Attachment M - F76 5_PIER3-FINAL_SUBMITTAL-PGS-130-149_SET_5-OF-6.pdf
PDF 17 MB Posted
- Solicitation number
- N6247026R0006
About this file
This document set comprises detailed engineering drawings and specifications for a fuel pipeline replacement project managed by Naval Facilities Engineering System Command – Atlantic. The project involves replacing the fuel pipeline from Pier 3 to bulk storage at a naval facility, with comprehensive cathodic protection and electrical grounding systems.
The primary deliverables include 15 cathodic protection plan sheets (EC106-EC120) detailing the pipeline route from Pier 3 through the Rio Salado Bridge to the tank farm, encompassing approximately 7,807 linear meters. The pipeline system transports multiple fuel types: F-76 (in 250mm to 600mm diameters), JP-5 (in 150mm to 450mm diameters), JP-8 (in 150mm to 500mm diameters), and ballast/inactive lines. The plans specify 22 cathodic protection test stations (T01-T22) with insulated flange kits, field test station installations (both above-grade and flush-mounted configurations), and reference electrode placements. Each test station incorporates #2 AWG HMWPE cable bonds and connections to an existing rectifier (RECT #12, 3-phase, 230/460V AC, 60 Hz, 50V/60A DC). Installation details include exothermic welding connections, packaged reference electrodes, and non-metallic conduit systems. Electrical grounding plans (EG401, EG501) show fence grounding locations with copper-clad steel ground rods and 10mm² solid copper wire connections. The drawings are prepared by Colorado-registered professional engineer Stanley C. Worcester and reference cross-connections between multiple pipeline systems and existing infrastructure including tank farms, booster pump houses, and clarifier buildings.
View the file
Other files
Show 40 more
Latest 50 of 67 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PIER III
ML-1
ML-4
TE-A
TE-B,C,D
ML-3
V-BRDG-OTLN
A2003
DRYER FOR POOL
FH #14
VALVE PIT #44
(OUTSIDE OF BASE)
TO BULK STORAGE
TO BOOSTER PUMP HOUSE
PIT #1
TANK-2
F-76
TANK-3
F-76
TANK-5
F-76
TANK-4
F-76
TANK-6
F-76
TANK-7
F-76
TANK-8
F-76
TANK-1
F-76
TANK-13
JP-8
TK-17
JP-5
TANK-11
JP-8
TANK-10
JP-8
TK-15
JP-5
TANK-9
JP-8
TK-14
JP-5
TANK-122
JP-8
TANK-120
JP-8
TANK-121
JP-8
TK-16
JP-5
3194B
PIER 3
PIER 3
TANK FARM
PUERTO GATE
RIO SALADO
BRIDGE
ML-2
A
L
I
C
A
N
T
E
L
A
N
E
A
L
I C
A
N
N
E
S
A
N
M
R
I
S
R
E
E
T
C
M
I
N
O
R
A
L
A
L
I C
A
N
N
E
F-76 PIPELINE
EC106
EC107
EC119
EC120
EC108
EC109
EC110
EC111
EC118
EC117
EC116
EC115
EC114
EC113
EC112
0 200
400 500
1:5000
EC101
B1
1:5000
OVERALL JP-5 CATHODIC PROTECTION KEY PLAN
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
36018
C
O
L
O
R
A
D
O
RE
G
I S
T
E
R
E
D
P
R
O
F
E
S
S
I
NA L
G
I
N
E
E
R
S
T A
N
L
Y
W
O
R
C
E
S
T
E R
MUELLE 3
PLANTA GENERAL DE REFERENCIA DE PROTECCIÓN CATÓDICA JP-5
ÁREA DE
TANQUES
MUELLE 3
PUENTE RÍO
SALADO
PUERTA DEL PUERTO
TUBERÍA F-76
m
F
J
P
R
G
O
B
L
L
A
S
T
C
L
H
PIT P3-1
0+450 0+460
5+280
5+300
5+320
5+340
5+360
5+380
5+400
B1
1:200
CATHODIC PROTECTION PLAN
EC106
0 8 12 16 20
1:200
F O
R
C
O N
T I N
U A
T I O
N
S
H E
KEYED NOTES:
GENERAL NOTES:
1. EACH TEST STATION HAS 0 ANODES CONNECTED.
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
36018
C
O
L
O
R
A
D
O
RE
G
I S
T
E
R
E
D
P
R
O
F
E
S
S
I
G
I
N
E
E
R
S
T A
N
L
W
O
R
C
E
S
T
E R
1. CATHODIC PROTECTION TEST STATION
2. INSULATED FLANGE KIT (IFK)
#2AWG HMWPE CABLE BOND
400mm F-76
CABLE DE CONEXIÓN #2AWG
HMWPE
FOSA P3-1
LÍNEA DE AGUA
NOTAS GENERALES:
NOTAS DE REFERENCIA:
PLANTA DE PROTECCIÓN CATÓDICA
1. CADA ESTACIÓN DE PRUEBA TIENE 0 ÁNODOS CONECTADOS.
2. KIT DE BRIDA AISLADA (IFK)
P A
N
T I N
U A
C I Ó
N
V
A
WATERLINE
1. ESTACIÓN DE PRUEBAS DE PROTECCIÓN CATÓDICA.
WATERLINE
5+400
5+440 5+460
5+480 5+500
T01
B1
1:200
CATHODIC PROTECTION PLAN
EC107
0 8 12 16 20
1:200
F O
R
C
O N
T I N
U A
T I O
N
S
E
KEYED NOTES:
GENERAL NOTES:
1. EACH TEST STATION HAS 0 ANODES CONNECTED.
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
36018
C
O
L
O
R
A
D
O
RE
G
I S
T
E
R
E
D
P
R
O
F
E
S
S
I
G
I
N
E
E
R
S
T A
N
L
W
O
R
C
E
S
T
E R
1. CATHODIC PROTECTION TEST STATION
2. INSULATED FLANGE KIT (IFK)
400mm F-76
FOSA P3-1
LÍNEA DE AGUA
NOTAS GENERALES:
NOTAS DE REFERENCIA:
PLANTA DE PROTECCIÓN CATÓDICA
1. CADA ESTACIÓN DE PRUEBA TIENE 0 ÁNODOS CONECTADOS.
2. KIT DE BRIDA AISLADA (IFK)
P A
N
T I N
U A
C I Ó
N
V
A
F O
R
C
O N
T I N
U A
T I O
N
S
E
P A
N
T I N
U A
C I Ó
N
V
A
S
U
E
R
G
O
A
C
T
I
V
E
5+520 5+540
5+580 5+600
T02
B1
1:200
CATHODIC PROTECTION PLAN
EC108
0 8 12 16 20
1:200
F O
R
C
O N
T I N
U A
T I O
N
S
E
KEYED NOTES:
GENERAL NOTES:
1. EACH TEST STATION HAS 0 ANODES CONNECTED.
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
36018
C
O
L
O
R
A
D
O
RE
G
I S
T
E
R
E
D
P
R
O
F
E
S
S
I
G
I
N
E
E
R
S
T A
N
L
W
O
R
C
E
S
T
E R
1. CATHODIC PROTECTION TEST STATION
2. INSULATED FLANGE KIT (IFK)
400mm F-76
FOSA P3-1
LÍNEA DE AGUA
NOTAS GENERALES:
NOTAS DE REFERENCIA:
PLANTA DE PROTECCIÓN CATÓDICA
1. CADA ESTACIÓN DE PRUEBA TIENE 0 ÁNODOS CONECTADOS.
2. KIT DE BRIDA AISLADA (IFK)
P A
N
T I N
U A
C I Ó
N
V
A
F O
R
C
O N
T I N
U A
T I O
N
S
E
P A
N
T I N
U A
C I Ó
N
V
A
B
L
L
A
S
T
S
U
E
R
G
O
A
C
T
I
V
E
CLARIFIER BLDG
BOOSTER
PUMP HOUSE
T03
T04
T05
B1
1:200
CATHODIC PROTECTION PLAN
EC109
0 8 12 16 20
1:200
F
N
T
I
N
U
A
T
I
E
KEYED NOTES:
GENERAL NOTES:
1. EACH TEST STATION HAS 0 ANODES CONNECTED.
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
36018
C
O
L
O
R
A
D
O
RE
G
I S
T
E
R
E
D
P
R
O
F
E
S
S
I
G
I
N
E
E
R
S
T A
N
L
W
O
R
C
E
S
T
E R
1. CATHODIC PROTECTION TEST STATION
2. INSULATED FLANGE KIT (IFK)
400mm F-76
FOSA P3-1
NOTAS GENERALES:
NOTAS DE REFERENCIA:
PLANTA DE PROTECCIÓN CATÓDICA
1. CADA ESTACIÓN DE PRUEBA TIENE 0 ÁNODOS CONECTADOS.
2. KIT DE BRIDA AISLADA (IFK)
P
A
N
T
I
N
U
A
C
I
Ó
V
A
F O
R
C
O N
T I N
U A
T I O
N
S
E
P A
N
T I N
U A
C I Ó
N
V
A
EDIFICIO CLARIFICADOR
#2AWG HMWPE CABLE BOND
CABLE DE CONEXIÓN #2AWG
HMWPE
EXISTING RECT #12
3Ph, 230/460Vac, 60 Hz, 50 V, 60A DC
RECT EXISTENTE #12
3Ph, 230/460Vac, 60 Hz, 50 V, 60A DC
CUARTO DE
BOMBAS
(TYP)
T06
B1
1:200
CATHODIC PROTECTION PLAN
EC110
0 8 12 16 20
1:200
F
N
T
I
N
U
A
T
I
E
KEYED NOTES:
GENERAL NOTES:
1. EACH TEST STATION HAS 0 ANODES CONNECTED.
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
36018
C
O
L
O
R
A
D
O
RE
G
I S
T
E
R
E
D
P
R
O
F
E
S
S
I
G
I
N
E
E
R
S
T A
N
L
W
O
R
C
E
S
T
E R
1. CATHODIC PROTECTION TEST STATION
2. INSULATED FLANGE KIT (IFK)
NOTAS GENERALES:
NOTAS DE REFERENCIA:
PLANTA DE PROTECCIÓN CATÓDICA
1. CADA ESTACIÓN DE PRUEBA TIENE 0 ÁNODOS CONECTADOS.
2. KIT DE BRIDA AISLADA (IFK)
P
A
N
T
I
N
U
A
C
I
A
F O
R
C
O N
T I N
U A
T I O
N
S
E
P A
N
T I N
U A
C I Ó
N
V
A
400mm F-76
FOSA P3-1
RIO SALADO
BRIDGE WEST END
5+880 5+900
5+920
5+940
T07
B1
1:200
CATHODIC PROTECTION PLAN
EC111
0 8 12 16 20
1:200
F O
R
C
O N
T I N
U A
T I O
N
S
E
KEYED NOTES:
GENERAL NOTES:
1. EACH TEST STATION HAS 0 ANODES CONNECTED.
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
36018
C
O
L
O
R
A
D
O
RE
G
I S
T
E
R
E
D
P
R
O
F
E
S
S
I
G
I
N
E
E
R
S
T A
N
L
W
O
R
C
E
S
T
E R
1. CATHODIC PROTECTION TEST STATION
2. INSULATED FLANGE KIT (IFK)
NOTAS GENERALES:
NOTAS DE REFERENCIA:
PLANTA DE PROTECCIÓN CATÓDICA
1. CADA ESTACIÓN DE PRUEBA TIENE 0 ÁNODOS CONECTADOS.
2. KIT DE BRIDA AISLADA (IFK)
P A
N
T I N
U A
C I Ó
N
V
A
F
N
T
I
N
U
A
T
I
E
P
A
N
T
I
N
U
A
C
I
A
BPH
EXTREMO OESTE DEL
PUENTE RÍO SALADO
HDD 400mm F-76
(BY OTHERS)
1. ESTACIÓN DE PRUEBAS DE PROTECCIÓN CATÓDICA.
F-76 HDD DE 400mm
(POR OTROS)
5+
6+000
6+020
6+040
6+060
6+080
B1
1:200
CATHODIC PROTECTION PLAN
EC112
0 8 12 16 20
1:200
F O
R
C
O N
T I N
U A
T I O
N
S
E
KEYED NOTES:
GENERAL NOTES:
1. EACH TEST STATION HAS 0 ANODES CONNECTED.
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
36018
C
O
L
O
R
A
D
O
RE
G
I S
T
E
R
E
D
P
R
O
F
E
S
S
I
G
I
N
E
E
R
S
T A
N
L
W
O
R
C
E
S
T
E R
1. CATHODIC PROTECTION TEST STATION
2. INSULATED FLANGE KIT (IFK)
NOTAS GENERALES:
NOTAS DE REFERENCIA:
PLANTA DE PROTECCIÓN CATÓDICA
1. CADA ESTACIÓN DE PRUEBA TIENE 0 ÁNODOS CONECTADOS.
2. KIT DE BRIDA AISLADA (IFK)
P A
N
T I N
U A
C I Ó
N
V
A
F O
R
C
O N
T I N
U A
T I O
N
S
E
P A
N
T I N
U A
C I Ó
N
V
A
HDD 400mm F-76
(BY OTHERS)
F-76 HDD DE 400mm
6+080
6+100
6+120
6+140
B1
1:200
CATHODIC PROTECTION PLAN
EC113
0 8 12 16 20
1:200
F O
R
C
O N
T I N
U A
T I O
N
S
E
KEYED NOTES:
GENERAL NOTES:
1. EACH TEST STATION HAS 0 ANODES CONNECTED.
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
36018
C
O
L
O
R
A
D
O
RE
G
I S
T
E
R
E
D
P
R
O
F
E
S
S
I
G
I
N
E
E
R
S
T A
N
L
W
O
R
C
E
S
T
E R
1. CATHODIC PROTECTION TEST STATION
2. INSULATED FLANGE KIT (IFK)
NOTAS GENERALES:
NOTAS DE REFERENCIA:
PLANTA DE PROTECCIÓN CATÓDICA
1. CADA ESTACIÓN DE PRUEBA TIENE 0 ÁNODOS CONECTADOS.
2. KIT DE BRIDA AISLADA (IFK)
P A
N
T I N
U A
C I Ó
N
V
A
F O
R
C
O N
T I N
U A
T I O
N
S
E
P A
N
T I N
U A
C I Ó
N
V
A
HDD 400mm F-76
(BY OTHERS)
1. ESTACIÓN DE PRUEBAS DE PROTECCIÓN CATÓDICA.
F-76 HDD DE 400mm
6+260
6+280
T09
B1
1:200
CATHODIC PROTECTION PLAN
EC114
0 8 12 16 20
1:200
F O
R
C
O N
T I N
U A
T I O
N
S
E
KEYED NOTES:
GENERAL NOTES:
1. EACH TEST STATION HAS 0 ANODES CONNECTED.
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
36018
C
O
L
O
R
A
D
O
RE
G
I S
T
E
R
E
D
P
R
O
F
E
S
S
I
G
I
N
E
E
R
S
T A
N
L
W
O
R
C
E
S
T
E R
1. CATHODIC PROTECTION TEST STATION
2. INSULATED FLANGE KIT (IFK)
NOTAS GENERALES:
NOTAS DE REFERENCIA:
PLANTA DE PROTECCIÓN CATÓDICA
1. CADA ESTACIÓN DE PRUEBA TIENE 0 ÁNODOS CONECTADOS.
2. KIT DE BRIDA AISLADA (IFK)
P A
N
T I N
U A
C I Ó
N
V
A
F
N
T
I
N
U
A
T
I
E
P
A
N
T
I
N
U
A
C
I
A
400mm F-76
FOSA P3-1
6+440 6+460
6+520 6+540 6+560
6+580
T10
T11
T12
EC115
F O
R
C
O N
T I N
U A
T I O
N
S
E
F
N
T
I
N
U
A
T
I
E
0 20 30 40 50
1:500
B1
1:500
CATHODIC PROTECTION PLAN
KEYED NOTES:
GENERAL NOTES:
1. EACH TEST STATION HAS 0 ANODES CONNECTED.
1. CATHODIC PROTECTION TEST STATION
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
36018
C
O
L
O
R
A
D
O
RE
G
I S
T
E
R
E
D
P
R
O
F
E
S
S
I
G
I
N
E
E
R
S
T A
N
L
W
O
R
C
E
S
T
E R
NOTAS GENERALES:
P A
N
T I N
U A
C I Ó
N
V
A
NOTAS DE REFERENCIA:
PLANTA DE PROTECCIÓN CATÓDICA
1. CADA ESTACIÓN DE PRUEBA TIENE 0 ÁNODOS CONECTADOS.
P
A
N
T
I
N
U
A
C
I
A
B
6+580
6+600
6+620
6+640
6+660
6+700
6+720
6+740
6+760 6+780
6+800
6+840
6+860
6+880
T12
T13
T14
0 20 30 40 50
1:500
EC116
F O
R
C
O N
T I N
U A
T I O
N
S
E
F O
R
C
O N
T I N
U A
T I O
N
S
E
B1
1:500
CATHODIC PROTECTION PLAN
KEYED NOTES:
GENERAL NOTES:
1. EACH TEST STATION HAS 0 ANODES CONNECTED.
1. CATHODIC PROTECTION TEST STATION
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
36018
C
O
L
O
R
A
D
O
RE
G
I S
T
E
R
E
D
P
R
O
F
E
S
S
I
G
I
N
E
E
R
S
T A
N
L
W
O
R
C
E
S
T
E R
NOTAS GENERALES:
P A
N
T I N
U A
C I Ó
N
V
A
P A
N
T I N
U A
C I Ó
N
V
A
NOTAS DE REFERENCIA:
PLANTA DE PROTECCIÓN CATÓDICA
1. CADA ESTACIÓN DE PRUEBA TIENE 0 ÁNODOS CONECTADOS.
A
C
T
I V
E
A
C
T
I V
E
6+900
6+940 6+960
6+980 7+000
7+020 7+040
7+060
7+120 7+140 7+160
T16
T15
EC117
F O
R
C
O N
T I N
U A
T I O
N
S
E
F O
R
C
O N
T I N
U A
T I O
N
S
E
0 20 30 40 50
1:500
B1
1:500
CATHODIC PROTECTION PLAN
KEYED NOTES:
GENERAL NOTES:
1. EACH TEST STATION HAS 0 ANODES CONNECTED.
1. CATHODIC PROTECTION TEST STATION
2. CATHODIC PROTECTION RECTIFIER NUMBER XX
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
36018
C
O
L
O
R
A
D
O
RE
G
I S
T
E
R
E
D
P
R
O
F
E
S
S
I
G
I
N
E
E
R
S
T A
N
L
W
O
R
C
E
S
T
E R
PLANTA DE PROTECCIÓN CATÓDICA
P A
N
T I N
U A
C I Ó
N
V
A
P A
N
T I N
U A
C I Ó
N
V
A
NOTAS GENERALES:
1. CADA ESTACIÓN DE PRUEBA TIENE 0 ÁNODOS CONECTADOS.
NOTAS DE REFERENCIA:
2. RECTIFICADOR DE PROTECCIÓN CATÓDICA NÚMERO XX
600mm F-76
500mm JP-8
500mm F-76
350mm JP-5
350mm INACTIVE
150mm JP-5
150mm JP-8
150mm INACTIVE
T17
T18
T19
0 20 30 40 50
1:500
EC118
F
N
T
I
N
U
A
T
I
E
F
N
T
I N
U
A
T
I
E
B1
1:500
CATHODIC PROTECTION PLAN
KEYED NOTES:
GENERAL NOTES:
1. EACH TEST STATION HAS 0 ANODES CONNECTED.
1. CATHODIC PROTECTION TEST STATION
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
36018
C
O
L
O
R
A
D
O
RE
G
I S
T
E
R
E
D
P
R
O
F
E
S
S
I
G
I
N
E
E
R
S
T A
N
L
W
O
R
C
E
S
T
E R
#2AWG HMWPE
CABLE BOND
#2AWG HMWPE
CABLE BOND
NOTAS DE REFERENCIA:
NOTAS GENERALES:
PLANTA DE PROTECCIÓN CATÓDICA
P
A
N
T
I
N
U
A
C
I
A
P
A
N
T
I N
U
A
C
I
A
1. CADA ESTACIÓN DE PRUEBA TIENE 0 ÁNODOS CONECTADOS.
CABLE DE
CONEXIÓN #2AWG
HMWPE
CABLE DE CONEXIÓN
#2AWG HMWPE
ML-1
V-BRDG-OTLN
FH #14
600mm F-76
500mm JP-8
500mm F-76
350mm JP-5
350mm INACTIVE
150mm JP-5
150mm JP-8
150mm INACTIVE
7+540
7+580
7+600
7+620
7+640
7+660
7+680
7+700
ML-1
B1
M-410
T20
T21
EC119
F
N
T I N
U A
T I O
N
S
E
F
N
T
I
N
U
A
T
I
E
0 20 30 40 50
1:500
B1
1:500
CATHODIC PROTECTION PLAN
KEYED NOTES:
GENERAL NOTES:
1. EACH TEST STATION HAS 0 ANODES CONNECTED.
1. CATHODIC PROTECTION TEST STATION
2. CP TEST STATION AND BONDING BOX TO BE REMOVED DURING PIPE
INSTALLATION AND REINSTALLED.
3. 450 mm JP-5 LINE TO BE INSTALLED UNDER ANOTHER CONTRACT.
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
36018
C
O
L
O
R
A
D
O
RE
G
I S
T
E
R
E
D
P
R
O
F
E
S
S
I
G
I
N
E
E
R
S
T A
N
L
W
O
R
C
E
S
T
E R
NOTAS DE REFERENCIA:
NOTAS GENERALES:
PLANTA DE PROTECCIÓN CATÓDICA
P A
N
T I N
U A
C I Ó
N
V
A
P
A
N
T
I
N
U
A
C
I
A
1. CADA ESTACIÓN DE PRUEBA TIENE 0 ÁNODOS CONECTADOS.
2. ESTACIÓN DE PRUEBA CP Y CAJA DE EMPALMES A RETIRAR DURANTE LA
INSTALACIÓN DE LA TUBERÍA Y REINSTALAR.
3. TUBERÍA JP-5 DE 450mm A SER INSTALADA BAJO OTRO CONTRATO.
#2AWG HMWPE
CABLE BOND
CABLE DE CONEXIÓN
#2AWG HMWPE
TANK-7
F-76
7+720
7+740
7+760
7+780
7+800 7+807
ML-2
T22
B1
M-411
EC120
F O
R
C
O N
T I N
U A
T I O
N
S
E
0 8 12 16 20
1:200
B1
1:500
CATHODIC PROTECTION PLAN
KEYED NOTES:
GENERAL NOTES:
1. EACH TEST STATION HAS 0 ANODES CONNECTED.
1. CATHODIC PROTECTION TEST STATION
2. 450 mm JP-5 LINE TO BE INSTALLED UNDER ANOTHER CONTRACT.
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
36018
C
O
L
O
R
A
D
O
RE
G
I S
T
E
R
E
D
P
R
O
F
E
S
S
I
G
I
N
E
E
R
S
T A
N
L
W
O
R
C
E
S
T
E R
NOTAS DE REFERENCIA:
NOTAS GENERALES:
1. CADA ESTACIÓN DE PRUEBA TIENE 0 ÁNODOS CONECTADOS.
PLANTA DE PROTECCIÓN CATÓDICA
P A
N
T I N
U A
C I Ó
N
V
A
2. TUBERÍA JP-5 DE 450mm A SER INSTALADA BAJO OTRO CONTRATO.
#2AWG HMWPE
CABLE BOND
CABLE DE
CONEXIÓN #2AWG
HMWPE
EC501
TYPICAL ABOVE GROUND FIELD TEST STATION INSTALLATION
ELEVATION
TYPICAL ABOVE GROUND TEST STATION TERMINATION DETAIL
FOR PIPE MULTIPLE ANODE GALVANIC SYSTEM
TYPICAL UNDERGROUND REFERENCE ELECTRODE
INSTALLATION FOR UNDERGROUND PIPE
PLAN
ABOVE GROUND FIELD TEST STATION
IDENTIFICATION TAG
M
I
N
I
M
U
M
TYPICAL EXOTHERMAL CONNECTION TO PIPE
INSULATED FLANGE FOR CATHODIC PROTECTION
9000 MIN
OR AS SPECIFIED
M I N
I M
U M
9000 MIN
OR AS SPECIFIED
50 MIN
M
N
XXXX
CP TEST
XXXX
NON-METALLIC
FIELD TEST STATION
50 NON-METALLIC CONDUIT
600 x 600 x 200
CONCRETE BASE
GRADE
LEAD WIRES
FIVE TERMINAL
BLOCK
UNDERGROUND
REFERENCE
ELECTRODE
LEAD WIRE
SOLID BRASS JUMPER
PIPE LEAD WIRES
ATTACH PERMANENT,
LEGIBLE MARKERS TO
IDENTIFY LEAD WIRES
(TYP)
ATTACH ID TAG HERE. SEE
DETAIL B4, THIS SHEET
EXOTHERMAL CONNECTIONS
SEE DETAIL B2, THIS SHEET
CL PIPE
50 PVC CONDUIT
PACKAGED REFERENCE
ELECTRODE
3 DIA DRILLED
HOLES (TYP OF 4)
20 GAUGE STAINLESS
STEEL PLATE
PIPE SYSTEM LABEL SHALL BE 5
SQUARE SEE SHEET EC502 FOR
SYSTEM LABELS
50 PVC CONDUIT
LEAD WIRES ROUTE TO
FIELD TEST STATION
BACKFILL WITH CLEAN SOIL
GRADE
PACKAGED REFERENCE
ELECTRODE BACKFILL WITH
MINIMUM 150mm CLEAN SOIL
PIPE LEAD WIRE CATHODIC
PROTECTION CABLE (TYP)
PIPE COATING
REPAIR MATERIAL
(TYP)
CABLE INSULATION SHALL
BE CUT SUCH THAT ANY
EXPOSED COPPER IS WITHIN THE
PIPE COATING REPAIR MATERIAL
REMOVE COATING TO CLEAN METAL
SURFACE, EXOTHERMIC WELD AND
PRIME AS REQUIRED BY PIPE COATING
REPAIR MATERIAL MANUFACTURER
CATHODICALLY
PROTECTED PIPE
INSULATING WASHER (TYP)
STEEL BACKING
WASHER (TYP)
ON HORIZONTAL PIPES RAISE THE
INSULATING AND SEALING GASKET
AS HIGH AS POSSIBLE
TO PREVENT BRIDGING OVER THE
GASKET BY FOREIGN CONDUCTING
MATERIAL IN THE PIPE
FULL-FACED
INSULATING AND SEALING
GASKET (ID 3 LESS
THAN FLANGE ID)
ISOLATE EACH STUD
FROM PIPING BY
FULL INSULATION
FULL LENGTH
BOLT INSULATING
SLEEVE (TYP)
SEE DETAIL B2, THIS SHEET
ATTACH PLATE TO TERMINAL HOUSING
USING STAINLESS STEEL SCREWS
(TYP 4 PLACES)
TO ABOVE GROUND FIELD TEST
STATION, SEE DETAIL C1, THIS SHEET
AFTER COATING OF PIPE LEAD WIRE
CONNECTIONS, STRAP EACH PAIR OF PIPE
LEAD WIRES TO PIPE
PLASTIC INSULATING BUSHING
FLUSH MOUNTED FIELD TEST STATION INSTALLATION
CAST IRON LID
130 DIA x
450 PVC PIPE
CONCRETE BASE
600 x 600 x 200
GRADE
AIRCRAFT RATED FIELD TEST
STATION TERMINATION
LEAD WIRES
END BELL
FIVE TERMINAL BLOCK
TEST STATION
SOLID
JUMPER
PIPE SYSTEM FLUSH MOUNTED BELOW GRADE
TEST STATION TERMINATION DETAIL
DC BLOCKING DEVICE FOR
USE IN HAZARDOUS
LOCATIONS ABOVE GRADE
MODEL OVP-4/4-3.7-100
LETTERS SHALL BE 5 SQUARE
TEST STATION NUMBER
LETTERS SHALL BE 5
SQUARE
CL PIPE
ATTACH ID TAG HERE. SEE DETAIL
B4, THIS SHEET. USE
MANUFACTURERS RECOMMENDED
METHOD FOR AFFIXING LABEL.
PIPE LEAD WIRES
NTS
C1
DETAIL
NTS
C2
DETAIL
NTS
C4
DETAIL
NTS
B1
DETAIL
NTS
B2
DETAIL
NTS
B4
DETAIL
NTS
A1
DETAIL
NTS
A2
DETAIL
NTS
A3
DETAIL
B1
EC012P
C4
EC501
A3
EC012P
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
36018
C
O
L
O
R
A
D
O
RE
G
I S
T
E
R
E
D
P
R
O
F
E
S
S
I
G
I
N
E
E
R
S
T A
N
L
W
O
R
C
E
S
T
E R
/ DETALLE
/ DETALLE
/ DETALLE
/ DETALLE
/ DETALLE
/ DETALLE
/ DETALLE
/ DETALLE
/ DETALLE
ETIQUETA DE IDENTIFICACIÓN DE ESTACIÓN DE
PRUEBA EN CAMPO SOBRE EL TERRENO
ORIFICIOS
TALADRADOS
DIAM. 3 (TÍP DE 4)
PLETINA DE ACERO
INOXIDABLE DE GALGA 20
LA ETIQUETA DEL SISTEMA DE
TUBERÍAS DEBE SER DE 5
CUADRADOS VER PLANO EC502
PARA ETIQUETAS DEL SISTEMA
ANCLAR PLETINA A LA
ENVOLVENTE DEL TERMINAL
UTILIZANDO TORNILLOS DE ACERO
INOXIDABLE (TIP 4 LUGARES)
LAS LETRAS TENDRÁN 5
CUADRADOS
LAS LETRAS DEL
NÚMERO DE LA
ESTACIÓN DE PRUEBA
TENDRÁ 5 CUADRADOS
ESTACIÓN DE
PRUEBA BLOQUE DE
5 TERMINALES
PUENTE
MACIZO
DETALLE DE TERMINACIÓN DE ESTACIÓN DE
PRUEBAS BAJO EL TERRENO MONTADA A RAS DEL
SISTEMA DE TUBERÍAS
ANCLAR LA ETIQUETA ID AQUÍ.
VER DETALLE B4 EN ESTE PLANO.
UTILIZAR MÉTODO RECOMENDADO
POR FABRICANTES PARA LA
COLOCACIÓN DE LA ETIQUETA
CONDUCTORES
INSTALACIÓN DE ESTACIÓN DE PRUEBA EN CAMPO MONTADA A RAS
TAPA DE FUNDICIÓN
TUBO DE PVC DE
450 x 130 DIA
BASE DE HORMIGÓN
TERRENO
TERMINACIÓN DE ESTACIÓN
DE PRUEBA EN CAMPO CON
CLASIFICACIÓN PARA AVIONES
CONDUCTORES
CAMPANA EN EXTREMO
BRIDA AISLADA PARA PROTECCIÓN CATÓDICA
ARANDELA DE AISLAMIENTO (TIP)
ARANDELA DE
SOPORTE DE
ACERO (TIP)
EN TUBERÍAS HORIZONTALES
SUBIR EL AISLAMIENTO Y JUNTA
DE SELLADO TAN ALTO COMO SEA
POSIBLE PARA PREVENIR EL
PUENTEO SOBRE LA JUNTA DE
MATERIAL CONDUCTOR EXTRAÑO
EN LA TUBERÍA
JUNTA DE AISLAMIENTO
Y ESTANQUEIDAD EN
TODAS LAS CARAS (ID 3
VECES MENOS QUE ID
DE BRIDA)
AISLAR CADA TORNILLO
CON AISLAMIENTO
COMPLETO DESDE LA
TUBERÍA
MANGUITO AISLANTE
DE LA LONGITUD DEL
PERNOCOMPLETA
DISPOSITIVO DE BLOQUEO
DC PARA USO EN
UBICACIONES PELIGROSAS
SOBRE EL TERRENO
MODELO OVP-4/4-3.7-100
TRADUCCIÓN:
TABLA PROTECCIÓN CATÓDICA
NÚMERO DE ESTACIÓN DE PRUEBA
TIPO DE ESTACIÓN DE PRUEBA -
NOTA 1 TUBERÍA DE ACERO AL
CARBONO
TRANSLATION:
CATHODIC PROTECTION TABLE
TEST STATION NUMBER
TEST STATION TYPE - NOTE 1
PIPING
CARBON STEEL
O SEGÚN SE ESPECIFIQUE
INSTALACIÓN TÍPICA DE ELECTRODO DE REFERENCIA
ENTERRADO PARA TUBERÍA ENTERRADA
PLANTA
ESTACIÓN DE PRUEBA
EN CAMPO NO METÁLICA
CONDUCTO NO METÁLICO
DE 50
CASQUILLO AISLANTE DE
PLÁSTICO
CONDUCTORES
TERRENO
BASE DE
HORMIGÓN
/ ALZADO
INSTALACIÓN TÍPICA DE ESTACIÓN DE PRUEBA EN CAMPO SOBRE EL TERRENO
ELECTRODO DE REFERENCIA
EMPACADO
CONDUCTO DE PVC DE 50
HASTA LA ESTACIÓN DE PRUEBA
SOBRE EL TERRENO, VER DETALLE
C1 EN ESTE PLANO
CONEXIONES EXOTÉRMICAS
VER DETALLE B2 EN ESTE PLANO
EJE DE TUBERÍA
RELLENAR CON TIERRA
LIMPIA
/ TERRENO
RELLENAR CON TIERRA
LIMPIA
CONDUCTO PVC
DE 50
EJE TUBERÍA
VER DETALLE B2 EN ESTE PLANO
O SEGÚN SE ESPECIFIQUE
ELECTRODO DE REFERENCIA
EMPACADO RELLENAR CON
TIERRA LIMPIA MÍNIMO 150mm
BLOQUE DE 5
TERMINALES
PUENTE DE BRONCE
MACIZO
CABLES CONDUCTORES
DE TUBERÍAS
COGIDA PERMANENTE,
MARCADORES LEGIBLES
PARA IDENTIFICAR LOS
CONDUCTORES
ANCLAR AQUÍ LA ETIQUETA
DE IDENTIFICACIÓN. VER
DETALLE B4 EN ESTE PLANO
CONDUCTOR
DEL ELECTRODO
DE REFERENCIA
ENTERRADO
DETALLE TÍPICO DE TERMINACIÓN DE ESTACIÓN DE PRUEBA SOBRE EL
TERRENO PARA EL SISTEMA GALVÁNICO DE TUBERÍA DE MÚLTIPLES ÁNODOS
DESPUÉS DEL REVESTIMIENTO DE
LAS CONEXIONES DE LOS
CONDUCTORES, ATAR CADA PAR
DE CONDUCTORES A LA TUBERÍA
MATERIAL DE
REPARACIÓN DE
REVESTIMIENTO DE
TUBERÍA (TIP)
CABLE DE PROTECCIÓN
CATÓDICA DEL CONDUCTOR
DE TUBERÍA (TIP)
EL AISLAMIENTO DEL CABLE SE
CORTARÁ DE MANERA QUE
CUALQUIER COBRE EXPUESTO
QUEDE DENTRO DEL MATERIAL
DE REPARACIÓN DEL
REVESTIMIENTO DE LA TUBERÍA
RETIRAR REVESTIMIENTO PARA LIMPIAR LA
SUPERFICIE METÁLICA, REALIZAR SOLDADURA
EXOTÉRMICA E IMPRIMAR SEGÚN REQUIERA
EL FABRICANTE DEL MATERIAL DE
REPARACIÓN DEL REVESTIMIENTO
TÍPICA CONEXIÓN EXOTÉRMICA A TUBERÍA
TUBERÍA PROTEGIDA
CATÓDICAMENTE
NOTA 1:
ESTACIÓN DE PRUEBA TIPO A = ESTACIÓN DE PRUEBA SOBRE EL TERRENO.
ESTACIÓN DE PRUEBA TIPO F = ESTACIÓN DE PRUEBA MONTADA A RAS.
11.0
PIER III
ML-1
ML-4
TE-A
TE-B,C,D
ML-3
V-BRDG-OTLN
A2003
DRYER FOR POOL
FH #14
VALVE PIT #44
(OUTSIDE OF BASE)
TO BULK STORAGE
TO BOOSTER PUMP HOUSE
PIT #1
TANK-2
F-76
TANK-3
F-76
TANK-5
F-76
TANK-4
F-76
TANK-6
F-76
TANK-7
F-76
TANK-8
F-76
TANK-1
F-76
TANK-13
JP-8
TK-17
JP-5
TANK-11
JP-8
TANK-10
JP-8
TK-15
JP-5
TANK-9
JP-8
TK-14
JP-5
TANK-122
JP-8
TANK-120
JP-8
TANK-121
JP-8
TK-16
JP-5
3194B
PIER 3
PUERTO GATE
RIO SALADO
BRIDGE
ML-2
ALICANTE LANE
S A
N T
A M
A R
IA
S
T R
E E
T
M
I
A
L
A
L
I C
A
N
N
E
EG401
EG401
EG401
EG401
EG401
EG401
F-76 PIPELINE
PUENTE DEL
RÍO SALADO
PUERTA DE EL
PUERTO
LÍNEA DE
TUBERÍA F-76
MUELLE 3
0 200
400 500
1:5000
EG101
B1
1:5000
OVERALL ELECTRICAL GROUNDING PLAN AND KEY MAP
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
36018
C
O
L
O
R
A
D
O
RE
G
I S
T
E
R
E
D
P
R
O
F
E
S
S
I
G
I
N
E
E
R
S
T A
N
L
W
O
R
C
E
S
T
E R
PLANTA GENERAL ELÉCTRICA DE PUESTA A TIERRA Y DE REFERENCIA
D1
EG401
C3
EG401
C4
EG401
B1
EG401
B3
EG401
A1
EG401
N
T
R
C
E
S
O
5+390
5+530
SEWER
C
CAUTION BURRIED PROTEC CABLES
E
M
H
EG401
KEYED NOTES:
0 2 3 4 5
1:50
D1
NTS
ENLARGED GROUNDING PLAN NEAR STATION 5+380
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
36018
C
O
L
O
R
A
D
O
RE
G
I S
T
E
R
E
D
P
R
O
F
E
S
S
I
G
I
N
E
E
R
S
T A
N
L
W
O
R
C
E
S
T
E R
NOTAS DE REFERENCIA:
GENERAL NOTES:
NOTAS GENERALES:
1. PROVIDE GROUNDING FOR NEW FENCE.
2. BOLD LINE INDICATES NEW FENCE THAT TIES INTO
EXISTING FENCE ON BOTH ENDS.
1. PROVEER PUESTA A TIERRA PARA LA VALLA NUEVA.
2. LA LÍNEA EN NEGRITA INDICA VALLA NUEVA QUE SE ATA
A LA VALLA EXISTENTE EN AMBOS EXTREMOS.
C2
NTS
ENLARGED GROUNDING PLAN NEAR STATION 5+530
A1
NTS
ENLARGED GROUNDING PLAN NEAR STATION 7+290
A3
NTS
ENLARGED GROUNDING PLAN NEAR STATION 7+505
C4
NTS
ENLARGED GROUNDING PLAN NEAR STATION 5+820
1. SEE GROUNDING DETAILS ON SHEET EG501.
1. VER DETALLES DE PUESTA A TIERRA EN PLANO EG501.
B3
NTS
ENLARGED GROUNDING PLAN NEAR STATION 7+365
PL. AMPLIADA DE TIERRA CERCA DE LA ESTACIÓN 5+820
PL. AMPLIADA DE TIERRA CERCA DE LA ESTACIÓN 5+530
PL. AMPLIADA DE TIERRA CERCA DE LA ESTACIÓN 5+380
PL. AMPLIADA DE TIERRA CERCA DE LA ESTACIÓN 7+290
PL. AMPLIADA DE TIERRA CERCA DE LA ESTACIÓN 7+505
PL. AMPLIADA DE TIERRA CERCA DE LA ESTACIÓN7+365
(SEE SHEET C-106 FOR DETAILS ON CHAIN LINK FENCE)
(SEE SHEET C-108 FOR DETAILS ON CHAIN LINK FENCE)
(SEE SHEET C-110 FOR DETAILS ON CHAIN LINK FENCE)
(SEE SHEET C-118 FOR DETAILS ON CHAIN LINK FENCE)
(SEE SHEET C-119 FOR DETAILS ON CHAIN LINK FENCE)
(SEE SHEET C-118 FOR DETAILS ON CHAIN LINK FENCE)
(VER PLANO C-118 PARA DETALLES DE VALLA DE SIMPLE TORSIÓN)
(VER PLANO C-119 PARA DETALLES DE VALLA DE SIMPLE TORSIÓN)
(VER PLANO C-118 PARA DETALLES DE VALLA DE SIMPLE TORSIÓN)
(VER PLANO C-106 PARA DETALLES DE VALLA DE SIMPLE TORSIÓN)
(VER PLANO C-108 PARA DETALLES DE VALLA DE SIMPLE TORSIÓN)
(VER PLANO C-110 PARA DETALLES DE VALLA DE SIMPLE TORSIÓN)
KEYED NOTES:
1. FENCE GROUNDING LOCATIONS ARE SHOWN ON DWG
EG 401.
C3
FENCE POST GROUNDING
C4
FENCE GROUND
TINNED SPLIT BOLT CONNECTOR
10mm
SOLID COPPER WIRE
FENCE POST
10mm
SOLID COPPER WIRE
ATTACH TO METAL FENCE POST WITH GROUND CLAMP
MOLDED EXOTHERMIC WELD OR APPROVED
CLAMP-TYPE FITTING OF BRONZE
COPPER-CLAD STEEL (19X3000)
GROUND ROD
TIERRA DE VALLAPUESTA A TIERRA DE POSTE DE VALLA
ALAMBRE DE COBRE MACIZO DE 10mm
CONECTOR DE PERNO PARTIDO DE ESTAÑO
ALAMBRE DE COBRE MACIZO DE 10mm
POSTE DE VALLA
SUJETAR A POSTE METÁLICO DE VALLA CON PINZA
DE TIERRA
SOLDADURA EXOTÉRMICA MOLDEADA O
ACCESORIO HOMOLOGADO DE TIPO
ABRAZADERA DE BRONCE
PICA DE TIERRA DE ACERO (19X3000)
CON REVESTIMIENTO DE COBRE
1. UBICACIONES DE PUESTA A TIERRA DE VALLA SE
MUESTRAN EN EL PLANO EG-401
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
RE
PL
AC
E
FU
EL
P
IP
EL
IN
E
FR
O M
P
IE
R
TO
B
U
LK
S
TO
RA
G
E
36018
C
O
L
O
R
A
D
O
RE
G
I S
T
E
R
E
D
P
R
O
F
E
S
S
I
G
I
N
E
E
R
S
T A
N
L
W
O
R
C
E
S
T
E R
EG501
NOTAS DE REFERENCIA:
| EC101 CATHODIC PROTECTION KEY PLAN |
| EC106 CATHODIC PROTECTION PLAN |
| EC107 CATHODIC PROTECTION PLAN |
| EC108 CATHODIC PROTECTION PLAN |
| EC109 CATHODIC PROTECTION PLAN |
| EC110 CATHODIC PROTECTION PLAN |
| EC111 CATHODIC PROTECTION PLAN |
| EC112 CATHODIC PROTECTION PLAN |
| EC113 CATHODIC PROTECTION PLAN |
| EC114 CATHODIC PROTECTION PLAN |
| EC115 CATHODIC PROTECTION PLAN |
| EC116 CATHODIC PROTECTION PLAN |
| EC117 CATHODIC PROTECTION PLAN |
| EC118 CATHODIC PROTECTION PLAN |
| EC119 CATHODIC PROTECTION PLAN |
| EC120 CATHODIC PROTECTION PLAN |
| EC501 CATHODIC PROTECTION DETAILS |
| ED401 ELECTRIC DEMOLITION PLAN - VP-1 MANHOLE |
| ED404 ELECTRIC DEMOLITION PLAN - VP-3 & 3.5 MANHOLE |
| EG101 ELECTRICAL GROUNDING SITE PLAN AND KEY MAP |
| EG401 ELECTRICAL ENLARGED GROUNDING PLANS |
| EG501 ELECTRICAL GROUNDING DETAILS |
| 2024-06-26T10:13:50-0500 | |
| Denver | |
| Stanley Worcester | |
| I am signing to certify the authenticity of this document. |
| 2024-06-26T10:14:17-0500 | |
| Denver | |
| Stanley Worcester | |
| I am signing to certify the authenticity of this document. |
| 2024-06-26T10:14:17-0500 | |
| Denver | |
| Stanley Worcester | |
| I am signing to certify the authenticity of this document. |
| 2024-06-26T10:14:18-0500 | |
| Denver | |
| Stanley Worcester | |
| I am signing to certify the authenticity of this document. |
| 2024-06-26T10:14:18-0500 | |
| Denver | |
| Stanley Worcester | |
| I am signing to certify the authenticity of this document. |
| 2024-06-26T10:14:18-0500 | |
| Denver | |
| Stanley Worcester | |
| I am signing to certify the authenticity of this document. |
| 2024-06-26T10:14:19-0500 | |
| Denver | |
| Stanley Worcester | |
| I am signing to certify the authenticity of this document. |
| 2024-06-26T10:14:19-0500 | |
| Denver | |
| Stanley Worcester | |
| I am signing to certify the authenticity of this document. |
| 2024-06-26T10:14:20-0500 | |
| Denver | |
| Stanley Worcester | |
| I am signing to certify the authenticity of this document. |
| 2024-06-26T10:14:20-0500 | |
| Denver | |
| Stanley Worcester | |
| I am signing to certify the authenticity of this document. |
| 2024-06-26T10:14:21-0500 | |
| Denver | |
| Stanley Worcester | |
| I am signing to certify the authenticity of this document. |
| 2024-06-26T10:14:21-0500 | |
| Denver | |
| Stanley Worcester | |
| I am signing to certify the authenticity of this document. |
| 2024-06-26T10:14:22-0500 | |
| Denver | |
| Stanley Worcester | |
| I am signing to certify the authenticity of this document. |
| 2024-06-26T10:14:23-0500 | |
| Denver | |
| Stanley Worcester | |
| I am signing to certify the authenticity of this document. |
| 2024-06-26T10:14:23-0500 | |
| Denver | |
| Stanley Worcester | |
| I am signing to certify the authenticity of this document. |
| 2024-06-26T10:14:24-0500 | |
| Denver | |
| Stanley Worcester | |
| I am signing to certify the authenticity of this document. |
| 2024-06-26T10:14:24-0500 | |
| Denver | |
| Stanley Worcester | |
| I am signing to certify the authenticity of this document. |
| 2024-06-26T10:14:25-0500 | |
| Denver | |
| Stanley Worcester | |
| I am signing to certify the authenticity of this document. |
| 2024-06-26T10:14:25-0500 | |
| Denver | |
| Stanley Worcester | |
| I am signing to certify the authenticity of this document. |
| 2024-06-26T10:14:25-0500 | |
| Denver | |
| Stanley Worcester | |
| I am signing to certify the authenticity of this document. |
File details come from the government source that posted it. Updated .