Attachment M - F76 5_PIER3-FINAL_SUBMITTAL-PGS-130-149_SET_5-OF-6.pdf

PDF 17 MB Posted

Attached to
P919 - Phase I, Bulk Fuel Tank Farm Improvements, Naval Station Rota, Spain
Solicitation number
N6247026R0006
Issued by

About this file

This document set comprises detailed engineering drawings and specifications for a fuel pipeline replacement project managed by Naval Facilities Engineering System Command – Atlantic. The project involves replacing the fuel pipeline from Pier 3 to bulk storage at a naval facility, with comprehensive cathodic protection and electrical grounding systems.

The primary deliverables include 15 cathodic protection plan sheets (EC106-EC120) detailing the pipeline route from Pier 3 through the Rio Salado Bridge to the tank farm, encompassing approximately 7,807 linear meters. The pipeline system transports multiple fuel types: F-76 (in 250mm to 600mm diameters), JP-5 (in 150mm to 450mm diameters), JP-8 (in 150mm to 500mm diameters), and ballast/inactive lines. The plans specify 22 cathodic protection test stations (T01-T22) with insulated flange kits, field test station installations (both above-grade and flush-mounted configurations), and reference electrode placements. Each test station incorporates #2 AWG HMWPE cable bonds and connections to an existing rectifier (RECT #12, 3-phase, 230/460V AC, 60 Hz, 50V/60A DC). Installation details include exothermic welding connections, packaged reference electrodes, and non-metallic conduit systems. Electrical grounding plans (EG401, EG501) show fence grounding locations with copper-clad steel ground rods and 10mm² solid copper wire connections. The drawings are prepared by Colorado-registered professional engineer Stanley C. Worcester and reference cross-connections between multiple pipeline systems and existing infrastructure including tank farms, booster pump houses, and clarifier buildings.

View the file

Other files

File Type Posted
N6247026R0006 Amendment 0009.pdf PDF
N6247026R0006 Amendment 0008.pdf PDF
Amendment 0008 Revised Specifications_Section 01.pdf PDF
P919 - Amendment 0007.pdf PDF
N6247026R0006 Amendment 0007.pdf PDF
Amendment 0006_Revised Specifications P919.pdf PDF
Amendment 0006_Revised Specifications F76 Pier 3.pdf PDF
Attachment M - F76 6_PIER3_REFERENCE-DRAWINGS_SET_6-OF-6.pdf PDF
Amendment 0006_Revised Tank DWGs Prime.pdf PDF
Attachment M - F76 3_PIER3-FINAL_SUBMITTAL-PGS-62-99_SET_3-OF-6.pdf PDF
Amendment 0006_Revised F76 Pier 3 Mech Dwgs.pdf PDF
Attachment M - F76 4_PIER3-FINAL_SUBMITTAL-PGS-100-129_SET_4-OF-6.pdf PDF
Amendment 0006_Revised P-919 Dwgs_Pipeline Dwgs.pdf PDF
N6247026R0006 Amendment 0006.pdf PDF
Attachment M - F76 2_PIER3-FINAL_SUBMITTAL-PGS-35-70_SET_2-OF-6.pdf PDF
Attachment M - F76 1_PIER3-FINAL-REV1_SUBMITTAL-PGS-1-34_SET_1-OF-6.pdf PDF
Amendment 0006_Revised 01 30 00.pdf PDF
Amendment 0006_Revised F76 Pier 3 Civil Dwgs.pdf PDF
P919 - Amendment 0006.pdf PDF
Amendment 0006_Revised EC502P CATHODIC PROTECTION DETAILS.pdf PDF
Amendment 0006_Revised 01 45 00.pdf PDF
Amendment 0006_Revised 01 35 26.pdf PDF
Attachment G - Certificate of Classification Revised.pdf PDF
P-919 - Amendment 0005.pdf PDF
N6247026R0006 Amendment 0005.pdf PDF
Attachment P - Photos.pdf PDF
N6247026R0006 Amendment 0004.pdf PDF
N6247026R0006 Amendment 0003.pdf PDF
P919 Amendment 0002.pdf PDF
Site Visit Log (Attachment O).pdf PDF
N6247026R0006 Amendment 0002.pdf PDF
Attachment B - Bid Schedule Revised.pdf PDF
N6247026R0006 Amedment 0001.pdf PDF
Attachment N - Specifications -Replace Fuel Pipeline Pier 3 Rota.pdf PDF
Attachment M - F74 4_PIER3-FINAL_SUBMITTAL-PGS-100-129_SET_4-OF-6.pdf PDF
Attachment M - F74 5_PIER3-FINAL_SUBMITTAL-PGS-130-149_SET_5-OF-6.pdf PDF
Attachment M - F74 6_PIER3_REFERENCE-DRAWINGS_SET_6-OF-6.pdf PDF
Attachment M - F74 2_PIER3-FINAL_SUBMITTAL-PGS-35-70_SET_2-OF-6.pdf PDF
Attachment M - F74 3_PIER3-FINAL_SUBMITTAL-PGS-62-99_SET_3-OF-6.pdf PDF
Attachment M - F74 1_PIER3-FINAL-REV1_SUBMITTAL-PGS-1-34_SET_1-OF-6.pdf PDF
Attachment_F_P919__Volume_12_of_15.pdf PDF
Attachment_F_P919__Volume_2_of_15.pdf PDF
Attachment_F_P919__Volume_9_of_15.pdf PDF
Attachment_F_P919__Volume_1_of_15.pdf PDF
Attachment L - Certificate Insurance Form.pdf PDF
Attachment_F_P919__Volume_7_of_15.pdf PDF
Attachment G - Certificates of Classifications.pdf PDF
Attachment_F_P919__Volume_14_of_15.pdf PDF
Attachment D - Construction Experience Project Data Sheet.pdf PDF
Attachment_F_P919_REFERENCE_Volume_15_of_15.pdf PDF
Show 40 more

Latest 50 of 67 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PIER III

ML-1

ML-4

TE-A

TE-B,C,D

ML-3

V-BRDG-OTLN

A2003

DRYER FOR POOL

FH #14

VALVE PIT #44

(OUTSIDE OF BASE)

TO BULK STORAGE

TO BOOSTER PUMP HOUSE

PIT #1

TANK-2

F-76

TANK-3

F-76

TANK-5

F-76

TANK-4

F-76

TANK-6

F-76

TANK-7

F-76

TANK-8

F-76

TANK-1

F-76

TANK-13

JP-8

TK-17

JP-5

TANK-11

JP-8

TANK-10

JP-8

TK-15

JP-5

TANK-9

JP-8

TK-14

JP-5

TANK-122

JP-8

TANK-120

JP-8

TANK-121

JP-8

TK-16

JP-5

3194B

PIER 3

PIER 3

TANK FARM

PUERTO GATE

RIO SALADO

BRIDGE

ML-2

A

L

I

C

A

N

T

E

L

A

N

E

A

L

I C

A

N

N

E

S

A

N

M

R

I

S

R

E

E

T

C

M

I

N

O

R

A

L

A

L

I C

A

N

N

E

F-76 PIPELINE

EC106

EC107

EC119

EC120

EC108

EC109

EC110

EC111

EC118

EC117

EC116

EC115

EC114

EC113

EC112

0 200

400 500

1:5000

EC101

B1

1:5000

OVERALL JP-5 CATHODIC PROTECTION KEY PLAN

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

36018

C

O

L

O

R

A

D

O

RE

G

I S

T

E

R

E

D

P

R

O

F

E

S

S

I

NA L

G

I

N

E

E

R

S

T A

N

L

Y

W

O

R

C

E

S

T

E R

MUELLE 3

PLANTA GENERAL DE REFERENCIA DE PROTECCIÓN CATÓDICA JP-5

ÁREA DE

TANQUES

MUELLE 3

PUENTE RÍO

SALADO

PUERTA DEL PUERTO

TUBERÍA F-76

m

F

J

P

R

G

O

B

L

L

A

S

T

C

L

H

PIT P3-1

0+450 0+460

5+280

5+300

5+320

5+340

5+360

5+380

5+400

B1

1:200

CATHODIC PROTECTION PLAN

EC106

0 8 12 16 20

1:200

F O

R

C

O N

T I N

U A

T I O

N

S

H E

KEYED NOTES:

GENERAL NOTES:

1. EACH TEST STATION HAS 0 ANODES CONNECTED.

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

36018

C

O

L

O

R

A

D

O

RE

G

I S

T

E

R

E

D

P

R

O

F

E

S

S

I

G

I

N

E

E

R

S

T A

N

L

W

O

R

C

E

S

T

E R

1. CATHODIC PROTECTION TEST STATION

2. INSULATED FLANGE KIT (IFK)

#2AWG HMWPE CABLE BOND

400mm F-76

CABLE DE CONEXIÓN #2AWG

HMWPE

FOSA P3-1

LÍNEA DE AGUA

NOTAS GENERALES:

NOTAS DE REFERENCIA:

PLANTA DE PROTECCIÓN CATÓDICA

1. CADA ESTACIÓN DE PRUEBA TIENE 0 ÁNODOS CONECTADOS.

2. KIT DE BRIDA AISLADA (IFK)

P A

N

T I N

U A

C I Ó

N

V

A

WATERLINE

1. ESTACIÓN DE PRUEBAS DE PROTECCIÓN CATÓDICA.

WATERLINE

5+400

5+440 5+460

5+480 5+500

T01

B1

1:200

CATHODIC PROTECTION PLAN

EC107

0 8 12 16 20

1:200

F O

R

C

O N

T I N

U A

T I O

N

S

E

KEYED NOTES:

GENERAL NOTES:

1. EACH TEST STATION HAS 0 ANODES CONNECTED.

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

36018

C

O

L

O

R

A

D

O

RE

G

I S

T

E

R

E

D

P

R

O

F

E

S

S

I

G

I

N

E

E

R

S

T A

N

L

W

O

R

C

E

S

T

E R

1. CATHODIC PROTECTION TEST STATION

2. INSULATED FLANGE KIT (IFK)

400mm F-76

FOSA P3-1

LÍNEA DE AGUA

NOTAS GENERALES:

NOTAS DE REFERENCIA:

PLANTA DE PROTECCIÓN CATÓDICA

1. CADA ESTACIÓN DE PRUEBA TIENE 0 ÁNODOS CONECTADOS.

2. KIT DE BRIDA AISLADA (IFK)

P A

N

T I N

U A

C I Ó

N

V

A

F O

R

C

O N

T I N

U A

T I O

N

S

E

P A

N

T I N

U A

C I Ó

N

V

A

S

U

E

R

G

O

A

C

T

I

V

E

5+520 5+540

5+580 5+600

T02

B1

1:200

CATHODIC PROTECTION PLAN

EC108

0 8 12 16 20

1:200

F O

R

C

O N

T I N

U A

T I O

N

S

E

KEYED NOTES:

GENERAL NOTES:

1. EACH TEST STATION HAS 0 ANODES CONNECTED.

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

36018

C

O

L

O

R

A

D

O

RE

G

I S

T

E

R

E

D

P

R

O

F

E

S

S

I

G

I

N

E

E

R

S

T A

N

L

W

O

R

C

E

S

T

E R

1. CATHODIC PROTECTION TEST STATION

2. INSULATED FLANGE KIT (IFK)

400mm F-76

FOSA P3-1

LÍNEA DE AGUA

NOTAS GENERALES:

NOTAS DE REFERENCIA:

PLANTA DE PROTECCIÓN CATÓDICA

1. CADA ESTACIÓN DE PRUEBA TIENE 0 ÁNODOS CONECTADOS.

2. KIT DE BRIDA AISLADA (IFK)

P A

N

T I N

U A

C I Ó

N

V

A

F O

R

C

O N

T I N

U A

T I O

N

S

E

P A

N

T I N

U A

C I Ó

N

V

A

B

L

L

A

S

T

S

U

E

R

G

O

A

C

T

I

V

E

CLARIFIER BLDG

BOOSTER

PUMP HOUSE

T03

T04

T05

B1

1:200

CATHODIC PROTECTION PLAN

EC109

0 8 12 16 20

1:200

F

N

T

I

N

U

A

T

I

E

KEYED NOTES:

GENERAL NOTES:

1. EACH TEST STATION HAS 0 ANODES CONNECTED.

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

36018

C

O

L

O

R

A

D

O

RE

G

I S

T

E

R

E

D

P

R

O

F

E

S

S

I

G

I

N

E

E

R

S

T A

N

L

W

O

R

C

E

S

T

E R

1. CATHODIC PROTECTION TEST STATION

2. INSULATED FLANGE KIT (IFK)

400mm F-76

FOSA P3-1

NOTAS GENERALES:

NOTAS DE REFERENCIA:

PLANTA DE PROTECCIÓN CATÓDICA

1. CADA ESTACIÓN DE PRUEBA TIENE 0 ÁNODOS CONECTADOS.

2. KIT DE BRIDA AISLADA (IFK)

P

A

N

T

I

N

U

A

C

I

Ó

V

A

F O

R

C

O N

T I N

U A

T I O

N

S

E

P A

N

T I N

U A

C I Ó

N

V

A

EDIFICIO CLARIFICADOR

#2AWG HMWPE CABLE BOND

CABLE DE CONEXIÓN #2AWG

HMWPE

EXISTING RECT #12

3Ph, 230/460Vac, 60 Hz, 50 V, 60A DC

RECT EXISTENTE #12

3Ph, 230/460Vac, 60 Hz, 50 V, 60A DC

CUARTO DE

BOMBAS

(TYP)

T06

B1

1:200

CATHODIC PROTECTION PLAN

EC110

0 8 12 16 20

1:200

F

N

T

I

N

U

A

T

I

E

KEYED NOTES:

GENERAL NOTES:

1. EACH TEST STATION HAS 0 ANODES CONNECTED.

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

36018

C

O

L

O

R

A

D

O

RE

G

I S

T

E

R

E

D

P

R

O

F

E

S

S

I

G

I

N

E

E

R

S

T A

N

L

W

O

R

C

E

S

T

E R

1. CATHODIC PROTECTION TEST STATION

2. INSULATED FLANGE KIT (IFK)

NOTAS GENERALES:

NOTAS DE REFERENCIA:

PLANTA DE PROTECCIÓN CATÓDICA

1. CADA ESTACIÓN DE PRUEBA TIENE 0 ÁNODOS CONECTADOS.

2. KIT DE BRIDA AISLADA (IFK)

P

A

N

T

I

N

U

A

C

I

A

F O

R

C

O N

T I N

U A

T I O

N

S

E

P A

N

T I N

U A

C I Ó

N

V

A

400mm F-76

FOSA P3-1

RIO SALADO

BRIDGE WEST END

5+880 5+900

5+920

5+940

T07

B1

1:200

CATHODIC PROTECTION PLAN

EC111

0 8 12 16 20

1:200

F O

R

C

O N

T I N

U A

T I O

N

S

E

KEYED NOTES:

GENERAL NOTES:

1. EACH TEST STATION HAS 0 ANODES CONNECTED.

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

36018

C

O

L

O

R

A

D

O

RE

G

I S

T

E

R

E

D

P

R

O

F

E

S

S

I

G

I

N

E

E

R

S

T A

N

L

W

O

R

C

E

S

T

E R

1. CATHODIC PROTECTION TEST STATION

2. INSULATED FLANGE KIT (IFK)

NOTAS GENERALES:

NOTAS DE REFERENCIA:

PLANTA DE PROTECCIÓN CATÓDICA

1. CADA ESTACIÓN DE PRUEBA TIENE 0 ÁNODOS CONECTADOS.

2. KIT DE BRIDA AISLADA (IFK)

P A

N

T I N

U A

C I Ó

N

V

A

F

N

T

I

N

U

A

T

I

E

P

A

N

T

I

N

U

A

C

I

A

BPH

EXTREMO OESTE DEL

PUENTE RÍO SALADO

HDD 400mm F-76

(BY OTHERS)

1. ESTACIÓN DE PRUEBAS DE PROTECCIÓN CATÓDICA.

F-76 HDD DE 400mm

(POR OTROS)

5+

6+000

6+020

6+040

6+060

6+080

B1

1:200

CATHODIC PROTECTION PLAN

EC112

0 8 12 16 20

1:200

F O

R

C

O N

T I N

U A

T I O

N

S

E

KEYED NOTES:

GENERAL NOTES:

1. EACH TEST STATION HAS 0 ANODES CONNECTED.

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

36018

C

O

L

O

R

A

D

O

RE

G

I S

T

E

R

E

D

P

R

O

F

E

S

S

I

G

I

N

E

E

R

S

T A

N

L

W

O

R

C

E

S

T

E R

1. CATHODIC PROTECTION TEST STATION

2. INSULATED FLANGE KIT (IFK)

NOTAS GENERALES:

NOTAS DE REFERENCIA:

PLANTA DE PROTECCIÓN CATÓDICA

1. CADA ESTACIÓN DE PRUEBA TIENE 0 ÁNODOS CONECTADOS.

2. KIT DE BRIDA AISLADA (IFK)

P A

N

T I N

U A

C I Ó

N

V

A

F O

R

C

O N

T I N

U A

T I O

N

S

E

P A

N

T I N

U A

C I Ó

N

V

A

HDD 400mm F-76

(BY OTHERS)

F-76 HDD DE 400mm

6+080

6+100

6+120

6+140

B1

1:200

CATHODIC PROTECTION PLAN

EC113

0 8 12 16 20

1:200

F O

R

C

O N

T I N

U A

T I O

N

S

E

KEYED NOTES:

GENERAL NOTES:

1. EACH TEST STATION HAS 0 ANODES CONNECTED.

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

36018

C

O

L

O

R

A

D

O

RE

G

I S

T

E

R

E

D

P

R

O

F

E

S

S

I

G

I

N

E

E

R

S

T A

N

L

W

O

R

C

E

S

T

E R

1. CATHODIC PROTECTION TEST STATION

2. INSULATED FLANGE KIT (IFK)

NOTAS GENERALES:

NOTAS DE REFERENCIA:

PLANTA DE PROTECCIÓN CATÓDICA

1. CADA ESTACIÓN DE PRUEBA TIENE 0 ÁNODOS CONECTADOS.

2. KIT DE BRIDA AISLADA (IFK)

P A

N

T I N

U A

C I Ó

N

V

A

F O

R

C

O N

T I N

U A

T I O

N

S

E

P A

N

T I N

U A

C I Ó

N

V

A

HDD 400mm F-76

(BY OTHERS)

1. ESTACIÓN DE PRUEBAS DE PROTECCIÓN CATÓDICA.

F-76 HDD DE 400mm

6+260

6+280

T09

B1

1:200

CATHODIC PROTECTION PLAN

EC114

0 8 12 16 20

1:200

F O

R

C

O N

T I N

U A

T I O

N

S

E

KEYED NOTES:

GENERAL NOTES:

1. EACH TEST STATION HAS 0 ANODES CONNECTED.

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

36018

C

O

L

O

R

A

D

O

RE

G

I S

T

E

R

E

D

P

R

O

F

E

S

S

I

G

I

N

E

E

R

S

T A

N

L

W

O

R

C

E

S

T

E R

1. CATHODIC PROTECTION TEST STATION

2. INSULATED FLANGE KIT (IFK)

NOTAS GENERALES:

NOTAS DE REFERENCIA:

PLANTA DE PROTECCIÓN CATÓDICA

1. CADA ESTACIÓN DE PRUEBA TIENE 0 ÁNODOS CONECTADOS.

2. KIT DE BRIDA AISLADA (IFK)

P A

N

T I N

U A

C I Ó

N

V

A

F

N

T

I

N

U

A

T

I

E

P

A

N

T

I

N

U

A

C

I

A

400mm F-76

FOSA P3-1

6+440 6+460

6+520 6+540 6+560

6+580

T10

T11

T12

EC115

F O

R

C

O N

T I N

U A

T I O

N

S

E

F

N

T

I

N

U

A

T

I

E

0 20 30 40 50

1:500

B1

1:500

CATHODIC PROTECTION PLAN

KEYED NOTES:

GENERAL NOTES:

1. EACH TEST STATION HAS 0 ANODES CONNECTED.

1. CATHODIC PROTECTION TEST STATION

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

36018

C

O

L

O

R

A

D

O

RE

G

I S

T

E

R

E

D

P

R

O

F

E

S

S

I

G

I

N

E

E

R

S

T A

N

L

W

O

R

C

E

S

T

E R

NOTAS GENERALES:

P A

N

T I N

U A

C I Ó

N

V

A

NOTAS DE REFERENCIA:

PLANTA DE PROTECCIÓN CATÓDICA

1. CADA ESTACIÓN DE PRUEBA TIENE 0 ÁNODOS CONECTADOS.

P

A

N

T

I

N

U

A

C

I

A

B

6+580

6+600

6+620

6+640

6+660

6+700

6+720

6+740

6+760 6+780

6+800

6+840

6+860

6+880

T12

T13

T14

0 20 30 40 50

1:500

EC116

F O

R

C

O N

T I N

U A

T I O

N

S

E

F O

R

C

O N

T I N

U A

T I O

N

S

E

B1

1:500

CATHODIC PROTECTION PLAN

KEYED NOTES:

GENERAL NOTES:

1. EACH TEST STATION HAS 0 ANODES CONNECTED.

1. CATHODIC PROTECTION TEST STATION

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

36018

C

O

L

O

R

A

D

O

RE

G

I S

T

E

R

E

D

P

R

O

F

E

S

S

I

G

I

N

E

E

R

S

T A

N

L

W

O

R

C

E

S

T

E R

NOTAS GENERALES:

P A

N

T I N

U A

C I Ó

N

V

A

P A

N

T I N

U A

C I Ó

N

V

A

NOTAS DE REFERENCIA:

PLANTA DE PROTECCIÓN CATÓDICA

1. CADA ESTACIÓN DE PRUEBA TIENE 0 ÁNODOS CONECTADOS.

A

C

T

I V

E

A

C

T

I V

E

6+900

6+940 6+960

6+980 7+000

7+020 7+040

7+060

7+120 7+140 7+160

T16

T15

EC117

F O

R

C

O N

T I N

U A

T I O

N

S

E

F O

R

C

O N

T I N

U A

T I O

N

S

E

0 20 30 40 50

1:500

B1

1:500

CATHODIC PROTECTION PLAN

KEYED NOTES:

GENERAL NOTES:

1. EACH TEST STATION HAS 0 ANODES CONNECTED.

1. CATHODIC PROTECTION TEST STATION

2. CATHODIC PROTECTION RECTIFIER NUMBER XX

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

36018

C

O

L

O

R

A

D

O

RE

G

I S

T

E

R

E

D

P

R

O

F

E

S

S

I

G

I

N

E

E

R

S

T A

N

L

W

O

R

C

E

S

T

E R

PLANTA DE PROTECCIÓN CATÓDICA

P A

N

T I N

U A

C I Ó

N

V

A

P A

N

T I N

U A

C I Ó

N

V

A

NOTAS GENERALES:

1. CADA ESTACIÓN DE PRUEBA TIENE 0 ÁNODOS CONECTADOS.

NOTAS DE REFERENCIA:

2. RECTIFICADOR DE PROTECCIÓN CATÓDICA NÚMERO XX

600mm F-76

500mm JP-8

500mm F-76

350mm JP-5

350mm INACTIVE

150mm JP-5

150mm JP-8

150mm INACTIVE

T17

T18

T19

0 20 30 40 50

1:500

EC118

F

N

T

I

N

U

A

T

I

E

F

N

T

I N

U

A

T

I

E

B1

1:500

CATHODIC PROTECTION PLAN

KEYED NOTES:

GENERAL NOTES:

1. EACH TEST STATION HAS 0 ANODES CONNECTED.

1. CATHODIC PROTECTION TEST STATION

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

36018

C

O

L

O

R

A

D

O

RE

G

I S

T

E

R

E

D

P

R

O

F

E

S

S

I

G

I

N

E

E

R

S

T A

N

L

W

O

R

C

E

S

T

E R

#2AWG HMWPE

CABLE BOND

#2AWG HMWPE

CABLE BOND

NOTAS DE REFERENCIA:

NOTAS GENERALES:

PLANTA DE PROTECCIÓN CATÓDICA

P

A

N

T

I

N

U

A

C

I

A

P

A

N

T

I N

U

A

C

I

A

1. CADA ESTACIÓN DE PRUEBA TIENE 0 ÁNODOS CONECTADOS.

CABLE DE

CONEXIÓN #2AWG

HMWPE

CABLE DE CONEXIÓN

#2AWG HMWPE

ML-1

V-BRDG-OTLN

FH #14

600mm F-76

500mm JP-8

500mm F-76

350mm JP-5

350mm INACTIVE

150mm JP-5

150mm JP-8

150mm INACTIVE

7+540

7+580

7+600

7+620

7+640

7+660

7+680

7+700

ML-1

B1

M-410

T20

T21

EC119

F

N

T I N

U A

T I O

N

S

E

F

N

T

I

N

U

A

T

I

E

0 20 30 40 50

1:500

B1

1:500

CATHODIC PROTECTION PLAN

KEYED NOTES:

GENERAL NOTES:

1. EACH TEST STATION HAS 0 ANODES CONNECTED.

1. CATHODIC PROTECTION TEST STATION

2. CP TEST STATION AND BONDING BOX TO BE REMOVED DURING PIPE

INSTALLATION AND REINSTALLED.

3. 450 mm JP-5 LINE TO BE INSTALLED UNDER ANOTHER CONTRACT.

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

36018

C

O

L

O

R

A

D

O

RE

G

I S

T

E

R

E

D

P

R

O

F

E

S

S

I

G

I

N

E

E

R

S

T A

N

L

W

O

R

C

E

S

T

E R

NOTAS DE REFERENCIA:

NOTAS GENERALES:

PLANTA DE PROTECCIÓN CATÓDICA

P A

N

T I N

U A

C I Ó

N

V

A

P

A

N

T

I

N

U

A

C

I

A

1. CADA ESTACIÓN DE PRUEBA TIENE 0 ÁNODOS CONECTADOS.

2. ESTACIÓN DE PRUEBA CP Y CAJA DE EMPALMES A RETIRAR DURANTE LA

INSTALACIÓN DE LA TUBERÍA Y REINSTALAR.

3. TUBERÍA JP-5 DE 450mm A SER INSTALADA BAJO OTRO CONTRATO.

#2AWG HMWPE

CABLE BOND

CABLE DE CONEXIÓN

#2AWG HMWPE

TANK-7

F-76

7+720

7+740

7+760

7+780

7+800 7+807

ML-2

T22

B1

M-411

EC120

F O

R

C

O N

T I N

U A

T I O

N

S

E

0 8 12 16 20

1:200

B1

1:500

CATHODIC PROTECTION PLAN

KEYED NOTES:

GENERAL NOTES:

1. EACH TEST STATION HAS 0 ANODES CONNECTED.

1. CATHODIC PROTECTION TEST STATION

2. 450 mm JP-5 LINE TO BE INSTALLED UNDER ANOTHER CONTRACT.

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

36018

C

O

L

O

R

A

D

O

RE

G

I S

T

E

R

E

D

P

R

O

F

E

S

S

I

G

I

N

E

E

R

S

T A

N

L

W

O

R

C

E

S

T

E R

NOTAS DE REFERENCIA:

NOTAS GENERALES:

1. CADA ESTACIÓN DE PRUEBA TIENE 0 ÁNODOS CONECTADOS.

PLANTA DE PROTECCIÓN CATÓDICA

P A

N

T I N

U A

C I Ó

N

V

A

2. TUBERÍA JP-5 DE 450mm A SER INSTALADA BAJO OTRO CONTRATO.

#2AWG HMWPE

CABLE BOND

CABLE DE

CONEXIÓN #2AWG

HMWPE

EC501

TYPICAL ABOVE GROUND FIELD TEST STATION INSTALLATION

ELEVATION

TYPICAL ABOVE GROUND TEST STATION TERMINATION DETAIL

FOR PIPE MULTIPLE ANODE GALVANIC SYSTEM

TYPICAL UNDERGROUND REFERENCE ELECTRODE

INSTALLATION FOR UNDERGROUND PIPE

PLAN

ABOVE GROUND FIELD TEST STATION

IDENTIFICATION TAG

M

I

N

I

M

U

M

TYPICAL EXOTHERMAL CONNECTION TO PIPE

INSULATED FLANGE FOR CATHODIC PROTECTION

9000 MIN

OR AS SPECIFIED

M I N

I M

U M

9000 MIN

OR AS SPECIFIED

50 MIN

M

N

XXXX

CP TEST

XXXX

NON-METALLIC

FIELD TEST STATION

50 NON-METALLIC CONDUIT

600 x 600 x 200

CONCRETE BASE

GRADE

LEAD WIRES

FIVE TERMINAL

BLOCK

UNDERGROUND

REFERENCE

ELECTRODE

LEAD WIRE

SOLID BRASS JUMPER

PIPE LEAD WIRES

ATTACH PERMANENT,

LEGIBLE MARKERS TO

IDENTIFY LEAD WIRES

(TYP)

ATTACH ID TAG HERE. SEE

DETAIL B4, THIS SHEET

EXOTHERMAL CONNECTIONS

SEE DETAIL B2, THIS SHEET

CL PIPE

50 PVC CONDUIT

PACKAGED REFERENCE

ELECTRODE

3 DIA DRILLED

HOLES (TYP OF 4)

20 GAUGE STAINLESS

STEEL PLATE

PIPE SYSTEM LABEL SHALL BE 5

SQUARE SEE SHEET EC502 FOR

SYSTEM LABELS

50 PVC CONDUIT

LEAD WIRES ROUTE TO

FIELD TEST STATION

BACKFILL WITH CLEAN SOIL

GRADE

PACKAGED REFERENCE

ELECTRODE BACKFILL WITH

MINIMUM 150mm CLEAN SOIL

PIPE LEAD WIRE CATHODIC

PROTECTION CABLE (TYP)

PIPE COATING

REPAIR MATERIAL

(TYP)

CABLE INSULATION SHALL

BE CUT SUCH THAT ANY

EXPOSED COPPER IS WITHIN THE

PIPE COATING REPAIR MATERIAL

REMOVE COATING TO CLEAN METAL

SURFACE, EXOTHERMIC WELD AND

PRIME AS REQUIRED BY PIPE COATING

REPAIR MATERIAL MANUFACTURER

CATHODICALLY

PROTECTED PIPE

INSULATING WASHER (TYP)

STEEL BACKING

WASHER (TYP)

ON HORIZONTAL PIPES RAISE THE

INSULATING AND SEALING GASKET

AS HIGH AS POSSIBLE

TO PREVENT BRIDGING OVER THE

GASKET BY FOREIGN CONDUCTING

MATERIAL IN THE PIPE

FULL-FACED

INSULATING AND SEALING

GASKET (ID 3 LESS

THAN FLANGE ID)

ISOLATE EACH STUD

FROM PIPING BY

FULL INSULATION

FULL LENGTH

BOLT INSULATING

SLEEVE (TYP)

SEE DETAIL B2, THIS SHEET

ATTACH PLATE TO TERMINAL HOUSING

USING STAINLESS STEEL SCREWS

(TYP 4 PLACES)

TO ABOVE GROUND FIELD TEST

STATION, SEE DETAIL C1, THIS SHEET

AFTER COATING OF PIPE LEAD WIRE

CONNECTIONS, STRAP EACH PAIR OF PIPE

LEAD WIRES TO PIPE

PLASTIC INSULATING BUSHING

FLUSH MOUNTED FIELD TEST STATION INSTALLATION

CAST IRON LID

130 DIA x

450 PVC PIPE

CONCRETE BASE

600 x 600 x 200

GRADE

AIRCRAFT RATED FIELD TEST

STATION TERMINATION

LEAD WIRES

END BELL

FIVE TERMINAL BLOCK

TEST STATION

SOLID

JUMPER

PIPE SYSTEM FLUSH MOUNTED BELOW GRADE

TEST STATION TERMINATION DETAIL

DC BLOCKING DEVICE FOR

USE IN HAZARDOUS

LOCATIONS ABOVE GRADE

MODEL OVP-4/4-3.7-100

LETTERS SHALL BE 5 SQUARE

TEST STATION NUMBER

LETTERS SHALL BE 5

SQUARE

CL PIPE

ATTACH ID TAG HERE. SEE DETAIL

B4, THIS SHEET. USE

MANUFACTURERS RECOMMENDED

METHOD FOR AFFIXING LABEL.

PIPE LEAD WIRES

NTS

C1

DETAIL

NTS

C2

DETAIL

NTS

C4

DETAIL

NTS

B1

DETAIL

NTS

B2

DETAIL

NTS

B4

DETAIL

NTS

A1

DETAIL

NTS

A2

DETAIL

NTS

A3

DETAIL

B1

EC012P

C4

EC501

A3

EC012P

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

36018

C

O

L

O

R

A

D

O

RE

G

I S

T

E

R

E

D

P

R

O

F

E

S

S

I

G

I

N

E

E

R

S

T A

N

L

W

O

R

C

E

S

T

E R

/ DETALLE

/ DETALLE

/ DETALLE

/ DETALLE

/ DETALLE

/ DETALLE

/ DETALLE

/ DETALLE

/ DETALLE

ETIQUETA DE IDENTIFICACIÓN DE ESTACIÓN DE

PRUEBA EN CAMPO SOBRE EL TERRENO

ORIFICIOS

TALADRADOS

DIAM. 3 (TÍP DE 4)

PLETINA DE ACERO

INOXIDABLE DE GALGA 20

LA ETIQUETA DEL SISTEMA DE

TUBERÍAS DEBE SER DE 5

CUADRADOS VER PLANO EC502

PARA ETIQUETAS DEL SISTEMA

ANCLAR PLETINA A LA

ENVOLVENTE DEL TERMINAL

UTILIZANDO TORNILLOS DE ACERO

INOXIDABLE (TIP 4 LUGARES)

LAS LETRAS TENDRÁN 5

CUADRADOS

LAS LETRAS DEL

NÚMERO DE LA

ESTACIÓN DE PRUEBA

TENDRÁ 5 CUADRADOS

ESTACIÓN DE

PRUEBA BLOQUE DE

5 TERMINALES

PUENTE

MACIZO

DETALLE DE TERMINACIÓN DE ESTACIÓN DE

PRUEBAS BAJO EL TERRENO MONTADA A RAS DEL

SISTEMA DE TUBERÍAS

ANCLAR LA ETIQUETA ID AQUÍ.

VER DETALLE B4 EN ESTE PLANO.

UTILIZAR MÉTODO RECOMENDADO

POR FABRICANTES PARA LA

COLOCACIÓN DE LA ETIQUETA

CONDUCTORES

INSTALACIÓN DE ESTACIÓN DE PRUEBA EN CAMPO MONTADA A RAS

TAPA DE FUNDICIÓN

TUBO DE PVC DE

450 x 130 DIA

BASE DE HORMIGÓN

TERRENO

TERMINACIÓN DE ESTACIÓN

DE PRUEBA EN CAMPO CON

CLASIFICACIÓN PARA AVIONES

CONDUCTORES

CAMPANA EN EXTREMO

BRIDA AISLADA PARA PROTECCIÓN CATÓDICA

ARANDELA DE AISLAMIENTO (TIP)

ARANDELA DE

SOPORTE DE

ACERO (TIP)

EN TUBERÍAS HORIZONTALES

SUBIR EL AISLAMIENTO Y JUNTA

DE SELLADO TAN ALTO COMO SEA

POSIBLE PARA PREVENIR EL

PUENTEO SOBRE LA JUNTA DE

MATERIAL CONDUCTOR EXTRAÑO

EN LA TUBERÍA

JUNTA DE AISLAMIENTO

Y ESTANQUEIDAD EN

TODAS LAS CARAS (ID 3

VECES MENOS QUE ID

DE BRIDA)

AISLAR CADA TORNILLO

CON AISLAMIENTO

COMPLETO DESDE LA

TUBERÍA

MANGUITO AISLANTE

DE LA LONGITUD DEL

PERNOCOMPLETA

DISPOSITIVO DE BLOQUEO

DC PARA USO EN

UBICACIONES PELIGROSAS

SOBRE EL TERRENO

MODELO OVP-4/4-3.7-100

TRADUCCIÓN:

TABLA PROTECCIÓN CATÓDICA

NÚMERO DE ESTACIÓN DE PRUEBA

TIPO DE ESTACIÓN DE PRUEBA -

NOTA 1 TUBERÍA DE ACERO AL

CARBONO

TRANSLATION:

CATHODIC PROTECTION TABLE

TEST STATION NUMBER

TEST STATION TYPE - NOTE 1

PIPING

CARBON STEEL

O SEGÚN SE ESPECIFIQUE

INSTALACIÓN TÍPICA DE ELECTRODO DE REFERENCIA

ENTERRADO PARA TUBERÍA ENTERRADA

PLANTA

ESTACIÓN DE PRUEBA

EN CAMPO NO METÁLICA

CONDUCTO NO METÁLICO

DE 50

CASQUILLO AISLANTE DE

PLÁSTICO

CONDUCTORES

TERRENO

BASE DE

HORMIGÓN

/ ALZADO

INSTALACIÓN TÍPICA DE ESTACIÓN DE PRUEBA EN CAMPO SOBRE EL TERRENO

ELECTRODO DE REFERENCIA

EMPACADO

CONDUCTO DE PVC DE 50

HASTA LA ESTACIÓN DE PRUEBA

SOBRE EL TERRENO, VER DETALLE

C1 EN ESTE PLANO

CONEXIONES EXOTÉRMICAS

VER DETALLE B2 EN ESTE PLANO

EJE DE TUBERÍA

RELLENAR CON TIERRA

LIMPIA

/ TERRENO

RELLENAR CON TIERRA

LIMPIA

CONDUCTO PVC

DE 50

EJE TUBERÍA

VER DETALLE B2 EN ESTE PLANO

O SEGÚN SE ESPECIFIQUE

ELECTRODO DE REFERENCIA

EMPACADO RELLENAR CON

TIERRA LIMPIA MÍNIMO 150mm

BLOQUE DE 5

TERMINALES

PUENTE DE BRONCE

MACIZO

CABLES CONDUCTORES

DE TUBERÍAS

COGIDA PERMANENTE,

MARCADORES LEGIBLES

PARA IDENTIFICAR LOS

CONDUCTORES

ANCLAR AQUÍ LA ETIQUETA

DE IDENTIFICACIÓN. VER

DETALLE B4 EN ESTE PLANO

CONDUCTOR

DEL ELECTRODO

DE REFERENCIA

ENTERRADO

DETALLE TÍPICO DE TERMINACIÓN DE ESTACIÓN DE PRUEBA SOBRE EL

TERRENO PARA EL SISTEMA GALVÁNICO DE TUBERÍA DE MÚLTIPLES ÁNODOS

DESPUÉS DEL REVESTIMIENTO DE

LAS CONEXIONES DE LOS

CONDUCTORES, ATAR CADA PAR

DE CONDUCTORES A LA TUBERÍA

MATERIAL DE

REPARACIÓN DE

REVESTIMIENTO DE

TUBERÍA (TIP)

CABLE DE PROTECCIÓN

CATÓDICA DEL CONDUCTOR

DE TUBERÍA (TIP)

EL AISLAMIENTO DEL CABLE SE

CORTARÁ DE MANERA QUE

CUALQUIER COBRE EXPUESTO

QUEDE DENTRO DEL MATERIAL

DE REPARACIÓN DEL

REVESTIMIENTO DE LA TUBERÍA

RETIRAR REVESTIMIENTO PARA LIMPIAR LA

SUPERFICIE METÁLICA, REALIZAR SOLDADURA

EXOTÉRMICA E IMPRIMAR SEGÚN REQUIERA

EL FABRICANTE DEL MATERIAL DE

REPARACIÓN DEL REVESTIMIENTO

TÍPICA CONEXIÓN EXOTÉRMICA A TUBERÍA

TUBERÍA PROTEGIDA

CATÓDICAMENTE

NOTA 1:

ESTACIÓN DE PRUEBA TIPO A = ESTACIÓN DE PRUEBA SOBRE EL TERRENO.

ESTACIÓN DE PRUEBA TIPO F = ESTACIÓN DE PRUEBA MONTADA A RAS.

11.0

PIER III

ML-1

ML-4

TE-A

TE-B,C,D

ML-3

V-BRDG-OTLN

A2003

DRYER FOR POOL

FH #14

VALVE PIT #44

(OUTSIDE OF BASE)

TO BULK STORAGE

TO BOOSTER PUMP HOUSE

PIT #1

TANK-2

F-76

TANK-3

F-76

TANK-5

F-76

TANK-4

F-76

TANK-6

F-76

TANK-7

F-76

TANK-8

F-76

TANK-1

F-76

TANK-13

JP-8

TK-17

JP-5

TANK-11

JP-8

TANK-10

JP-8

TK-15

JP-5

TANK-9

JP-8

TK-14

JP-5

TANK-122

JP-8

TANK-120

JP-8

TANK-121

JP-8

TK-16

JP-5

3194B

PIER 3

PUERTO GATE

RIO SALADO

BRIDGE

ML-2

ALICANTE LANE

S A

N T

A M

A R

IA

S

T R

E E

T

M

I

A

L

A

L

I C

A

N

N

E

EG401

EG401

EG401

EG401

EG401

EG401

F-76 PIPELINE

PUENTE DEL

RÍO SALADO

PUERTA DE EL

PUERTO

LÍNEA DE

TUBERÍA F-76

MUELLE 3

0 200

400 500

1:5000

EG101

B1

1:5000

OVERALL ELECTRICAL GROUNDING PLAN AND KEY MAP

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

36018

C

O

L

O

R

A

D

O

RE

G

I S

T

E

R

E

D

P

R

O

F

E

S

S

I

G

I

N

E

E

R

S

T A

N

L

W

O

R

C

E

S

T

E R

PLANTA GENERAL ELÉCTRICA DE PUESTA A TIERRA Y DE REFERENCIA

D1

EG401

C3

EG401

C4

EG401

B1

EG401

B3

EG401

A1

EG401

N

T

R

C

E

S

O

5+390

5+530

SEWER

C

CAUTION BURRIED PROTEC CABLES

E

M

H

EG401

KEYED NOTES:

0 2 3 4 5

1:50

D1

NTS

ENLARGED GROUNDING PLAN NEAR STATION 5+380

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

36018

C

O

L

O

R

A

D

O

RE

G

I S

T

E

R

E

D

P

R

O

F

E

S

S

I

G

I

N

E

E

R

S

T A

N

L

W

O

R

C

E

S

T

E R

NOTAS DE REFERENCIA:

GENERAL NOTES:

NOTAS GENERALES:

1. PROVIDE GROUNDING FOR NEW FENCE.

2. BOLD LINE INDICATES NEW FENCE THAT TIES INTO

EXISTING FENCE ON BOTH ENDS.

1. PROVEER PUESTA A TIERRA PARA LA VALLA NUEVA.

2. LA LÍNEA EN NEGRITA INDICA VALLA NUEVA QUE SE ATA

A LA VALLA EXISTENTE EN AMBOS EXTREMOS.

C2

NTS

ENLARGED GROUNDING PLAN NEAR STATION 5+530

A1

NTS

ENLARGED GROUNDING PLAN NEAR STATION 7+290

A3

NTS

ENLARGED GROUNDING PLAN NEAR STATION 7+505

C4

NTS

ENLARGED GROUNDING PLAN NEAR STATION 5+820

1. SEE GROUNDING DETAILS ON SHEET EG501.

1. VER DETALLES DE PUESTA A TIERRA EN PLANO EG501.

B3

NTS

ENLARGED GROUNDING PLAN NEAR STATION 7+365

PL. AMPLIADA DE TIERRA CERCA DE LA ESTACIÓN 5+820

PL. AMPLIADA DE TIERRA CERCA DE LA ESTACIÓN 5+530

PL. AMPLIADA DE TIERRA CERCA DE LA ESTACIÓN 5+380

PL. AMPLIADA DE TIERRA CERCA DE LA ESTACIÓN 7+290

PL. AMPLIADA DE TIERRA CERCA DE LA ESTACIÓN 7+505

PL. AMPLIADA DE TIERRA CERCA DE LA ESTACIÓN7+365

(SEE SHEET C-106 FOR DETAILS ON CHAIN LINK FENCE)

(SEE SHEET C-108 FOR DETAILS ON CHAIN LINK FENCE)

(SEE SHEET C-110 FOR DETAILS ON CHAIN LINK FENCE)

(SEE SHEET C-118 FOR DETAILS ON CHAIN LINK FENCE)

(SEE SHEET C-119 FOR DETAILS ON CHAIN LINK FENCE)

(SEE SHEET C-118 FOR DETAILS ON CHAIN LINK FENCE)

(VER PLANO C-118 PARA DETALLES DE VALLA DE SIMPLE TORSIÓN)

(VER PLANO C-119 PARA DETALLES DE VALLA DE SIMPLE TORSIÓN)

(VER PLANO C-118 PARA DETALLES DE VALLA DE SIMPLE TORSIÓN)

(VER PLANO C-106 PARA DETALLES DE VALLA DE SIMPLE TORSIÓN)

(VER PLANO C-108 PARA DETALLES DE VALLA DE SIMPLE TORSIÓN)

(VER PLANO C-110 PARA DETALLES DE VALLA DE SIMPLE TORSIÓN)

KEYED NOTES:

1. FENCE GROUNDING LOCATIONS ARE SHOWN ON DWG

EG 401.

C3

FENCE POST GROUNDING

C4

FENCE GROUND

TINNED SPLIT BOLT CONNECTOR

10mm

SOLID COPPER WIRE

FENCE POST

10mm

SOLID COPPER WIRE

ATTACH TO METAL FENCE POST WITH GROUND CLAMP

MOLDED EXOTHERMIC WELD OR APPROVED

CLAMP-TYPE FITTING OF BRONZE

COPPER-CLAD STEEL (19X3000)

GROUND ROD

TIERRA DE VALLAPUESTA A TIERRA DE POSTE DE VALLA

ALAMBRE DE COBRE MACIZO DE 10mm

CONECTOR DE PERNO PARTIDO DE ESTAÑO

ALAMBRE DE COBRE MACIZO DE 10mm

POSTE DE VALLA

SUJETAR A POSTE METÁLICO DE VALLA CON PINZA

DE TIERRA

SOLDADURA EXOTÉRMICA MOLDEADA O

ACCESORIO HOMOLOGADO DE TIPO

ABRAZADERA DE BRONCE

PICA DE TIERRA DE ACERO (19X3000)

CON REVESTIMIENTO DE COBRE

1. UBICACIONES DE PUESTA A TIERRA DE VALLA SE

MUESTRAN EN EL PLANO EG-401

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

RE

PL

AC

E

FU

EL

P

IP

EL

IN

E

FR

O M

P

IE

R

TO

B

U

LK

S

TO

RA

G

E

36018

C

O

L

O

R

A

D

O

RE

G

I S

T

E

R

E

D

P

R

O

F

E

S

S

I

G

I

N

E

E

R

S

T A

N

L

W

O

R

C

E

S

T

E R

EG501

NOTAS DE REFERENCIA:

EC101 CATHODIC PROTECTION KEY PLAN
EC106 CATHODIC PROTECTION PLAN
EC107 CATHODIC PROTECTION PLAN
EC108 CATHODIC PROTECTION PLAN
EC109 CATHODIC PROTECTION PLAN
EC110 CATHODIC PROTECTION PLAN
EC111 CATHODIC PROTECTION PLAN
EC112 CATHODIC PROTECTION PLAN
EC113 CATHODIC PROTECTION PLAN
EC114 CATHODIC PROTECTION PLAN
EC115 CATHODIC PROTECTION PLAN
EC116 CATHODIC PROTECTION PLAN
EC117 CATHODIC PROTECTION PLAN
EC118 CATHODIC PROTECTION PLAN
EC119 CATHODIC PROTECTION PLAN
EC120 CATHODIC PROTECTION PLAN
EC501 CATHODIC PROTECTION DETAILS
ED401 ELECTRIC DEMOLITION PLAN - VP-1 MANHOLE
ED404 ELECTRIC DEMOLITION PLAN - VP-3 & 3.5 MANHOLE
EG101 ELECTRICAL GROUNDING SITE PLAN AND KEY MAP
EG401 ELECTRICAL ENLARGED GROUNDING PLANS
EG501 ELECTRICAL GROUNDING DETAILS
2024-06-26T10:13:50-0500
Denver
Stanley Worcester
I am signing to certify the authenticity of this document.
2024-06-26T10:14:17-0500
Denver
Stanley Worcester
I am signing to certify the authenticity of this document.
2024-06-26T10:14:17-0500
Denver
Stanley Worcester
I am signing to certify the authenticity of this document.
2024-06-26T10:14:18-0500
Denver
Stanley Worcester
I am signing to certify the authenticity of this document.
2024-06-26T10:14:18-0500
Denver
Stanley Worcester
I am signing to certify the authenticity of this document.
2024-06-26T10:14:18-0500
Denver
Stanley Worcester
I am signing to certify the authenticity of this document.
2024-06-26T10:14:19-0500
Denver
Stanley Worcester
I am signing to certify the authenticity of this document.
2024-06-26T10:14:19-0500
Denver
Stanley Worcester
I am signing to certify the authenticity of this document.
2024-06-26T10:14:20-0500
Denver
Stanley Worcester
I am signing to certify the authenticity of this document.
2024-06-26T10:14:20-0500
Denver
Stanley Worcester
I am signing to certify the authenticity of this document.
2024-06-26T10:14:21-0500
Denver
Stanley Worcester
I am signing to certify the authenticity of this document.
2024-06-26T10:14:21-0500
Denver
Stanley Worcester
I am signing to certify the authenticity of this document.
2024-06-26T10:14:22-0500
Denver
Stanley Worcester
I am signing to certify the authenticity of this document.
2024-06-26T10:14:23-0500
Denver
Stanley Worcester
I am signing to certify the authenticity of this document.
2024-06-26T10:14:23-0500
Denver
Stanley Worcester
I am signing to certify the authenticity of this document.
2024-06-26T10:14:24-0500
Denver
Stanley Worcester
I am signing to certify the authenticity of this document.
2024-06-26T10:14:24-0500
Denver
Stanley Worcester
I am signing to certify the authenticity of this document.
2024-06-26T10:14:25-0500
Denver
Stanley Worcester
I am signing to certify the authenticity of this document.
2024-06-26T10:14:25-0500
Denver
Stanley Worcester
I am signing to certify the authenticity of this document.
2024-06-26T10:14:25-0500
Denver
Stanley Worcester
I am signing to certify the authenticity of this document.

File details come from the government source that posted it. Updated .