N4008523R2575.pdf

PDF 574 KB Posted

Attached to
Small Projects MACC MCAS Beaufort Federal contract opportunity
Solicitation number
N4008523R2575
Issued by
Department of the Navy Naval Facilities Engineering Command

View the file

Other files for this federal contract opportunity

Other files attached to Small Projects MACC MCAS Beaufort, newest first.
File Type Posted
AMENDMENT 0008.pdf PDF
23R2575 AMENDMENT 0007.pdf PDF
Amendment 0007 - Attachment E - Price Proposal Form REV 3.docx DOCX document
23R2575 AMENDMENT 0006.pdf PDF
Amendment 0006 - Attachment E - Price Proposal Form REV 2.docx DOCX document
Amendment 0006 - BLDG-P485-1362850-AE531 - MISCELLANEOUS DETAILS_REV3.pdf PDF
Amendment 0005 - Site Visit Sign-In Sheet.pdf PDF
23R2575 AMENDMENT 0005.pdf PDF
Amendment 0005 - Attachment E - Price Proposal Form REV 1.docx DOCX document
N4008523R2575 AMENDMENT 0004.pdf PDF
N4008523R2575 AMENDMENT 0003.pdf PDF
N4008523R2575 AMENDMENT 0002.pdf PDF
N4008523R2575 AMENDMENT 0001.pdf PDF
Attachment I - ASO 5510.14 Installation Access Control Measures.pdf PDF
Attachment G - 1362850dwg15of15_ELEC.pdf PDF
Attachment G - 1362850dwg8of15_STRUCT.pdf PDF
Attachment G - 1362850dwg4of15_CIVIL.pdf PDF
Attachment G - 1362850dwg12of15_FIRE SUPPRESSION.pdf PDF
Attachment G - 1362850dwg11of15_FIRE ALARM.pdf PDF
Attachment H - P485 OSF_SPECIFICATIONS_VOL 2.pdf PDF
Attachment G - 1362850Amend0002dwg_ELECTRICAL.pdf PDF
Attachment G - 1362850dwg5of15_ENV.pdf PDF
Attachment D - PIEE Vendor Access Instructions.pdf PDF
Attachment A - Construction and Design Experience Project Data Sheet.docx DOCX document
Attachment E - Price Proposal Form.docx DOCX document
Attachment H - P485 OSF_SPECIFICATIONS_VOL 1.pdf PDF
Attachment G - 1362850dwg9of15_ARCH.pdf PDF
Attachment G - 1362850dwg6of15_CIVIL.pdf PDF
Attachment G - 1362850dwg3of15_GEOTECHNICAL.pdf PDF
Attachment G - 1362850Amend0001dwg_CIVIL.pdf PDF
Attachment G - 1362850dwg10of15_SIGNAGE.pdf PDF
Attachment G - 1362850dwg14of15_MECH.pdf PDF
Attachment G - 1362850dwg2of15_LIFE SAFETY.pdf PDF
Attachment F - SECNAV 5512.pdf PDF
Attachment C - Pre-Proposal Inquiry Form.xlsx XLSX spreadsheet
Attachment B - Past Performance Questionnaire (PPQ).pdf PDF
Attachment G - 1362850dwg1of15_GENERAL.pdf PDF
Attachment G - 1362850dwg7of15_LANDSCAPE.pdf PDF
Attachment G - 1362850dwg13of15_PLUMBING.pdf PDF
Attachment G -1362850Amend0001dwg_ARCHITECTURAL.pdf PDF
Attachment G - 1362850Amend0001dwg_ENVIRONMENTAL.pdf PDF
Show all 41

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESIGN-BUILD/DESIGN-BID-BUILD, INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) FIRM FIXED PRICE (FFP) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR GENERAL CONSTRUCTION OF FACILITIES LOCATED AT MCAS BEAUFORT, MCRD PARRIS

ISLAND, AND NAVAL HOSPITAL BEAUFORT

THIS SOLICITATION IS BEING ISSUED AS A HISTORICALLY UNDERUTILIZED BUSINESS ZONE (HUBZONE) SET-ASIDE.

LAURA E. THOMAS 757-341-1624

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

16-Feb-2023

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

X

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______15 calendar days and complete it w ithin ________ calendar days after receiving aw ard, notice to proceed. This performance period is mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________20 Mar 2023 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

NAVFACSYSCOM MID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

N4008523R2575 54

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

N4008523R2575

Section 00 10 00 - Solicitation

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

MCAS Beaufort AOR MACC

FFP

Design-Build/Design-Bid-Build (DB/DBB), Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for General Construction of Facilities Located at MCAS Beaufort, MCRD Parris Island, and Naval Hospital Beaufort FOB: Destination

NET AMT

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 N/A N/A N/A N/A

Section 00 21 00 - Instructions

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.207-6 Solicitation of Offers from Small Business Concerns and

Small Business Teaming Arrangements or Joint Ventures (Multiple-Award Contracts)

OCT 2016

52.211-7 Alternatives to Government-Unique Standards NOV 1999 52.211-14 Notice Of Priority Rating For National Defense, Emergency

Preparedness, and Energy Program Use

APR 2008

52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.215-1 Instructions to Offerors--Competitive Acquisition NOV 2021 52.215-1 Alt I Instructions to Offerors--Competitive Acquisition (NOV

2021) - Alternate I

OCT 1997

52.215-22 Limitations on Pass-Through Charges--Identification of Subcontract Effort

OCT 2009

52.216-27 Single or Multiple Awards OCT 1995 52.222-5 Construction Wage Rate Requirements--Secondary Site of the

Work

MAY 2014

52.222-56 Certification Regarding Trafficking in Persons Compliance Plan.

OCT 2020

52.225-12 Notice of Buy American Requirement - Construction Materials Under Trade Agreements

MAY 2014

252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements MAR 2022 252.215-7008 Only One Offer JUL 2019

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a FIRM FIXED PRICE contract resulting from this solicitation.

(End of provision)

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

Philip Cole, Contracting Officer NAVFAC Mid-Atlantic, Contracting Support Line Capital Improvements/Asset Management (CON21) 9324 Virginia Ave Bldg Z-140, Room 225 Norfolk, VA 23511

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Site visits may be arranged during normal duty hours by contacting:

SITE VISIT INFORMATION TO BE DETERMINED VIA AMENDMENT AT A LATER DATE.

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov/content/regulations

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any Department of Defense Federal Acquisition Regulation Supplement (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.

(b) The use in this solicitation or contract of any FAR or DFARS (48 CFR Chapter 1 and 2) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

(End of clause)

Section 00 21 16 - Instructions to Proposers

INSTRUCTIONS TO OFFERORS

TABLE OF CONTENTS

1. GENERAL

1.1 NOTICE TO OFFERORS

1.2 GENERAL OVERVIEW OF PROCUREMENT PROCESS

1.3 GENERAL OVERVIEW OF CONTRACT

2. GENERAL OVERVIEW OF THE SEED PROJECT

3. BASIS FOR AWARD

4. EVALUATION FACTORS FOR AWARD

5. PROPOSAL REQUIREMENTS

5.1 PRE-PROPOSAL CONFERENCE AND SITE VISIT

5.2 PROPOSAL SUBMISSION INSTRUCTIONS

5.3 PRE-PROPOSAL INQUIRIES (PPIS)

5.4 CONTRACT OPPORTUNITIES (SAM.GOV)

5.5 INCORPORATION OF TECHNICAL PROPOSALS

6. ATTACHMENTS:

ATTACHMENT A – CONSTRUCTION EXPERIENCE PROJECT DATA SHEET

ATTACHMENT B – PAST PERFORMANCE QUESTIONNAIRE

ATTACHMENT C – PPI LOG TEMPLATE

ATTACHMENT D – PIEE VENDOR ACCESS INSTRUCTIONS

ATTACHMENT E – PRICE PROPOSAL FORM

ATTACHMENT F – SECNAV 5512

1. GENERAL

1.1 NOTICE TO OFFERORS

THIS SOLICITATION IS BEING ISSUED AS A HISTORICALLY UNDERUTILIZED BUSINESS ZONE

(HUBZONE) SET-ASIDE. THE NAICS CODE FOR THIS PROCUREMENT IS 236220 AND THE SIZE

STANDARD IS $45M.

1.2 GENERAL OVERVIEW OF PROCUREMENT PROCESS

This solicitation is formatted as a Request for Proposal (RFP) in accordance with the requirements designated by sections of the FAR 15.203. This method permits evaluation of proposals based on price competition, technical merit and other factors; permits impartial and comprehensive evaluation of offerors' proposals; permits discussions if necessary; and ensures selection of the source(s) whose performance provides the best value to the Government.

This acquisition will be solicited as a competitively negotiated procurement as a HUBZone set-aside.

The Government reserves the right to reject any or all proposals at any time prior to award; to negotiate with any or all offerors; to award the contracts to other than the offeror submitting the lowest total price; to award to other than the offeror submitting the highest technically rated proposal; and to award to the offeror submitting the proposal determined by the Government to be the most advantageous (best value) to the Government. OFFERORS ARE

ADVISED THAT AWARD MAY BE MADE WITHOUT DISCUSSION OR ANY CONTACT CONCERNING

THE PROPOSALS RECEIVED. Therefore, proposals should be submitted initially on the most favorable price and technical terms. Offerors should not assume that they will be contacted or afforded an opportunity to qualify, discuss, or revise their proposals. However, the Government reserves the right to clarify certain aspects of proposals or conduct discussions providing an opportunity for the offeror to revise its proposal.

1.3 GENERAL OVERVIEW OF CONTRACT

This acquisition will result in the award of approximately five (5), Firm Fixed Price (FFP) Indefinite- Delivery/Indefinite Quantity (IDIQ), Design-Build and Design-Bid-Build Multiple Award Construction Contracts (MACCs) for the Marine Corps Air Station (MCAS) Beaufort, Marine Corps Recruit Depot (MCRD) Parris Island, and Naval Hospital Beaufort, South Carolina, and may be required in other areas in the area of responsibility of NAVFAC Mid-Atlantic if deemed necessary. The Government intends to award no more than five (5) contracts resulting from this solicitation to the responsible offerors whose proposals represent the best value after evaluation in accordance with the factors in the solicitation.

Construction projects to be performed under this MACC will require the ability to manage multiple task orders concurrently across the MCAS Beaufort, MCRD Parris Island, and Naval Hospital Beaufort AOR. This MACC will encompass a wide range of DB and DBB construction projects that include, but are not limited to, new construction, demolition, repair, alteration, and renovation of buildings, systems and infrastructure. Types of facilities may include administrative, industrial, maintenance, warehouses, communications, personnel support, recreational, lodging, medical, training, ranges, and roads. Lead or asbestos abatement may be required in accomplishment of the work. Work in explosive facilities and/or sites may be required. Work associated with this MACC will be in support of the MCAS Beaufort, MCRD Parris Island, and Naval Hospital Beaufort AOR managed by NAVFAC Mid-Atlantic. Work may be required in other areas in the area of responsibility of NAVFAC Mid-Atlantic if deemed necessary.

The completion date for the basic contract is one (1) year from the date of contract award with four (4) one-year option periods. The total five-year (base and four one-year options) estimated construction cost for all contracts is not to exceed $120,000,000.00 for the life of the contract. Projects for the MACC have an estimated construction cost between $150,000 and $5,000,000; however, smaller and larger dollar value projects may be considered at the discretion of the Contracting Officer. The Government guarantees an award amount of $5,000.00 to each successful offeror over the full term of the contract, including option years.

After award of the initial contracts and “seed” project, the successful IDIQ contractors will compete for task orders based on best value, using the tradeoff process or lowest price technically acceptable (to include lowest price). Only the successful IDIQ contractors will compete for task orders.

The intent of this contract is that all MACC Contractors participate in pre-proposal conferences and site-visits and submit proposals on each task order. Contract awardees will be expected to submit a proposal for all Task Order Requests for Proposal (RFP) received from the Government. However, in the event a MACC awardee is unable to submit a proposal on a particular RFP, the contractor is required to notify, in writing, the Contracting Officer who issued the RFP and the ACO for the basic contract within five (5) working days from receipt of the RFP. A MACC awardee can only elect to withdraw from submitting a proposal on three (3) task order RFPs during the course of each year of the contract (base plus four options). Additional withdrawal requests, in excess of three per year, may result in the Government choosing not to exercise remaining option terms.

Each task order will contain project specific evaluation factors that will vary depending on the unique requirements for each task order. Additionally, each task order will cite a specific completion date and associated liquidated damages.

Contractor Performance Information: Contractor’s performance will be evaluated using the respective contractor performance evaluation report entry system located on the website http://www.cpars.gov/. Prior to commencement of work the contractor is required to provide the government with the name, phone number and e-mail address of the “Contractor’s Representative” that will be responsible for receipt and review of draft performance evaluations prepared by the government in the appropriate system. It is the contractor’s responsibility to keep this contact information current.

2. GENERAL OVERVIEW OF THE SEED PROJECT

The initial project (seed project) to be awarded as the first task order along with the basic contract will be Design- Bid-Build (DBB), P485 - F35 Operational Support Facility, at Marine Corps Air Station (MCAS) Beaufort, South Carolina. The anticipated scope of work includes providing construction of a new 12,000 SF operational support facility. Site preparation includes site clearing, excavation, and preparation for construction. Special foundation features include a pile supported foundation system. Paving and site improvements include landscaping, curbs, signage, sidewalks, storm water management, earthwork, grading, and approximately 337 m of level 2 fencing.

Electrical utilities include primary and secondary distribution systems, transformer, interior and site lighting, and telecommunications information systems. Mechanical utilities include heating and ventilation, water lines, fire protection system and supply lines. There is one option associated with this project.

* Solicitation Section 01 00 00 will include the General Requirements for the seed project.

Pursuant to FAR 52.232-18, Availability of Funds, the Government's obligation under this solicitation, or any task order or contract that might result from the solicitation is entirely subject to, and contingent upon, the availability of appropriated funds. Should the Government be unable to award the seed project, the Government guarantees an award in the amount of $5,000.00 to each successful offeror upon award of the Multiple Award Construction Contracts. This minimum guarantee is over the full term of the contract, including option years. No legal liability on the part of the Government shall arise until funds are made available to the Contracting Officer and a task order or contract is awarded by the Contracting Officer. Any offeror proposing on this solicitation does so at its own cost and with the full knowledge that a task order for the seed project, might not result from this solicitation.

3. BASIS FOR AWARD

The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contracts; to negotiate with offerors in the competitive range; and to award the contracts to the offerors submitting the proposals determined to represent the best value—the proposals most advantageous to the Government, cost/price and other factors considered.

The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

The tradeoff process is selected as appropriate for this acquisition. The Government considers it to be in its best interest to allow consideration of award to other than the lowest priced offeror or other than the highest technically rated offeror.

The relative order of importance of the non-cost/price evaluation factors is the technical factors Factors 1, 2, 3 are of equal importance to each other and, when combined, are equal in importance to the past performance evaluation/performance confidence assessment factor (Factor 4). When the proposal is evaluated as a whole, the technical factors and past performance/performance confidence assessment factor combined (i.e., the non-cost/price evaluation factors) are approximately equal to price.

3.5 Any proposal found to have a Deficiency in meeting the stated solicitation requirements or performance objectives will be considered ineligible for award, unless the Deficiency is corrected through discussions. Proposals may be found to have either a Significant Weakness or multiple Weaknesses that impact either the individual factor rating or the overall rating for the proposal. The evaluation report must document the evaluation board’s assessment of the identified Weakness(s) and/or Significant Weaknesses and the associated risk to successful contract performance resulting from the Weakness(s) and/or Significant Weaknesses. This assessment must provide the rationale for proceeding to award without discussions.

4. EVALUATION FACTORS FOR AWARD

1. The solicitation requires the evaluation of price and the following non-price factors:

Factor 1 – Corporate Experience Factor 2 – Safety Factor 3 – Management Approach Factor 4 – Past Performance

The distinction between corporate experience and past performance is corporate experience pertains to the types of work and volume of work completed by a contractor that are comparable to the types of work covered by this requirement, in terms of size, scope, and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.

2. The relative order of importance of the non-price evaluation factors is the technical factors (Factors 1, 2, and 3) are of equal importance to each other and, when combined, are equal in importance to the past performance evaluation/performance confidence assessment factor (Factor 4). When the proposal is evaluated as a whole, the technical factors and past performance evaluation/performance confidence assessment factor combined (i.e., the non-price evaluation factors) are approximately equal to price.

The importance of price will increase if the Offerors’ non-price proposals are considered essentially equal in terms of overall quality, or if price is so high as to significantly diminish the value of a non-price proposal’s superiority to the Government. Award will be made to the responsible Offerors whose offers conform to the solicitation and represents the best value to the Government, price and non-price factors considered.

3. Basis of Evaluation and Submittal Requirements for Each Factor.

(a) Price:

(1) Solicitation Submittal Requirements:

Price shall be submitted on the Price Proposal Form included in the solicitation. The offeror shall submit one (1) electronic copy marked original via PIEE, one (1) hard copy marked copy and one (1) CD of the solicitation submittal requirements identified below. In case of variation, the original electronic copy proposal takes precedence over hard copies. Also, price information included in the non-price/technical proposal will not be considered.

Likewise, non- price/technical information included in the price proposal will not be considered.

• Cover page with solicitation number, solicitation title, offeror name, address, phone number, fax number, SAM Unique Identifier Number, CAGE code, and Federal Tax ID, Point of Contact (POC), POC phone number, and POC email address;

• Completed SF 1442 signed with all amendments acknowledged;

• Price Proposal Form for the Seed Project;

• Copy of Representation and Certifications and proof of registration in System for Award

Management (SAM);

• Confirmation of filing of Veterans’ Employment and Training (VETS) VETS-4212 for the 2022 filing cycle;

• Bid Guarantee in accordance with FAR Clause 52.228-1, Bid Guarantee. Amount shall be at least

20 percent of the proposed price, but shall not exceed $3 million; and

• Responsibility Determination Information (see below).

In the event of a discrepancy between the original and copies, the electronic version marked “Original” of the proposal will govern. Additionally, hard copy proposals shall match the electronic version of the proposal. Also, price information included in the non-price/technical proposal will not be considered. Likewise, non-price/technical information included in the price proposal.

The offeror is required to submit a complete Price Proposal Form that includes completion of all contract line items numbers (CLINs). Pricing information is not required to be completed under Section 00010 – Solicitation Contract Form in SF 1442. All required proposal documents shall be submitted in accordance with FAR 15.208.

(i) Executed SF1442. Offeror shall insert its company name and address in Block #14, telephone number in Block #15, acknowledge all amendments in Block #19 (if applicable), name and title of person authorized to sign in Block #20A, signature in Block #20B, and offer date in Block #20C of the SF1442. In addition, Offeror shall provide its SAM Unique Identifier Number, CAGE code, and Federal Tax ID number with its proposal.

(ii) Completed Price Proposal Form for the Seed Project that includes all contract line item numbers (CLINs).

(iii) Bid bond (SF-24). Offeror shall submit a bid bond (SF-24) in the amount of 20% of total project bid price for the seed project or $3M, whichever amount is less. The bid bond shall be in the name of the offeror identified on the SF1442.

(iv) SAM registration. Offeror shall ensure current registration on the SAM Website, www.sam.gov, including Annual Representations and Certifications are complete and updated for this procurement. If a Representation or Certification required by Section 00600 of the RFP is not provided in SAM, include the representation or certification in your price proposal.

(v) FAPIIS Certification. Offeror shall ensure Federal Awardee Performance and Integrity Information System (FAPIIS) Certification as required by FAR 52.209-7, Information Regarding Responsibility Matters.

(vi) VETS-4212 registration. Offeror shall ensure a current VETS-4212 report has been submitted to the Department of Labor (DOL) website, http://www.dol.gov/vets/vets4212.htm, if the Offeror is required to submit.

An email confirmation of submission can be requested and received by the Offeror from the DOL website and submitted in the price proposal. If the Offeror is not required to submit a report to VETS-4212, include a brief statement and justification explaining why the Offeror is not required to submit a report. Visit the VETS-4212 website for details concerning if your company is required to submit a VETS-4212 report and to request an email confirmation of submission.

Proposal packages from unsuccessful offerors will not be returned to the offeror, but shall be destroyed by the Contracting Officer. No certificate of destruction will be issued.

ADDITIONAL INFORMATION TO BE SUBMITTED WITH PRICE PROPOSAL PACKAGE:

RESPONSIBILITY DETERMINATION INFORMATION - In order to be eligible for award, the offeror must be determined responsible in accordance with FAR Part 9, specifically 9.104-1, General Standards.

Although required to be submitted with offeror’s price proposal, this information will not be evaluated as part of the price proposal. This information forms the basis of your firm’s responsibility determination should your firm be considered for award. In a separate Tab, the offeror shall provide the following information in the price proposal package:

1. One (1) Signed Bank Reference demonstrating adequate financial resources. If offeror’s firm has a line of credit – provide information on how many figures offeror can borrow against the line of credit (i.e. medium 6 figures – exact line of credit is not required).

2. The offeror shall provide the latest three complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm, if practicable, or signed by an authorized officer of the organization.

Submit evidence of availability of working/operating capital, which will be used for the performance of the resultant contract. For Joint Venture arrangements, submit the latest three complete fiscal year financial statements for each company in the Joint Venture and discuss the financial responsibilities among the companies. The Government may also utilize Dun & Bradstreet reports to evaluate the financial capacity of the offeror.

3. Description of offeror’s facilities and equipment.

4. Other offeror’s work presently under contract.

(2) Basis of Evaluation: The Government will evaluate price based on the total price. Total price consists of the basic requirements and all option items (see attached Price Proposal Form). The Government intends to evaluate all options and has included the provision FAR 52.217-5, Evaluation of Options (JUL 1990) in the solicitation. In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the option(s). Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:

(i) Comparison of proposed prices received in response to the RFP.

(ii) Comparison of proposed prices with the IGCE.

(iii) Comparison of proposed prices with available historical information.

(iv) Comparison of market survey results.”

(b) Non-cost/price Factors:

The offeror shall submit one (1) electronic copy marked “Original” via PIEE, one (1) hard copy marked ”Copy,” and one (1) CD in accordance with the solicitation submittal requirements identified below. In the case of a conflict between submissions, the electronic proposal marked “Original” and submitted via PIEE shall govern. Also, price information included in the non-price/technical proposal will not be considered.

Likewise, nonprice/technical information included in the price proposal will not be considered.

All submissions shall including the following characteristics:

• Text pages 8 ½ x 11 format

• Drawings 11x17 inches and folded down to 8-1/2 x 11 inches

• 10 point font

• One complete electronic copy of the non-price/technical proposal factors as a single .pdf searchable file on the CD-ROM (include with the “Original” hard copy of non-price/technical submission).

• Include a cover page with Solicitation Number, Solicitation Title, Prime Contractor Name, Address, Phone Number, Fax Number, UEI, Cage Code, Point of Contact, Title, phone number, and email address. *If proposing as a JV, please include the CAGE and UEI for each partner.

(1) Factor 1, Corporate Experience:

(i) Solicitation Submittal Requirements:

Construction Experience:

Offerors shall submit a minimum of three (3) up to a maximum of five (5) relevant construction projects as the prime contractor that best demonstrates your experience on relevant projects that are similar in size, scope, and complexity to the projects proposed for this MACC.

For purposes of this evaluation, a relevant project is further defined as follows:

Size: A final construction cost of $250,000 or greater. At least one (1) relevant project must have a final construction cost of $2,000,000 or greater.

Scope/Complexity: Individual projects shall demonstrate experience with at least one of the following:

• New building construction or building addition of a commercial and institutional buildings

• Renovation of a building that includes repairs/alterations to multiple building systems and infrastructures (e.g. mechanical, electrical, architectural, fire protection).

Additionally, in addition to meeting the above Size and Scope/Complexity, all submitted relevant projects shall demonstrate the following characteristics:

a) Experience as the prime contractor on all submitted projects. The Government will not consider experience of proposed subcontractors.

b) Experience with new construction or building addition (at least one (1) relevant project).

c) Experience with renovation or alteration that contains multiple building systems (at least one (1) relevant project).

d) Experience with design-build projects (at least one (1) relevant project).

Note: The Offeror must clearly state which building systems the renovation project includes within their narrative.

The board may assign a rating of Not Relevant if unable to determine which building systems were performed.

Additionally, work ancillary to a main system will not be considered as multiple systems (e.g. electrical work ancillary to mechanical installation).

Note: Projects submitted that only include horizontal or civil site work will not be considered.

Projects submitted for the Offeror shall have been completed within the past five (5) years of the date of issuance of this RFP. If the contract completion date is not clearly identified, the Government may deem the project Not Relevant.

For all submitted projects, ensure that the project description clearly identifies whether or not the project is new construction or renovation, the final construction cost, and addresses how the project meets the scope/complexity requirements. The absence of any such information may result in the Project being considered Not Relevant, which could result in a rating of UNACCEPTABLE for this Factor.

A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project and will not be considered; rather, Offerors shall submit the work performed under a task order as a project.

The attached Construction & Design Experience Project Data Sheet (Attachment A) is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrate Construction and Design Experience, submit separate Project Data Sheets for construction and design or the Government may not consider the project. Except as specifically requested, the Government will not consider information submitted in addition to this form nor will the Government consider information submitted via any other medium. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages). Information beyond this page limit will not be considered.

If the offeror is a Joint Venture (JV), recent/relevant experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have such experience, recent/relevant experience may be submitted for individual JV partners. Experience submitted for individual JV partners in which the company was a partner in a different Joint Venture entity may be submitted to demonstrate relevant project experience; however, the Offeror must specifically address what portion of the work under the submitted project was performed by the JV partner offering on this contract and demonstrate that the work meets the above requirements or the project may be considered not relevant. Offerors who fail to submit experience for all JV members may be rated lower (except forofferors covered by Mentor-Protege Agreements approved by the Small Business Administration). Offerors are still limited to a total of five (5) projects combined. Offerors proposing as a JV shall submit a signed JV agreement.

For Mentor-Protégé Joint Ventures, the offeror shall submit the signed and U.S. Small Business Administration (SBA) approved Mentor-Protégé agreement.

If an offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract. If meaningful involvement is not demonstrated, experience of the affiliate/subsidiary/parent firm will not be considered, and will be deemed “Not Relevant”.

Design Experience:

While the seed project is not design-build, design-build projects may be contemplated under this MACC. Therefore, the offeror is required to address the design firm to be proposed on future projects.

Offerors shall clearly state the Architect-Engineer firm that is proposed to be utilized as the Designer of Record (DOR) for future task orders under this MACC. Provide the full name of the firm, address, DUNS number, and CAGE code. The designated firm will be required to be utilized as the DOR on future design-build task orders under the resulting MACC, unless a substitution is approved by the Contracting Officer for the proposed task order.

Offerors shall submit a minimum of three (3) up to a maximum of five (5) relevant projects performed by the designer of record (DOR) that best demonstrate the DOR’s experience in a diverse range of design tasks similar in size, scope, and complexity to the projects proposed for this MACC.

For purposes of this evaluation, a relevant design project is further defined as follows:

Size: A design project with a final construction cost of $250,000 or greater. At least (1) one relevant project must have a final construction cost of $2,000,000 or greater.

Scope/Complexity: Individual projects shall demonstrate experience with at least one of the following:

• New building construction or building addition of a commercial and institutional buildings

• Renovation of a building that includes repairs/alterations to multiple building systems and infrastructures (e.g. mechanical, electrical, architectural, fire protection).

Additionally, in addition to meeting the above Size and Scope/Complexity, all submitted relevant design projects shall demonstrate the following characteristics:

1. Experience as the prime contractor on all submitted projects. The Government will not consider experience of proposed subcontractors.

b) Experience with new construction or building addition (at least one (1) relevant project).

c) Experience with renovation or alteration that contains multiple building systems (at least one

(1) relevant project).

Note: The Offeror must clearly state which building systems the renovation project includes within their narrative.

The board may assign a rating of Not Relevant if unable to determine which building systems were performed.

Additionally, work ancillary to a main system will not be considered as multiple systems (e.g. electrical work ancillary to mechanical installation).

Note: Projects submitted that only include horizontal or civil site work will not be considered.

Projects submitted for the DOR shall have been completed within the past five (5) years of the date of issuance of this RFP. Submitted projects that were not completed within this timeframe will be considered “Not Relevant”. For design-build projects, the design portion of the contract shall have been completed within the past five (5) years of the date of issuance of this RFP. The design completion date shall be clearly stated on the Construction & Design

Experience Project Data Sheet (Attachment A). The project will be considered “Not Relevant” if the design completion date is not clearly provided.

For all submitted projects, ensure that the project description clearly identifies whether or not the project is new construction or renovation, the final construction cost, and addresses how the project meets the scope/complexity requirements. The absence of any such information may result in the Project being considered Not Relevant, which could result in a rating of UNACCEPTABLE for this Factor.

A project is defined as a complete design effort performed under a single task order or contract/subcontract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project and will not be considered; rather, Offerors shall submit the work performed under a task order as a project.

The attached Construction & Design Experience Project Data Sheet (Attachment A) is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrate Construction and Design Experience, submit separate Project Data Sheets for construction and design or the Government reserves the right to not consider the project. Except as specifically requested, the Government will not consider information submitted in addition to this form nor will the Government consider information submitted via any other medium. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages). Information beyond this page limit will not be considered.

If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract. If meaningful involvement is not demonstrated, experience of the affiliate/subsidiary/parent firm will not be considered, and will be deemed “Not Relevant”.

The Offeror may utilize experience of a design subcontractor as the Designer of Record in order to demonstrate design experience under this evaluation factor. The Offer must provide a supporting joint venture agreement, partnership agreement, teaming agreement, or letter of commitment and an explanation of the meaningful involvement for the design subcontractor. If the agreement/letter is not provided or meaningful involvement is not demonstrated, experience of the proposed designer will not be considered.

(ii) Basis of Evaluation:

The basis of evaluation will include the Offeror’s demonstrated experience and depth of experience in performing relevant construction and design projects as defined in the solicitation submittal requirements. The assessment of the Offeror’s relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP. The Government will only review the first five projects submitted for construction and the first five projects submitted for design. Any projects submitted in excess of the five (5) for Construction Experience and five (5) for Design Experience will not be considered.

Relevant projects where the Offeror and the proposed design firm(s) have previously worked together may be considered more favorably than those that have not worked together.

Relevant projects that demonstrate the ability to perform multiple projects simultaneously may be considered more favorably than those who do not have experience performing multiple simultaneous projects.

(2) Factor 2, Safety

The Offeror shall submit the following information: The Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate; and Total Case Rate (TCR) for the specified five (5) Calendar Years (CY), as well as a safety narrative, as described further below. For a partnership or joint venture, the Offeror shall submit separate DART rates and TCR for the specified five (5) CY for each contractor who is part of the partnership/joint venture; however, only one safety narrative is required. Any fatalities experienced within this 5-year timeframe must be explained in detail, to include root cause and corrective actions.

NOTE: DART and TCR shall not be submitted for subcontractors

1. DART Rate: Submit five (5) previous complete calendar years’ [CY2018, CY2019, CY2020, CY2021, and CY2022] worth of data (not an overall average). If the Offeror has no DART rate, for any year, affirmatively state so and explain why. Should a negative trend occur above moderate risk levels, an acceptable/detailed explanation is required that includes any corrective actions taken for improvement.

a. DART cases include injuries or illnesses resulting in death, days away from work, and/or restricted work or transfer to another job days beyond the day of injury/illness.

b. Calculation of DART rate: Multiply the total number of DART cases by 200,000, and then divide by the number of employee labor hours worked.

2. TCR Rate: Submit five (5) previous complete calendar years’ [CY2018, CY2019, CY2020, CY2021, and CY2022] worth of data (not an overall average). If the Offeror has no TCR rate, for any year, affirmatively state so and explain why. Should a negative trend occur above moderate risk levels, an acceptable/detailed explanation is required that includes any corrective actions taken for improvement.

a. TCR cases include injuries or illnesses resulting in death, days away from work, restricted work or transfer to another job days beyond the day of injury/illness, medical treatment beyond first aid, or loss of consciousness.

b. Calculation of TCR rate: Multiply the total number of TCR incidents by 200,000, and then divide by the number of employee labor hours worked.

3. Technical Approach to Safety: Submit a narrative that addresses the following:

a. Describe the Offeror’ s approach to implementing and executing a Safety Management System (SMS) including Management/Leadership involvement, Employee involvement, Hazard prevention, Hazard control, Worksite analysis, and Safety and health training, to include the standard(s) used to benchmark the SMS.

b. Describe the evaluation process used to select potential subcontractors.

c. Describe the processes of how the Offeror will oversee safety compliance of subcontractors at all levels throughout performance of the contract (to include the Offeror’s own in-house workforce).

d. The Technical Approach to Safety narrative shall be limited to two (2) single-sided pages or one

(1) double-sided page.

4. The Government reserves the right to review other available sources (public/Government internal) of information. These may include but are not limited to OSHA data, NAVFAC’s Contractor Incident Reporting System (CIRS), Contractor Performance Assessment Reporting System (CPARS), Electronic Contract Management System (eCMS), etc

(ii) Basis of Evaluation:

The Government is seeking to determine that the Offeror has consistently demonstrated a commitment to safety and that the Offeror plans to properly manage and implement safety procedures for itself and its subcontractors. The evaluation will collectively consider the DART rate, TCR, Technical Approach to Safety, and other sources of information available to the Government as part of such collective evaluation. The board will evaluate the DART rates and TCR to determine if the Offeror has demonstrated a history of safe work practices taking into account any negative trends and extenuating circumstances that impact the rating.

1. DART Rate: The board will evaluate trends over the last five years considering changes that take it from one risk level (or more) to the next up or down. Negative trends occurring above moderate risk levels require the offeror to provide a detailed explanation that includes any corrective actions taken for improvement.

a. Missing data without an explanation is considered a deficiency.

b. Declining trends that push the risk levels from Moderate Risk (MR) or higher to Low Risk (LR) or Very Low Risk (VLR) would indicate a strength.

c. An increasing DART rate trend could be considered a weakness (i.e. MR or better to High Risk (HR) or Extremely High Risk EHR)) if an acceptable explanation is not provided for any trends that rise above Moderate.

d. This chart correlates the DART rate to the level of risk:

Risk DART Rate Very Low Risk Less Than 1.0 Low Risk From 1.0 to 1.99 Moderate Risk From 2.0 to 2.99 High Risk From 3.0 to 4.0 Extremely High Risk Greater than 4.0

2. TCR Rate: The board will evaluate trends over the last five years considering changes that take it from one risk level (or more) to the next up or down. Negative trends occurring above moderate risk levels require the offeror to provide a detailed explanation that includes any corrective actions taken for improvement.

a. Missing data without…

This is the start of the file's text. The full file is on GovTribe.