Amendment 0006_Revised Tank DWGs Prime.pdf

PDF 4 MB Posted

Attached to
P919 - Phase I, Bulk Fuel Tank Farm Improvements, Naval Station Rota, Spain
Solicitation number
N6247026R0006
Issued by

About this file

This document is a comprehensive technical design package for the P-919 Bulk Tank Farm Improvements, Phase 1 project, issued by Naval Facilities Engineering System Command Atlantic. The project encompasses the design and installation of a cut-and-cover fuel storage and distribution system with supporting infrastructure including pump vaults, additive injection buildings, tie-in vaults, off-loading facilities, and leak detection systems. The system is designed to handle multiple fuel types with capacities including 100,000 gallons for Tank 100, 50,000 gallons each for Tanks 200 and 300, and an additive tank with supporting injection equipment. Key mechanical components include multiple fuel transfer pumps (P-101 through P-204 series), water drain-off pumps, leak detection pumps (LDP-101, LDP-201), fuel additive injection systems rated at 1,200 GPH, and associated flow control, pressure regulation, and thermal relief equipment. The piping system incorporates dual-return lines for additive injection across multiple tanks with automatic switching capabilities between primary and secondary systems.

The design includes comprehensive safety and operational features with low-point drain pits, receipt and discharge nozzles with compatible coatings, intrinsically safe electrical circuits for hazardous area classification, and an automated tank gauging (ATG) system integrated with control panels. Electrical specifications include motor starter circuits, fuel pump wiring diagrams for multiple pump configurations, leak pit control panel wiring, and site/exterior lighting control systems. The project documentation provides detailed piping and instrument diagrams, equipment schedules listing pump specifications (flow rates, RPM, motor configurations), mechanical abbreviations and legends, and demolition notes for existing fuel system components. All drawings are presented in dual English and Spanish language documentation with graphic scales, sections, and reference notes for construction implementation at the Naval Facilities Engineering System Command Atlantic site.

View the file

Other files

File Type Posted
N6247026R0006 Amendment 0007.pdf PDF
Amendment 0006_Revised F76 Pier 3 Civil Dwgs.pdf PDF
Attachment M - F76 2_PIER3-FINAL_SUBMITTAL-PGS-35-70_SET_2-OF-6.pdf PDF
Amendment 0006_Revised EC502P CATHODIC PROTECTION DETAILS.pdf PDF
Amendment 0006_Revised 01 35 26.pdf PDF
Amendment 0006_Revised 01 45 00.pdf PDF
P919 - Amendment 0006.pdf PDF
Amendment 0006_Revised 01 30 00.pdf PDF
Amendment 0006_Revised Specifications P919.pdf PDF
Amendment 0006_Revised Specifications F76 Pier 3.pdf PDF
Attachment M - F76 1_PIER3-FINAL-REV1_SUBMITTAL-PGS-1-34_SET_1-OF-6.pdf PDF
Attachment M - F76 3_PIER3-FINAL_SUBMITTAL-PGS-62-99_SET_3-OF-6.pdf PDF
Attachment M - F76 5_PIER3-FINAL_SUBMITTAL-PGS-130-149_SET_5-OF-6.pdf PDF
Attachment G - Certificate of Classification Revised.pdf PDF
Attachment P - Photos.pdf PDF
N6247026R0006 Amendment 0005.pdf PDF
P-919 - Amendment 0005.pdf PDF
N6247026R0006 Amendment 0003.pdf PDF
N6247026R0006 Amendment 0002.pdf PDF
P919 Amendment 0002.pdf PDF
N6247026R0006 Amedment 0001.pdf PDF
Attachment B - Bid Schedule Revised.pdf PDF
Attachment M - F74 1_PIER3-FINAL-REV1_SUBMITTAL-PGS-1-34_SET_1-OF-6.pdf PDF
Attachment M - F74 2_PIER3-FINAL_SUBMITTAL-PGS-35-70_SET_2-OF-6.pdf PDF
Attachment M - F74 3_PIER3-FINAL_SUBMITTAL-PGS-62-99_SET_3-OF-6.pdf PDF
Attachment M - F74 5_PIER3-FINAL_SUBMITTAL-PGS-130-149_SET_5-OF-6.pdf PDF
Attachment M - F74 6_PIER3_REFERENCE-DRAWINGS_SET_6-OF-6.pdf PDF
Attachment M - F74 4_PIER3-FINAL_SUBMITTAL-PGS-100-129_SET_4-OF-6.pdf PDF
Attachment N - Specifications -Replace Fuel Pipeline Pier 3 Rota.pdf PDF
N6247026R0006.pdf PDF
ATTACHMENT A - Pre-Proposal Inquiry Form.xlsx XLSX spreadsheet
Attachment E_P919_Specifications.pdf PDF
Attachment_F_P919__Volume_4_of_15.pdf PDF
Attachment_F_P919__Volume_8_of_15.pdf PDF
Attachment_F_P919__Volume_9_of_15.pdf PDF
Attachment B - Price Schedule.pdf PDF
Attachment C - Past Performance Questionnaire (PPQ).pdf PDF
Attachment_F_P919__Volume_6_of_15.pdf PDF
Attachment_F_P919__Volume_10_of_15.pdf PDF
Attachment_F_P919__Volume_11_of_15.pdf PDF
Attachment J - Employee Certification Form.pdf PDF
Attachment K - Temporary Pass Form.xlsx XLSX spreadsheet
Attachment D - Construction Experience Project Data Sheet.pdf PDF
Attachment_F_P919__Volume_1_of_15.pdf PDF
Attachment_F_P919__Volume_2_of_15.pdf PDF
Attachment_F_P919__Volume_5_of_15.pdf PDF
Attachment_F_P919__Volume_12_of_15.pdf PDF
Attachment_F_P919__Volume_14_of_15.pdf PDF
Attachment I - Work Pass Format.pdf PDF
Attachment L - Certificate Insurance Form.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

XXXXXXXXXXXXXXXXXX

X X

X

X

X

X

X

X

X

X

X

X

X

X X

C-101T

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

P-

BU

LK

T

AN

K

FA

RM

IM

PR

O

VE

M

EN

TS

, P

H

AS

E

CIVIL LAYOUT

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

P-

BU

LK

T

AN

K

FA

RM

IM

PR

O

VE

M

EN

TS

, P

H

AS

E

M-001T

³ ³

A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

P-

BU

LK

T

AN

K

FA

RM

IM

PR

O

VE

M

EN

TS

, P

H

AS

E

M-002T

CUT-AND-COVER FUEL SYSTEM FLOW SCHEMATIC

PRVV

A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

P-

BU

LK

T

AN

K

FA

RM

IM

PR

O

VE

M

EN

TS

, P

H

AS

E

M-401T

PUMP VAULT PIPING PLAN

C1

SECTION

A1

SECTION

A4

SECTION

A3

TANK NOZZLES

D4

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

P-

BU

LK

T

AN

K

FA

RM

IM

PR

O

VE

M

EN

TS

, P

H

AS

E

M-402T

ADDITIVE INJECTOR BUILDING PIPING PLAN

C1

SECTION

A2

1565 965965

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

P-

BU

LK

T

AN

K

FA

RM

IM

PR

O

VE

M

EN

TS

, P

H

AS

E

M-403T

TIE-IN VAULT PIPING PLAN

C1

SECTION

C4

A4

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

P-

BU

LK

T

AN

K

FA

RM

IM

PR

O

VE

M

EN

TS

, P

H

AS

E

M-404T

OFF-LOADING PIPING PLAN

D1

SECTION

A1

LEAK DETECTION VAULT

D1

SECTION

B1

MANHOLE WITH TANK VENT PIPING

B1

SECTION

B1

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

P-

BU

LK

T

AN

K

FA

RM

IM

PR

O

VE

M

EN

TS

, P

H

AS

E

M-502T

TYPE 1 SMALL PIPE SUPPORT TYPE 2 FLOOR SUPPORTED LARGE PIPE SUPPORT

LOW POINT DRAIN (LPD) PIT

A1

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

P-

BU

LK

T

AN

K

FA

RM

IM

PR

O

VE

M

EN

TS

, P

H

AS

E

M-504T

RECEIPT NOZZLE

C1

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

P-

BU

LK

T

AN

K

FA

RM

IM

PR

O

VE

M

EN

TS

, P

H

AS

E

M-602T

PIPING & INSTRUMENT DIAGRAM (ADDITIVE SYSTEM)

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

P-

BU

LK

T

AN

K

FA

RM

IM

PR

O

VE

M

EN

TS

, P

H

AS

E

M-603T

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

P-

BU

LK

T

AN

K

FA

RM

IM

PR

O

VE

M

EN

TS

, P

H

AS

E

E-407T

ADDITIVE TANK AREA POWER AND CONTROLS PLAN

C3

LEAK DETECTION PIT ELECTRICAL PLAN

A1

LEAK DETECTION WELL SECTION 1

TYPICAL MOTOR STARTER CIRCUIT

FUEL PUMP WIRING DIAGRAM (P-x)

ATG SYSTEM WIRING DIAGRAM

DRAIN TANK PUMP P-501 WIRING DIAGRAMLEAK PIT CONTROL PANEL WIRING DIAGRAM

LEAK PIT PUMP WIRING DIAGRAM (LDP-101, LDP-201)

SITE/EXTERIOR LIGHTING CONTROL

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

P-

BU

LK

T

AN

K

FA

RM

IM

PR

O

VE

M

EN

TS

, P

H

AS

E

E-602T

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

A

TL

A

N

TI

C

P-

BU

LK

T

AN

K

FA

RM

IM

PR

O

VE

M

EN

TS

, P

H

AS

E

E-609T

P-919 Amendment 0004 Dwgs_Tanks Dwgs.pdf
Sheets and Views
C-101T CIVIL LAYOUT
Plan
M-001T MECHANICAL ABBREVIATIONS
M-401T PUMP VAULT PIPING PLAN
M-002T CUT AND COVER FUEL SYSTEM FLOW SCHEMATIC
M-403T TIE-IN VAULT PIT
M-404T OFF LOADING
M-502T DETAILS
M-504T SUPPORT DETAILS
M-602T PIPING & INSTRUMENT DIAGRAM (ADDITIVE SYSTEM)
M-603T SCHEDULES
E-407T ADDITIVE TANK AREA AND LEAK DETECTION PIT ELECTRICAL PLANS
E-609T CONTROL AND IS CIRCUIT SCHEDULES
Amend 06 Tank Dwgs.pdf
Sheets and Views
M-002T CUT-AND-COVER FUEL SYSTEM FLOW SCHEMATIC
M-403T TIE-IN VAULT PIT
M-602T PIPING & INSTRUMENT DIAGRAM (ADDITIVE SYSTEM)

File details come from the government source that posted it. Updated .