This is a Standard Form 30 (SF-30) Amendment of Solicitation/Modification of Contract issued by NAVFACSYSCOM ATLANTIC on 9 April 2026. The amendment number 0008 is effective 9 April 2026 and applies to solicitation N6247026R0006, dated 4 November 2025, for project P919. The amendment is issued by facility code N62470 in Norfolk, Virginia (23508-1278) and administered by the same office.

The amendment addresses two primary purposes: responses to Pre-Proposal Inquiry (PPI) #215 and provision of revised specifications. PPI #215 requested a defined construction sequence for fuel pipeline works comparable to the detailed sequence provided for fuel storage tanks on Drawing G-011T. The response directs proposers to revised Specification 01 14 00 for projects P-919 and RM19-1428, and revised Specification 01 32 17.00 20 for P-919. The amendment includes revised specification documents in the file "Amendment 0008_Revised Specifications Section 01.pdf." Offerors must acknowledge receipt of this amendment prior to the proposal submission deadline through completion of items 8 and 15, acknowledgment on each copy of the offer, or separate written communication referencing the solicitation and amendment numbers. All terms and conditions of the original solicitation remain unchanged except as explicitly modified herein.

View the file

Other files

File Type Posted
N6247026R0006 Amendment 0009.pdf PDF
Amendment 0008 Revised Specifications_Section 01.pdf PDF
P919 - Amendment 0007.pdf PDF
N6247026R0006 Amendment 0007.pdf PDF
Amendment 0006_Revised Specifications P919.pdf PDF
Amendment 0006_Revised Specifications F76 Pier 3.pdf PDF
Attachment M - F76 6_PIER3_REFERENCE-DRAWINGS_SET_6-OF-6.pdf PDF
Attachment M - F76 5_PIER3-FINAL_SUBMITTAL-PGS-130-149_SET_5-OF-6.pdf PDF
Amendment 0006_Revised Tank DWGs Prime.pdf PDF
Attachment M - F76 3_PIER3-FINAL_SUBMITTAL-PGS-62-99_SET_3-OF-6.pdf PDF
Amendment 0006_Revised F76 Pier 3 Mech Dwgs.pdf PDF
Attachment M - F76 4_PIER3-FINAL_SUBMITTAL-PGS-100-129_SET_4-OF-6.pdf PDF
Amendment 0006_Revised P-919 Dwgs_Pipeline Dwgs.pdf PDF
N6247026R0006 Amendment 0006.pdf PDF
Attachment M - F76 2_PIER3-FINAL_SUBMITTAL-PGS-35-70_SET_2-OF-6.pdf PDF
Attachment M - F76 1_PIER3-FINAL-REV1_SUBMITTAL-PGS-1-34_SET_1-OF-6.pdf PDF
Amendment 0006_Revised 01 30 00.pdf PDF
Amendment 0006_Revised F76 Pier 3 Civil Dwgs.pdf PDF
P919 - Amendment 0006.pdf PDF
Amendment 0006_Revised EC502P CATHODIC PROTECTION DETAILS.pdf PDF
Amendment 0006_Revised 01 45 00.pdf PDF
Amendment 0006_Revised 01 35 26.pdf PDF
Attachment G - Certificate of Classification Revised.pdf PDF
P-919 - Amendment 0005.pdf PDF
N6247026R0006 Amendment 0005.pdf PDF
Attachment P - Photos.pdf PDF
N6247026R0006 Amendment 0004.pdf PDF
N6247026R0006 Amendment 0003.pdf PDF
P919 Amendment 0002.pdf PDF
Site Visit Log (Attachment O).pdf PDF
N6247026R0006 Amendment 0002.pdf PDF
Attachment B - Bid Schedule Revised.pdf PDF
N6247026R0006 Amedment 0001.pdf PDF
Attachment N - Specifications -Replace Fuel Pipeline Pier 3 Rota.pdf PDF
Attachment M - F74 4_PIER3-FINAL_SUBMITTAL-PGS-100-129_SET_4-OF-6.pdf PDF
Attachment M - F74 5_PIER3-FINAL_SUBMITTAL-PGS-130-149_SET_5-OF-6.pdf PDF
Attachment M - F74 6_PIER3_REFERENCE-DRAWINGS_SET_6-OF-6.pdf PDF
Attachment M - F74 2_PIER3-FINAL_SUBMITTAL-PGS-35-70_SET_2-OF-6.pdf PDF
Attachment M - F74 3_PIER3-FINAL_SUBMITTAL-PGS-62-99_SET_3-OF-6.pdf PDF
Attachment M - F74 1_PIER3-FINAL-REV1_SUBMITTAL-PGS-1-34_SET_1-OF-6.pdf PDF
Attachment_F_P919__Volume_12_of_15.pdf PDF
Attachment_F_P919__Volume_2_of_15.pdf PDF
Attachment_F_P919__Volume_9_of_15.pdf PDF
Attachment_F_P919__Volume_1_of_15.pdf PDF
Attachment L - Certificate Insurance Form.pdf PDF
Attachment_F_P919__Volume_7_of_15.pdf PDF
Attachment G - Certificates of Classifications.pdf PDF
Attachment_F_P919__Volume_14_of_15.pdf PDF
Attachment D - Construction Experience Project Data Sheet.pdf PDF
Attachment_F_P919_REFERENCE_Volume_15_of_15.pdf PDF
Show 40 more

Latest 50 of 67 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Block 14 (Description of Amendment/Modification): The purpose of this amendment is to provide the following:

1. Pre-Proposal Inquiries (PPIs) Responses

2. Provide Revised Specifications

1. Responses to Pre-proposal Inquiries (PPIs) # 215

215. Inquiry: The drawings include a detailed Sequence of Construction for the fuel storage tanks, as shown on Drawing G-011T - Sequence of Construction. However, a corresponding construction sequence for the fuel pipeline works is not identified in the drawings or specifications. Given the scope of the fuel pipeline installations, a defined construction sequence for the fuel pipelines is required to properly plan and execute the works.

Please provide the construction sequence applicable to the fuel pipeline works.

Response: Please see revised Specification 01 14 00 for P-919 and RM19-1428; and revised Specification 01 32 17.00 20 for P-919.

2. Provide Revised Specifications

Revised Specifications

Amendment 0008_Revised Specifications Section 01.pdf

N6247026R00060008

IDCode: J
Page: 1
Pages: 2
AmendNo: 0008
EffDate: 09 Apr 2026
ReqNo: See Continuation Sheet
ProjNo: P919
IssCode: N62470
AdmCode:
IssuedBy: NAVFACSYSCOM ATLANTIC

6506 HAMPTON BLVD, NORFOLK VA 23508-1278

NORFOLK, VA 23508-1278

UNITED STATES

Elizabeth Roberts, Email: elizabeth.l.roberts31.civ@us.navy.mil Telephone: 757-322-8273 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: N6247026R0006
SolDate: 04 Nov 2025
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: See Section 00 70 00 - Conditions of the Contract
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: See Schedule
ContNameTitle:
CoNameTitle: KATHLEEN A. DELASHMITT
ContDate:
CODate: 09 Apr 2026