Attachment B - Bid Schedule Revised.pdf
PDF 139 KB Posted
- Solicitation number
- N6247026R0006
About this file
This document is a comprehensive Price Schedule for Project P919, a Phase 1 Bulk Tank Farm Improvements project. The price schedule includes multiple line items covering various aspects of the project, with both base price and optional items. Key line items include Tank-100 and Tank-200 (each with pump vault and leak detection), a Tie-In Vault Tank Pad, an Additive Injection Building, decommissioning and demolition work, cargo transfer pipeline, horizontal directional drilling, and supporting site work.
Optional items include excess contaminated soil removal (2,550 tons), excess backfill (3,800 cubic meters), and an F76 Fuel Line from Pier 3 to Bulk Storage Fuel Farm. The document provides a detailed breakdown of pricing structures for each component, with spaces for unit prices and subtotals. The pricing is structured to capture specific scopes of work, typically complete to the 1.5-meter line outside of structures or utilities, and explicitly excludes work covered in other line items. The final page includes placeholders for the total price for CLIN 0001 and an overall total price for all Contract Line Items (CLINs).
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE SCHEDULE
Line
Item
Description Quantity Unit Unit Price Sub-Total Total Price
(CC)
1 BASE PRICE: Total Price for the entire work for Project
P919 - Phase 1 Bulk Tank
Farm Improvements in accordance with the drawings and specifications, complete, but excluding work provided in another Priced line Item.
1 EA $_____ $ ________ $_______
1A Tank-100 including Pump
Vault, Leak Detection Well
Tank
Subtotal of Base Price for the entire work for P919 – Tank-
100 complete to the 1.5-meter line outside of the structure in accordance with the drawings and specifications, but excluding work provided in another line item.
EA $ ______ $ ________
1B Tank-200 including Pump
Vault, Leak Detection Well
Tank
Subtotal of Base Price for the entire work for P919 – Tank-
200 complete to the 1.5-meter line outside of the structure in accordance with the drawings and specifications, but excluding work provided in another line item.
1 EA $______ $ ________
1C Tie-In Vault Tank Pad
Subtotal of Base Price for the entire work for P919 – Tie-in
Vault Tank Pad complete to the
1.5-meter line outside of the structure in accordance with the drawings and specifications, but excluding work provided in another line item.
1 EA $ ______ $ ________
1D Additive Injection Building
Subtotal of Base Price for the entire work for P919 –
Additive Injection Building complete to the 1.5-meter line outside of the structure in accordance with the drawings and specifications, but excluding work provided in
1 EA $ ______5 $ ________
1E Decommissioning and
Demolition
Subtotal of Base Price for the entire work for P919 –
Decommissioning and any demolition to the 1.5-meter line outside of the structure in accordance with the drawings and specifications, but excluding work provided in another line item.
1 EA $ ______ $ ________
1F
Cargo Transfer Pipeline
(JP-5)
Subtotal of Base Price for the entire work for P919 – Cargo
Transfer Pipeline (JP-5) complete to the 1.5-meter line outside of the utility in accordance with the drawings and specifications, but excluding work provided in another line item.
1 EA $ ______ $ ________
1G Horizontal Directional
Drilling (JP-5)
Subtotal Price for the entire
Horizontal Directional Drilling
(HDD) infrastructure for P919 scope in accordance with the drawings and specifications, complete to the 1.5-meter (5-foot) line outside of the bore pit, but excluding work provided in another Priced line
Item.
315 M $ ______ $ ________
1H Supporting Site Work
Subtotal of Base Price for the remainder of entire project site work, outside the facilities, utilities, and structures 1.5-meter line, for all of P919, complete in accordance with the drawings and specifications, but excluding work described in another line
Item.
1 EA $ ______ $ ________
2 Option 01: Excess
Contaminated Soil
Unit Price for excess removal and disposal of contaminate stockpiled soils complete in accordance with the drawings and specifications, but excluding work provided in
2,550 TN $ ______ $ ________ $ ________
3 Option 02: Excess Backfill for
Contaminated Soil
Unit Price for provision and compaction of fill in place of removed contaminate soil, complete in accordance with the drawings and specifications, but excluding work provided in another line item.
3,800 CM $ ______ $ ________ $ ________
4 Option Item 03: F76 Fuel Line from Pier 3 to Bulk Storage
Fuel Farm.
Total Price for the entire F76
Fuel Line from Pier 3 to the
Bulk Storage Farm
Improvements (RM19-1428) in accordance with the drawings and specifications, complete to the 1.5 meter line outside of the utility footprint, but excluding work provided in another
Priced line Item.
1 EA $ ______ $ ________ $ ________
4A Option Item 03A: F76 Fuel
Line from Pier 3 to Bulk
Storage Fuel Farm.
Subtotal for the F76 Fuel Line from Pier 3 to the Bulk Storage
Farm Improvements (RM19-
1428) in accordance with the drawings and specifications, complete to the 1.5 meter line outside of the utility footprint, but excluding work provided in another Priced line Item.
1 EA $ ______ $ ________
4B Option Item 03B: Horizontal
Directional Drilling for F76
Fuel Line.
Subtotal for the F76 Fuel Line
Horizontal Directional Drilling
(HDD) (RM19-1428) scope in accordance with the drawings and specifications, complete to the 1.5-meter (5-foot) line outside of the bore pit, but excluding work provided in another Priced line Item.
315 M $ ______ $ ________
4C Option Item 03C: Horizontal
Directional Drilling for other utilities.
Subtotal for the remaining
Horizontal Directional Drilling
(HDD) (RM19-1428) scope in accordance with the drawings and specifications, complete to the 1.5-meter (5-foot) line
1,230 M $ ______ $ ________
TOTAL PRICE FOR CLIN 0001: $_____________
OVERALL TOTAL PRICE FOR ALL CLINS: $_____________
outside of the bore pit, but excluding work provided in another Priced line Item.