Attachment E - Price Proposal Form.docx

DOCX document 30 KB Posted

Attached to
Small Projects MACC MCAS Beaufort Federal contract opportunity
Solicitation number
N4008523R2575
Issued by
Department of the Navy Naval Facilities Engineering Command

View the file

Other files for this federal contract opportunity

Other files attached to Small Projects MACC MCAS Beaufort, newest first.
File Type Posted
AMENDMENT 0008.pdf PDF
23R2575 AMENDMENT 0007.pdf PDF
Amendment 0007 - Attachment E - Price Proposal Form REV 3.docx DOCX document
23R2575 AMENDMENT 0006.pdf PDF
Amendment 0006 - Attachment E - Price Proposal Form REV 2.docx DOCX document
Amendment 0006 - BLDG-P485-1362850-AE531 - MISCELLANEOUS DETAILS_REV3.pdf PDF
Amendment 0005 - Site Visit Sign-In Sheet.pdf PDF
23R2575 AMENDMENT 0005.pdf PDF
Amendment 0005 - Attachment E - Price Proposal Form REV 1.docx DOCX document
N4008523R2575 AMENDMENT 0004.pdf PDF
N4008523R2575 AMENDMENT 0003.pdf PDF
N4008523R2575 AMENDMENT 0002.pdf PDF
N4008523R2575 AMENDMENT 0001.pdf PDF
Attachment I - ASO 5510.14 Installation Access Control Measures.pdf PDF
Attachment G - 1362850dwg15of15_ELEC.pdf PDF
Attachment G - 1362850dwg8of15_STRUCT.pdf PDF
Attachment G - 1362850dwg4of15_CIVIL.pdf PDF
Attachment G - 1362850dwg12of15_FIRE SUPPRESSION.pdf PDF
Attachment G - 1362850dwg11of15_FIRE ALARM.pdf PDF
N4008523R2575.pdf PDF
Attachment H - P485 OSF_SPECIFICATIONS_VOL 1.pdf PDF
Attachment G - 1362850dwg9of15_ARCH.pdf PDF
Attachment G - 1362850dwg6of15_CIVIL.pdf PDF
Attachment G - 1362850dwg3of15_GEOTECHNICAL.pdf PDF
Attachment G - 1362850Amend0001dwg_CIVIL.pdf PDF
Attachment G - 1362850dwg10of15_SIGNAGE.pdf PDF
Attachment G - 1362850dwg14of15_MECH.pdf PDF
Attachment G - 1362850dwg2of15_LIFE SAFETY.pdf PDF
Attachment F - SECNAV 5512.pdf PDF
Attachment C - Pre-Proposal Inquiry Form.xlsx XLSX spreadsheet
Attachment B - Past Performance Questionnaire (PPQ).pdf PDF
Attachment H - P485 OSF_SPECIFICATIONS_VOL 2.pdf PDF
Attachment G - 1362850Amend0002dwg_ELECTRICAL.pdf PDF
Attachment G - 1362850dwg5of15_ENV.pdf PDF
Attachment D - PIEE Vendor Access Instructions.pdf PDF
Attachment A - Construction and Design Experience Project Data Sheet.docx DOCX document
Attachment G - 1362850dwg1of15_GENERAL.pdf PDF
Attachment G - 1362850dwg7of15_LANDSCAPE.pdf PDF
Attachment G - 1362850dwg13of15_PLUMBING.pdf PDF
Attachment G -1362850Amend0001dwg_ARCHITECTURAL.pdf PDF
Attachment G - 1362850Amend0001dwg_ENVIRONMENTAL.pdf PDF
Show all 41

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P-485 OPERATIONS SUPPORT FACILITY 1362850

MCAS BEAUFORT, SC

PRICE SCHEDULE

Provide line item prices, where indicated by blank underlines, for the following items:

Line Item
Description
Quantity
Unit
Unit Price
Sub-Total
Total Price
0001
BASE PRICE: Total Price for the entire work for P-485 - F-35 Operational Support Facility (OSF) in accordance with the drawings and specifications, but excluding work provided in another Priced lined Item.
1
EA
0001A
Subtotal of Base Price for the entire work for the F35 OSF complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item.
1
EA
0001B
Subtotal of Base Price for the entire project sitework, outside the facility 5-foot line, for the OSF, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
0001C
Price for foundation piling complete in accordance with

drawings and specifications , but excluding work described in another line Item

4,700
LF
$_____
$_____
0001D
Price for pile load test, complete in accordance with

the drawings and specifications, but excluding work described in another line Item

1
EA
$_____
$_____

0001E

Price for relocation of existing groundwater monitoring well in accordance with the drawings and specifications and the following requirements and schedule:
2
EA
$_____
$_____
00001A-E
SUBTOTAL FOR CLIN 0001A-E
0002
Option Item No. 1: Price for Removal, Disposal, and Replacement of Geotechnically Unsuitable Soil in accordance with the drawings, but excluding work described in another line Item
100
CY
$_____
$_____
$_____
0003
Option Item No. 2: Price for stockpiling, sampling, testing, and disposal of soil impacted with petroleum and/or PFAS requiring special handling and disposal in accordance with the drawings and specifications and in accordance with the following schedule:
50
Tons
$_____
$_____
$_____

Option Item No. 3: Price for storing, sampling, testing, and disposal of groundwater or fire water contaminated by PFAS as industrial waste complete in accordance with drawings and specifications and in accordance with the following schedule:

40,000 Gallons
Gallons
$_____
$_____
$_____
0005
Option No. 4: Price for providing work in connection with labor, material, equipment, transportation and supervision required for the Furniture, Fixtures, and Equipment (FF&E), complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item.
Government Estimated Price Government FF&E Estimate:

$28,928.93 HAR Percent (NTE 5%)

___%HAR (NTE 5%)

HAR AMOUNT
HAR Subtotal

Total FF&E Estimated Price

00002-00005
SUBTOTAL FOR CLIN 0002-0005
00001-00005
TOTAL FOR CLIN 0001-0005

GENERAL BID NOTES

a. Award will be made on the total sum of Contract Line Items 0001.

b. The Government reserves the unilateral right to award CLIN 0002, 0003 or 0004 to the Contractor at the proposed price within 30 calendar days after the contract award. A firm fixed proposed price is required for CLIN 0002 through 0005. No provision is made for economic price adjustment.

c. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206(b) Evaluation not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s) to the total price for CLIN 0001. In accordance with FAR 52.217-5 Evaluation of Options, evaluation of options will not obligate the Government to exercise the Option(s).

d. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the additive quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

e. If CLIN 0002, 0003 or 0004 are exercised, additional bonding and consent of surety is required. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all Items.

1.3 PLANNED OPTION BID NOTES

These notes apply to Option 4 CLIN 0005.

a. The estimated amount for FF&E has been supplied by the Government, to provide offerors with the projected magnitude of effort. The estimated amount includes the actual cost of the FF&E including freight and installation charges. The Government FF&E Estimate is only an estimated amount.

b. If awarded, line items will be funded separately after completion of FF&E design package review by the Government, and receipt of appropriate funding by the Government. Requirements and details are provided in Section 01 30 01.00 20 DESIGN PROCUREMENT AND INSTALLATION OF FURNITURE, FIXTURES, AND EQUIPMENT.

c. Bonding is not required for the design, procurement and installation of FF&E.

d. Offerors may propose a Handling and Administration Rate (HAR) for the FF&E not to exceed 5 percent. This fee will account for all administrative costs, overhead, bonding fees, administration of subcontracts, profit, and any other costs associated with and related to the coordination and processing of the procurement and installation of FF&E. The proposed HAR percentage will be incorporated into the contract award and will not be adjusted regardless of fluctuations from the estimate amount for the FF&E. The proposed HAR is a fixed rate.

e. The Government is not obligated to award the Planned Option line item(s). Should the Government choose to award the Planned Option; the line item will be awarded as a negotiated modification to the contract/task order. The Contractor's proposed HAR will be applied to all vendor/supplier costs for the FF&E.

f. If awarded, the FF&E modification will be awarded at least six months prior to the contract completion date. A minimum of six months is required for the Contractor to purchase, deliver and install the FF&E without impacting the overall completion date of the project. The Contractor's schedule must assume the award of the FF&E as a modification. No schedule extensions will be granted if the modification is awarded at least six months prior to the contract completion date. If the Government decides to negotiate and award the furniture modification with less than six months prior to the contact completion date, the Contractor may be entitled to a contract extension and extended field overhead. A contract extension and extended field overhead will only be granted in those cases where the Contractor demonstrates that an accepted Final FF&E package was submitted within the approved schedule deadlines and sufficient lead-time for the FF&E is not available and the Government's award of the modification is in the last six months of the contract.

-- End of Document --

File details come from the government source that posted it. Updated .