Attachment E_P919_Specifications.pdf

PDF 16 MB Posted

Attached to
P919 - Phase I, Bulk Fuel Tank Farm Improvements, Naval Station Rota, Spain
Solicitation number
N6247026R0006
Issued by

About this file

This document is a Specification for the P-919 Bulk Tank Farm Improvements, Phase 1 project at Naval Station Rota, Spain.

The project involves constructing two new 50,000-gallon "cut-and-cover" tanks with dedicated pump vaults, associated pumping equipment, and standby generators. Key elements include removing out-of-service piping, conducting hazardous material surveying and testing, designing an 18-inch diameter fuel pipeline from Pier 3 to the Bulk Tank Farm, and installing the pipeline via Horizontal Directional Drilling (HDD) method under the Rio Salado River. The project also includes designing a cathodic protection system for both tanks and pipeline. The work is located at Naval Station Rota, Spain, and will involve extensive site civil work, mechanical installations, electrical systems, and structural improvements. The project drawings include comprehensive plans covering civil, structural, architectural, mechanical, electrical, and fire protection aspects of the tank farm improvements.

View the file

Other files

File Type Posted
Amendment 0008 Revised Specifications_Section 01.pdf PDF
N6247026R0006 Amendment 0007.pdf PDF
P919 - Amendment 0007.pdf PDF
Amendment 0006_Revised F76 Pier 3 Civil Dwgs.pdf PDF
Attachment M - F76 2_PIER3-FINAL_SUBMITTAL-PGS-35-70_SET_2-OF-6.pdf PDF
P919 - Amendment 0006.pdf PDF
Amendment 0006_Revised 01 30 00.pdf PDF
Amendment 0006_Revised Specifications P919.pdf PDF
Amendment 0006_Revised Specifications F76 Pier 3.pdf PDF
Attachment M - F76 1_PIER3-FINAL-REV1_SUBMITTAL-PGS-1-34_SET_1-OF-6.pdf PDF
Attachment M - F76 3_PIER3-FINAL_SUBMITTAL-PGS-62-99_SET_3-OF-6.pdf PDF
Attachment M - F76 5_PIER3-FINAL_SUBMITTAL-PGS-130-149_SET_5-OF-6.pdf PDF
Attachment M - F76 6_PIER3_REFERENCE-DRAWINGS_SET_6-OF-6.pdf PDF
Amendment 0006_Revised EC502P CATHODIC PROTECTION DETAILS.pdf PDF
N6247026R0006 Amendment 0005.pdf PDF
P-919 - Amendment 0005.pdf PDF
Attachment G - Certificate of Classification Revised.pdf PDF
Attachment P - Photos.pdf PDF
N6247026R0006 Amendment 0003.pdf PDF
N6247026R0006 Amendment 0002.pdf PDF
P919 Amendment 0002.pdf PDF
N6247026R0006 Amedment 0001.pdf PDF
Attachment B - Bid Schedule Revised.pdf PDF
Attachment M - F74 4_PIER3-FINAL_SUBMITTAL-PGS-100-129_SET_4-OF-6.pdf PDF
Attachment N - Specifications -Replace Fuel Pipeline Pier 3 Rota.pdf PDF
Attachment M - F74 1_PIER3-FINAL-REV1_SUBMITTAL-PGS-1-34_SET_1-OF-6.pdf PDF
Attachment M - F74 2_PIER3-FINAL_SUBMITTAL-PGS-35-70_SET_2-OF-6.pdf PDF
Attachment M - F74 3_PIER3-FINAL_SUBMITTAL-PGS-62-99_SET_3-OF-6.pdf PDF
Attachment M - F74 5_PIER3-FINAL_SUBMITTAL-PGS-130-149_SET_5-OF-6.pdf PDF
Attachment M - F74 6_PIER3_REFERENCE-DRAWINGS_SET_6-OF-6.pdf PDF
N6247026R0006.pdf PDF
ATTACHMENT A - Pre-Proposal Inquiry Form.xlsx XLSX spreadsheet
Attachment_F_P919__Volume_4_of_15.pdf PDF
Attachment_F_P919__Volume_8_of_15.pdf PDF
Attachment_F_P919__Volume_9_of_15.pdf PDF
Attachment D - Construction Experience Project Data Sheet.pdf PDF
Attachment_F_P919__Volume_1_of_15.pdf PDF
Attachment_F_P919__Volume_2_of_15.pdf PDF
Attachment_F_P919__Volume_5_of_15.pdf PDF
Attachment_F_P919__Volume_12_of_15.pdf PDF
Attachment_F_P919__Volume_14_of_15.pdf PDF
Attachment I - Work Pass Format.pdf PDF
Attachment L - Certificate Insurance Form.pdf PDF
Attachment B - Price Schedule.pdf PDF
Attachment C - Past Performance Questionnaire (PPQ).pdf PDF
Attachment_F_P919__Volume_6_of_15.pdf PDF
Attachment_F_P919__Volume_10_of_15.pdf PDF
Attachment_F_P919__Volume_11_of_15.pdf PDF
Attachment J - Employee Certification Form.pdf PDF
Attachment K - Temporary Pass Form.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WORK ORDER NO.

At the

PREPARED BY:

Architectural: Mechanical:

Civil: Electrical:

Structural:

APPROVED BY:

Specifications:

For Commander, NAVFAC:

Date:

Submitted By: Date:

nancy.wroten Line

HAVING PARTICIPATED IN THE DESIGN OF PROJECT No. 1671552, P-919 - BULK TANK FARM

IMPROVEMENTS, ROTA NAVAL STATION, SPAIN, AND HAVING THOROUGHLY REVIEWED THE

COMPLETED PROJECT DOCUMENTS, I DECLARE THAT THE FACILITIES DESIGN INCLUDED HEREIN

COMPLIES WITH ALL APPLICABLE SPANISH AND EUROPEAN CODES AND LAWS.

HABIENDO PARTICIPADO EN EL DISEÑO DEL PROYECTO Nº 1671552, P-919 - BULK TANK FARM

IMPROVEMENTS EN LA BASE NAVAL DE ROTA, ESPAÑA, Y HABIENDO REVISADO LOS DOCUMENTOS

DEL PROYECTO COMPLETO, DECLARO QUE EL DISEÑO DE LAS INSTALACIONES INCLUIDAS AQUÍ

CUMPLE CON TODA LA NORMATIVA Y LEYES APLICABLES ESPAÑOLAS Y EUROPEAS.

Date: Signature Professional Seal

Fecha: Firma: Sello Profesional:

16 April 2024 Juan Ricardo de Andrés

16 de Abril de 2024 Registered Professional Engineer # 6606 Colegiado nº 6606

P- 919 BULK TANK FARM I MPROVEMENTS, PHASE 1

NAVSTA ROTA, SPAI N

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 01 15 02/ 11, CHG 1: 08/ 14 LI ST OF DRAWI NGS

00 73 04. 00 41 08/ 08 SUPPLEMENTARY CONDI TI ONS FOR PROJECTS

I N MEDI TERRANEAN AREA

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 08/ 15, CHG 2: 08/ 21 SUMMARY OF WORK

01 14 00 11/ 22, CHG 1: 02/ 23 WORK RESTRI CTI ONS

01 20 00 11/ 20, CHG 3: 02/ 23 PRI CE AND PAYMENT PROCEDURES

01 30 00 11/ 20, CHG 3: 08/ 23 ADMI NI STRATI VE REQUI REMENTS

01 33 00 08/ 18, CHG 4: 02/ 21 SUBMI TTAL PROCEDURES

01 35 26 11/ 20, CHG 4: 08/ 23 GOVERNMENTAL SAFETY REQUI REMENTS

01 35 29. 13 11/ 15, CHG 1: 08/ 22 HEALTH, SAFETY, AND EMERGENCY RESPONSE

PROCEDURES FOR CONTAMI NATED SI TES

01 42 00 02/ 19 SOURCES FOR REFERENCE PUBLI CATI ONS

01 42 15 02/ 14 METRI C MEASUREMENTS

01 45 00 08/ 23 QUALI TY CONTROL

01 45 35 11/ 20 SPECI AL I NSPECTI ONS

01 50 00 11/ 20, CHG 2: 08/ 22 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND

CONTROLS

01 57 19. 01 21 ENVI RONMENTAL CONTROLS

01 58 00 08/ 19, CHG 5: 08/ 22 PROJECT I DENTI FI CATI ON

01 74 19 02/ 19, CHG 3: 11/ 21 CONSTRUCTI ON WASTE MANAGEMENT AND

DI SPOSAL

01 78 00 05/ 19, CHG 1: 08/ 21 CLOSEOUT SUBMI TTALS

01 78 23 05/ 23 OPERATI ON AND MAI NTENANCE DATA

01 78 23. 33 08/ 18, CHG 1: 02/ 21 OPERATI ON AND MAI NTENANCE MANUALS FOR

AVI ATI ON FUEL SYSTEMS

01 78 24. 00 20 05/ 23 FACI LI TY DATA WORKBOOK ( FDW)

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00 08/ 22 DEMOLI TI ON

02 61 13 02/ 10, CHG 1: 02/ 21 EXCAVATI ON AND HANDLI NG OF

CONTAMI NATED MATERI AL

02 81 00 11/ 18 TRANSPORTATI ON AND DI SPOSAL OF

HAZARDOUS MATERI ALS

02 82 00 11/ 18 ASBESTOS REMEDI ATI ON

02 83 00 11/ 18 LEAD REMEDI ATI ON

DI VI SI ON 03 - CONCRETE

03 30 00 02/ 19, CHG 4: 08/ 22 CAST- I N- PLACE CONCRETE

DI VI SI ON 05 - METALS

05 50 13 05/ 17, CHG 1: 08/ 18 MI SCELLANEOUS METAL FABRI CATI ONS

05 51 00 08/ 23 METAL STAI RS

05 51 33 02/ 16, CHG 2: 02/ 18 METAL LADDERS

05 52 00 08/ 23 METAL RAI LI NGS

05 59 10 11/ 22 ROLLI NG COVER FOR AVI ATI ON REFUELI NG

VAULTS

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

PROJECT TABLE OF CONTENTS Page 1

07 11 13 08/ 23 BI TUMI NOUS DAMPPROOFI NG

07 12 00 02/ 16 BUI LT- UP BI TUMI NOUS WATERPROOFI NG

07 14 00 08/ 23 FLUI D- APPLI ED WATERPROOFI NG

07 21 13 08/ 23 BOARD AND BLOCK I NSULATI ON

07 21 16 08/ 23 MI NERAL FI BER BLANKET I NSULATI ON

07 60 00 08/ 23 FLASHI NG AND SHEET METAL

07 84 00 05/ 10, CHG 1: 08/ 13 FI RESTOPPI NG

07 92 00 08/ 23 JOI NT SEALANTS

DI VI SI ON 08 - OPENI NGS

08 51 23 08/ 20, CHG 1: 02/ 22 STEEL WI NDOWS

08 71 00 02/ 16, CHG 4: 02/ 22 DOOR HARDWARE

08 81 00 05/ 19 GLAZI NG

08 91 00 08/ 20 METAL WALL LOUVERS

DI VI SI ON 09 - FI NI SHES

09 22 00 02/ 10, CHG 2: 08/ 18 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 08/ 16, CHG 4: 02/ 20 GYPSUM BOARD

09 51 00 08/ 20 ACOUSTI CAL CEI LI NGS

09 69 13 11/ 15, CHG 1: 08/ 18 RI GI D GRI D ACCESS FLOORI NG

09 90 00 02/ 21 PAI NTS AND COATI NGS

09 97 13. 17 05/ 22 THREE COAT EPOXY I NTERI OR COATI NG OF

WELDED STEEL PETROLEUM FUEL TANKS

09 97 13. 27 02/ 21, CHG 1: 08/ 22 HI GH PERFORMANCE COATI NG FOR STEEL

STRUCTURES

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 03 00. 00 20 08/ 10, CHG 3: 08/ 18 BASI C MECHANI CAL MATERI ALS AND METHODS

23 05 93 11/ 15 TESTI NG, ADJUSTI NG, AND BALANCI NG FOR

HVAC

23 31 13. 00 40 05/ 16 METAL DUCTS

23 34 23. 00 40 02/ 17 HVAC POWER VENTI LATORS

23 81 00 05/ 18, CHG 1: 02/ 21 DECENTRALI ZED UNI TARY HVAC EQUI PMENT

DI VI SI ON 25 - I NTEGRATED AUTOMATI ON

25 05 11 05/ 21 CYBERSECURI TY FOR FACI LI TY- RELATED

CONTROL SYSTEMS

DI VI SI ON 26 - ELECTRI CAL

26 08 00 11/ 22 APPARATUS I NSPECTI ON AND TESTI NG

26 12 19. 10 05/ 19, CHG 1: 11/ 19 THREE- PHASE, LI QUI D- FI LLED PAD- MOUNTED

TRANSFORMERS

26 13 00 05/ 21, CHG 1: 05/ 22 SF6/ HI GH- FI REPOI NT FLUI DS I NSULATED

PAD- MOUNTED SWI TCHGEAR

26 20 00 08/ 23 I NTERI OR DI STRI BUTI ON SYSTEM

26 27 14. 00 20 02/ 21, CHG 1: 05/ 21 ELECTRI CI TY METERI NG

26 32 15. 00 05/ 20 ENGI NE- GENERATOR SET STATI ONARY

15- 2500 KW, WI TH AUXI LI ARI ES

26 41 00 08/ 23 LI GHTNI NG PROTECTI ON SYSTEM

26 42 17 05/ 21 I MPRESSED CURRENT CATHODI C PROTECTI ON

( I CCP) SYSTEM

26 51 00 05/ 20, CHG 2: 11/ 21 I NTERI OR LI GHTI NG

26 56 00 08/ 21 EXTERI OR LI GHTI NG

PROJECT TABLE OF CONTENTS Page 2

DI VI SI ON 27 - COMMUNI CATI ONS

27 10 00 08/ 11 BUI LDI NG TELECOMMUNI CATI ONS CABLI NG

SYSTEM

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

28 31 70 08/ 20 I NTERI OR FI RE ALARM SYSTEM, ADDRESSABLE

DI VI SI ON 31 - EARTHWORK

31 00 00 08/ 23 EARTHWORK

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 05 33 08/ 17 LANDSCAPE ESTABLI SHMENT

32 11 23 05/ 22 AGGREGATE BASE COURSE

32 12 13 05/ 17 BI TUMI NOUS TACK AND PRI ME COATS

32 12 16. 16 11/ 20 ROAD- MI X ASPHALT PAVI NG

32 15 00 05/ 17 AGGREGATE SURFACI NG

32 16 19 05/ 18 CONCRETE CURBS AND SI DEWALKS

32 17 23 08/ 16, CHG 5: 11/ 18 PAVEMENT MARKI NGS

32 31 13. 53 11/ 21 HI GH- SECURI TY FENCES ( CHAI N LI NK AND

ORNAMENTAL) AND GATES

32 92 19 08/ 17, CHG 1: 08/ 21 SEEDI NG

DI VI SI ON 33 - UTI LI TI ES

33 01 50. 55 02/ 21 CLEANI NG OF PETROLEUM STORAGE TANKS

33 05 23. 13 11/ 19 UTI LI TY HORI ZONTAL DI RECTI ONAL DRI LLI NG

33 08 55. 01 08/ 19 FUEL DI STRI BUTI ON SYSTEM START- UP

( NON- HYDRANT)

33 08 55. 02 08/ 19 FUEL DI STRI BUTI ON SYSTEM START- UP

( NON- HYDRANT)

33 09 52 11/ 18 FUEL PUMP CONTROL AND ANNUNCI ATI ON

SYSTEM ( NON- HYDRANT)

33 11 00 02/ 18, CHG 1: 02/ 22 WATER UTI LI TY DI STRI BUTI ON PI PI NG

33 40 00 11/ 21 STORMWATER UTI LI TI ES

33 52 23. 15 11/ 18 POL SERVI CE PI PI NG WELDI NG

33 52 40 11/ 18, CHG 2: 11/ 20 FUEL SYSTEMS PI PI NG ( NON- HYDRANT)

33 52 43. 11 08/ 18 AVI ATI ON FUEL MECHANI CAL EQUI PMENT

33 52 43. 14 08/ 18, CHG 1: 02/ 21 AVI ATI ON FUEL CONTROL VALVES

33 52 43. 23 08/ 18, CHG 1: 02/ 21 AVI ATI ON FUEL PUMPS

33 52 80 08/ 22 LI QUI D FUELS PI PELI NE COATI NG SYSTEMS

33 56 10 05/ 19, CHG 1: 11/ 20 FACTORY- FABRI CATED FUEL STORAGE TANKS

33 56 19 11/ 22 FUEL I MPERMEABLE LI NER SYSTEM

33 56 21. 17 11/ 18, CHG 1: 11/ 20 SI NGLE WALL ABOVEGROUND FI XED ROOF

STEEL POL STORAGE TANK

33 71 02 08/ 21 UNDERGROUND ELECTRI CAL DI STRI BUTI ON

33 82 00 04/ 06 TELECOMMUNI CATI ONS OUTSI DE PLANT ( OSP)

DI VI SI ON 40 - PROCESS I NTERCONNECTI ONS

40 60 00 05/ 20 PROCESS CONTROL

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 3

SECTI ON TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

DOCUMENT 00 01 15

LI ST OF DRAWI NGS

02/ 11, CHG 1: 08/ 14

PART 1 GENERAL

1. 1 SUMMARY

1. 2 CONTRACT DRAWI NGS

1. 3 SUPPLEMENTARY DRAWI NGS

1. 3. 1 Bor i ng Logs

1. 3. 2 Subsur f ace Dat a

- - End of Sect i on Tabl e of Cont ent s - -ms2226 DOCUMENT 00 01 15 Page 1

DOCUMENT 00 01 15

LI ST OF DRAWI NGS

02/ 11, CHG 1: 08/ 14

PART 1 GENERAL

1. 1 SUMMARY

Thi s sect i on l i s t s t he dr awi ngs f or t he pr oj ect pur suant t o cont r act c l ause " DFARS 252. 236- 7001, Cont r act Dr awi ngs, Maps and Speci f i cat i ons. "

1. 2 CONTRACT DRAWI NGS

NOTE: Tank dr awi ng sheet s i ncl ude a " T" suf f i x t o t he Dr awi ng No.

Pi pel i ne dr awi ng sheet s i ncl ude a " P" suf f i x t o t he Dr awi ng No.

Cont r act dr awi ngs ar e as f ol l ows:

DRAWI NG NO REVI SI ON

NO

NAVFAC Dwg No

TI TLE

GENERAL

G- 001 0 14140105 COVER SHEET

G- 002 0 14140106 I NDEX - SHEET 1

G- 003 0 14140107 I NDEX - SHEET 2

G- 004 0 14140108 I NDEX - SHEET 3

G- 010T 0 14140109 GENERAL NOTES AND SEQUENCE OF CONSTRUCTI ON

G- 011T 0 14140110 SEQUENCE OF CONSTRUCTI ON

LI FE SAFETY

LS001T 0 14140111 BUI LDI NG CODE LI FE SAFETY ANALYSI S - PUMP

VAULTS

LS002T 0 14140112 BUI LDI NG CODE/ LI FE SAFETY ANALYSI S - I NJECTOR

BUI LDI NG

LS101T 0 14140113 PUMP VAULT BUI LDI NGS LI FE SAFETY FLOOR PLANS

LS102T 0 14140114 I NJECTOR BUI LDI NG LI FE SAFETY FLOOR PLAN

CI VI L

C- 001T 0 14140115 CI VI L LEGEND AND NOTES

CD100T 0 14140116 DEMOLI TI ON PLAN

C- 101T 0 14140117 CI VI L LAYOUT

ms2226 DOCUMENT 00 01 15 Page 2

C- 102T 0 14140118 GRADI NG AND DRAI NAGE

C- 103T 0 14140119 EROSI ON AND SEDI MENT CONTROL PHASE I

C- 104T 0 14140120 EROSI ON AND SEDI MENT CONTROL PHASE I I

C- 105T 0 14140121 DRAI NAGE PLAN

C- 201T 0 14140122 PROFI LES

C- 501T 0 14140123 CI VI L DETAI LS

C- 502T 0 14140124 CI VI L DETAI LS

C- 503T 0 14140125 CI VI L DETAI LS

C- 504T 0 14140126 CI VI L DETAI LS

C- 505T 0 14140127 FENCE DETAI LS

C- 506T 0 14140128 CI VI L NOTES AND DETAI LS

STRUCTURAL

S- 001T 0 14140129 STRUCTURAL ABBREVI ATI ONS, LEGEND AND NOTES

S- 002T 0 14140130 STRUCTURAL ABBREVI ATI ONS, LEGEND AND NOTES

S- 003T 0 14140131 STRUCTURAL ABBREVI ATI ONS, LEGEND AND NOTES

S- 101T 0 14140132 STRUCTURAL LAYOUT PLAN

S- 401T 0 14140133 BULK TANK FLOOR SLAB REI NFORCI NG PLAN

S- 402T 0 14140134 BULK TANK RADI AL GUTTER PLAN

S- 403T 0 14140135 BULK TANK COLUMN LAYOUT PLAN

S- 404T 0 14140136 BULK TANK ROOF PLAN

S- 405T 0 14140137 BULK TANK ROOF SLAB REI NFORCI NG PLAN

S- 406T 0 14140138 PUMP VAULT FLOOR PLAN

S- 407T 0 14140139 PUMP VAULT ROOF PLAN

S- 408T 0 14140140 FOUNDATI ON PLAN - I NJECTOR BUI LDI NG

S- 409T 0 14140141 ROOF PLAN - I NJECTOR BUI LDI NG

S- 410T 0 14140142 ADDI TI VE I NJECTOR TANKS PAD PLAN

S- 411T 0 14140143 TI E- I N VAULT

ms2226 DOCUMENT 00 01 15 Page 3

S- 412T 0 14140144 TRUCK OFF- LOAD PLAN

S- 501T 0 14140145 BULK TANK DETAI LS AND SECTI ONS

S- 502T 0 14140146 BULK TANK DETAI LS AND SECTI ONS

S- 503T 0 14140147 BULK TANK DETAI LS AND SECTI ONS

S- 504T 0 14140148 BULK TANK DETAI LS AND SECTI ONS

S- 505T 0 14140149 BULK TANK DETAI LS AND SECTI ONS

S- 506T 0 14140150 PUMP VAULT REI NFORCEMENT ELEVATI ONS

S- 507T 0 14140151 ADDI TI VE I NJECTOR BUI LDI NG REI NFORCEMENT

ELEVATI ONS

S- 508T 0 14140152 DETAI LS AND SECTI ONS - I NJECTOR BUI LDI NG

S- 509T 0 14140153 ADDI TI VE I NJECTOR TANKS DETAI LS AND SECTI ONS

S- 510T 0 14140154 BERM ACCESS STAI RS DETAI LS

S- 511T 0 14140155 ROLLI NG COVER PLAN AND DETAI LS

S- 512T 0 14140156 ROLLI NG COVER DETAI LS

S- 513T 0 14140157 ROLLI NG COVER PLAN AND DETAI LS

S- 514T 0 14140158 ROLLI NG COVER DETAI LS

ARCHI TECTURAL

A- 001T 0 14140159 ABBREVI ATI ONS, LEGEND AND NOTES

A- 401T 0 14140160 FLOOR PLAN - PUMP VAULTS

A- 402T 0 14140161 ROOF PLAN - PUMP VAULTS

A- 403T 0 14140162 BUI LDI NG ELEVATI ONS - PUMP VAULTS

A- 404T 0 14140163 BUI LDI NG SECTI ONS - PUMP VAULTS

A- 405T 0 14140164 FLOOR PLAN - I NJECTOR BUI LDI NG

A- 406T 0 14140165 ROOF PLAN - I NJECTOR BUI LDI NG

A- 407T 0 14140166 REFLECTED CEI LI NG PLAN

A- 408T 0 14140167 BUI LDI NG ELEVATI ONS - I NJECTOR BUI LDI NG

A- 409T 0 14140168 BUI LDI NG SECTI ONS - I NJECTOR BUI LDI NG

A- 501T 0 14140169 DETAI LS - PUMP VAULTS

ms2226 DOCUMENT 00 01 15 Page 4

A- 502T 0 14140170 DETAI LS - I NJECTOR BUI LDI NG

A- 503T 0 14140171 DETAI LS

A- 504T 0 14140172 DETAI LS

A- 505T 0 14140173 DETAI LS

A- 601T 0 14140174 SCHEDULES

FI RE PROTECTI ON

FA001T 0 14140175 FI RE ALARM LEGEND, NOTES & DETAI LS

FA101T 0 14140176 I NJECTOR BUI LDI NG FI RE ALARM PLAN

MECHANI CAL

M- 001T 0 14140177 MECHANI CAL ABBREVI ATI ONS

M- 002T 0 14140178 CUT- AND- COVER FUEL SYSTEM FLOW SCHEMATI C

M- 101T 0 14140179 MECHANI CAL SI TE PLAN

M- 201T 0 14140180 FUEL PI PELI NE PLAN

M- 202T 0 14140181 FUEL PI PELI NE PLAN

M- 401T 0 14140182 PUMP VAULT PI PI NG PLAN

M- 402T 0 14140183 ADDI TI VE I NJECTOR BUI LDI NG PI PI NG PLAN

M- 403T 0 14140184 TI E- I N VAULT PI T

M- 404T 0 14140185 OFF- LOADI NG

M- 405T 0 14140186 MECHANI CAL TANK PLAN

M- 501T 0 14140187 DETAI LS

M- 502T 0 14140188 DETAI LS

M- 503T 0 14140189 DETAI LS

M- 504T 0 14140190 SUPPORT DETAI LS

M- 601T 0 14140191 PI PI NG & I NSTRUMENT DI AGRAM ( STORAGE TANKS)

M- 602T 0 14140192 PI PI NG & I NSTRUMENT DI AGRAM ( ADDI TI VE SYSTEM)

M- 603T 0 14140193 SCHEDULES

M- 604T 0 14140194 SEQUENCE OF OPERATI ON

ms2226 DOCUMENT 00 01 15 Page 5

M- 605T 0 14140195 SEQUENCE OF OPERATI ON

MECHANI CAL HVAC

MH401T 0 14140196 TANK VAULT HVAC PLAN

MH402T 0 14140197 HVAC PLAN - I NJECTOR BUI LDI NG

MH501T 0 14140198 DETAI LS

MH502T 0 14140199 DETAI LS

MH601T 0 14140200 HVAC SCHEDULES

ELECTRI CAL

E- 001T 0 14140201 ELECTRI CAL ABBREVI ATI ONS AND NOTES

E- 002T 0 14140202 ELECTRI CAL LEGEND

E- 101T 0 14140203 ELECTRI CAL LAYOUT

E- 102T 0 14140204 ELECTRI CAL LAYOUT

E- 401T 0 14140205 I NJECTOR BUI LDI NG - LI GHTNI NG PROTECTI ON PLAN

E- 402T 0 14140206 I NJECTOR BUI LDI NG - POWER AND CONTROL PLAN

E- 403T 0 14140207 I NJECTOR BUI LDI NG GROUNDI NG PLAN

E- 404T 0 14140208 BULK TANK GROUNDI NG PLAN

E- 405T 0 14140209 PUMP VAULT LI GHTI NG AND GROUNDI NG PLANS

E- 406T 0 14140210 PUMP VAULT POWER AND CONTROL PLANS

E- 407T 0 14140211 ADDI TI VE TANK AREA AND LEAK DETECTI ON PI T

ELECTRI CAL PLANS

E- 408T 0 14140212 FSI I OFF- LOADI NG ELECTRI CAL PLANS

E- 501T 0 14140213 DETAI LS

E- 502T 0 14140214 DETAI LS

E- 503T 0 14140215 DETAI LS

E- 504T 0 14140216 DETAI LS

E- 505T 0 14140217 DETAI LS

E- 601T 0 14140218 ONE- LI NE DI AGRAM

E- 602T 0 14140219 WI RI NG DI AGRAMS

ms2226 DOCUMENT 00 01 15 Page 6

E- 603T 0 14140220 WI RI NG DI AGRAMS

E- 604T 0 14140221 SYSTEM GROUNDI NG DI AGRAM

E- 605T 0 14140222 CABLE, MCC, AND LI GHTI NG SCHEDULES

E- 606T 0 14140223 PANEL SCHEDULES

E- 607T 0 14140224 POWER CI RCUI T SCHEDULE

E- 608T 0 14140225 CONTROL CI RCUI T SCHEDULE

E- 609T 0 14140226 CONTROL AND I S CI RCUI T SCHEDULES

E- 701T 0 14140227 I NTERI OR LI GHTI NG DETAI LS

E- 702T 0 14140228 EXTERI OR LI GHTI NG DETAI LS

E- 703T 0 14140229 LI GHTI NG POLES DETAI LS

E- 704T 0 14140230 MANHOLE AND HANDHOLE DETAI LS

E- 705T 0 14140231 HAZARDOUS AREA CLASSI FI CATI ONS

E- 706T 0 14140232 ADDI TI VE I NJECTOR BUI LDI NG AND DRAI N TANK

HAZARDOUS PLAN

E- 707T 0 14140233 FSI I OFF- LOADI NG HAZARDOUS PLAN

EC144T 0 14140234 CATHODI C PROTECTI ON PLAN

ELECTRI CAL I NSTRUMENATI ON

EI 601T 0 14140235 PUMP CONTROL PANEL, SECTI ON 1 LAYOUT

EI 602T 0 14140236 PUMP CONTROL PANEL, SECTI ON 2 LAYOUT

EI 603T 0 14140237 CONTROL SYSTEM BLOCK DI AGRAM

EI 604T 0 14140238 TERMI NAL BLOCK CONNECTI ONS

EI 605T 0 14140239 TERMI NAL BLOCK CONNECTI ONS

CI VI L GENERAL

C- 021P 0 14140240 CI VI L LEGEND - SHEET 1

C- 022P 0 14140241 CI VI L LEGEND - SHEET 2

CI VI L DEMOLI TI ON

CD121P 0 14140242 SI TE DEMOLI TI ON KEY PLAN

CD126P 0 14140243 DEMOLI TI ON PLAN

ms2226 DOCUMENT 00 01 15 Page 7

CD127P 0 14140244 DEMOLI TI ON PLAN

CD128P 0 14140245 DEMOLI TI ON PLAN

CD129P 0 14140246 DEMOLI TI ON PLAN

CD130P 0 14140247 DEMOLI TI ON PLAN

CD131P 0 14140248 DEMOLI TI ON PLAN

CD132P 0 14140249 DEMOLI TI ON PLAN

CD133P 0 14140250 DEMOLI TI ON PLAN

CD134P 0 14140251 DEMOLI TI ON PLAN

CD135P 0 14140252 DEMOLI TI ON PLAN

CD136P 0 14140253 DEMOLI TI ON PLAN

CD137P 0 14140254 DEMOLI TI ON PLAN

CD138P 0 14140255 DEMOLI TI ON PLAN

CD139P 0 14140256 DEMOLI TI ON PLAN

CD140P 0 14140257 DEMOLI TI ON PLAN

CD141P 0 14140258 DEMOLI TI ON PLAN

CD142P 0 14140259 DEMOLI TI ON PLAN

CD143P 0 14140260 DEMOLI TI ON PLAN

CD144P 0 14140261 DEMOLI TI ON PLAN

CI VI L SI TE

C- 121P 0 14140262 OVERALL SI TE KEY PLAN

C- 126P 0 14140263 SI TE PLAN

C- 127P 0 14140264 SI TE PLAN

C- 128P 0 14140265 SI TE PLAN

C- 129P 0 14140266 SI TE PLAN

C- 130P 0 14140267 SI TE PLAN

C- 131P 0 14140268 SI TE PLAN

C- 132P 0 14140269 SI TE PLAN

ms2226 DOCUMENT 00 01 15 Page 8

C- 133P 0 14140270 SI TE PLAN

C- 134P 0 14140271 SI TE PLAN

C- 135P 0 14140272 SI TE PLAN

C- 136P 0 14140273 SI TE PLAN

C- 137P 0 14140274 SI TE PLAN

C- 138P 0 14140275 SI TE PLAN

C- 139P 0 14140276 SI TE PLAN

C- 140P 0 14140277 SI TE PLAN

C- 141P 0 14140278 SI TE PLAN

C- 142P 0 14140279 SI TE PLAN

C- 143P 0 14140280 SI TE PLAN

C- 144P 0 14140281 SI TE PLAN

C- 427P 0 14140282 ENLARGED SI TE PLAN

C- 434P 0 14140283 ENLARGED SI TE PLAN

C- 435P 0 14140284 ENLARGED SI TE PLAN

C- 437P 0 14140285 ENLARGED SI TE PLAN

C- 438P 0 14140286 ENLARGED SI TE PLAN

C- 439P 0 14140287 ENLARGED SI TE PLAN

C- 440P 0 14140288 ENLARGED SI TE PLAN

C- 501P 0 14140289 CI VI L DETAI LS

C- 502P 0 14140290 CI VI L DETAI LS

C- 503P 0 14140291 CI VI L DETAI LS

CI VI L GRADI NG

CG- 428P 0 14140292 ENLARGED GRADI NG PLAN

CG- 440P 0 14140293 ENLARGED GRADI NG PLAN

STRUCTURAL

S- 021P 0 14140294 STRUCTURAL NOTES - SHEET 1

ms2226 DOCUMENT 00 01 15 Page 9

S- 022P 0 14140295 STRUCTURAL NOTES - SHEET 2

S- 428P 0 14140296 STRUCTURAL WEST PI T PLAN

S- 429P 0 14140297 STRUCTURAL SOUTHEAST PI T PLAN

S- 430P 0 14140298 STRUCTURAL NORTHEAST PI T PLAN

S- 501P 0 14140299 TYPI CAL HDD PI T DETAI LS

S- 521P 0 14140300 TYPI CAL REI NFORCI NG DETAI LS

S- 522P 0 14140301 TYPI CAL FOUNDATI ON DETAI LS

S- 524P 0 14140302 TYPI CAL LOADI NG STATI ON STRUCTURAL DETAI LS

S- 525P 0 14140303 TYPI CAL LOADI NG STATI ON STRUCTURAL DETAI LS

S- 526P 0 14140304 PI G LAUNCH EQUI PMENT PAD PLAN

S- 527P 0 14140305 FLOW METER EQUI PMENT PAD PLAN

S- 528P 0 14140306 MI SCELLANEOUS DETAI LS

S- 530P 0 14140307 TYPI CAL PI PE SUPPORT DETAI LS

MECHANI CAL GENERAL

M- 021P 0 14140308 MECHANI CAL LEGEND

MECHANI CAL DEMOLI TI ON

MD121P 0 14140309 DEMOLI TI ON KEY PLAN

MD122P 0 14140310 MECHANI CAL DEMO PLAN

MD123P 0 14140311 MECHANI CAL DEMO PLAN

MD124P 0 14140312 MECHANI CAL DEMO PLAN

MD125P 0 14140313 MECHANI CAL DEMO PLAN

MD126P 0 14140314 MECHANI CAL DEMO PLAN

MD127P 0 14140315 MECHANI CAL DEMO PLAN

MD128P 0 14140316 MECHANI CAL DEMO PLAN

MD129P 0 14140317 MECHANI CAL DEMO PLAN

MD130P 0 14140318 MECHANI CAL DEMO PLAN

MD141P 0 14140319 DEMOLI TI ON PLAN- WEST SI DE RI O SALADO BRI DGE

ms2226 DOCUMENT 00 01 15 Page 10

MD142P 0 14140320 DEMOLI TI ON PLAN- EAST SI DE RI O SALADO BRI DGE

MD421P 0 14140321 DEMOLI TI ON PLAN VP- 1 MANHOLE

MD422P 0 14140322 DEMOLI TI ON PLAN BPH- VP- 1. 5 MANHOLE

MD423P 0 14140323 DEMOLI TI ON PLAN BPH- VP- 2 MANHOLE

MD424P 0 14140324 DEMOLI TI ON PLAN BPH- VP- 3 & 3. 5 MANHOLE

MD425P 0 14140325 DEMOLI TI ON PLAN - SPAGHETTI MANHOLE

MD428P 0 14140326 DEMOLI TI ON PLAN ML- 4 MANHOLE

MECHANI CAL SI TE

M- 121P 0 14140327 OVERALL MECHANI CAL SI TE & KEY PLAN

M- 122P 0 14140328 MECHANI CAL SI TE PLAN

M- 123P 0 14140329 MECHANI CAL SI TE PLAN

M- 124P 0 14140330 MECHANI CAL SI TE PLAN

M- 125P 0 14140331 MECHANI CAL SI TE PLAN

M- 126P 0 14140332 MECHANI CAL SI TE PLAN

M- 127P 0 14140333 MECHANI CAL SI TE PLAN

M- 128P 0 14140334 MECHANI CAL SI TE PLAN

M- 129P 0 14140335 MECHANI CAL SI TE PLAN

M- 130P 0 14140336 MECHANI CAL SI TE PLAN

M- 131P 0 14140337 MECHANI CAL SI TE PLAN

M- 132P 0 14140338 MECHANI CAL SI TE PLAN

M- 133P 0 14140339 MECHANI CAL SI TE PLAN

M- 134P 0 14140340 MECHANI CAL SI TE PLAN

M- 135P 0 14140341 MECHANI CAL SI TE PLAN

M- 136P 0 14140342 MECHANI CAL SI TE PLAN

M- 137P 0 14140343 MECHANI CAL SI TE PLAN

M- 138P 0 14140344 MECHANI CAL SI TE PLAN

M- 139P 0 14140345 MECHANI CAL SI TE PLAN

ms2226 DOCUMENT 00 01 15 Page 11

M- 140P 0 14140346 MECHANI CAL SI TE PLAN

M- 141P 0 14140347 MECHANI CAL SI TE PLAN

M- 142P 0 14140348 MECHANI CAL SI TE PLAN

M- 143P 0 14140349 MECHANI CAL SI TE PLAN

M- 421P 0 14140350 SI TE PLAN VP- 1 MANHOLE

M- 422P 0 14140351 SI TE PLAN BPH- VP- 1. 5 MANHOLE

M- 423P 0 14140352 SI TE PLAN BPH- VP- 2 MANHOLE

M- 424P 0 14140353 SI TE PLAN BPH- VP- 3 & 3. 5 MANHOLE

M- 425P 0 14140354 SI TE PLAN - SPAGHETTI MANHOLE

M- 428P 0 14140355 WEST HDD PI T

M- 429P 0 14140356 SOUTHEAST HDD PI T

M- 430P 0 14140357 NORTHEAST HDD PI T

M- 439P 0 14140358 SI TE PLAN ML- 4

M- 521P 0 14140359 MECHANI CAL DETAI LS - SHEET 1

M- 522P 0 14140360 MECHANI CAL DETAI LS - SHEET 2

M- 523P 0 14140361 MECHANI CAL DETAI LS - SHEET 3

M- 524P 0 14140362 MECHANI CAL DETAI LS - SHEET 4

M- 525P 0 14140363 TYPI CAL PI PI NG PLAN

M- 526P 0 14140364 MECHANI CAL SECTI ON

M- 528P 0 14140365 FLOW METER PLAN

M- 620P 0 14140366 ALI GNMENT & PI PE SCHEDULES

M- 621P 0 14140367 ALI GNMENT & PI PE SCHEDULES

M- 622P 0 14140368 ALI GNMENT & PI PE SCHEDULES

M- 631P 0 14140369 PROCESS FLOW DI AGRAM - SHEET 1

M- 632P 0 14140370 PROCESS FLOW DI AGRAM - SHEET 2

M- 633P 0 14140371 PROCESS FLOW DI AGRAM - SHEET 3

M- 634P 0 14140372 PROCESS FLOW DI AGRAM - SHEET 4

ms2226 DOCUMENT 00 01 15 Page 12

M- 635P 0 14140373 PROCESS FLOW DI AGRAM - SHEET 5

M- 636P 0 14140374 PROCESS FLOW DI AGRAM - SHEET 6

M- 637P 0 14140375 PROCESS FLOW DI AGRAM - SHEET 7

M- 638P 0 14140376 PROCESS FLOW DI AGRAM - SHEET 8

ELECTRI CAL

E- 021P 0 14140377 ELECTRI CAL SYMBOLS & LEGEND SHEET

E- 022P 0 14140378 ELECTRI CAL SYMBOLS & LEGEND SHEET

E- 023P 0 14140379 ELECTRI CAL SYMBOLS & LEGEND SHEET

E- 024P 0 14140380 ELECTRI CAL SYMBOLS & LEGEND SHEET

E- 025P 0 14140381 GENERAL NOTES SHEET

E- 026P 0 14140382 GENERAL NOTES SHEET

ELECTRI C DEMOLI TI ON

ED128P 0 14140383 SI TE ELECTRI CAL DEMOLI TI ON PLAN

ED130P 0 14140384 SI TE ELECTRI CAL DEMOLI TI ON PLAN

ED134P 0 14140385 SI TE ELECTRI CAL DEMOLI TI ON PLAN

ED421P 0 14140386 DEMOLI TI ON PLAN PI T VP- 1

ED427P 0 14140387 DEMOLI TI ON PLAN - RI O SALADO RI VER CROSSI NG

EAST SI DE

ELECTRI C SI TE

E- 121P 0 14140388 ELECTRI CAL OVERALL KEY PLAN

E- 130P 0 14140389 ELECTRI CAL SI TE PLAN

E- 132P 0 14140390 ELECTRI CAL SI TE PLAN

E- 133P 0 14140391 ELECTRI CAL SI TE PLAN

E- 134P 0 14140392 ELECTRI CAL SI TE PLAN

E- 142P 0 14140393 ELECTRI CAL SI TE PLAN

E- 143P 0 14140394 ELECTRI CAL SI TE PLAN

E- 144P 0 14140395 ELECTRI CAL SI TE PLAN

E- 421P 0 14140396 ELECTRI C VAULT PLAN BPH- VP- 1

ms2226 DOCUMENT 00 01 15 Page 13

E- 427P 0 14140397 RI O SALADO PI PE BRI DGE EAST SI DE

E- 428P 0 14140398 METERI NG STATI ONS PLAN

E- 429P 0 14140399 SOUTHEAST HDD PI T

E- 430P 0 14140400 NORTHEAST HDD PI T

E- 501P 0 14140401 ELECTRI CAL DETAI LS

E- 528P 0 14140402 ELECTRI CAL METERI NG STATI ON PLAN

E- 621P 0 14140403 P3- 1- VP1 CONTROL PANEL 1- LI NE DI AGRAM

E- 627P 0 14140404 RI O SALADO EAST 1- LI NE DI AGRAM

E- 629P 0 14140405 METERI NG STATI ON 1- LI NE DI AGRAM

ELECTRI C I NSTRUMENTATI ON

EI 121P 0 14140406 FI BER OPTI C OVERALL KEY PLAN

EI 122P 0 14140407 METERI NG STATI ON FI BER OPTI C CABLE

EI 123P 0 14140408 METERI NG STATI ON FI BER OPTI C CABLE LAYOUT

EI 124P 0 14140409 METERI NG STATI ON FI BER OPTI C CABLE

EI 125P 0 14140410 BUI LDI NG 603 FI BER OPTI C CABLE

EI 133P 0 14140411 FI BER OPTI C SI TE PLAN

EI 134P 0 14140412 FI BER OPTI C SI TE PLAN

EI 135P 0 14140413 FI BER OPTI C SI TE PLAN

EI 136P 0 14140414 FI BER OPTI C SI TE PLAN

EI 137P 0 14140415 FI BER OPTI C SI TE PLAN

EI 138P 0 14140416 FI BER OPTI C SI TE PLAN

EI 143P 0 14140417 FI BER OPTI C SI TE PLAN

EI 144P 0 14140418 FI BER OPTI C SI TE PLAN

EI 601P 0 14140419 CONTROL SYSTEM BLOCK DI AGRAM

EI 602P 0 14140420 SOUTHEAST PI T CONTROL PANEL

EI 603P 0 14140421 SOUTHEAST PI T CONTROL WI RI NG DI AGRAMS

EI 604P 0 14140422 NORTHEAST PI T CONTROL PANEL

ms2226 DOCUMENT 00 01 15 Page 14

EI 605P 0 14140423 NORTHEAST PI T CONTROL WI RI NG DI AGRAMS

EI 606P 0 14140424 METERI NG STATI ON CONTROL PANEL

EI 607P 0 14140425 METERI NG STATI ON CONTROL WI RI NG DI AGRAMS

ELECTRI C CATHODI C PROTECTI ON

EC121P 0 14140426 CATHODI C PROTECTI ON KEY PLAN

EC126P 0 14140427 CATHODI C PROTECTI ON PLAN

EC127P 0 14140428 CATHODI C PROTECTI ON PLAN

EC128P 0 14140429 CATHODI C PROTECTI ON PLAN

EC129P 0 14140430 CATHODI C PROTECTI ON PLAN

EC130P 0 14140431 CATHODI C PROTECTI ON PLAN

EC131P 0 14140432 CATHODI C PROTECTI ON PLAN

EC132P 0 14140433 CATHODI C PROTECTI ON PLAN

EC133P 0 14140434 CATHODI C PROTECTI ON PLAN

EC134P 0 14140435 CATHODI C PROTECTI ON PLAN

EC135P 0 14140436 CATHODI C PROTECTI ON PLAN

EC136P 0 14140437 CATHODI C PROTECTI ON PLAN

EC137P 0 14140438 CATHODI C PROTECTI ON PLAN

EC138P 0 14140439 CATHODI C PROTECTI ON PLAN

EC139P 0 14140440 CATHODI C PROTECTI ON PLAN

EC140P 0 14140441 CATHODI C PROTECTI ON PLAN

EC141P 0 14140442 CATHODI C PROTECTI ON PLAN

EC142P 0 14140443 CATHODI C PROTECTI ON PLAN

EC143P 0 14140444 CATHODI C PROTECTI ON PLAN

EC501P 0 14140445 CATHODI C PROTECTI ON DETAI LS

EC502P 0 14140446 CATHODI C PROTECTI ON DETAI LS

REFERENCE DRAWI NGS

P- 919 - BULK TANK FARM I MPROVEMENTS - PREFI NAL PDFs ms2226 DOCUMENT 00 01 15 Page 15

SURVEY

V- 001 N/ A NOTES, LEGEND AND SYMBOLS

V- 002 N/ A BENCHMARKS

V- 003 N/ A BENCHMARKS

V- 004 N/ A BENCHMARK SCHEDULES

V- 005 N/ A BENCHMARK SCHEDULES

V- 006 N/ A BENCHMARK SCHEDULES

V- 101 N/ A GENERAL SURVEY - EN - ROUTE SI TE

V- 102 N/ A GENERAL SURVEY - NEW PI PE

V- 401 N/ A ENLARGED SURVEY - AREA I - EN- ROUTE SI TE

V- 402 N/ A ENLARGED SURVEY - AREA I I - EN- ROUTE SI TE

V- 403 N/ A ENLARGED SURVEY - AREA I I I - EN- ROUTE SI TE

V- 404 N/ A ENLARGED SURVEY - AREA I V - EN- ROUTE SI TE

V- 405 N/ A ENLARGED SURVEY - AREA I - NEW PI PE

V- 406 N/ A ENLARGED SURVEY - AREA I I - NEW PI PE

V- 407 N/ A ENLARGED SURVEY - AREA I I I - NEW PI PE

V- 408 N/ A ENLARGED SURVEY - AREA I V - NEW PI PE

V- 409 N/ A ENLARGED SURVEY - AREA V - NEW PI PE

V- 410 N/ A ENLARGED SURVEY - AREA VI - NEW PI PE

V- 411 N/ A ENLARGED SURVEY - AREA VI I - NEW PI PE

V- 412 N/ A ENLARGED SURVEY - AREA VI I I - NEW PI PE

V- 413 N/ A ENLARGED SURVEY - AREA I X - NEW PI PE

V- 414 N/ A ENLARGED SURVEY - AREA X - NEW PI PE

V- 415 N/ A ENLARGED SURVEY - AREA XI - NEW PI PE

V- 416 N/ A ENLARGED SURVEY - AREA XI I - NEW PI PE

V- 417 N/ A ENLARGED SURVEY - AREA XI I I - NEW PI PE

V- 418 N/ A ENLARGED SURVEY - AREA XI V - NEW PI PE

ms2226 DOCUMENT 00 01 15 Page 16

V- 419 N/ A ENLARGED SURVEY - AREA XV - NEW PI PE

V- 420 N/ A ENLARGED SURVEY - AREA XVI - NEW PI PE

V- 421 N/ A ENLARGED SURVEY - AREA XVI I - NEW PI PE

V- 422 N/ A ENLARGED SURVEY - AREA XVI I I - NEW PI PE

V- 423 N/ A ENLARGED SURVEY - AREA XI X - NEW PI PE

V- 424 N/ A ENLARGED SURVEY - NEW PI PE

V- 425 N/ A ENLARGED SURVEY - DETAI L BPH- VP- 1. 5 MANHOLE

V- 426 N/ A ENLARGED SURVEY - DETAI L BPH- VP- 2 MANHOLE

V- 427 N/ A ENLARGED SURVEY - DETAI L BPH- VP- 3 MANHOLE

V- 428 N/ A ENLARGED SURVEY - DETAI L ESPAGUETI MANHOLE

V- 429 N/ A ENLARGED SURVEY - PI PI NG DETAI LS SALADO RI VER

CROSSI NG

V- 430 N/ A ENLARGED SURVEY - AREA I I - NEW PI PE

V- 431 N/ A ENLARGED SURVEY - ML- 1

V- 432 N/ A ENLARGED SURVEY - ML- 2

V- 433 N/ A ENLARGED SURVEY - ML- 3

V- 434 N/ A ENLARGED SURVEY - ML- 4

GEOTECHNI CAL

B- 001 N/ A GENERAL NOTES

BJ101 N/ A BORI NGS LOCATI ON

BJ102 N/ A BORI NGS LOCATI ON - KEY PLAN - NEW PI PE

BJ103 N/ A BORI NGS LOCATI ON - AREA I - NEW PI PE

BJ104 N/ A BORI NGS LOCATI ON - AREA I I - NEW PI PE

BJ105 N/ A BORI NGS LOCATI ON - AREA I I I - NEW PI PE

BJ106 N/ A BORI NGS LOCATI ON - AREA I V - NEW PI PE

BJ107 N/ A BORI NGS LOCATI ON - AREA V - NEW PI PE

BJ108 N/ A BORI NGS LOCATI ON - AREA VI - NEW PI PE

BJ301 N/ A PROFI LES

ms2226 DOCUMENT 00 01 15 Page 17

BJ302 N/ A PROFI LES

BJ601 N/ A BORI NGS LOGS - EN ROUTE SI TE

BJ602 N/ A BORI NGS LOGS - EN ROUTE SI TE

BJ603 N/ A BORI NGS LOGS - EN ROUTE SI TE

BJ604 N/ A BORI NGS LOGS - EN ROUTE SI TE

BJ605 N/ A BORI NG LOGS - NEW PI PE SI TE

BJ606 N/ A BORI NG LOGS - NEW PI PE SI TE

BJ607 N/ A BORI NG LOGS - NEW PI PE SI TE

BJ608 N/ A BORI NG LOGS - NEW PI PE SI TE

BJ609 N/ A BORI NG LOGS - NEW PI PE SI TE

BJ610 N/ A BORI NG LOGS - NEW PI PE SI TE

BJ611 N/ A BORI NG LOGS - NEW PI PE SI TE

BJ612 N/ A SCHEDULES

BJ613 N/ A SCHEDULES

BJ614 N/ A SCHEDULES

BJ615 N/ A SCHEDULES

BJ001 N/ A GENERAL NOTES

BJ101 N/ A BORI NGS LOCATI ON

BJ301 N/ A SECTI ONS

BJ601 N/ A BORI NG LOGS

BJ602 N/ A BORI NG LOGS

BJ603 N/ A BORI NG LOGS

BJ604 N/ A BORI NG LOGS

BJ605 N/ A BORI NG LOGS

BJ606 N/ A BORI NG LOGS

BJ607 N/ A BORI NG LOGS

ms2226 DOCUMENT 00 01 15 Page 18

BJ608 N/ A BORI NG LOGS

1. 3 SUPPLEMENTARY DRAWI NGS

1. 3. 1 Bor i ng Logs

The Gover nment does not guar ant ee t hat bor i ngs i ndi cat e act ual condi t i ons, except f or t he exact l ocat i ons and t he t i me t hat t hey wer e made. The dat a ar e avai l abl e f or exami nat i on by pr ospect i ve bi dder s i n t he of f i ce of t he Cont r act i ng Of f i cer .

1. 3. 2 Subsur f ace Dat a

Subsur f ace dat a, not speci f i ed or i ndi cat ed, have been obt ai ned by t he Gover nment at t he st at i on. The dat a ar e avai l abl e f or exami nat i on by pr ospect i ve bi dder s. The soi l s r epor t i s i ncl uded as par t of t he sol i c i t at i on.

- - End of Document - -ms2226 DOCUMENT 00 01 15 Page 19

SECTI ON TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

DOCUMENT 00 73 04. 00 41

SUPPLEMENTARY CONDI TI ONS FOR PROJECTS I N MEDI TERRANEAN AREA

08/ 08

PART 1 GENERAL

1. 1 SUBMI TTALS

1. 2 COOPERATI ON WI TH OTHER CONTRACTORS

1. 3 REFERENCE TO GENERAL PROVI SI ONS CLAUSES

1. 4 PUBLI C RELEASE OF I NFORMATI ON

1. 4. 1 Pr ohi bi t i on

1. 4. 2 Subcont r act s and Pur chase Or der s

1. 5 ENGLI SH SPEAKI NG REPRESENTATI VE

1. 6 CORRESPONDENCE I N THE ENGLI SH LANGUAGE

1. 7 NORMS AND LAWS

1. 8 I NDUSTRY STANDARDS

1. 9 PROHI BI TED I TEMS

1. 10 PROPRI ETARY NAMES

1. 11 SUBMI TTAL OF PROOF OF QUALI FI CATI ONS AND EXPERI ENCE

1. 12 ORAL MODI FI CATI ON

1. 13 NO WAI VER BY GOVERNMENT

1. 14 PRODUCTS SPECI FI ED USI NG USA STANDARDS

1. 14. 1 Local Pr oduct s Speci f i ed Usi ng Uni t ed St at es of Amer i ca ( USA)

St andar ds

1. 14. 2 USA Manuf act ur ed Pr oduct s Speci f i ed Usi ng USA St andar ds

1. 14. 3 Consi gnment , Mar ki ng, and Cust oms Cl ear ance

1. 14. 4 Excess

1. 15 FI NAL GOVERNI NG STANDARDS ( FGS)

1. 16 EXCLUSI ON OF PRI CE REVI SI ON LAWS

1. 17 OPTI ONAL PURCHASE

1. 18 SECURI TY REQUI REMENTS

1. 18. 1 Cont r act or Empl oyee Base Access Pass:

1. 18. 2 Responsi bi l i t y f or Physi cal Secur i t y

1. 18. 3 Access t o Oper at i onal Ar eas

1. 18. 4 Empl oyment

1. 18. 5 Vehi c l e Secur i t y I nspect i ons

1. 18. 6 Vehi c l e Li st

1. 18. 7 Cont r ol

1. 18. 8 Phot ogr aphs

1. 18. 9 Compl i ance

PART 2 PRODUCTS

PART 3 EXECUTI ON

ms2226 DOCUMENT 00 73 04. 00 41 Page 1

DOCUMENT 00 73 04. 00 41

SUPPLEMENTARY CONDI TI ONS FOR PROJECTS I N MEDI TERRANEAN AREA

08/ 08

PART 1 GENERAL

1. 1 SUBMI TTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00

SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Cont r act or per sonnel i dent i f i cat i on; G

1. 2 COOPERATI ON WI TH OTHER CONTRACTORS

Ot her cont r act or s may be engaged i n s i mi l ar and/ or suppor t i ng wor k r equi r i ng c l ose cooper at i on. The Cont r act or shal l cooper at e and schedul e hi s wor k t o avoi d conf l i c t wi t h and i nt er r upt i on of t he wor k of ot her s i nsof ar as pr act i cabl e. I n t he case of conf l i c t s wi t h ot her cont r act or s t hat cannot be r esol ved sat i sf act or i l y , t he mat t er shal l be r ef er r ed t o t he Cont r act i ng Of f i cer f or deci s i on, and such deci s i on shal l be f i nal , subj ect t o r i ght of appeal i n accor dance wi t h t er ms of t he cont r act .

1. 3 REFERENCE TO GENERAL PROVI SI ONS CLAUSES

Wher ever a r ef er ence t o a c l ause of t he Gener al Pr ovi s i ons occur s i n t he t echni cal sect i ons of t he speci f i cat i ons, i t shal l be t aken t o mean r ef er ence t o a c l ause of t he Cont r act Cl auses havi ng t he same t i t l e as t he r ef er enced Gener al Pr ovi s i ons c l ause.

1. 4 PUBLI C RELEASE OF I NFORMATI ON

1. 4. 1 Pr ohi bi t i on

Ther e shal l be no publ i c r el ease of i nf or mat i on or phot ogr aphs concer ni ng any aspect of t he mat er i al s or ser vi ces r el at i ng t o t hi s bi d, cont r act , or pur chase or der or ot her document s r esul t i ng t her ef r om wi t hout t he pr i or wr i t t en appr oval of t he Cont r act i ng Of f i cer .

1. 4. 2 Subcont r act s and Pur chase Or der s

The Cont r act or agr ees t o i nser t t he subst ance of above par agr aph " Pr ohi bi t i on" i n each subcont r act and pur chase or der gener at ed f or t hi s cont r act .

1. 5 ENGLI SH SPEAKI NG REPRESENTATI VE

At al l t i mes when any per f or mance of t he wor k at t he s i t e i s bei ng conduct ed by any empl oyee of t he Cont r act or or hi s subcont r act or s, t he Cont r act or shal l have a r epr esent at i ve pr esent on t he si t e who i s capabl e of expl ai ni ng t he wor k oper at i ons and r ecei v i ng i nst r uct i ons i n t he Engl i sh l anguage. The Cont r act i ng Of f i cer shal l have t he r i ght t o ms2226 DOCUMENT 00 73 04. 00 41 Page 2 det er mi ne wi t hout appeal of such deci s i on, whet her t he pr oposed r epr esent at i ve has suf f i c i ent t echni cal and l i ngual capabi l i t i es and t he Cont r act or shal l i mmedi at el y r epl ace any i ndi v i dual not accept abl e t o t he Cont r act i ng Of f i cer . The Const r uct i on Cont r act or ' s qual i f i ed Pr oj ect Manager , on- si t e Super i nt endent , Qual i t y Cont r ol Manager , and Qual i t y Cont r ol Speci al i st shal l be f l uent ( can r ead, speak, and wr i t e) i n bot h Engl i sh and Spani sh l anguages.

1. 6 CORRESPONDENCE I N THE ENGLI SH LANGUAGE

I t shal l be t he r esponsi bi l i t y of t he Cont r act or t o pr epar e al l pr oposal s, change or der s, shop dr awi ngs and submi t t al s, qual i t y cont r ol r epor t s, comput at i ons, and al l cor r espondence per t ai ni ng t o t hi s cont r act , i n t he Engl i sh l anguage; but t he Cont r act or may, f or hi s own r ecor d pur poses, pr epar e t hem i n t he l ocal l anguage. Al l cor r espondence t o t he Cont r act i ng Of f i cer shal l be i n t he Engl i sh l anguage. I n case of di sput e or c l ai m, t he Engl i sh ver si on wi l l gover n.

1. 7 NORMS AND LAWS

I n case of di f f er ences bet ween pr oj ect speci f i cat i ons or t he accompanyi ng dr awi ngs and r ef er enced nor ms and l aws, nor ms and l aws shal l gover n. I n case of di f f er ences bet ween pr oj ect speci f i cat i ons and t he accompanyi ng dr awi ngs, t he speci f i cat i ons shal l gover n.

1. 8 I NDUSTRY STANDARDS

When bot h U. S. and Eur opean, or Spani sh, I ndust r y St andar ds ar e appl i cabl e t o t hi s pr oj ect and t he st andar ds ar e i n conf l i c t wi t h each ot her , t he most st r i ngent of t he i ndust r y shal l gover n.

1. 9 PROHI BI TED I TEMS

Use of t he f ol l owi ng i t ems i n t hi s const r uct i on pr oj ect i s pr ohi bi t ed:

a. Use of al umi num f or el ect r i cal conduct or s.

b. Embeddi ng al umi num condui t i n concr et e.

c. Use of f l uor escent l i ght bal l ast s and ot her pr oduct s cont ai ni ng PCB' s.

d. Use of ur ea- f or mal dehyde f oam i nsul at i on pr oduct s.

e. Use of any pai nt / coat i ngs havi ng a l ead cont ent of over 0. 06 per cent by wei ght of non- vol at i l e cont ent . The use of ozone depl et i ng chemi cal s i s pr ohi bi t ed. The use of z i nc- chr omat e i s pr ohi bi t ed.

f . The use of mat er i al s cont ai ni ng asbest os i s pr ohi bi t ed.

1. 10 PROPRI ETARY NAMES

Manuf act ur er ' s pr opr i et ar y names i ndi cat ed f or col or s, t ext ur es and pat t er ns of mat er i al s ar e f or t he pur pose of col or , t ext ur e and pat t er n sel ect i on onl y. Ot her manuf act ur er s mat er i al s ar e accept abl e and pr ovi ded t hey cl osel y appr oxi mat e col or s, t ext ur es and pat t er ns i ndi cat ed and pr ovi ded t hey conf or m t o al l ot her r equi r ement s subj ect t o Cont r act i ng Of f i cer ' s appr oval .

ms2226 DOCUMENT 00 73 04. 00 41 Page 3

1. 11 SUBMI TTAL OF PROOF OF QUALI FI CATI ONS AND EXPERI ENCE

Wher e qual i f i cat i ons or exper i ence r equi r ement s ar e set f or t h i n t he speci f i cat i ons wi t h r espect t o equi pment and equi pment i nst al l er s, wr i t t en pr oof of such qual i f i cat i ons or exper i ence must be pr ovi ded wi t hi n t hi r t y ( 30) cal endar days af t er Cont r act awar d, and bef or e pl aci ng any or der f or such equi pment or bef or e di spat chi ng equi pment i nst al l er s t o t he pr oj ect s i t e.

1. 12 ORAL MODI FI CATI ON

No or al st at ement of any per son ot her t han t he Cont r act i ng Of f i cer as pr ovi ded i n t he c l ause i n t hi s Cont r act ent i t l ed FAR 52. 243- 4 " Changes" ( AUG 1987) , shal l i n any manner or degr ee modi f y or ot her wi se af f ect t he t er ms of t hi s Cont r act .

1. 13 NO WAI VER BY GOVERNMENT

The f ai l ur e of t he Gover nment , i n any one or mor e i nst ances, t o i nsi st upon t he st r i ct per f or mance of any of t he t er ms of t hi s Cont r act or t o exer ci se any opt i on her ei n conf er r ed shal l not be const r ued as a wai ver or r el i nqui shment t o any ext ent of t he r i ght t o asser t or r el y upon such t er ms or opt i on on any f ut ur e occasi on.

1. 14 PRODUCTS SPECI FI ED USI NG USA STANDARDS

1. 14. 1 Local Pr oduct s Speci f i ed Usi ng Uni t ed St at es of Amer i ca ( USA) St andar ds

Ther e ar e l ocal l y avai l abl e pr oduct s speci f i ed i n t hi s cont r act t hat meet USA st andar ds. " Local l y avai l abl e pr oduct s t hat meet USA st andar ds" ar e def i ned as:

a. " Pr oduct s t hat meet t he r ef er enced USA st andar ds, and ar e manuf act ur ed and di st r i but ed i n- count r y, or manuf act ur ed and di st r i but ed i n t he Eur opean Uni on, and ar e r eadi l y avai l abl e l ocal l y f r om i n- count r y sour ces or f r om t he Eur opean Uni on sour ces" ; or

b. " Pr oduct s manuf act ur ed i n t he USA and di st r i but ed i n- count r y or i n t he Eur opean Uni on or i n t he USA, and ar e r eadi l y avai l abl e l ocal l y f r om i n- count r y sour ces or f r om t he Eur opean Uni on sour ces, or f r om USA sour ces. " .

1. 14. 2 USA Manuf act ur ed Pr oduct s Speci f i ed Usi ng USA St andar ds

Ther e ar e pr oduct s t o be pr ovi ded i n t hi s cont r act t hat ar e not r eadi l y avai l abl e l ocal l y and must be manuf act ur ed i n t he Uni t ed St at es of Amer i ca ( USA) and i n compl i ance wi t h USA st andar ds. Pr oduct s manuf act ur ed i n anot her count r y ar e consi der ed USA manuf act ur ed, i f t he manuf act ur er s or suppl i er s ar e under l i cense by USA manuf act ur er s and t he pr oduct s meet t he same appl i cabl e speci f i cat i ons and st andar ds.

1. 14. 3 Consi gnment , Mar ki ng, and Cust oms Cl ear ance

I n or der f or t he Cont r act or t o be exempt f r om payi ng dut y on mat er i al or equi pment t o be i mpor t ed f or i ncor por at i on i nt o t he cont r act wor k, al l shi pment s shal l be consi gned t o t he Cont r act i ng Of f i cer and mar ked f or t he cont r act by cont r act number . Addi t i onal l y, t he Cont r act or shal l suppl y t o t he Cont r act i ng Of f i cer wi t h cer t i f i ed copi es of t he conf i r med ms2226 DOCUMENT 00 73 04. 00 41 Page 4 mat er i al / equi pment or der s and i nvoi ces i n or der t hat t he dut y f r ee cust oms cl ear ance may be accompl i shed. Fai l ur e on t he par t of t he Cont r act or t o compl y wi t h t he r equi r ement s her ei n wi l l not be gr ounds f or non- enf or cement of t he pr ovi s i ons of t he Cl ause, " Taxes" of t he Cont r act Cl auses.

1. 14. 4 Excess

The Cont r act or shal l f ur ni sh t o t he Cont r act i ng Of f i cer , j ust pr i or t o compl et i on of t hi s cont r act , a consol i dat ed i nvent or y of al l excess suppl i es, mat er i al s, and equi pment i mpor t ed dut y f r ee f or use under t hi s cont r act . The Cont r act shal l ei t her pay r equi r ed dut i es on t he excesses or r e- expor t t he excesses.

1. 15 FI NAL GOVERNI NG STANDARDS ( FGS)

Fi nal Gover ni ng St andar ds ( FGS) f or envi r onment al pr ot ect i on at DOD i nst al l at i ons and f aci l i t i es i n Spai n went i nt o ef f ect June 1994. These st andar ds wer e devel oped by compar i ng and adopt i ng t he mor e pr ot ect i ve r equi r ement s of t he Over seas Envi r onment al Basel i ne Gui dance Document ( OEBGD) , Eur opean Uni on and nat i onal , r egi onal , and l ocal envi r onment al l aws and r egul at i ons. The FGS ar e appl i cabl e t o wor k under t hi s cont r act . The FGS ( bot h Engl i sh and l ocal l anguage ver si ons) may be r evi ewed at t he NAVFAC Rot a Of f i ce dur i ng nor mal busi ness hour s.

1. 16 EXCLUSI ON OF PRI CE REVI SI ON LAWS

The Cont r act or and t he Uni t ed St at es Gover nment , as t he sol e par t i es t o t hi s cont r act , do speci f i cal l y and i r r evocabl y agr ee t hat t hi s cont r act i s a FI RM FI XED- PRI CE CONTRACT, and do expr essl y wai ve and excl ude t he appl i cat i on of any and al l l ocal Laws, Decr ees, Or der s, and Regul at i ons, whi ch mi ght mandat e, aut hor i ze, or per mi t an i ncr ease i n t he cont r act pr i ce, r evi s i on or any ot her mechani sm as a r esul t of i ncr eased l abor cost s, equi pment cost s, mat er i al cost s, suppl i es, subcont r act or cost s, ot her over head cost s, di r ect or i ndi r ect , or ot her wi se.

The r i sks and consequences of t hi s excl usi on of t he appl i cat i on of Laws as af or ement i oned ar e under st ood by t he par t i es, and have been t aken i nt o consi der at i on i n ar r i v i ng at t he cont r act pr i ce set f or t h her ei n.

I t i s t he par t i es ' i nt ent i on t hat t he wor k cont r act ed f or , i ncl udi ng any subsequent modi f i cat i ons t o t hi s cont r act , shal l be per f or med on a f i r m f i xed- pr i ce basi s wi t hout pr i ce r evi s i on of any k i nd.

Any di sput e i n t hi s r espect ar i s i ng bet ween t he par t i es wi l l be r esol ved by st r i ct i nt er pr et at i on of t he pr ovi s i on of t he cont r act i t sel f .

1. 17 OPTI ONAL PURCHASE

Al l mat er i al s and equi pment not speci f i cal l y r equi r ed t o be pur chased i n t he Uni t ed St at es of Amer i ca shal l be pur chased i n Spai n and may not be pur chased el sewher e wi t hout speci f i c wr i t t en appr oval of t he Cont r act i ng Of f i cer . I f pur chase of mat er i al and equi pment i s not f easi bl e i n Spai n or i t i s speci f i ed t hat mat er i al and equi pment be pur chased i n t he Uni t ed St at es, t he Cl ause, " STATUS OF CONTRACTOR AS DI RECT CONTRACTOR" of t hi s Sect i on, wi l l appl y.

ms2226 DOCUMENT 00 73 04. 00 41 Page 5

1. 18 SECURI TY REQUI REMENTS

1. 18. 1 Cont r act or Empl oyee Base Access Pass:

The Cont r act or shal l be r esponsi bl e f or f ur ni shi ng each empl oyee, and f or r equi r i ng t hat each empl oyee engaged i n t he wor k di spl ay, such i dent i f i cat i on as may be appr oved and di r ect ed by t he Cont r act i ng Of f i cer . Al l pr escr i bed i dent i f i cat i on shal l i mmedi at el y be del i ver ed t o t he Cont r act i ng Of f i cer f or cancel l at i on upon r el ease of any empl oyee.

Cont r act or per sonnel i dent i f i cat i on, i ncl udi ng names and phot ogr aphs, D. N. I . ( Document o Naci onal de I dent i dad) number s, vehi c l es i dent i f i cat i on and l i cense pl at e number s, of al l per sonnel t o be empl oyed i n t he per f or mance of t he wor k at t he s i t e, shal l be submi t t ed t o t he Cont r act i ng Of f i cer at l east seven ( 7) days pr i or t o commencement of t he wor k.

Cont r act or per sonnel shal l be r est r i ct ed f r om ent er i ng oper at i onal bui l di ngs or ar eas wi t hout t he speci f i c aut hor i zat i on of t he Cont r act i ng Of f i cer .

1. 18. 2 Responsi bi l i t y f or Physi cal Secur i t y

The Cont r act or shal l be r esponsi bl e f or physi cal secur i t y of al l const r uct i on mat er i al s, suppl i es, and equi pment of ever y descr i pt i on ( i ncl udi ng pr oper t y whi ch may be Gover nment f ur ni shed or owned) pr ovi ded and/ or ut i l i zed i n t he execut i on of t hi s cont r act .

1. 18. 3 Access t o Oper at i onal Ar eas

Cont r act or per sonnel ar e expr essl y pr ohi bi t ed and shal l be r est r i ct ed f r om ent er i ng oper at i onal bui l di ngs or ar eas wi t hout t he speci f i c aut hor i zat i on of t he Cont r act i ng Of f i cer . To per f or m wor k, wher e " secur i t y escor t s" ar e r equi r ed f or access t o a f aci l i t y , t he Cont r act or shal l coor di nat e wi t h t he Cont r act i ng Of f i cer f or access t o such f aci l i t i es.

1. 18. 4 Empl oyment

Shoul d t he cont i nued empl oyment of any per son i n connect i on wi t h t hi s cont r act , or any subcont r act her eunder , be deemed by t he Cont r act i ng Of f i cer t o be pr ej udi c i al t o t he i nt er est s of t he Gover nment , t hat per son shal l i mmedi at el y be r emoved f r om t he wor k. I n t hi s connect i on t he Cont r act or agr ees t hat :

a. Cases whi ch may i nvol ve di sci pl i nar y act i on agai nst such per sons, or t he necessi t y of r eassi gnment or t er mi nat i on of t hei r ser vi ces, shal l be i nvest i gat ed, pr ocessed, r epor t ed and di sposed of , as di r ect ed by t he Cont r act i ng Of f i cer .

b. Empl oyment cont r act s of al l per sons empl oyed i n connect i on wi t h t hi s cont r act , or any subcont r act t her eunder shal l i ncl ude cl auses cont ai ni ng t he subst ance of t hi s c l ause.

1. 18. 5 Vehi c l e Secur i t y I nspect i ons

Al l Cont r act or and subcont r act or vehi c l es ent er i ng t he St at i on i ncl udi ng, but not l i mi t ed t o, ser vi ce vehi c l es, mat er i al del i ver y vehi c l es, equi pment del i ver y vehi c l es, and var i ous ot her suppor t vehi c l es, shal l f i r st under go a secur i t y i nspect i on.

ms2226 DOCUMENT 00 73 04. 00 41 Page 6

1. 18. 6 Vehi c l e Li st

Submi t an or i gi nal l i s t of vehi c l es t o be ut i l i zed at t he wor k s i t e wi t h t he f ol l owi ng i nf or mat i on f or each vehi c l e:

a. Make.

b. Year .

c. Model .

d. Li cense number and i nsur ance dat a' s.

e. Regi st er ed owner .

1. 18. 7 Cont r ol

Mai nt ai n st r i ct account abi l i t y over passes. I mmedi at el y r epor t t o t he sour ce of i ssue, passes mi ssi ng or l ost and ci r cumst ances. I f t he Cont r act or has anot her act i ve cont r act and one commenci ng i mmedi at el y, empl oyee' s names may be t r ansf er r ed f r om one cont r act t o t he ot her . Fi nal payment wi l l not be ef f ect ed unt i l empl oyees ar e t r ansf er r ed t o anot her cont r act or t he r ecor ds ar e c l ear ed. Fur ni sh a s i gned l et t er , count er si gned by t he sour ce of i ssue, st at i ng t hat passes have been t ur ned i n.

1. 18. 8 Phot ogr aphs

Phot ogr aphs ar e pr ohi bi t ed i n and ar ound t he bui l di ng unl ess a wr i t t en r equest cont ai ni ng speci f i c j ust i f i cat i on and det ai l s i s appr oved by t he secur i t y of f i cer v i a t he Cont r act i ng Of f i cer . Four days' advance not i ce i s r equi r ed. Phot ogr aphs, when appr oved, shal l be t aken i n t he pr esence of an act i v i t y escor t .

1. 18. 9 Compl i ance

Compl i ance wi t h t he f or egoi ng pr ovi s i ons of t hi s c l ause by subcont r act or s shal l be t he r esponsi bi l i t y of t he Cont r act or .

PART 2 PRODUCTS

Not Used

PART 3 EXECUTI ON

Not Used

- - End of Document - -ms2226 DOCUMENT 00 73 04. 00 41 Page 7

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 11 00

SUMMARY OF WORK

08/ 15, CHG 2: 08/ 21

PART 1 GENERAL

1. 1 SUBMI TTALS

1. 2 WORK COVERED BY CONTRACT DOCUMENTS

1. 2. 1 Pr oj ect Descr i pt i on

1. 2. 2 Locat i on

1. 3 CONTRACT DRAWI NGS

1. 4 LOCATI ON OF UNDERGROUND UTI LI TI ES

1. 4. 1 Not i f i cat i on Pr i or t o Excavat i on

1. 5 SALVAGE MATERI AL AND EQUI PMENT

PART 2 PRODUCTS

PART 3 EXECUTI ON

ms2226 SECTI ON 01 11 00 Page 1

SECTI ON 01 11 00

SUMMARY OF WORK

08/ 15, CHG 2: 08/ 21

PART 1 GENERAL

1. 1 SUBMI TTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Sal vage Pl an; G

1. 2 WORK COVERED BY CONTRACT DOCUMENTS

1. 2. 1 Pr oj ect Descr i pt i on

The wor k i ncl udes t wo new " cut - and- cover " 50, 000 gal l on t anks. Each t ank wi l l have a dedi cat ed pump vaul t , associ at ed pumpi ng equi pment and st andby gener at or . Associ at ed Si t e/ Ci v i l wor k. Remove out - of - ser vi ce pi pi ng and conduct HazMat sur veyi ng and t est i ng. Desi gn a new 18 i nch di amet er f uel pi pel i ne, wi t h associ at ed met er i ng, t o t r anspor t f uel f r om Pi er 3 t o t he Bul k Tank Far m. The pi pel i ne wi l l be i nst al l ed under t he Ri o Sal ado Ri ver v i a Hor i zont al Di r ect i onal Dr i l l i ng ( HDD) met hod. Desi gn a cat hodi c pr ot ect i on syst em f or bot h t he t anks and pi pel i ne. Remove out - of - ser vi ce pi pi ng and conduct HazMat sur veyi ng and t est i ng and i nci dent al r el at ed wor k.

1. 2. 2 Locat i on

The wor k i s l ocat ed at t he NAVSTA Rot a, Spai n, appr oxi mat el y as i ndi cat ed. The exact l ocat i on wi l l be shown by t he Cont r act i ng Of f i cer .

1. 3 CONTRACT DRAWI NGS

The f ol l owi ng dr awi ngs accompany t hi s speci f i cat i on and ar e a par t t her eof .

Dr awi ng Nos. :

G- 001 COVER SHEET

G- 002 I NDEX SHEET

G- 003 I NDEX SHEET

G- 004T GENERAL NOTES AND SEQUENCE OF CONSTRUCTI ON

G- 005T SEQUENCE OF CONSTRUCTI ON

LI FE SAFETY

LS001T BUI LDI NG CODE LI FE SAFETY ANALYSI S - PUMP VAULTS

LS002T BUI LDI NG CODE LI FE SAFETY ANALYSI S - I NJECTOR BUI LDI NG

LS101T PUMP VAULT BUI LDI NGS LI FE SAFETY FLOOR PLANS

LS002T BUI LDI NG CODE LI FE SAFETY ANALYSI S - I NJECTOR BUI LDI NG

LS101T PUMP VAULT BUI LDI NGS LI FE SAFETY FLOOR PLANS

LS102T I NJECTOR BUI LDI NGS LI FE SAFETY FLOOR PLAN

ms2226 SECTI ON 01 11 00 Page 2

CI VI L

C- 001T CI VI L LEGEND AND NOTES

CD100T DEMOLI TI ON PLAN

C- 101T CI VI L LAYOUT

C- 102T GRADI NG AND DRAI NAGE

C- 103T EROSI ON AND SEDI MENT CONTROL PHASE I

C- 104T EROSI ON AND SEDI MENT CONTROL PHASE I I

C- 105T DRAI NAGE PLAN

C- 201T PROFI LES

C- 501T CI VI L DETAI LS

C- 502T CI VI L DETAI LS

C- 503T CI VI L DETAI LS

C- 504T CI VI L DETAI LS

C- 505T FENCE DETAI LS

C- 506T CI VI L NOTES AND DETAI LS

STRUCTURAL

S- 001T STRUCTURAL ABBREVI ATI ONS, LEGEND AND NOTES

S- 002T STRUCTURAL ABBREVI…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .