Attachment B - Bid Schedule Revised.pdf

PDF 139 KB Posted

Attached to
P919 - Phase I, Bulk Fuel Tank Farm Improvements, Naval Station Rota, Spain
Solicitation number
N6247026R0006
Issued by

About this file

This document is a comprehensive Price Schedule for Project P919, a Phase 1 Bulk Tank Farm Improvements project. The price schedule includes multiple line items covering various aspects of the project, with both base price and optional items. Key line items include Tank-100 and Tank-200 (each with pump vault and leak detection), a Tie-In Vault Tank Pad, an Additive Injection Building, decommissioning and demolition work, cargo transfer pipeline, horizontal directional drilling, and supporting site work.

Optional items include excess contaminated soil removal (2,550 tons), excess backfill (3,800 cubic meters), and an F76 Fuel Line from Pier 3 to Bulk Storage Fuel Farm. The document provides a detailed breakdown of pricing structures for each component, with spaces for unit prices and subtotals. The pricing is structured to capture specific scopes of work, typically complete to the 1.5-meter line outside of structures or utilities, and explicitly excludes work covered in other line items. The final page includes placeholders for the total price for CLIN 0001 and an overall total price for all Contract Line Items (CLINs).

View the file

Other files

File Type Posted
Amendment 0008 Revised Specifications_Section 01.pdf PDF
N6247026R0006 Amendment 0007.pdf PDF
P919 - Amendment 0007.pdf PDF
Amendment 0006_Revised F76 Pier 3 Civil Dwgs.pdf PDF
Attachment M - F76 2_PIER3-FINAL_SUBMITTAL-PGS-35-70_SET_2-OF-6.pdf PDF
P919 - Amendment 0006.pdf PDF
Amendment 0006_Revised 01 30 00.pdf PDF
Amendment 0006_Revised Specifications P919.pdf PDF
Amendment 0006_Revised Specifications F76 Pier 3.pdf PDF
Attachment M - F76 1_PIER3-FINAL-REV1_SUBMITTAL-PGS-1-34_SET_1-OF-6.pdf PDF
Attachment M - F76 3_PIER3-FINAL_SUBMITTAL-PGS-62-99_SET_3-OF-6.pdf PDF
Attachment M - F76 5_PIER3-FINAL_SUBMITTAL-PGS-130-149_SET_5-OF-6.pdf PDF
Attachment M - F76 6_PIER3_REFERENCE-DRAWINGS_SET_6-OF-6.pdf PDF
Amendment 0006_Revised EC502P CATHODIC PROTECTION DETAILS.pdf PDF
N6247026R0006 Amendment 0005.pdf PDF
P-919 - Amendment 0005.pdf PDF
Attachment G - Certificate of Classification Revised.pdf PDF
Attachment P - Photos.pdf PDF
N6247026R0006 Amendment 0003.pdf PDF
N6247026R0006 Amendment 0002.pdf PDF
P919 Amendment 0002.pdf PDF
N6247026R0006 Amedment 0001.pdf PDF
Attachment M - F74 4_PIER3-FINAL_SUBMITTAL-PGS-100-129_SET_4-OF-6.pdf PDF
Attachment N - Specifications -Replace Fuel Pipeline Pier 3 Rota.pdf PDF
Attachment M - F74 1_PIER3-FINAL-REV1_SUBMITTAL-PGS-1-34_SET_1-OF-6.pdf PDF
Attachment M - F74 2_PIER3-FINAL_SUBMITTAL-PGS-35-70_SET_2-OF-6.pdf PDF
Attachment M - F74 3_PIER3-FINAL_SUBMITTAL-PGS-62-99_SET_3-OF-6.pdf PDF
Attachment M - F74 5_PIER3-FINAL_SUBMITTAL-PGS-130-149_SET_5-OF-6.pdf PDF
Attachment M - F74 6_PIER3_REFERENCE-DRAWINGS_SET_6-OF-6.pdf PDF
N6247026R0006.pdf PDF
ATTACHMENT A - Pre-Proposal Inquiry Form.xlsx XLSX spreadsheet
Attachment E_P919_Specifications.pdf PDF
Attachment_F_P919__Volume_4_of_15.pdf PDF
Attachment_F_P919__Volume_8_of_15.pdf PDF
Attachment_F_P919__Volume_9_of_15.pdf PDF
Attachment D - Construction Experience Project Data Sheet.pdf PDF
Attachment_F_P919__Volume_1_of_15.pdf PDF
Attachment_F_P919__Volume_2_of_15.pdf PDF
Attachment_F_P919__Volume_5_of_15.pdf PDF
Attachment_F_P919__Volume_12_of_15.pdf PDF
Attachment_F_P919__Volume_14_of_15.pdf PDF
Attachment I - Work Pass Format.pdf PDF
Attachment L - Certificate Insurance Form.pdf PDF
Attachment B - Price Schedule.pdf PDF
Attachment C - Past Performance Questionnaire (PPQ).pdf PDF
Attachment_F_P919__Volume_6_of_15.pdf PDF
Attachment_F_P919__Volume_10_of_15.pdf PDF
Attachment_F_P919__Volume_11_of_15.pdf PDF
Attachment J - Employee Certification Form.pdf PDF
Attachment K - Temporary Pass Form.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE SCHEDULE

Line

Item

Description Quantity Unit Unit Price Sub-Total Total Price

(CC)

1 BASE PRICE: Total Price for the entire work for Project

P919 - Phase 1 Bulk Tank

Farm Improvements in accordance with the drawings and specifications, complete, but excluding work provided in another Priced line Item.

1 EA $_____ $ ________ $_______

1A Tank-100 including Pump

Vault, Leak Detection Well

Tank

Subtotal of Base Price for the entire work for P919 – Tank-

100 complete to the 1.5-meter line outside of the structure in accordance with the drawings and specifications, but excluding work provided in another line item.

EA $ ______ $ ________

1B Tank-200 including Pump

Vault, Leak Detection Well

Tank

Subtotal of Base Price for the entire work for P919 – Tank-

200 complete to the 1.5-meter line outside of the structure in accordance with the drawings and specifications, but excluding work provided in another line item.

1 EA $______ $ ________

1C Tie-In Vault Tank Pad

Subtotal of Base Price for the entire work for P919 – Tie-in

Vault Tank Pad complete to the

1.5-meter line outside of the structure in accordance with the drawings and specifications, but excluding work provided in another line item.

1 EA $ ______ $ ________

1D Additive Injection Building

Subtotal of Base Price for the entire work for P919 –

Additive Injection Building complete to the 1.5-meter line outside of the structure in accordance with the drawings and specifications, but excluding work provided in

1 EA $ ______5 $ ________

1E Decommissioning and

Demolition

Subtotal of Base Price for the entire work for P919 –

Decommissioning and any demolition to the 1.5-meter line outside of the structure in accordance with the drawings and specifications, but excluding work provided in another line item.

1 EA $ ______ $ ________

1F

Cargo Transfer Pipeline

(JP-5)

Subtotal of Base Price for the entire work for P919 – Cargo

Transfer Pipeline (JP-5) complete to the 1.5-meter line outside of the utility in accordance with the drawings and specifications, but excluding work provided in another line item.

1 EA $ ______ $ ________

1G Horizontal Directional

Drilling (JP-5)

Subtotal Price for the entire

Horizontal Directional Drilling

(HDD) infrastructure for P919 scope in accordance with the drawings and specifications, complete to the 1.5-meter (5-foot) line outside of the bore pit, but excluding work provided in another Priced line

Item.

315 M $ ______ $ ________

1H Supporting Site Work

Subtotal of Base Price for the remainder of entire project site work, outside the facilities, utilities, and structures 1.5-meter line, for all of P919, complete in accordance with the drawings and specifications, but excluding work described in another line

Item.

1 EA $ ______ $ ________

2 Option 01: Excess

Contaminated Soil

Unit Price for excess removal and disposal of contaminate stockpiled soils complete in accordance with the drawings and specifications, but excluding work provided in

2,550 TN $ ______ $ ________ $ ________

3 Option 02: Excess Backfill for

Contaminated Soil

Unit Price for provision and compaction of fill in place of removed contaminate soil, complete in accordance with the drawings and specifications, but excluding work provided in another line item.

3,800 CM $ ______ $ ________ $ ________

4 Option Item 03: F76 Fuel Line from Pier 3 to Bulk Storage

Fuel Farm.

Total Price for the entire F76

Fuel Line from Pier 3 to the

Bulk Storage Farm

Improvements (RM19-1428) in accordance with the drawings and specifications, complete to the 1.5 meter line outside of the utility footprint, but excluding work provided in another

Priced line Item.

1 EA $ ______ $ ________ $ ________

4A Option Item 03A: F76 Fuel

Line from Pier 3 to Bulk

Storage Fuel Farm.

Subtotal for the F76 Fuel Line from Pier 3 to the Bulk Storage

Farm Improvements (RM19-

1428) in accordance with the drawings and specifications, complete to the 1.5 meter line outside of the utility footprint, but excluding work provided in another Priced line Item.

1 EA $ ______ $ ________

4B Option Item 03B: Horizontal

Directional Drilling for F76

Fuel Line.

Subtotal for the F76 Fuel Line

Horizontal Directional Drilling

(HDD) (RM19-1428) scope in accordance with the drawings and specifications, complete to the 1.5-meter (5-foot) line outside of the bore pit, but excluding work provided in another Priced line Item.

315 M $ ______ $ ________

4C Option Item 03C: Horizontal

Directional Drilling for other utilities.

Subtotal for the remaining

Horizontal Directional Drilling

(HDD) (RM19-1428) scope in accordance with the drawings and specifications, complete to the 1.5-meter (5-foot) line

1,230 M $ ______ $ ________

TOTAL PRICE FOR CLIN 0001: $_____________

OVERALL TOTAL PRICE FOR ALL CLINS: $_____________