY OTHERS.
5. 500mm JP-8 BY OTHERS.
6. 350mm JP-5 BY OTHERS.
NOTAS DE REFERENCIA:
1. PROVEER TUBERÍA F-76 DE 500mm
2. TUBERÍA JP-5 DE 450mm A SER INSTALADA BAJO
OTRO CONTRATO. CONTACTAR CON OBRAS PÚBLICAS
EN ROTA PARA EL PROGRAMA DE CONSTRUCCIÓN.
P A
N
T I N
U A
C I Ó
N
V
A
PLANTA EXTERIOR
PERFIL STA 0+480 A STA 0+520
NOTAS GENERALES:
1. LAS POSICIONES HORIZONTALES DE LOS CRUCES DE
INSTALACIONES SE MUESTRAN SÓLO COMO
REFERENCIA. EL CONTRATISTA SERÁ RESPONSABLE DE
LA POSICIÓN Y PROTECCIÓN DE LAS INSTALACIONES
EXISTENTES. LOS DAÑOS SOBRE LA INFRAESTRUCTURA
EXISTENTE DEBERÁN SER REPARADOS SIN COSTE
PARA EL GOBIERNO.
2. PARA LOS ACCESORIOS, ELEVACIONES Y
ALINEACIONES DE TUBERÍAS, VER TABLAS EN
PLANOS M-601 Y M-602.
1. HORIZONTAL LOCATIONS OF UTILITY CROSSINGS
SHOWN FOR REFERENCE ONLY. CONTRACTOR
RESPONSIBLE FOR LOCATING AND PROTECTING
EXISTING UTILITIES . DAMAGE TO EXISTING
INFRASTRUCTURE MUST BE REPAIRED AT NO COST TO
GOVERNMENT.
2. FOR PIPE APPURTENANCES, ELEVATION AND
ALIGNMENT SEE TABLES ON SHEETS M-601 AND M-602.
3. SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.
3. VER HOJA M-001 PARA LEYENDA Y NOTAS GENERALES.
3. F-76 DE 500mm POR OTROS.
RIO SALADO
POZO DE VÁLVULAS OESTE/
POZO DE ESPAGHETTI
4. JP-8 DE 250mm POR OTROS.
5. JP-8 DE 500mm POR OTROS.
6. JP-5 DE 350mm POR OTROS.
POZO DE HDD
OESTE
-TP
F
N
T
I
N
U
A
T
I
E
P
A
N
T
I
N
U
A
C
I
A
RIO SALADO
VALVE PIT WEST/
SPAGHETTI PIT
E
V A
T I O
N
E L E
V A
T I O
N
STATION
-30
-28
-26
-24
-22
-20
-18
-16
-14
-12
-10
-8
-6
-4
-2
-30
-28
-26
-24
-22
-20
-18
-16
-14
-12
-10
-8
-6
-4
-2
5+970 5+980 6+000 6+020 6+040 6+060 6+080
5+970 5+980 6+000 6+020 6+040 6+060 6+080
P3-097, 15.05m OF 500mm F-76
P -0
, 1
.8 m
O F m m F
-7
P3-099, 15.02m OF 500mm F-76
P3-100, 14.85m OF 500mm F-76 P3-101, 14.93m OF 500mm F-76
P3-102, 15.13m OF 500mm F-76
P3-103, 1 4.93m O
F 500mm F-76
P3-104, 15.21m OF 500mm F-76
HD12
S T
A
HD11
S T
A
HD10
S T
A
HD09
S T
A
HD08
S T
A
HD07
S T
A
HD06
S T
A
B1
1:200
SITE PLAN
M-112 A1
1:200
PROFILE
GENERAL NOTES:
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
TIMOTHY A.
SCHMITT
17386
KEYED NOTES:
1. 500mm F-76 BY OTHERS.
2. 450mm JP-5 LINE TO BE INSTALLED UNDER
ANOTHER CONTRACT. CONTACT ROTA PUBLIC
WORKS FOR THE CONSTRUCTION SCHEDULE.
3. 250mm JP-8 BY OTHERS.
NOTAS GENERALES:
NOTAS DE REFERENCIA:
1. TUBERÍA F-76 DE 500mm POR OTROS.
2. TUBERÍA JP-5 DE 450mm A SER INSTALADA
BAJO OTRO CONTRATO. CONTACTAR CON
OBRAS PÚBLICAS EN ROTA PARA EL
PROGRAMA DE CONSTRUCCIÓN.
PLANTA EXTERIOR
PERFIL
1. LAS POSICIONES HORIZONTALES DE LOS
CRUCES DE INSTALACIONES SE MUESTRAN
SÓLO COMO REFERENCIA. EL CONTRATISTA
SERÁ RESPONSABLE DE LA POSICIÓN Y
PROTECCIÓN DE LAS INSTALACIONES
EXISTENTES. LOS DAÑOS SOBRE LA
INFRAESTRUCTURA EXISTENTE DEBERÁN SER
REPARADOS SIN COSTE PARA EL GOBIERNO.
2. PARA LOS ACCESORIOS, ELEVACIONES Y
ALINEACIONES DE TUBERÍAS, VER TABLAS EN
PLANOS M-601 Y M-602.
1. HORIZONTAL LOCATIONS OF UTILITY CROSSINGS
SHOWN FOR REFERENCE ONLY. CONTRACTOR
RESPONSIBLE FOR LOCATING AND PROTECTING
EXISTING UTILITIES . DAMAGE TO EXISTING
INFRASTRUCTURE MUST BE REPAIRED AT NO COST
TO GOVERNMENT.
2. FOR PIPE APPURTENANCES, ELEVATION AND
ALIGNMENT SEE TABLES ON SHEETS M-601 AND
M-602.
3. SEE SHEET M-001 FOR LEGEND AND GENERAL
NOTES.
3. VER HOJA M-001 PARA LEYENDA Y NOTAS
GENERALES.
3. TUBERÍA JP-8 DE 250mm POR OTROS.
0 8 12 16 20
1:200
F O
R
C
O N
T I N
U A
T I O
N
S
E
P A
N
T I N
U A
C I Ó
N
V
A
F O
R
C
O N
T I N
U A
T I O
N
S
E
P A
N
T I N
U A
C I Ó
N
V
A
0 8 12 16 20
1:200
0 1
1:40
HORIZONTAL
VERTICAL
E V
A T
I O
N
E L
E V
A T
I O
N
STATION
-30
-28
-26
-24
-22
-20
-18
-16
-14
-12
-10
-8
-6
-4
-2
-30
-28
-26
-24
-22
-20
-18
-16
-14
-12
-10
-8
-6
-4
-2
6+080 6+100 6+120 6+140 6+160 6+180 6+190
6+080 6+100 6+120 6+140 6+160 6+180 6+190
P3-104, 15.21m OF 500mm F-76
HD13
S T
A
P -1
.6 m
O F m m F
-7
HD14
S T
A
P -1
.0 m
O F m m F
-7
HD15
S T
A
P .0 m
O
F m m
F
HD16
S T
A
P
HD17
S T
A
P
HD18
S T
A
P
HD19
S T
A
P
HD20
S T
A
M-113
A1
1:500
PROFILE
KEYED NOTES:
F O
R
C
O N
T I N
U A
T I O
N
S
E
F O
R
C
O N
T I N
U A
T I O
N
S
E
1. 500mm F-76 PIPELINE BY OTHERS.
2. 450mm JP-5 LINE TO BE INSTALLED UNDER ANOTHER
CONTRACT. CONTACT ROTA PUBLIC WORKS FOR
THE CONSTRUCTION SCHEDULE.
3. 250mm JP-8 BY OTHERS.
GENERAL NOTES:
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
TIMOTHY A.
SCHMITT
17386
PERFIL
P A
N
T I N
U A
C I Ó
N
V
A
P A
N
T I N
U A
C I Ó
N
V
A
NOTAS DE REFERENCIA:
1. TUBERÍA F-76 DE 500mm POR OTROS.
2. TUBERÍA JP-5 DE 450mm A SER INSTALADA BAJO
OTRO CONTRATO. CONTACTAR CON OBRAS
PÚBLICAS EN ROTA PARA EL PROGRAMA DE
CONSTRUCCIÓN.
NOTAS GENERALES:
1. LAS POSICIONES HORIZONTALES DE LOS CRUCES
DE INSTALACIONES SE MUESTRAN SÓLO COMO
REFERENCIA. EL CONTRATISTA SERÁ
RESPONSABLE DE LA POSICIÓN Y PROTECCIÓN DE
LAS INSTALACIONES EXISTENTES. LOS DAÑOS
SOBRE LA INFRAESTRUCTURA EXISTENTE
DEBERÁN SER REPARADOS SIN COSTE PARA EL
GOBIERNO.
2. PARA LOS ACCESORIOS, ELEVACIONES Y
ALINEACIONES DE TUBERÍAS, VER TABLAS
EN PLANOS M-601 Y M-602.
1. HORIZONTAL LOCATIONS OF UTILITY CROSSINGS
SHOWN FOR REFERENCE ONLY. CONTRACTOR
RESPONSIBLE FOR LOCATING AND PROTECTING
EXISTING UTILITIES . DAMAGE TO EXISTING
INFRASTRUCTURE MUST BE REPAIRED AT NO
COST TO GOVERNMENT.
2. FOR PIPE APPURTENANCES, ELEVATION AND
ALIGNMENT SEE TABLES ON SHEETS M-601 AND
M-602.
3. SEE SHEET M-001 FOR LEGEND AND GENERAL
NOTES.
3. VER HOJA M-001 PARA LEYENDA Y NOTAS
GENERALES.
B1
1:200
SITE PLAN
PLANTA EXTERIOR 0 8 12 16 20
1:200
0 8 12 16 20
1:200
0 1
1:40
HORIZONTAL
VERTICAL
3. TUBERÍA JP-8 DE 250mm POR OTROS.
E
V A
T I O
N
E L
E V
A T
I O
N
STATION
-6
-4
-2
-6
-4
-2
6+190 6+200 6+220 6+240 6+260 6+280 6+300
6+190 6+200 6+220 6+240 6+260 6+280 6+300
P
HD21
S T
A
P -1
.8 m
O F m m F
-7
BH42
S T
A
P3-114, 2.59m OF 500mm F-76
CP11
S T
A
CP12
S T
A
P3-043, 4.60m OF 500mm F-76
BH43
S T
A
P3-043A, 54.33m OF 500mm F-76
BV12
S T
A
P3-044, 14.94m OF 500mm F-76
6+260
6+280
6+300
M-114
F O
R
C
O N
T I N
U A
T I O
N
S
E
F
N
T
I N
U
A
T
I
E
A1
1:200
PIER 3 STA 6+530 TO 6+830
KEYED NOTES:
GENERAL NOTES:
1. HORIZONTAL LOCATIONS OF UTILITY
CROSSINGS SHOWN FOR REFERENCE ONLY.
CONTRACTOR RESPONSIBLE FOR LOCATING
AND PROTECTING EXISTING UTILITIES .
DAMAGE TO EXISTING INFRASTRUCTURE MUST
BE REPAIRED AT NO COST TO GOVERNMENT
2. FOR PIPE APPURTENANCES, ELEVATION AND
ALIGNMENT SEE TABLES ON SHEETS M-601 AND
M-602.
3. SEE SHEET M-001 FOR LEGEND AND GENERAL
NOTES.
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
TIMOTHY A.
SCHMITT
17386
1. PROVIDE 500mm F-76 PIPELINE.
2. 450mm JP-5 LINE TO BE INSTALLED UNDER
ANOTHER CONTRACT. CONTACT ROTA PUBLIC
WORKS FOR THE CONSTRUCTION SCHEDULE.
3. 250mm JP-8 BY OTHERS.
4. 500mm F-76 BY OTHERS.
MUELLE 3 STA 6+530 A 6+830
NOTAS GENERALES:
1. LAS POSICIONES HORIZONTALES DE LOS CRUCES
DE INSTALACIONES SE MUESTRAN SÓLO COMO
REFERENCIA. EL CONTRATISTA SERÁ
RESPONSABLE DE LA POSICIÓN Y PROTECCIÓN
DE LAS INSTALACIONES EXISTENTES. LOS DAÑOS
SOBRE LA INFRAESTRUCTURA EXISTENTE
DEBERÁN SER REPARADOS SIN COSTE PARA EL
GOBIERNO.
2. PARA LOS ACCESORIOS, ELEVACIONES Y
ALINEACIONES DE TUBERÍAS, VER TABLAS
EN PLANOS M-601 Y M-602.
NOTAS DE REFERENCIA:
1. PROVEER TUBERÍA F-76 DE 500mm
2. TUBERÍA JP-5 DE 450mm A SER INSTALADA
BAJO OTRO CONTRATO. CONTACTAR CON
OBRAS PÚBLICAS EN ROTA PARA EL
PROGRAMA DE CONSTRUCCIÓN.
3. TUBERÍA DE 250mm JP-8 POR OTROS.
4. TUBERÍA DE 500mm F-76 POR OTROS.
P A
N
T I N
U A
C I Ó
N
V
A
P
A
N
T
I N
U
A
C
I
A
3. VER HOJA M-001 PARA LEYENDA Y NOTAS
GENERALES.
0 8 12 16 20
1:200
B1
1:200
SITE PLAN
PLANTA EXTERIOR
0 8 12 16 20
1:200
0 1
1:40
HORIZONTAL
VERTICAL
1 2
-TP
SOUTHEAST HDD PIT
E
V A
T I O
N
E L E
V A
T I O
N
F-76_PIER 3 PROFILE - STA 6+300 TO 6+580
6+300 6+320 6+340 6+360 6+380 6+400 6+420 6+440 6+460 6+480 6+500 6+520 6+540 6+560 6+580
P3-044, 14.94m OF 500mm F-76
BEND
BH18
S T
A
H O
R I Z
O N
T A
L m m
E
X
S
A N
BEND
BV13
S T
A
V E
R T
I C
A L
P3-046, 1.71m OF 500mm F-76
P3-047, 21.63m OF 500mm F-76
EXISTING GROUND
BEND
BH19
S T
A
H O
R I Z
O N
T A
L
BEND
BH20
S T
A
V E
R T
I C
A L
P3-048, 32.61m OF 500mm F-76
P3-050, 8.91m OF 500mm F-76 m m
E
X
S
A N
BEND
BH22
S T
A
V E
R T
I C
C
O M
P3-051, 38.10m OF 500mm F-76
P3-052, 3.79m OF 500mm F-76
BEND
BH23
S T
A
V E
R T
I C
A L
BEND
BV14
S T
A
V E
R T
I C
A L m m
E
X
S
A N
P3-053, 13.71m OF 500mm F-76
P3-054, 32.23m OF 500mm F-76
P3-057, 34.09m OF 500mm F-76
BEND
BH24
S T
A
H O
R I Z
O N
T A
L
P3-051, 38.10m OF 500mm F-76
P3-045, 30.75m OF 500mm F-76
BEND
BV10
S T
A
H O
R I Z
O N
T A
L m m
S
T
C U
L V
E R
T
P3-049, 23.38m OF 500mm F-76
BEND
BH21
S T
A
H O
R I Z
O N
T A
L
P3-047A, 39.81m OF 500mm F-76
6+420 6
KEYED NOTES:
M-115 A1
1:500
PROFILE
0 20 30 40 50
1:500
GENERAL NOTES:
0 4 6 8 10
1:100
HORIZONTAL
VERTICAL
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
TIMOTHY A.
SCHMITT
17386
1. PROVIDE 500mm F-76 PIPELINE.
2. 450 mm JP-5 LINE TO BE INSTALLED UNDER ANOTHER
CONTRACT. CONTACT ROTA PUBLIC WORKS FOR THE
CONSTRUCTION SCHEDULE.
PERFIL
NOTAS DE REFERENCIA:
1. PROVEER TUBERÍA F-76 DE 500mm
2. TUBERÍA JP-5 DE 450mm A SER INSTALADA BAJO
OTRO CONTRATO. CONTACTAR CON OBRAS
PÚBLICAS EN ROTA PARA EL PROGRAMA DE
CONSTRUCCIÓN.
NOTAS GENERALES:
1. LAS POSICIONES HORIZONTALES DE LOS
CRUCES DE INSTALACIONES SE MUESTRAN
SÓLO COMO REFERENCIA. EL CONTRATISTA
SERÁ RESPONSABLE DE LA POSICIÓN Y
PROTECCIÓN DE LAS INSTALACIONES
EXISTENTES. LOS DAÑOS SOBRE LA
INFRAESTRUCTURA EXISTENTE DEBERÁN SER
REPARADOS SIN COSTE PARA EL GOBIERNO.
2. PARA LOS ACCESORIOS, ELEVACIONES Y
ALINEACIONES DE TUBERÍAS, VER TABLAS
EN PLANOS M-601 Y M-602.
1. HORIZONTAL LOCATIONS OF UTILITY CROSSINGS
SHOWN FOR REFERENCE ONLY. CONTRACTOR
RESPONSIBLE FOR LOCATING AND PROTECTING
EXISTING UTILITIES . DAMAGE TO EXISTING
INFRASTRUCTURE MUST BE REPAIRED AT NO
COST TO GOVERNMENT.
2. FOR PIPE APPURTENANCES, ELEVATION AND
ALIGNMENT SEE TABLES ON SHEETS M-601 AND
M-602.
3. SEE SHEET M-001 FOR LEGEND AND GENERAL
NOTES.
3. VER HOJA M-001 PARA LEYENDA Y
NOTAS GENERALES.
B1
1:500
SITE PLAN
F
N
T
I N
U
A
T
I
E
0 20 30 40 50
1:500
PLANTA EXTERIOR
P
A
N
T
I N
U
A
C
I
A
F
N
T
I
N
U
A
T
I
E
P
A
N
T
I
N
U
A
C
I
A
E
V A
T I O
N
E L E
V A
T I O
N
F-76_PIER 3 PROFILE - STA 6+580 TO 6+870
6+580 6+600 6+620 6+640 6+660 6+680 6+700 6+720 6+740 6+760 6+780 6+800 6+820 6+840 6+860 6+870
EXISTING GROUND
VAULT IE: 8.802
IE IN: 8.902, 500mm, W
OUT: 8.902, 500mm, E
HPV06
S T
A
R
P3-058, 59.73m OF 500m m F-76 m m
E
X
S
A N
E
M
BEND
BV15
S T
A
H O
R I Z
O N
T A
L
BEND
BH28
S T
A
H O
R I Z
O N
T A
L
BEND
BH29
S T
A
H O
R I Z
O N
T A
L
P3-059, 34.45m OF 500mm F-76 P3-060, 35.05m OF 500mm F-76
P3-061, 20.12m OF 500mm F-76
VAULT IE: 7.603
IE IN: 7.703, 500mm, W
OUT: 7.703, 500mm, E
LPD05
S T
A
R
P -0
.3 m
O F m m F
-7
P3-063, 19.31m OF 500mm F-76
P3-064, 85.49m OF 500mm F-76 m m
E
X
S
A N m m
E
X
S
A N
BEND
BH30
S T
A
H O
R I Z
O N
T A
L m m
E
X
W m m
E
X
S
A N m m
E
X
F
U E
L m m
E
X
F
F
U E
L m m
E
X
J P
E
L m m
E
X
F
F
U E
L m m
E
X
J P
E
L m m
I N
A C
T I V
E
F
U E
L m m
E
X
J P
E
L m m
E
X
J P
E
L
A2
M-503
B2
M-503
P3-058A, 13.89m OF 500mm F-76
P3-061A, 2.78m OF 500mm F-76
P3-061B, 19.33m OF 500mm F-76
B
6+580
6+600
6+620
6+640
6+660
6+700
6+720
6+740
6+760 6+780
6+800
6+840
6+860
6+880
M-116
B1
1:500
PROFILE
KEYED NOTES:
0 20 30 40 50
1:500
GENERAL NOTES:
0 4 6 8 10
1:100
HORIZONTAL
VERTICAL
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
TIMOTHY A.
SCHMITT
17386
1. PROVIDE 500mm F-76 PIPELINE.
2. 450 mm JP-5 LINE TO BE INSTALLED UNDER ANOTHER
CONTRACT. CONTACT ROTA PUBLIC WORKS FOR THE
CONSTRUCTION SCHEDULE.
3. LOW-POINT DRAIN
4. HIGH-POINT VENT
NOTAS GENERALES:
NOTAS DE REFERENCIA:
1. PROVEER TUBERÍA F-76 DE 500mm
2. TUBERÍA JP-5 DE 450mm A SER INSTALADA
BAJO OTRO CONTRATO. CONTACTAR CON
OBRAS PÚBLICAS EN ROTA PARA EL
PROGRAMA DE CONSTRUCCIÓN.
3. DRENAJE EN PUNTO BAJO
PERFIL
1. LAS POSICIONES HORIZONTALES DE LOS CRUCES DE
INSTALACIONES SE MUESTRAN SÓLO COMO
REFERENCIA. EL CONTRATISTA SERÁ RESPONSABLE
DE LA POSICIÓN Y PROTECCIÓN DE LAS
INSTALACIONES EXISTENTES. LOS DAÑOS SOBRE LA
INFRAESTRUCTURA EXISTENTE DEBERÁN SER
REPARADOS SIN COSTE PARA EL GOBIERNO.
2. PARA LOS ACCESORIOS, ELEVACIONES Y
ALINEACIONES DE TUBERÍAS, VER TABLAS EN
PLANOS M-601 Y M-602.
1. HORIZONTAL LOCATIONS OF UTILITY CROSSINGS
SHOWN FOR REFERENCE ONLY. CONTRACTOR
RESPONSIBLE FOR LOCATING AND PROTECTING
EXISTING UTILITIES . DAMAGE TO EXISTING
INFRASTRUCTURE MUST BE REPAIRED AT NO COST
TO GOVERNMENT.
2. FOR PIPE APPURTENANCES, ELEVATION AND
ALIGNMENT SEE TABLES ON SHEETS M-601 AND M-602.
3. SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.
3. VER HOJA M-001 PARA LEYENDA Y NOTAS GENERALES.
4. VENTEO EN PUNTO ALTO
P A
N
T I N
U A
C I Ó
N
V
A
B1
1:500
SITE PLAN
0 20 30 40 50
1:500
PLANTA EXTERIOR
F O
R
C
O N
T I N
U A
T I O
N
S
E
P A
N
T I N
U A
C I Ó
N
V
A
F O
R
C
O N
T I N
U A
T I O
N
S
E
E V
A T
I O
N
6+870 6+880 6+900 6+920 6+940 6+960 6+980 7+000 7+020 7+040 7+060 7+080 7+100 7+120 7+140 7+150
EXISTING GROUND
P3-0 64, 8
5.4 9m O
F 5 00mm F
-7
BEND
BH32
S T
A
H O
R I Z
O N
T A
L
P3-065, 35.31m OF 500mm F-76
BEND
BH39
S T
A
H O
R I Z
O N
T A
L m m
E
X
S
A N
P3-067, 37.53m O
F 500m m
F-76 m m
E
X
S
A N
HPV02
S T
A
R
P3-066, 7.52m OF 500mm F-76
A2
M-503
P3-064A, 19.01m OF 500mm F-76
P3-0 64B, 1
29.7 0m
O F 5
00m m
F -7
BEND
BH55
S T
A
H O
R I Z
O N
T A
L
BEND
BH54
S T
A
H O
R I Z
O N
T A
L
A
C
T
I V
E
A
C
T
I V
E
6+880
6+900
6+940 6+960
6+980 7+000
7+020 7+040
7+060
7+120 7+140 7+160
M-117
KEYED NOTES:
A1
1:500
PROFILE
0 20 30 40 50
1:500
GENERAL NOTES:
0 4 6 8 10
1:100
HORIZONTAL
VERTICAL
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
TIMOTHY A.
SCHMITT
17386
1. PROVIDE 500mm F-76 PIPELINE.
2. 450 mm JP-5 LINE TO BE INSTALLED UNDER
ANOTHER CONTRACT. CONTACT ROTA PUBLIC
WORKS FOR THE CONSTRUCTION SCHEDULE
3. HIGH-POINT VENT.
PERFIL
NOTAS DE REFERENCIA:
1. PROVEER TUBERÍA F-76 DE 500mm
2. TUBERÍA JP-5 DE 450mm A SER INSTALADA BAJO
OTRO CONTRATO. CONTACTAR CON OBRAS PÚBLICAS
EN ROTA PARA EL PROGRAMA DE CONSTRUCCIÓN.
3. VENTEO EN PUNTO ALTO.
NOTAS GENERALES:
1. LAS POSICIONES HORIZONTALES DE LOS CRUCES DE
INSTALACIONES SE MUESTRAN SÓLO COMO REFERENCIA.
EL CONTRATISTA SERÁ RESPONSABLE DE LA POSICIÓN Y
PROTECCIÓN DE LAS INSTALACIONES EXISTENTES. LOS
DAÑOS SOBRE LA INFRAESTRUCTURA EXISTENTE
DEBERÁN SER REPARADOS SIN COSTE PARA EL
GOBIERNO.
2. PARA LOS ACCESORIOS, ELEVACIONES Y
ALINEACIONES DE TUBERÍAS, VER TABLAS EN
PLANOS M-601 Y M-602.
1. HORIZONTAL LOCATIONS OF UTILITY CROSSINGS SHOWN
FOR REFERENCE ONLY. CONTRACTOR RESPONSIBLE
FOR LOCATING AND PROTECTING EXISTING UTILITIES .
DAMAGE TO EXISTING INFRASTRUCTURE MUST BE
REPAIRED AT NO COST TO GOVERNMENT.
2. FOR PIPE APPURTENANCES, ELEVATION AND ALIGNMENT
SEE TABLES ON SHEETS M-601 AND M-602.
3. SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.
3. VER HOJA M-001 PARA LEYENDA Y NOTAS GENERALES.
F O
R
C
O N
T I N
U A
T I O
N
S
E
F O
R
C
O N
T I N
U A
T I O
N
S
E
P A
N
T I N
U A
C I Ó
N
V
A
P A
N
T I N
U A
C I Ó
N
V
A
B1
1:500
SITE PLAN
0 20 30 40 50
1:500
PLANTA EXTERIOR
E
V A
T I O
N
E L E
V A
T I O
N
7+150 7+160 7+180 7+200 7+220 7+240 7+260 7+280 7+300 7+320 7+340 7+360 7+380 7+400 7+420 7+440
EXISTING GROUND
M
M
P3-070, 24.58m OF 500mm F-76
P3-073, 4.35m OF 500mm F-76 m m
E
X
S
A N
P3-075, 101.48m OF 500mm F-76
BEND
BH33
S T
A
H O
R I Z
O N
T A
L
BEND
BH34
S T
A
H O
R I Z
O N
T A
L
P3-076, 25.16m OF 500mm F-76
P3-077, 34.93m OF 500mm F-76 m m
E
X
S
A N m m
E
X
W
M m m
E
X
S
A N
B2
M-503
P3-068, 47.81m OF 500mm F-76
BEND
BH40
S T
A
H O
R I Z
O N
T A
L
BEND
BV23
S T
A
V E
R T
I C
A L
LPD04
S T
A
R
P3-073A, 2.22m OF 500mm F-76
BEND
BH41
S T
A
H O
R I Z
O N
T A
L
P3-075A, 37.12m OF 500mm F-76
BEND
BH44
S T
A
H O
R I Z
O N
T A
L
600mm F-76
500mm JP-8
500mm F-76
350mm JP-5
350mm INACTIVE
150mm JP-5
150mm JP-8
150mm INACTIVE
KEYED NOTES:
M-118 A1
1:500
PROFILE
0 20 30 40 50
1:500
GENERAL NOTES:
0 4 6 8 10
1:100
HORIZONTAL
VERTICAL
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
TIMOTHY A.
SCHMITT
17386
1. PROVIDE 500mm F-76 PIPELINE.
2. 450 mm JP-5 LINE TO BE INSTALLED UNDER
ANOTHER CONTRACT. CONTACT ROTA PUBLIC
WORKS FOR THE CONSTRUCTION SCHEDULE.
3. LOW-POINT DRAIN.
PERFIL
NOTAS DE REFERENCIA:
1. PROVEER TUBERÍA F-76 DE 500mm.
2. TUBERÍA JP-5 DE 450mm A SER INSTALADA BAJO
OTRO CONTRATO. CONTACTAR CON OBRAS
PÚBLICAS EN ROTA PARA EL PROGRAMA DE
CONSTRUCCIÓN.
3. DRENAJE EN PUNTO BAJO
NOTAS GENERALES:
1. LAS POSICIONES HORIZONTALES DE LOS
CRUCES DE INSTALACIONES SE MUESTRAN
SÓLO COMO REFERENCIA. EL CONTRATISTA
SERÁ RESPONSABLE DE LA POSICIÓN Y
PROTECCIÓN DE LAS INSTALACIONES
EXISTENTES. LOS DAÑOS SOBRE LA
INFRAESTRUCTURA EXISTENTE DEBERÁN SER
REPARADOS SIN COSTE PARA EL GOBIERNO.
2. PARA LOS ACCESORIOS, ELEVACIONES Y
ALINEACIONES DE TUBERÍAS, VER TABLAS
EN PLANOS M-601 Y M-602.
1. HORIZONTAL LOCATIONS OF UTILITY CROSSINGS
SHOWN FOR REFERENCE ONLY. CONTRACTOR
RESPONSIBLE FOR LOCATING AND PROTECTING
EXISTING UTILITIES . DAMAGE TO EXISTING
INFRASTRUCTURE MUST BE REPAIRED AT NO
COST TO GOVERNMENT.
2. FOR PIPE APPURTENANCES, ELEVATION AND
ALIGNMENT SEE TABLES ON SHEETS M-601 AND
M-602.
3. SEE SHEET M-001 FOR LEGEND AND GENERAL
NOTES.
3. VER HOJA M-001 PARA LEYENDA Y NOTAS
GENERALES.
0 20 30 40 50
1:500
B1
1:500
SITE PLAN
F
N
T
I N
U
A
T
I
E
PLANTA EXTERIOR
P
A
N
T
I N
U
A
C
I
A
P
A
N
T
I
N
U
A
C
I
A
F
N
T
I
N
U
A
T
I
E
600mm F-76
500mm JP-8
500mm F-76
350mm JP-5
350mm INACTIVE
150mm JP-5
150mm JP-8
150mm INACTIVE
ML-1
V-BRDG-OTLN
FH #14
PIT #1
ML-1
B1
M-410
7+540
7+580
7+600
7+620
7+640
7+660
7+680
7+700
7+720
7+740
E L
E V
A T
I O
N
E L
E V
A T
I O
N
F-76_PIER 3 PROFILE - STA 7+440 TO 7+720
7+440 7+460 7+480 7+500 7+520 7+540 7+560 7+580 7+600 7+620 7+640 7+660 7+680 7+700 7+720
EXISTING GROUND
BEND
B48
S T
A
H O
R I Z
O N
T A
L
P -0
.4 m
O F m m F
-7
P3-085, 118.15m OF 500mm F-76
CP06
S T
A
I N
V
CP07
S T
A
I N
V
BEND
BH35
S T
A
H O
R I Z
O N
T A
L
BEND
BH36
S T
A
H O
R I Z
O N
T A
L
BEND
BH37
S T
A
H O
R I Z
O N
T A
L m m
I N
A C
T I V
E
F
U E
L m m
E
X
J P
E
L m m
E
X
J P
E
L m m
E
X
J P
E
L m m
E
X
J P
E
L m m
E
X
F
F
U E
L m m
E
X
J P
E
L m m
E
X
F
F
U E
L m m
E
X
S
A N m m
E
X
W m m
E
X
W
E
L m m
E
X
S
A N
P3-079, 28.54m OF 500mm F-76
P3-081, 17.47m OF 500mm F-76
P3-082, 22.57m OF 500mm F-76
P3-083, 3.19m OF 500mm F-76
BEND
BH38
S T
A
V E
R T
I C
A L
P3-084, 17.99m OF 500mm F-76
LDP-9
S T
A
R
ML-1
P3-085, 118.15m OF 500mm F-76 m m
E
X
W
B1
1:500
SITE PLAN
M-119
F O
R
C
O N
T I N
U A
T I O
N
S
E
F
N
T
I
N
U
A
T
I
E
KEYED NOTES:
A1
1:500
PROFILE
0 20 30 40 50
1:500
0 20 30 40 50
1:500
GENERAL NOTES:
0 4 6 8 10
1:100
HORIZONTAL
VERTICAL
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .