These documents are bid documents for a Perform Site Prep for SPS (Sterile Processing) Equipment renovation project for the U.S. Department of Veterans Affairs in Fargo, North Dakota. The project involves comprehensive electrical, technology, and facility modifications for a medical equipment processing area, with key components including:
Electrical work features a mobile SPD (Sterile Processing Department) trailer with a 500kW diesel generator, temporary electrical distribution system, and complex power infrastructure modifications. Technology systems include relocating existing network infrastructure, installing new cable trays, information outlets, and wireless access points. The renovation encompasses detailed demolition and restoration plans for the lower level, with specific focus on preparing spaces for medical equipment like endoscope processors, sterilizers, and supporting infrastructure. The bid documents are dated January 2025, with detailed technical specifications covering electrical, technology, and facility system requirements across multiple drawing sheets.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SYMMONS 7-102-1 MIXING
VALVE SET TO 95°F
SHUTOFF VALVE (TYP.)
PRESSURE GUAGE (TYP.)
PRESSURE REGULATOR (TYP.)
BALANCE VALVE
SET TO 0.3 GPM
NOTES:
1. ALL WATER PIPING AND ASSOCIATED VALVES/GUAGES ARE TO BE SUITABLE FOR POTABLE WATER
APPLICATIONS
1/2" HWC
1/2" CW
1/2" HW
PIPING ROUTED BEHIND WALL
FROM HERE UP TO CABINET
ABOVE UNIT
TEMP/PRESSURE COMBO
GUAGE
1/2 " T
W
TEMP/PRESSURE
COMBO GUAGE
FLOOR
DRAIN
NETWORK
OUTLET
PRESSURE
4" Ø
VE
NT
3/4 " I
A
NICKLE BRONZE ADJUSTABLE
STRAINER (FLUSH WITH
FINISHED FLOOR)
CEMENT BED
TILE FLOOR
CONCRETE FILL
STRUCTURAL SLAB
FLASHING
CLAMP WITH
WEEP HOLES
THREADED, CAULKED OR
NO-HUB CONNECTION
WATERPROOF
MEMBRANE
PROVIDE A METAL SUPPORT
PLATE WHEN DRAIN IS INSTALLED
IN AN EXISTING FLOOR - CAULK
AROUND DRAIN PRIOR TO
RE-GROUTING
CLAMP WATERPROOF
MEMBRANE INSIDE OF DRAIN
BODY TO DRAIN TO WEEP HOLES
NOTE:
SLOPE MEMBRANE LINER 2% TO DRAIN.
LOOSE GRAVEL
AT WEEP HOLES
3mm to 6mm SIZE
FAUCET SEE
SPECIFICATIONS
LAMINAR FLOW
CONTROL DEVICE
OFFSET
WASTE
TRAP
PARALLEL TO
WALL
LOOSE KEY
STOP
ESCUTCHEON
FINISHED FLOOR
[85 0m m] [200mm]
[26 9m m]
FO
R
FI
XT
UR
E
HE
IG
HT
S
SE
E
AR
CH
IT
EC
TU
RA
L D
RA
W
IN
GS
PROVIDE COVER FOR EXPOSED PIPING
NOTE:
8"
3/
4"
A
A
B B
SECTION A-A (BASE NOT POURED WITH SLAB)
SECTION A-A (BASE POURED WITH FLOOR SLAB)
PLAN
TYPICAL ANCHOR BOLT
NUT & WASHER
SECTION B-B
EQUIPMENT BASE PLATE
PROVIDE #3 BARS 12" [300mm]
O.C. EACH WAY IN THE BASE &
DOWEL BASE TO FLOOR
EQUIPMENT BASE PLATE
PROVIDE DOUBLE SLAB
REINFORCING IN BASE AREA
WELD HEAD TO PLATE OR BEND
OVER END 5D
FLOOR
PIPE SLEEVE (5D, 3" [75mm] MIN.)
ANCHOR BOLT
(TYP)
CONCRETE BASE
NOTE:
L & W DIMENSIONS SHALL BE 6" [150mm]
GREATER THAN THE EQUIPMENT BASE
PLATE.
[400mm]
5" M
IN
[12 5m m] 5"
M
IN
[12
5m m]
[25 mm
L/
L/
5D 1"
16"
TYPICAL ANCHOR BOLT
NUT & WASHER
2D
L
W
D
5D
THREADED ROD. (TYP.)
OVERSIZE HANGER TO ALLOW
LONGITUDINAL PIPE EXPANSION AND PIPE
INSULATION TO PASS THROUGH
UNBROKEN. (TYP.)
UNI-STRUT OR EQUIVALENT
HIGH DENSITY INSULATION INSERT OR, FOR
APPLICATIONS PERMITTED IN SPEC
SECTION (SECTION 22 05 11-PLUMBING),
STEEL SADDLE FILLED WITH INSULATION.
(TYP.)
THREADED ROD. (TYP.)
PIPE INSULATION (TYP.)
INSULATION SHIELD (TYP.)
INSULATION SHIELD
INSTALL CLAMP ON ALL
PIPES LESS THAN 4"Ø
THREADED ROD
INSULATION
CLEVIS HANGER
HIGH DENSITY INSULATION INSERT OR, FOR
APPLICATIONS PERMITTED IN SPEC SECTION
(SECTION 22 05 11-PLUMBING), STEEL
SADDLE FILLED WITH INSULATION.
1.
NOTES:
REFER TO SPECIFICATION SECTIONS SECTION 22 05 11 - PLUMBING.
EYEWASH BOWL
PUSH FLAG HANDLE
1.
NOTES:
EYEWASH PERFORMANCE AND ROUGH-IN SHALL MEET THE CURRENT VERSION OF ANSI Z358.1.
CEILING
1/2" TW
EYEWASH
IDENTIFICATION
SIGNS
FLOOR
SEE PLANS FOR
CONTINUATION.
WALL
SEE PLANS FOR VENT
CONTINUATION.
SEE FLOOR PLANS FOR
CONTINUATION.
1/2" CW
1/2" HW
NAVIGATOR S19-2000 EFX8
EMERGENCY MIXING VALVE
ALARM HORN
AND LIGHT
LOCKABLE SHUT OFF VALVE
2" SAN
CHECK VALVE
TEMPERATURE
GAUGE
WIRING TO HORN AND LIGHT
FLOW SWITCH
P-TRAP
1/2" HWCPOTABLE BALANCING VALVE
ASSEMBLY - 0.3 GPM
SIDE VIEW
PLAN VIEW
FINISHED FLOOR
OPERATING
END
DRAIN
STEAM CONNECTION
COLD WATER
STEAM
CONNECTION
DRAIN COLD
WATER
1/2" MPS
1-1/2" DRAIN TO
FLOOR DRAIN 1" CW
PLAN VIEW
WALL, TYP.
1/2" MPS WALL, TYP.
FINISHED
FLOOR
SIDE VIEW
1-1/2" DRAIN TO
FLOOR DRAIN
1" CW
1/2" HW
1/2" CW
1/2" RO
1/8" IA
1/2" MPS
1/2" MPC1-1/2" DRAIN
1/2" HW
1/2" CW
1/2 " R
O 1/8" IA
1/2" MPS
1/2" MPC
1-1/2" DRAIN
TO 4" FS
FINISHED FLOOR
WASHER/DISINFECTOR
WASHER/DISINFECTOR
TOP VIEW
FRONT VIEW
RO CW
RO
C
W HW
RO
VACUUM RELIEF VALVE.
WATTS N36 OR EQUAL.
EXPANSION
TANK
UNION (TYP.)
DRAIN
A.S.M.E. PRESSURE AND
TEMPERATURE RELIEF VALVE
THERMOMETER IN WELL (0-200˚F)
PIPE DIRECTLY OVER
FLOOR DRAIN
EQUIPMENT
PAD
ELECTRIC WATER
HEATER
HALF GRATEMINIMUM 1"
AIR GAP FINISHED FLOOR, VERIFY FLOOR
COVERING THICKNESS
INTERNAL DOME
STRAINER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106TH STREET
DES MOINES IA 50322
BID DOCUMENT SUBMISSION
C :\U se rs \S Fo rs be rg \D oc um en ts \1 -M E- R _s fo rs be rg 6U 6U 7.
rv t
1/ /2 :5 2:
A M
P-501
PLUMBING DETAILS PERFORM SITE PREP
FOR SPS EQUIPMENT
FARGO, ND
437-CSI-241
01/22/2025 KAH SEF
17639
NOT TO SCALE1 PIPE SUPPORT DETAIL
NOT TO SCALE2 EYEWASH DETAIL
NOT TO SCALE3 (01) ADVANTAGE PLUS (PASS-THRU) - ENDOSCOPE PROCESSOR
NOT TO SCALE4 (02) STERILIZER PIPING CONNECTION DETAIL
NOT TO SCALE5 (03) SMALL STERILIZER DETAIL
NOT TO SCALE6 (06) SINGLE CHAMBER WASHER DETAIL
NOT TO SCALE7 ELECTRIC WATER HEATER DETAIL
NOT TO SCALE8 FD-C DETAIL
NOT TO SCALE11 LAVATORY DETAIL
NOT TO SCALE10 CONCRETE PAD DETAIL
NOT TO SCALE9 FLOOR SINK DETAIL
Revisions: Date:
01/22/2025
(E) = EXISTING FIXTURE OR PIPING TO REMAIN.
SHEET SPECIFIC NOTE
HAND
SINK (E)
EMERGENCY
EYEWASH (E)
EMERGENCY
EYEWASH (E)
HAND
SINK (E)
HAND
SINK (E)
EMERGENCY
EYEWASH (E)
4" SAN (E)
4" SAN (E)
4" SAN (E)
4" SAN (E)
4" SAN
4" SAN
4" SAN 4" SAN
4" SAN
2" V (E)
2" V (E)
2" V (E)
2" V (E)
3" V (E) 2" V (E)
2" V (E)
2" V
2" V
2" V
1 1 /2"
V
4" SAN (E)
2" V (E)
2" V (E)
2" V (E)
FD (E)
FS (E)
FCO (E)
FCO (E)
4" SAN (E)
4" SAN (E)
2" SAN (E)
2" SAN (E)
2" SAN (E)
2" V1 1
/2" V
1 1 /2"
V
FD-C
FD-C
FD-S
FD-S
2" V
2" V
2" V
FD-S
FD-S
FD-S
FD-S
FD-S
FD-S
2" V
2" V
2" V
2" V
2" V
2" V
2" V
2" V
2" V
3" SAN
3" SAN
3" SAN
3" SAN
4" SAN
4" SAN
FCO (E)03
2" V
2" V
2" V
FD-S
FCO
FCO
1 1/2" V (E)
2" V
(E
3" V (E)
4" SAN (E)
2" SAN (E)
2" SAN (E)
P-408
P-708
2" V
2" V
2" V
2" V
3" SAN
3" SAN
4" (E
INDICATES THRU
FLOOR, TYP.
2" V
(E
3" SAN
2" V
FD-S
P-708
P-502
1 1 /2"
V 1 1 /2"
V 1-1/2" V
2" V (E)
3" SAN
4" SAN (E)
FCO (E)
2" SAN
2" V (E)
2" V (E)
P-502
P-708
4" SAN (E)
3" SAN
2" SAN
1 1/2" V
1 1/2"V 1 1 /2"V
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106TH STREET
DES MOINES IA 50322
BID DOCUMENT SUBMISSION
C :\U se rs \S Fo rs be rg \D oc um en ts \1 -M E- R _s fo rs be rg 6U 6U 7.
rv t
1/ /2 :5 2:
A M
P-701
SANITARY WASTE AND VENT RISER
DIAGRAMS
PERFORM SITE PREP
FOR SPS EQUIPMENT
FARGO, ND
437-CSI-241
01/22/2025 KAH SEF
17639
NOT TO SCALE1 SANITARY WASTE AND VENT RISER DIAGRAM
HAND
SINK (E)
EMERGENCY
EYEWASH (E)
1/2" (E)
MIXING VALVE (E)
HAND
SINK (E)
HAND
SINK (E)
CARTWASH (E)
EMERGENCY
EYEWASH (E)
1 1/4" CW (E)
1" HW (E)
1/2" HWC (E)
3/4" CW (E)
3/4"
1/2" CW
1/2" HW 1/2" HWC
1/2" HW
1/2" CW
1/2" HWC
1/2" HWC
1/2" HWC
1/2" HWC
1/2" HWC
1" HW 1 1/4" CW
3/4" CW
1 1/4" CW1" HW
1/2" HWC
1" CW1" HW
1/2" HWC
3/4"
3/4"
3/4"
3/4"
MT-1
MT-1
MODULATING
VALVE, TYP.
SHUT-OFF
VALVE, TYP.
1" C
W
1" C
W
1" C
W
1" C
W
1" C
W
1" C
W
1" H
W
1" H
W
1 1/4" CW
1" CW
1 1/4" CW
1" CW
3/4" CW
3/4" CW
1" HW
1" CW
1" 1"
2" CW2" HW
2" CW2" HW 2" CW
2" HW
1 CW"
1 1/2" CW
1 1/2" HW
HW
MATCH SIZES.
FIELD VERIFY
SIZES.
1 1/2" CW (E)
1 1/2" HW (E)
1 1/2" CW
1 1/2" HW 1 1/2"
1 1/4" CW1 1/4" HW
1" CW 1" HW
1 1/2" CW
1 1/4" HW
1" CW
1/2" HW
1/2" HWC
NOTE: ROUTE HWC
PIPING DOWN IN WALL
P-408 P-708
THERMOSTATIC
MIXING VALVE, TYP.
HW (E)
1/2" CW1/2" HW
1/2" CW1/2" HW
1/2" HWC
1/2" HWC1/2" HWC1/2" HW1/2" CW
1" HW1" CW
1/2" HWC
1 1/4"
1/2"
1/2"
1" CW (E)
(E) = EXISTING FIXTURE OR PIPING TO REMAIN.
NOTE:
MIXING
VALVE
1/2" CW
S2615
THERMOSTATIC
MIXING VALVE, TYP.
P-708
P-502
3" CW (E)
3" CW (E)
2 1/2" HW (E)
2 1/2" HW (E) 1 1/2" HWC (E)
1 1/2" HWC (E)
P-708 P-502
THERMOSTATIC
MIXING VALVE, TYP.
1/2" HWC3/4" CW
3/4" HW
2 1/2" CW (E)3/4" HWC (E)
2" HW (E)
3/4" HW 3/4" CW
1/2" HWC
2" CW (E)
1 1/2" HW (E)
3/4" HWC (E)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106TH STREET
DES MOINES IA 50322
BID DOCUMENT SUBMISSION
C :\U se rs \S Fo rs be rg \D oc um en ts \1 -M E- R _s fo rs be rg 6U 6U 7.
rv t
1/ /2 :5 2:
A M
P-702
DOMESTIC WATER RISER
DIAGRAMS
PERFORM SITE PREP
FOR SPS EQUIPMENT
FARGO, ND
437-CSI-241
01/22/2025 KAH SEF
17639
NOT TO SCALE1 DOMESTIC WATER RISER DIAGRAM
DRAWING TITLE
##" = 1'-0"
SPD
DRAWING/ DETAIL TITLE
NOTE:
DRAWING TITLE MAY
NOT APPEAR ON
LARGE SCALE DETAIL
DRAWINGS
DETAIL NUMBER
SECTION CUT SYMBOL
NORTH ARROW ENLARGED PLAN DETAIL
REFER TO THIS
SHEET FOR
ENLARGED
PLAN
ELECTRICAL LEGEND
NOTE: NOT ALL SYMBOLS ARE USED ON THIS PROJECT.
ELECTRICAL ABBREVIATIONS
ABBREVIATIONS USED ON DRAWINGS IN GENERAL ARE LISTED BELOW.
A AMPS
AC AIR CONDITIONING
AF AMP FRAME
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHU AIR HANDLING UNIT
A.I.C. AMPS INTERRUPTING CAPACITY
ATS AUTOMATIC TRANSFER SWITCH
AT AMP TRIP
BRKR BREAKER
C CONDUIT
CATV CABLE ANTENNA TELEVISION
CKT CIRCUIT
CLG CEILING MOUNTED
CPT CONTROL POWER TRANSFORMER
CPU CENTRAL PROCESSING UNIT
CUH CABINET UNIT HEATER
Cu COPPER
DIA DIAMETER
DISTR DISTRIBUTION
E EXISTING TO REMAIN
EC ELECTRICAL CONTRACTOR
EF EXHAUST FAN
ELEC ELECTRICAL
EM
EMERGENCY LIGHTING WITH CONNECTION TO
EMERGENCY POWER SOURCE
EMT ELECTRICAL METALLIC TUBING
ER EXISTING TO BE REMOVED
EXP EXPLOSION PROOF
EWC ELECTRIC WATER COOLER
F FUSE
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FAGAP FIRE ALARM GRAPHIC ANNUNCIATOR PANEL
FCU FAN COIL UNIT
FIXT LIGHT FIXTURE
FLUOR FLUORESCENT
FS FUSIBLE SWITCH
G GROUND
GFCI GROUND FAULT CIRCUIT INTERRUPTING PROTECTION
GRC GALVANIZED RIGID CONDUIT
HID HIGH INTENSITY DISCHARGE
HP HORSE POWER
IDF INTERMEDIATE DISTRIBUTION FRAME
IG ISOLATED GROUND
J JUNCTION BOX
KEC KITCHEN EQUIPMENT CONTRACTOR
KVA KILOVOLT AMPERE
KW KILOWATTS
LC LIGHTING CONTACTOR
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MDF MAIN DISTRIBUTION FRAME
MECH MECHANICAL
MLO MAIN LUG ONLY
MSB MAIN SWITCHBOARD
MTD MOUNTED
NAC NOTIFICATION APPLIANCE CIRCUIT
NEC NATIONAL ELECTRICAL CODE
NIC NOT IN CONTRACT
NL NIGHT LIGHT
NTS NOT TO SCALE
OC ON CENTER
PH PHASE
P POLE
PB PULL BOX
PC PHOTOELECTRIC CONTROL
PE PNEUMATIC/ELECTRIC
PNL PANEL
PVC POLYVINYL CHLORIDE
QR QUARTZ RESTRIKE
R RELOCATED
SW SWITCH
TCP TEMPERATURE CONTROL PANEL
TV TELEVISION
TVSS TRANSIENT VOLTAGE SURGE SUPPRESSOR
TYP TYPICAL
UH UNIT HEATER
UNO UNLESS NOTED OTHERWISE
UPS UNINTERRUPTIBLE POWER SUPPLY
V VOLTS
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
VIF VERIFY IN FIELD
VC VOLUME CONTROL
W WATTS OR WALL MOUNTED
WG WIRE GUARD
WP WEATHER PROOF TYPE DEVICE
XFMR TRANSFORMER
GENERAL SYMBOLS
CONDUIT CONCEALED ABOVE CEILING OR IN WALL WHEREVER POSSIBLE
CONDUIT CONCEALED BELOW SLAB OR GRADE
CONDUIT EXPOSED ON CEILING, WALL OR BAR JOIST FOR EXPOSED
HOME RUN TO PANELBOARD SHOWING CIRCUIT DESIGNATION,
INDICATING PANEL AND CIRCUIT BREAKER NUMBER WITHIN PANEL
POWER SYMBOLS
DUPLEX WALL RECEPTACLE
DUPLEX WALL RECEPTACLE ON BACKUP POWER
QUADRUPLEX RECEPTACLE
QUADRUPLEX RECEPTACLE LOCATED ABOVE COUNTER BACKSPLASH OR AS INDICATED.
ELECTRIC WATER COOLER GFCI RECEPTACLE. THE CONTRACTOR
SHALL VERIFY EXACT LOCATION OF WATER COOLER RECEPTACLE
WITH MANUFACTURERS DWGS.
DUPLEX RECEPTACLE WITH ISOLATED GROUND
SPECIAL PURPOSE OUTLET, AS NOTED ON PLANS OR SPECIFICATIONS
FLUSH FLOOR MOUNTED DUPLEX RECEPTACLE
FLOOR BOX, REFER TO FLOOR BOX SCHEDULE FOR ADDITIONAL
INFORMATION.
LIGHTING/ RECEPTACLE PANEL
DISTRIBUTION/ POWER PANEL
SURGE PROTECTION DEVICE
TRANSFORMER
MANUAL MOTOR STARTER SWITCH WITH THERMAL OVERLOAD
PROTECTION AND PILOT LIGHT
NON-FUSED DISCONNECT SWITCH
FUSED DISCONNECT SWITCH
MAGNETIC MOTOR STARTER
MAGNETIC MOTOR STARTER COMBINED WITH DISCONNECT SWITCH
PUSH PLATE FOR DOOR OPERATOR
CIRCUIT BREAKER
FUSIBLE SWITCH
SWITCH PROVIDED W/ MOTORIZED PROJECTION SCREEN, INSTALLED
AND WIRED BY ELECTRICAL
EMERGENCY POWER OFF, REFER TO PLANS FOR WIRING DETAILS.
VARIABLE FREQUENCY DRIVE; FURNISHED BY OTHERS, INSTALLED
BY ELECTRICAL CONTRACTOR
A-1
LIGHTING SYMBOLS
2' x 4' LED LIGHT FIXTURE
2' x 4' LED LIGHT FIXTURE WITH CONNECTION TO
EMERGENCY POWER SOURCE
1' x 4' LED LIGHT FIXTURE
1' x 4' LED LIGHT FIXTURE WITH CONNECTION TO
EMERGENCY POWER SOURCE
LED DOWNLIGHT FIXTURE
LED DOWNLIGHT FIXTURE WITH
CONNECTION TO EMERGENCY POWER SOURCE
WALL MOUNTED LIGHT FIXTURE
4' LED STRIP FIXTURE
EXIT LIGHT FIXTURE. SHADED AREA DENOTES SINGLE OR DOUBLE
FACE. DIRECTIONAL ARROWS AS SHOWN ON PLANS
EMERGENCY BATTERY PACK FIXTURE
POLE MOUNTED SITE LIGHT FIXTURE. NUMBER OF HEADS AS PER
DRAWINGS. (NOTE THAT ARROWS INDICATE DIRECTION FOR WHICH
OPTIMUM PHOTOMETRIC PERFORMANCE IS DESIRED. FIELD ROTATE
REFLECTOR ASSEMBLY IF REQUIRED.
GENERAL PURPOSE SINGLE POLE SWITCH EQUAL TO HUBBELL CSL120
DOUBLE POLE TOGGLE SWITCH EQUAL HUBBELL TO CSL220
GENERAL PURPOSE 3-WAY SWITCH EQUAL TO HUBBELL CSL320
GENERAL PURPOSE 4-WAY SWITCH EQUAL TO HUBBELL CSL420
GENERAL PURPOSE KEY-OPERATED SWITCH
GENERAL PURPOSE 3-WAY KEY-OPERATED SWITCH
GENERAL PURPOSE 4-WAY KEY-OPERATED SWITCH
GENERAL PURPOSE SWITCH WITH PILOT LIGHT
CONTACTOR
TIME CLOCK
ENLARGED PLAN NUMBER
VFD
EWC
N
SECTION NUMBER
SHEET WHERE SECTION IS
DRAWN
PROJECT
NORTH
TRUE
NORTH
T
PS
T
TC
C
H10
ELECTRICAL SYSTEM INDICATION
HEAVY LINE-
WEIGHT
INDICATES
NEW WORK
LIGHT LINE
WEIGHT-
INDICATES
EXISTING
EQUIPMENT OR
REFERENCED
INFORMATION
DASHED LINE-
EQUIPMENT OR
MATERIALS TO BE
DISCONNECTED
AND REMOVED
TEXT LEADER
NOTES BY SYMBOLDRAWING REVISION
SYMBOL
DRAWING REVISION
NUMBER
KEYED
NOTE NUMBER
INFORMATION TEXT
VAV-XX
EQUIPMENT TAG
IDENTIFICATION
REFERENCE E002 FOR
EQUIPMENT BRANCH CIRCUIT
REQUIREMENTS
DUPLEX RECEPTACLE WITH USB CONNECTION.
U
K
3K
4K
P
DUPLEX RECEPTACLE LOCATED ABOVE COUNTER BACKSPLASH OR AS INDICATED.
GFI DUPLEX WALL RECEPTACLE
GFIGFIGFI
OCCUPANCY SENSOR SWITCH EQUAL TO CURRENT NXSMDT
DIGITAL WALL SWITCH EQUAL TO CURRENT NXSWR
SIMPLEX WALL RECEPTACLE
IG
QUADRUPLEX RECEPTACLE ON BACKUP POWER
SPECIAL PURPOSE OUTLET ON BACKUP POWER, AS NOTED ON PLANS OR SPECIFICATIONS
FB-# PT-#
F
EPO
SIMPLEX WALL RECEPTACLE ON BACKUP POWER
2' x 2' LED LIGHT FIXTURE
2' x 2' LED LIGHT FIXTURE WITH CONNECTION TO
EMERGENCY POWER SOURCE
JUNCTION BOX
MOTOR; REFER TO PLANS FOR CIRCUITING AND PHASE.
JJ
J
WIREMOLD/ PLUGMOLD W/ ENTRANCE FITTING AS SPECIFIED AND
RECEPTACLES/ DEVICES AS INDICATED ON PLAN
CONNECT SYMBOL
D DIMMING SWITCH EQUAL TO LUTRON DIVA
S
S
S
S
S
S
S
S
S
W
SWITCHES - LINE VOLTAGE (120/277V)
(REFER TO SPECIFICATIONS AND LIGHTING SEQUENCE OF OPERATIONS FOR ADDITIONAL INFORMATION)
SWITCHES - LOW VOLTAGE (DIGITAL)
(REFER TO SPECIFICATIONS AND LIGHTING SEQUENCE OF OPERATIONS FOR ADDITIONAL INFORMATION)
S CEILING MOUNT OCCUPANCY SENSOR EQUAL TO CURRENT NXSMDT
PC EXTERIOR PHOTOCELL
L DAYLIGHT PHOTOSENSOR EQUAL TO CURRENT NXDS
LIGHTING WIRING DENOTING CONTROL ZONES. FIXTURES SHALL BE
CONTROLLED TOGETHER.
EXR EXISTING TO BE RELOCATED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106TH STREET
DES MOINES IA 50322
BID DOCUMENT SUBMISSION
C U s e rs \A
W e b e r\ D o c u m e n ts
\1
-M E
-R a w e b e r9
S
.r v t
/2
/2
:4
:0
A
M
E-001
ELECTRICAL SYMBOLS,
ABBREVIATIONS, GENERAL NOTES
PERFORM SITE PREP
FOR SPS EQUIPMENT
FARGO, ND
437-CSI-241
01/22/2025 ATW JPC
17639
ELECTRICAL SHEET INDEX
E-001 ELECTRICAL SYMBOLS, ABBREVIATIONS, GENERAL NOTES
ES-101 ELECTRICAL SITE PLAN
ESR-101 ELECTRICAL SITE RESTORATION PLAN
ED-101 LOWER LEVEL - LIGHTING DEMOLITION PLAN
ED-102 LOWER LEVEL - POWER DEMOLITION PLAN
EL-101 LOWER LEVEL - LIGHTING PLAN
EP-101 LOWER LEVEL - POWER PLAN
EQ-101 LOWER LEVEL - EQUIPMENT POWER PLAN
E-501 ONE-LINE DIAGRAM & ELECTRICAL DETAILS
E-601 ELECTRICAL SCHEDULES
E-602 ELECTRICAL SCHEDULES
GRAND TOTAL: 11
Revisions: Date:
Andrew T. Weber s s s s
J
J
J
J
J
J
J J J
J
S
T-SPD-ATS
600A GENERATOR QUICK CONNECT
T-SPD-XFMR-500
T-SPD-DP
T-SPD-XFMR-30
T-SPD-PANEL
500kW MOBILE
GENERATOR
SAC-1
SAC-2
F@600A
REFER TO ONE-LINE DIAGRAM FOR
CONDUCTOR AND CONDUIT DETAILS.
ES1
ES2
ES3ES4ES5
ES6
ES7
ES8
ES9 ES9
EXR
ES10
RA
RA
RA
RA
RA
RA
RA
RA
RA
RA
RA
11 12 13 14 15
ES11
WPWP
SPD TRAILER
480V-3P/250A
T-SPD-DP-1,3,5
SPD TRAILER
480V-3P/250A
T-SPD-DP-2,4,6
STERIS HEATER PANEL
208V-2P/100A
T-SPD-PANEL-1,3
WP TEMP AHU
208V-2P/40A
T-SPD-PANEL-2,4
T-SPD-PANEL-5
A
A
MECH
BE-09
ES12
ES12ES12
RA
ES13
WH-1
480V-3P/150A
T-SPD-DP-8,10,12
VFD
P-2 480V-3P/20A
T-SPD-DP-13,15,17
ES14
EXISTING UNDERGROUND
25KV ELEC
EXISTING UNDERGROUND
25KV ELEC
EXISTING
UNDERGROUND
ELEC
EXISTING UNDERGROUND
4KV ELEC
EXISTING ELECTRICAL
MANHOLE 9 TO REMAIN
EXISTING UNDERGROUND
4KV ELEC
EXISTING
UNDERGROUND
ELEC
ES15
ES15
ES16
ES15
PROVIDE RMC TYPE CONDUIT WITH
CONDUIT SUPPORTS. REFER TO ONE-
LINE DIAGRAM FOR CONDUCTOR AND
CONDUIT DETAILS.
A B C D
EXR
EB
EB
ES19
HEAT TRACING
208V-2P/20A
T-SPD-PANEL-11,13
ES20
HEAT TRACING
208V-2P/20A
T-SPD-PANEL-10,12
HEAT TRACING
208V-2P/20A
T-SPD-PANEL-15,17
HEAT TRACING
208V-2P/20A
T-SPD-PANEL-7,9
ES17 ES18
(TYP 3.)
AUTO OPERATORS
T-SPD-PANEL-14
T-SPD-PANEL-8 LOCATION OF ARCHITECTURAL CHASE.
COORDINATE ROUTING OF CONDUITS
UNDER TEMP ENCLOSURE WITH ALL
TRADES.
12.2 15.2 IF
WP
ELECTRICAL SITE NOTES
1. UTILITIES SHOWN ARE INDICATED SCHEMATICALLY. CONTRACTORS SHALL VERIFY
ALL DEPTHS AND ALL LOCATIONS/DIMENSIONS PRIOR TO EXCAVATING. ALL
UTILITIES MAY NOT BE SHOWN.
2. REFER TO CIVIL DRAWINGS FOR ADDITIONAL INFORMATION ON EXISTING AND NEW
SITE CONDITIONS INCLUDING UTILITIES.
3. ALL UNDERGROUND UTILITIES, PIPING, ETC, SHALL BE LOCATED EXACTLY PRIOR TO
DIGGING.
4. ANY BACKFILL SHALL BE TAMPED AND COMPACTED TO PREVENT FUTURE
SETTLING. ALL EXCESS DIRT SHALL BE CLEARED FROM THE AREA AND DISPOSED
OF.
5. MECHANICAL AND ELECTRICAL CONTRACTORS SHALL REPAIR ALL DISTURBED
SURFACES SUCH AS SIDEWALKS, DRIVEWAYS, STREETS, GRASS, AND CONCRETE.
REPLACED SURFACES SHALL MATCH EXISTING.
ELECTRICAL SITE PLAN KEYED NOTES
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
ES1
CONNECT TO EXISTING 23.9kV SECTIONALIZING SWITCH. PROVIDE NEW 25E
FUSES AND ACCESSORIES REQUIRED FOR COMPLETE CONNECTION.
ES2
PROVIDE TEMPORARY 500kW DIESEL MOBILE GENERATOR AND TRAILER
WITH 480V, 3-PHASE OUTPUT. GENERATOR SHALL BE PROVIDED WITH 600A
ADJUSTABLE CIRCUIT BREAKER AND 50' QUICK CONNECT CABLES. REFER
TO SPECIFICATIONS FOR ADDITIONAL DETAILS. PROVIDE RENTAL
EQUIPMENT FOR DURATION OF CONSTRUCTION. COORDINATE ORDERING
WITH GENERAL CONTRACTOR AND ARRIVAL OF MOBILE SPD TRAILER.
ES3
PROVIDE 480V, 3P, 600A, FUSED, NEMA 3R DISCONNECT. COORDINATE
MOUNTING WITH TEMPORARY POST STRUCTURE.
ES4
PROVIDE 480V, 3P, 600A, AUTOMATIC TRANSFER SWITCH. PROVIDE RENTAL
FOR THE DURATION OF CONSTRUCTION. COORDINATE ORDERING WITH
GENERAL CONTRACTOR AND ARRIVAL OF MOBILE SPD TRAILER.
ES5
PROVIDE 480V, 600A, NEMA 3R GENERATOR QUICK CONNECT CABINET.
COORDINATE MOUNITNG WITH TEMPORARY POST STRUCTURE.
ES6
PROVIDE 480/277V, 600A RATED DISTRIBUTION PANEL WITH 600A MAIN
CIRCUIT BREAKER. PANEL SHALL BE NEMA 3R. REFER TO ONE-LINE
DIAGRAM FOR ADDITIONAL PANEL AND CIRCUITIING INFORMATION.
ES7
PROVIDE 30kVA, NEMA 3R TRANSFORMER WITH 480V DELTA PRIMARY AND
208/120V WYE SECONDARY. PROVIDE TEMPORARY UNISTRUT STRUCTURE
TO MOUNT TRANSFORMER LEVEL.
ES8
PROVIDE 208/120V, 100A PANEL WITH 30 SPACES. PANEL SHALL BE NEMA
3R RATED. REFER TO PANEL SCHEDULE FOR ADDITIONAL PANEL AND
CIRCUITING INFORMATION.
ES9
PROVIDE 480V, 400A RATED, NEMA 3R DISCONNECT. COORDINATE
ELECTRICAL CONNECTION WITH STERIS EQUIPMENT. PROVIDE TYPE #SO
CABLES TO DISCONNECTS. ROUTE UNDER TEMP ENCLOSURE. PROVIDE
CONDUIT SLEEVES AS REQUIRED.
ES13
FINAL CONDUIT ROUTING SHALL BE COORDINATED WITH ALL TRADES.
COORDINATE ALL REQUIRED CEILING REMOVAL AND CORE DRILLING WITH
GENERAL CONTRACTOR. DOWNTIME SHALL BE COORDINATED WITH
OWNER AND MAY OCCUR AT ANY TIME.
ES14
PROVIDE TEMPORARY 500KVA PAD-MOUNTED TRANSFORMER WITH 23.9KV
PRIMARY AND 480V SECONDARY. TRANSFORMER SHALL HAVE PRIMARY
SURGE ARRESTORS. PROVIDE RENTAL FOR DURATION OF CONSTRUCTION.
COORDINATE ORDERING WITH GENERAL CONTRACTOR AND ARRIVAL OF
MOBILE SPD TRAILER. COORDINATE CONDUIT STUB UP IN CONCRETE PAD
WITH GENERAL CONTRACTOR.
ES15
ACCESS CONTROL LOCATION. REFER TO LOW VOLTAGE DETAILS AND
ARCHITECTURAL SPECIFICATIONS FOR OPERATIONI AND FURTHER
ROUGH-IN/BIDDING INFORMATION. COORDINATE ALL DOOR HOLDS, CARD
READERS, AUTOMATIC OPERATORS, AND OTHER ACCESSORIES WITH
DESIGN TEAM PRIOR TO ROUGH-IN.
ES16
PROVIDE SURFACE MOUNTED RACEWAY TO NEW AUTOMATIC OPERATOR
PUSH PAD DOOR OPERATORS.
ES17
CONTRACTOR SHALL PROVIDE HEAT TRACE CONTROLLER AND INTALL ON
EXTERIOR OF PIPE ABOVE ACCESSIBLE CEILING. INSTALL SENSOR ON
EXTERIOR OF TEMPORARY ENCLOSURE. COORDINATE WITH MECHANICAL
AND FIRE PROTECTION CONTRACTOR.
ES18
INSTALL RAYCHEM SELF REGULATING HEATING CABLE MODEL NUMBER
5BTV2-CR 3W/FT OR EQUAL ON FIRE PROTECTION, HOT, AND COLD WATER
PIPING FROM TEMPORARY ENCLOSURE TO SPD TRAILER, APPOXIMATE
DISTANCE 40'. COORDINATE INSTALLATION WITH FIRE PROTECTION AND
MECHANICAL CONTRACTORS. PROVIDE ALL PARTS AND PIECES REQUIRED
FOR COMPLETE AND FUNCTIONAL INSTALLATION.
ES19
CONTRACTOR SHALL PROVIDE HEAT TRACE CONTROLLER AND INTALL ON
EXTERIOR OF WASTE WATER PIPE BELOW SPD TRAILER. INSTALL SENSOR
ON EXTERIOR OF TEMPORARY ENCLOSURE. COORDINATE WITH
MECHANICAL CONTRACTOR.
ES20
INSTALL RAYCHEM SELF REGULATING HEATING CABLE MODEL NUMBER
5BTV2-CR 3W/FT OR EQUAL ON WASTE WATER PIPING FROM SPD TRAILER
TO SEWER CONNECTION. TOTAL APPROXIMATE DISTANCE 20'.
COORDINATE INSTALLATION WITH MECHANICAL CONTRACTOR. PROVIDE
ALL PARTS AND PIECES REQUIRED FOR COMPLETE AND FUNCTIONAL
INSTALLATION.
ES10
EXISTING EXTERIOR WALL PACK SHALL BE REMOVED AND REINSTALLED
ON EXTERIOR OF TEMPORARY ENCLOSURE FOR THE DURATION OF
CONSTRUCTION. EXTEND EXISTING CIRCUIT TO NEW LOCATION.
COORDINATE PHASING WITH GENERAL CONTRACTOR.
ES11
COORDINATE ELECTRICAL CONNECTION WITH STERIS PROVIDED
ELECTRICAL PANEL SERVING HEATERS. 208V-1PH, 100A CIRCUIT SHALL BE
LANDED IN PANEL LUGS.
ES12
PROVIDE TEMPORARY FREE STANDING RACK TO MOUNT EQUIPMENT.
EXTERIOR RACK SHALL BE CONSTRUCTED FROM WOOD AND UNISTRUT
AND BE CAPABLE OF SUPPORTING ALL EQUIPMENT INDICATED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106TH STREET
DES MOINES IA 50322
BID DOCUMENT SUBMISSION
C U s e rs \A
W e b e r\ D o c u m e n ts
\1
-M E
-R a w e b e r9
S
.r v t
/2
/2
:4
:1
A
M
ES-101
ELECTRICAL SITE PLAN PERFORM SITE PREP
FOR SPS EQUIPMENT
FARGO, ND
437-CSI-241
01/22/2025 ATW JPC
17639
1/8" = 1'-0"
ELECTRICAL TEMP SITE PLAN - SPD MOBILE TRAILER
B MANUAL ON/OFF LIGHTING SHALL OPERATE MANUAL ON/OFF VIA TOGGLE SWITCH(ES) N/A
A AUTO ON/OFF AUTO ON/OFF w/ CEILING MOUNTED SENSOR(S) AS INDICATED ON PLANS WITH WALL MOUNTED MANUAL OVERRIDE. 15 MINUTE...
TAG ACTIVATION DECRIPTION SCHEDULE
LIGHTING CONTROL - SEQUENCE OF OPERATION
Revisions: Date:
s s s s
J
J
J
J
J
J
J J J
J
J
S
ELECTRICAL SITE RESTORATION PLAN
KEYED NOTES
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
ESR1
DISCONNECT POWER TO TRANSFORMER AND PREPARE FOR REMOVAL.
REMOVE CONDUCTORS FROM SAC-2 AND CAP CONDUIT. PRIMARY
CONDUIT AND TRANSFORMER PAD SHALL REMAIN.
ESR2
DISCONNECT MOBILE GENERATOR FROM QUICK CONNECT CABINET.
REMOVE ATS, DISCONNECT, GENERATOR CABINET, ALL ASSOCIATED
CONDUCTORS, CONDUIT, CABLES, DISCONNECT, AND TEMPORARY
MOUNTING STRUCTURE.
ESR3
DISCONNECT POWER TO ALL LIGHTS, DOOR OPERATORS, AND DEVICES IN
TEMPORARY STRUCUTRE. REMOVE ALL DEVICES AND ASSOCIATED
CONDUCTORS AND CONDUITS.
ESR4
DISCONNECT AND REMOVE ALL EXTERIOR TEMPORARY ELECTRICAL
EQUIPMENT. REMOVE ALL MOUNTING STRUCTURE, ASSOCIATED RACEWAY
AND CONDUCTORS.
ESR5
DISCONNECT POWER TO PUMP VFD. REMOVE ALL ASSOCIATED RACEWAY
AND CONDUCTORS BACK TO EXERIOR TEMPORARY PANEL.
ESR6
DISCONNECT POWER TO WATER HEATER. REMOVE ALL ASSOCIATED
RACEWAY AND CONDUCTORS BACK TO EXTERIOR TEMPORARY PANEL.
ESR7
DISCONNECT POWER TO SPD TRAILER DISCONNECTS AND HEATERS.
REMOVE ALL ASSOCIATED CONDUCTORS, CONDUIT, TEMPORARY
STRUCTURE AND CABLES BACK TO SOURCE.
ESR8
EXTERIOR WALL PACK SHALL BE REMOVED AND REINSTALLED AT
PREVIOUS MOUNTING LOCATION WHEN TEMPORARY ENCLOSURE
REMOVED. REMOVE CIRCUIT BACK TO PREVIOUS LOCATION AND
RECONNECT FIXTURE. COORDINATE PHASING WITH GENERAL
CONTRACTOR.
ESR9
DISCONNECT AND REMOVE HEAT TRACING, CONTROLLER, AND ALL
ASSOCIATED RACEWAY AND CONDUCTORS.
10 11 12 13 14 15
T-SPD-XFMR-500
T-SPD-DP
T-SPD-XFMR-30
T-SPD-PANEL
ER 500kW
MOBILE
GENERATOR
SAC-1
SAC-2
EXR
MECH
BE-09
VFD
EXISTING UNDERGROUND
25KV ELEC
EXISTING UNDERGROUND
25KV ELEC
EXISTING
UNDERGROUND
ELEC
EXISTING UNDERGROUND
4KV ELEC
EXISTING ELECTRICAL
MANHOLE 9 TO REMAIN
EXISTING UNDERGROUND
4KV ELEC
EXISTING
UNDERGROUND
ELEC
ER
ER
ER
ER
ER
ERER
ER
ER
ER
ER
ER
ER
ER
ER
ER
ER
ER
ER
ER
ER ER
ER ER
ER ER
ER
ER
ER
ER
ER
T-SPD-ATS
ER
ER
ER
ER
ER
ER ER
ER
ESR1
ESR2
ESR3
ESR3
ESR4
ESR5
ESR6
ESR7
UNDERGROUND
CONDUIT TO REMAIN
A B EF
C D
A B C D
EXR
ESR8
ER
ER
ER
ER ER ER
ER ER
ER
12.2 15.2 IF
ESR9
ESR9
ER
ELECTRICAL SITE
RETORATION NOTES
1. COORDINDATE PHASING WITH ALL TRADES. REFER TO ARCHITECTURAL DRAWINGS
FOR PHASING DETAILS.
2. UTILITIES SHOWN ARE INDICATED SCHEMATICALLY. CONTRACTORS SHALL VERIFY
ALL DEPTHS AND ALL LOCATIONS/DIMENSIONS PRIOR TO EXCAVATING. ALL
UTILITIES MAY NOT BE SHOWN.
3. REFER TO CIVIL DRAWINGS FOR ADDITIONAL INFORMATION ON EXISTING AND NEW
SITE CONDITIONS INCLUDING UTILITIES.
4. ALL UNDERGROUND UTILITIES, PIPING, ETC, SHALL BE LOCATED EXACTLY PRIOR TO
DIGGING.
5. ANY BACKFILL SHALL BE TAMPED AND COMPACTED TO PREVENT FUTURE
SETTLING. ALL EXCESS DIRT SHALL BE CLEARED FROM THE AREA AND DISPOSED
OF.
6. MECHANICAL AND ELECTRICAL CONTRACTORS SHALL REPAIR ALL DISTURBED
SURFACES SUCH AS SIDEWALKS, DRIVEWAYS, STREETS, GRASS, AND CONCRETE.
REPLACED SURFACES SHALL MATCH EXISTING.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106TH STREET
DES MOINES IA 50322
BID DOCUMENT SUBMISSION
C U s e rs \A
W e b e r\ D o c u m e n ts
\1
-M E
-R a w e b e r9
S
.r v t
/2
/2
:4
:1
A
M
ESR-101
ELECTRICAL SITE RESTORATION
PLAN
PERFORM SITE PREP
FOR SPS EQUIPMENT
FARGO, ND
437-CSI-241
01/22/2025 ATW JPC
17639
1/8" = 1'-0"
ELECTRICAL SITE RESTORATION PLAN - SPD MOBILE TRAILER
ER
Revisions: Date:
S
S
S
S
S
S
S
S S S
S
S
S
S
S S
S
S
S
S
SS
SS
S
S
SS
S
S S
S
S S
SSSS
SS
SS
SS
SSS
S w
S
ELECTRICAL DEMOLITION
GENERAL NOTES
1. DEMOLITION DRAWINGS ARE BASED ON EXISTING AVAILABLE DRAWINGS AND FIELD
OBSERVATION. ELECTRICAL CONTRACTORS SHALL FIELD VERIFY THE SITE AND
INCLUDE ALL REQUIRED DEMOLITION IN THE BID.
2. ALL REQUIRED DEMOLITION MAY NOT BE INDICATED. IT IS THE INTENT OF THESE
DOCUMENTS THAT ALL MECHANICAL AND ELECTRICAL SYSTEMS (NOT TO BE
REUSED OR EXTENDED) BE REMOVED. COORDINATE WITH ARCHITECTURAL
DRAWINGS.
3. REMOVE ALL ELECTRICAL CONNECTIONS, WIRING, AND CONDUIT SERVING ALL
EQUIPMENT TO BE REMOVED.
4. MAINTAIN FIRE RATINGS OF WALLS AND FLOORS AFFECTED BY DEMOLITION.
5. REFER TO ARCHITECTURAL DRAWINGS FOR DETAILS ON FLOOR CUTTING AND
CEILING REMOVAL. CONTRACTOR SHALL COORDINATE WORK TO BE CONSISTENT
WITH SCOPE OF GENERAL CONTRACTOR'S DEMOLITION.
ELECTRICAL DEMOLITION PLAN KEYED
NOTES
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
ED1 NO ELECTRICAL DEMOLITION SCOPE IN THIS AREA.
ED2
REMOVE ALL LIGHT FIXTURES, LIGHTING CONTROLS, EMERGENCY
LIGHTING, RECEPTACLES, AND ELECTRICAL EQUIPMENT IN THIS AREA
UNLESS NOTED OTHERWISE OR NECESSARY FOR THE OPERATION OF
DEVICES OUTSIDE THE SCOPE OF REMODELING.
ED3
DISCONNECT AND STORE FOR RELOCATION IN NEW LOCATION AFTER
ARCHITECTURAL WORK HAS BEEN COMPELTED. SEE NEW WORK PLAN FOR
NEW LOCATIONS.
ED2
ED2
ED2
ER ER
ER ER
ER ER
ER ER
ER ER
ER ER
ER ER
ER ER
ER
ER
ER
ER
ER
ER
ER
ER
ER
ER
ER
ER
ERER
ER
ERER
ERER
ERER
ERER ERER
ERER
ERER
ERER
ERER
ERER
ERER
ERER
ER
ER
ER
E
EE
ER ER
ER ER
E
EE
EEEEEEE
EEEE
E
E
EEEEEEEE
EEEEEEEE
EEEEEEEE
EEEEEEEE
EEEEE
E E
E
E
E
E
E
E
E E
E
E E
E
E E E
E E E E E
E
E E E E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E
E
E
E E
E
E
EE
E E
E E
E E
E E
E E
E E
E E
E ER
E
E
E
E E E E
ER
E
EXEX
EX
EX
E
E
EX
EX
E
ER
ER ER
E
E
E E E E
E E
EE
E E
EE
E E E
E E
E
E E E
E
E
E
E
E
E
E
E
E E
EEEE
E
E
ER
ER
E
ER
EXR
EXR
ED1
ED1
ED1
ED1
ED1
ED1
ER
ER
D.3
E E
ER
EXR
ED3
ED3
ED3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106TH STREET
DES MOINES IA 50322
BID DOCUMENT SUBMISSION
C U s e rs \A
W e b e r\ D o c u m e n ts
\1
-M E
-R a w e b e r9
S
.r v t
/2
/2
:4
:1
A
M
ED-101
LOWER LEVEL - LIGHTING
DEMOLITION PLAN
PERFORM SITE PREP
FOR SPS EQUIPMENT
FARGO, ND
437-CSI-241
01/22/2025 ATW JPC
17639
1/8" = 1'-0"
LOWER LEVEL - LIGHTING DEMOLITION PLAN
N
O R
HT
Revisions: Date:
SS
S
SS
S
M T
S
M T
S M
T S
ELECTRICAL DEMOLITION
GENERAL NOTES
1. DEMOLITION DRAWINGS ARE BASED ON EXISTING AVAILABLE DRAWINGS AND FIELD
OBSERVATION. ELECTRICAL CONTRACTORS SHALL FIELD VERIFY THE SITE AND
INCLUDE ALL REQUIRED DEMOLITION IN THE BID.
2. ALL REQUIRED DEMOLITION MAY NOT BE INDICATED. IT IS THE INTENT OF THESE
DOCUMENTS THAT ALL MECHANICAL AND ELECTRICAL SYSTEMS (NOT TO BE
REUSED OR EXTENDED) BE REMOVED. COORDINATE WITH ARCHITECTURAL
DRAWINGS.
3. REMOVE ALL ELECTRICAL CONNECTIONS, WIRING, AND CONDUIT SERVING ALL
EQUIPMENT TO BE REMOVED.
4. MAINTAIN FIRE RATINGS OF WALLS AND FLOORS AFFECTED BY DEMOLITION.
5. REFER TO ARCHITECTURAL DRAWINGS FOR DETAILS ON FLOOR CUTTING AND
CEILING REMOVAL. CONTRACTOR SHALL COORDINATE WORK TO BE CONSISTENT
WITH SCOPE OF GENERAL CONTRACTOR'S DEMOLITION.
ELECTRICAL DEMOLITION PLAN KEYED
NOTES
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
ED1 NO ELECTRICAL DEMOLITION SCOPE IN THIS AREA.
ED2
REMOVE ALL LIGHT FIXTURES, LIGHTING CONTROLS, EMERGENCY
LIGHTING, RECEPTACLES, AND ELECTRICAL EQUIPMENT IN THIS AREA
UNLESS NOTED OTHERWISE OR NECESSARY FOR THE OPERATION OF
DEVICES OUTSIDE THE SCOPE OF REMODELING.
ED3
DISCONNECT AND STORE FOR RELOCATION IN NEW LOCATION AFTER
ARCHITECTURAL WORK HAS BEEN COMPELTED. SEE NEW WORK PLAN FOR
NEW LOCATIONS.
EB90W2
EB90W3
EC90W1
90W1 EB90W1
90W4
ES90C2
ER
E
ER
ER
E E
ER
ER
ER
ER ER
ER ER ER ER ER ER
ER
ER ER
ER
ER
ER
ER
ER
ER
ER ER
ER
ER
ERERERERER
ER
ER
ERER
ERER
ER ER
ER ER ER
ER
ER
ER
ER
ER ER
ER ER
ER
ER
ER
ER
ER ERER ER
ER
ERER ERER ER
ER
ER
E E E
E E
E
E
E
E
E
E E
E E E E
E
E
E
ER
ER
ER
ER
ER
ER
E
E
E E
E
ER
E
E E
E
E
E
E
E
E
E
E
ER
ER
EEEEE
EEEE
E
E
E E
E
E
E
E
EE
E
E E
E
E
E
E
E
E
E
E
E E
EE
E
E
EE
E
E
E
E
E E
E
E
E E
E
E
E
E
E
E
E
E
E
EE E E
E
E
E
E
E
E
E
E
E
E
E
E
E E EE
E
E
EE
EE
EE
E
E
E
E
E
E
E E E
E
EEE
E E E
E
ED2
ED2
E
ERER
ER
ER
ED1
ED1
ED1
ED1
ED1
E1
PREP/ ASEMBLY / STORAGE
BB-18C
OFFICE
BA-70
ER
ER
D.3
ER
ER
ER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106TH STREET
DES MOINES IA 50322
BID DOCUMENT SUBMISSION
C U s e rs \A
W e b e r\ D o c u m e n ts
\1
-M E
-R a w e b e r9
S
.r v t
/2
/2
:4
:1
A
M
ED-102
LOWER LEVEL - POWER
DEMOLITION PLAN
PERFORM SITE PREP
FOR SPS EQUIPMENT
FARGO, ND
437-CSI-241
01/22/2025 ATW JPC
17639
1/8" = 1'-0"
LOWER LEVEL - POWER DEMOLITION PLAN
N O R
HT
Revisions: Date:
M
TS
M
TS
M
TS
S
S S S
S
S
S
S
S S
S S
S
SS
SS
S
S
SS
S
S S
S
SS
SSSS
SS
SS
SS
SSS
S s s s s s s
S
S S
S
S s s s s w
S
S
LIGHTING GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
REFER TO SPECIFICATION SECTION 26 0923 FOR ADDITIONAL DETAILS ASSOCIATED
WITH LIGHTING CONTROLS.
SURFACE RACEWAY SHALL NOT BE USED IN ANY FINISHED AREAS WITHOUT PRIOR
APPROVAL OF THE DESIGN TEAM.
INSTALL DEVICES SUCH THAT NO TWO DEVICES ON OPPOSITES SIDES OF THE
SAME WALL ARE WITHIN 6" OF EACH OTHER.
COORDINATE ALL DEVICES WITH ARCHITECTURAL PLANS AND CASEWORK.
ALL LIGHTING FIXTURES SHALL BE INSTALLED IN SUCH A WAY THAT DRIVERS ARE
ACCESSIBLE WITHOUT CUTTING OF CEILING. THE DESIGN TEAM SHALL BE NOTIFIED
IMMEDIATELY OF AREAS WHERE THIS IS NOT POSSIBLE.
ALL WALL-MOUNTED FIXTURES SHALL HAVE THEIR EXACT ROUGH-IN LOCATION
DETERMINED BY THE DESIGN TEAM PRIOR TO ROUGH-IN.
THE ELECTRICAL CONTRACTOR SHALL EXTEND AN "UNSWITCHED" HOT
CONDUCTOR FROM THE NEAREST LIFE SAFETY CIRCUIT TO EXIT SIGNS REQUIRED
FOR EMERGENCY EGRESS OPERATION.
CONTRACTOR SHALL PROVIDE A UL924 RATED TRANSFER DEVICE IN ALL AREAS
WHERE EMERGENCY EGRESS LIGHTING IS REQUIRED PER NFPA 101. LIGHTING
CONTROLS MANUFACTURER SHALL DETERMINE EXACT QUANTITIES WITH LIGHTING
CONTROL ZONES AND LAYOUTS.
UNLESS NOTED OTHERWISE BY DESIGNATED LIGHTING CONTROL ZONES,
SWITCHES SHOWN SHALL CONTROL ALL FIXTURES IN THE ROOM.
REFER TO ARCHITECTURAL ELEVATIONS AND REFLECTED CEILING PLANS FOR
THE SPECIFIC DEVICE ROUGH-IN AND PLACEMENT. ANY DEVIATIONS FROM THE
ARCHITECTURAL ELEVATIONS AND REFLECTED CEILING PLANS SHALL BE REVIEWED
AND APPROVED BY THE DESIGN TEAM PRIOR TO ROUGH-IN.
LIGHTING PLAN KEYED NOTES
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
L1 NO LIGHTING SCOPE IN THIS AREA.
L2 REINSTALL AFTER ARCHITECTURAL WORK HAS BEEN COMPLETED.
RECONNECT AND RESTORE TO ORIGINAL FUNCTIONALITY.
L3
EXTEND EXISTING 120V LIFE SAFETY BRANCH CIRCUIT FROM PANEL
ES90C2 TO NEW LIGHT FIXTURES IN THIS SPACE. PROVIDE UL924 DEVICES
AS REQUIRED TO BE CONTROLLED WITH LIGHTING IN THE SPACE.
EB90W2
90W1
EC90W1
EB90W3
EB90W1
90W4
ES90C2
E E
E E E E
EE E E
E E
E E
E E
E E
E
E
EE
E
EE
E
E E E
E E E E E
EEEEEEEE
E E E E E E E E
EEEEEEEE
E E E E E E E E
EEEEEE
E
E
E E E E E E E
E E
E E E
E
E
E
E
E
E
EE
E
E
E
EE
EE
E
E
EE
E
E E
EEEEE
E E E E E
EEEEEE
E E
EEEEEE
E
E
E
EE
EX EX
EX
FA
FA FA FA
FAFA
FA FA FA
FA
FA
FAFAFAFA
FAFA
FA FA FA FA FA
FAFAFAFA
FA
E
FA
A
A
A
A
E
L3
L3
L3
L3
FB
FB
B
EA
EA
L3 L3
L3
L3 L3
EXR
L1 L1
L1
L1
L1
L1
L3
PREP/ ASEMBLY / STORAGE
BB-18C
STERILIZERS
BB-20A
RECEIVING / DECONTAMINATION
BB-20
SCOPE PROCESSING
BB-20B
MECHANICAL
BA-70A
FB HAC
BA-70C
D.3
FB
A
A
FA
A
EXR
FA
EA
L3
E
EXR
L2
L4 L2
E
EC90W1-22
EC90W1-24
EA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106TH STREET
DES MOINES IA 50322
BID DOCUMENT SUBMISSION
C :\U se rs \A W eb er \D oc um en ts \1 -M E- R _a w eb er S4 6.
rv t
6/ /2 4:
:3
PM
EL-101
LOWER LEVEL - LIGHTING PLAN PERFORM SITE PREP
FOR SPS EQUIPMENT
FARGO, ND
437-CSI-241
01/22/2025 ATW JPC
17639
1/8" = 1'-0"1 LOWER LEVEL - LIGHTING PLAN
N O R HT
B MANUAL ON/OFF LIGHTING SHALL OPERATE MANUAL ON/OFF VIA TOGGLE SWITCH(ES) N/A
A AUTO ON/OFF w/ DIMMING AUTO ON/OFF w/ WALL MOUNTED AND/OR CEILING MOUNTED SENSOR(S) AS INDICATED ON PLANS. FIXTURES SHALL HAVE FULL DIMMING CONTROL. 15 MINUTE TIMEOUT
TAG ACTIVATION DECRIPTION SCHEDULE
LIGHTING CONTROL - SEQUENCE OF OPERATION
KEY PLAN
LOWER LEVEL
Revisions: Date:
M T
S
M T
S M
T S
J
J
ELECTRICAL GENERAL NOTES
1. ALL DEVICES, EQUIPMENT, FIXTURES, AND THE LIKE MUST BE GROUNDED BY USE
OF A PROPERLY SIZED GROUNDING CONDUCTOR. MECHANICAL AND ELECTRICAL
BONDS OF THE METALLIC RACEWAY SYSTEM SHALL BE MAINTAINED. GROUND AND
BOND PER NEC ARTICLE 250.
2. ELECTRICAL CONTRACTOR SHALL PROVIDE TAMPER RESISTANCE RECEPTACLES
PER NEC 406.12.
3. ALL DISCONNECTS ON MECHANICAL EQUIPMENT SHALL BE MOUNTED ON
STRUCTURE TO ALLOW REMOVAL OF THE EQUIPMENT FOR MAINTENANCE WITH A
MINIMUM OF WIRING WORK. VERIFY NEC CLEARANCE REQUIREMENTS ARE MET
PRIOR TO ROUGH-IN.
4. MAINTAIN SERVICE CLEARANCE AROUND MECHANICAL & ELECTRICAL EQUIPMENT.
DO NOT ROUTE PIPING OR CONDUIT IN CLEARANCE SPACE.
5. SURFACE RACEWAY SHALL NOT BE USED IN ANY FINISHED AREAS WITH PRIOR
APPROVAL FROM THE DESIGN TEAM.
6. ALL RECEPTACLE CIRCUITS SHALL HAVE DEDICATED NEUTRAL.
7. INSTALL DEVICES SUCH THAT NO TWO DEVICES ON OPPOSITE SIDES OF THE SAME
WALL ARE WITHIN 24" OF EACH OTHER.
8. PRIOR TO ROUGH-IN, COORDINATE ALL WALL DEVICES WITH FINAL CASEWORK
ELEVATIONS AND OTHER TRADES. CONFLICTS SHALL BE BROUGHT IMMEDIATELY TO
THE ATTENTION OF THE DESIGN TEAM.
9. ALL FLOOR BOXES SHALL HAVE THEIR EXACT ROUGH-IN LOCATIONS DETERMINED
BY THE DESIGN TEAM THROUGH DIMENSIONED DRAWINGS APPROVED BY THE
OWNER PRIOR TO ROUGH-IN. LOCATIONS SHOWN ARE FOR BIDDING PURPOSES
ONLY.
10. REFER TO TECH SHEETS FOR ADDITIONAL ROUGH-IN INFORMATION OF LOW
VOLTAGE DEVICES.
11. REFER TO ARCHITECTURAL ELEVATIONS AND REFLECTED CEILING PLANS FOR
THE SPECIFIC DEVICE ROUGH-IN AND PLACEMENT. ANY DEVIATIONS FROM THE
ARCHITECTURAL ELEVATIONS AND REFLECTED CEILING PLANS SHALL BE REVIEWED
AND APPROVED BY THE DESIGN TEAM PRIOR TO ROUGH-IN.
ELECTRICAL PLAN KEYED NOTES
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
E1 NO ELECTRICAL SCOPE IN THIS AREA.
E2
COORDINATE INSTALLATION OF RECEPTACLE WITH EQUIPMENT ACCESS
PANEL. COORDINATE WITH EQUIPMENT LOCATION AND REQUIREMENTS
PRIOR TO ROUGH-IN.
E3
EXTEND NEAREST 120V, NORMAL POWER CIRCUIT TO NEW DEVICE
LOCATION.
E4
COORDINATE EXACT TV/MONITOR DEVICE LOCATIONS WITH OWNER'S
DESIRED MOUNTING HEIGHT PRIOR TO ROUGH-IN. COORDINATE WITH
OWNER PROVIDED TV/MONITOR AND MOUNTING SYSTEM SO THAT
DEVICES AND CABLES ARE NEAT AND CONCEALED.
E5
PROVIDE (2) 3-INCH CONDUIT ABOVE CEILING FROM WASHER/DISINFECTOR
TO DOSING STATION LOCATION.
E6
COORDINATE EXACT INSTALLATION LOCATION OF WEATHERPROOF
SWITCH FOR CONVEYOR DISCONNECT.
E7
PROVIDE DUAL CHANNEL TELE-POWER POLE EQUAL TO LEGRAND 24DTP-4.
TELE-POWER POLE SHALL HAVE DEDICATED COMPARTMENTS FOR
ROUTING DATA CABLING AND POWER CONDUCTORS. FINISH SHALL BE
SELECTED AT TIME OF SUBMITTAL. PROVIDE (2) HOSPITAL GRADE DUPLEX
RECEPTACLES (RED) AND CM2 MODULE(S) FOR DATA TERMINATION.
COORDINATE EXACT INSTALLATION LOCATION WITH FURNITURE LOCATION
PRIOR TO ROUGH-IN.
EB90W2
90W1
EC90W1
EB90W3
EB90W1
90W4
ES90C2
E
E
E E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E
E
E
E E
E
E
E
E
E
E
E
E
E
E
EE
E
E E
E
E
E E E E
E
E
E
E
E
E
E E
E
E
E
E
E
E E E
E E E E E
E
E E
E
E
E
E
E
E
E
E E E E
E E E E
E
E
E
E
E E E
E E E
E E
E
E
E
E
E
E
EE EEEEEE
E
E
E
E
EE
E
E
E E
E
E E
E
E
E
E E
E
E
GFI
+56"
GFI
+56"
GFI
+56"
GFI
+56"
E
GFI
GFI
+54"
GFI
E E E
EC90W1-23
90W1-24
EC90W1-1
90W1-54
EC90W1-11
GFI
GFI GFI
GFI
GFI
+70"
GFI
+70"
GFI
EC90W1-17
90W1-54
EC90W1-16
E3
E4
E4
E
GFI
GFI
GFI
GFI
GFI
GFI
EC90W1-21
EC90W1-18
GFI GFI
E1 E1
E1
E1
E1
E1EC90W1-25
EC90W1-27
E7
E7
RECEIVING / DECONTAMINATION
BB-20
STERILIZERS
BB-20A
MECHANICAL
BA-70A
PREP/ ASEMBLY / STORAGE
BB-18C
SCOPE PROCESSING
BB-20B
EC90W1-29
HAC
BA-70C
D.3
GFI
GFI
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106TH STREET
DES MOINES IA 50322
BID DOCUMENT SUBMISSION
C U s e rs \A
W e b e r\ D o c u m e n ts
\1
-M E
-R a w e b e r9
S
.r v t
/2
/2
:4
:2
A
M
EP-101
LOWER LEVEL - POWER PLAN PERFORM SITE PREP
FOR SPS EQUIPMENT
FARGO, ND
437-CSI-241
01/22/2025 ATW JPC
17639
1/8" = 1'-0"1
LOWER LEVEL - POWER PLAN
N
O R HT
Revisions: Date:
T
S
M T
S M
T S
J JJ
J
J J S S
SS
J J J J
J J
J
S S
J
EB90W2
90W1
EC90W1
EB90W3
EB90W1
90W4
E E
+92" +92"
GFI
WP WP
WP WP
+84"
E2 E2
GFI
SONIC WASHER
208V-3P/30A
EB90W2-8,10,12
SONIC WASHER
208V-3P/35A
EB90W2-44,46,48
STERILIZER
EB90W2-21
WASHER
208V-3P/50A
EB90W2-7,9,11
WASHER
208V-3P/50A
EB90W2-13,15,17
CONVEYOR
EB90W1-35
STERILIZER
208V-3P/20A
EB90W2-38,40,42
STERILIZER
208V-3P/20A
EB90W2-37,39,41
STERILIZER
90W1-39
STERILIZER
90W1-37
STERILIZER
EB90W3-37
STERILIZER
EB90W3-39
EB90W3-42
MEDIVATOR
EB90W3-19
MEDIVATOR
EB90W3-21
DRYING CABINET
EB90W3-41
E
RO-1
120V-1P/20A
EB90W3-27
RO-2
120V-1P/20A
EB90W3-29
E1
EC90W1-11E1
E1
E1
E1
E1
E6 E6 E5
RECEIVING / DECONTAMINATION
BB-20
STERILIZERS
BB-20A
MECHANICAL
BA-70A
PREP/ ASEMBLY / STORAGE
BB-18C
SCOPE PROCESSING
BB-20B
HAC
BA-70C
D.3
P-1 120V-1P/20A
EB90W3-31
INNOWAVE
EC90W1-20
+56"
GFI
WP
WP
ELECTRICAL GENERAL NOTES
1. ALL DEVICES, EQUIPMENT, FIXTURES, AND THE LIKE MUST BE GROUNDED BY USE
OF A PROPERLY SIZED GROUNDING CONDUCTOR. MECHANICAL AND ELECTRICAL
BONDS OF THE METALLIC RACEWAY SYSTEM SHALL BE MAINTAINED. GROUND AND
BOND PER NEC ARTICLE 250.
2. ELECTRICAL CONTRACTOR SHALL PROVIDE TAMPER RESISTANCE RECEPTACLES
PER NEC 406.12.
3. ALL DISCONNECTS ON MECHANICAL EQUIPMENT SHALL BE MOUNTED ON
STRUCTURE TO ALLOW REMOVAL OF THE EQUIPMENT FOR MAINTENANCE WITH A
MINIMUM OF WIRING WORK. VERIFY NEC CLEARANCE REQUIREMENTS ARE MET
PRIOR TO ROUGH-IN.
4. MAINTAIN SERVICE CLEARANCE AROUND MECHANICAL & ELECTRICAL EQUIPMENT.
DO NOT ROUTE PIPING OR CONDUIT IN CLEARANCE SPACE.
5. SURFACE RACEWAY SHALL NOT BE USED IN ANY FINISHED AREAS WITH PRIOR
APPROVAL FROM THE DESIGN TEAM.
6. ALL RECEPTACLE CIRCUITS SHALL HAVE DEDICATED NEUTRAL.
7. INSTALL DEVICES SUCH THAT NO TWO DEVICES ON OPPOSITE SIDES OF THE SAME
WALL ARE WITHIN 24" OF EACH OTHER.
8. PRIOR TO ROUGH-IN, COORDINATE ALL WALL DEVICES WITH FINAL CASEWORK
ELEVATIONS AND OTHER TRADES. CONFLICTS SHALL BE BROUGHT IMMEDIATELY TO
THE ATTENTION OF THE DESIGN TEAM.
9. ALL FLOOR BOXES SHALL HAVE THEIR EXACT ROUGH-IN LOCATIONS DETERMINED
BY THE DESIGN TEAM THROUGH DIMENSIONED DRAWINGS APPROVED BY THE
OWNER PRIOR TO ROUGH-IN. LOCATIONS SHOWN ARE FOR BIDDING PURPOSES
ONLY.
10. REFER TO TECH SHEETS FOR ADDITIONAL ROUGH-IN INFORMATION OF LOW
VOLTAGE DEVICES.
11. REFER TO ARCHITECTURAL ELEVATIONS AND REFLECTED CEILING PLANS FOR
THE SPECIFIC DEVICE ROUGH-IN AND PLACEMENT. ANY DEVIATIONS FROM THE
ARCHITECTURAL ELEVATIONS AND REFLECTED CEILING PLANS SHALL BE REVIEWED
AND APPROVED BY THE DESIGN TEAM PRIOR TO ROUGH-IN.
ELECTRICAL PLAN KEYED NOTES
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
E1 NO ELECTRICAL SCOPE IN THIS AREA.
E2
COORDINATE INSTALLATION OF RECEPTACLE WITH EQUIPMENT ACCESS
PANEL. COORDINATE WITH EQUIPMENT LOCATION AND REQUIREMENTS
PRIOR TO ROUGH-IN.
E3
EXTEND NEAREST 120V, NORMAL POWER CIRCUIT TO NEW DEVICE
LOCATION.
E4
COORDINATE EXACT TV/MONITOR DEVICE LOCATIONS WITH OWNER'S
DESIRED MOUNTING HEIGHT PRIOR TO ROUGH-IN. COORDINATE WITH
OWNER PROVIDED TV/MONITOR AND MOUNTING SYSTEM SO THAT
DEVICES AND CABLES ARE NEAT AND CONCEALED.
E5
PROVIDE (2) 3-INCH CONDUIT ABOVE CEILING FROM WASHER/DISINFECTOR
TO DOSING STATION LOCATION.
E6
COORDINATE EXACT INSTALLATION LOCATION OF WEATHERPROOF
SWITCH FOR CONVEYOR DISCONNECT.
E7
PROVIDE DUAL CHANNEL TELE-POWER POLE EQUAL TO LEGRAND 24DTP-4.
TELE-POWER POLE SHALL HAVE DEDICATED COMPARTMENTS FOR
ROUTING DATA CABLING AND POWER CONDUCTORS. FINISH SHALL BE
SELECTED AT TIME OF SUBMITTAL. PROVIDE (2) HOSPITAL GRADE DUPLEX
RECEPTACLES (RED) AND CM2 MODULE(S) FOR DATA TERMINATION.
COORDINATE EXACT INSTALLATION LOCATION WITH FURNITURE LOCATION
PRIOR TO ROUGH-IN.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106TH STREET
DES MOINES IA 50322
BID DOCUMENT SUBMISSION
C U s e rs \A
W e b e r\ D o c u m e n ts
\1
-M E
-R a w e b e r9
S
.r v t
/2
/2
:4
:3
A
M
EQ-101
LOWER LEVEL - EQUIPMENT
POWER PLAN
PERFORM SITE PREP
FOR SPS EQUIPMENT
FARGO, ND
437-CSI-241
01/22/2025 ATW JPC
17639
1/8" = 1'-0"
LOWER LEVEL - EQUIPMENT POWER PLAN
Revisions: Date:
S9610 PREP-PACK TABLE 5 120/1 15A N/A
S2636 INNOWAVE ECO ULTRASONIC CLEANER 2.6 GAL 1 208/3 24A HARD WIRED
S2635 INNOWAVE PCF SCONIC IRRIGATOR 20 LUMEN CAPACITY 2 208/3 24A N/A
S2627 ADVANTAGE PLUS PASS-THRU ENDOSCOPE REPROCESSING 2 120/1 15A N/A
S2615 TROPHON 1 120/1 15A N/A
S1905 STERIS AUTOMATIC PASS-THROUGH WINDOW 2 120/1 15A 1/2" NPT
S0942 WASHER/DISINFECTOR CHEMICAL HOLDERS 2 3" CONDUIT FROM WASHER/DISINFECTOR TO CHEMICAL HOLDERS
S0941 WASHER/DISINFECTOR-LOAD UNLOAD CONVEYOR 2 120/1 15A 1/2"
S0940 AMSCO WASHER/DISINFECTOR 2 120/1 N/A N/A
S0091 RACK RETURN 1 120/1 15A NEMA 5-15
S0045 AMSCO 400 SMALL STEAM STERILIZER 2 120/1 2A N/A
120/1 3A N/A
S0042 AMSCO 400 MEDIUM STEAM STERILIZER 2
208/3 8A N/A
# EQUIPMENT NAME QTY VOLTAGE/PHASE MCA CONNECTION TYP NOTE
EX XCEL SOURCE #3
23.9kV
M
80E
EX 25KV SERVICE
DISCONNET SWITCHGEAR
WITH METERING
SS-NORTH
80E
M
BLDG 38
PULL BOX
METERING
CABLE
METERING
CABLE
EX 25KV SERVICE
DISCONNET SWITCHGEAR
WITH METERING
SS-SOUTH
EX XCEL SOURCE #4
23.9kV
EX 25KV
SECTIONALIZING
SWITCH
SAC-2
EX 25KV
SECTIONALIZING
SWITCH
SAC-1
25E
25E
25E
25E
500kVA
PAD-MOUNTED
TRANSFOMER
23.9kV : 480V
600/3
600A DISCONNECT
480V, 3-POLE
NEMA 3R
F @ 600A
T-SPD ATS
600A ATS
NEMA 3R
3-POLE
N E
L
600A-3P [100%]
500kW DIESEL POWERED
PORTABLE GENERATOR
(480Y/277V, 3PH, 4W)50' CAM-LOK
CABLES
600/3
600A, 600V, 3P
NEMA 3R
CAM-LOK QUICK
CONNECT CABINET
250A-3P
250A-3P
600/3
600/3
250/3
250/3
400A RATED, 600V, 3-POLE
NEMA 3R DISCONNECT
400A RATED, 600V, 3-POLE
NEMA 3R DISCONNECT
250/3
250/3
J
J
SPD MOBILE
TRAILER
SPD MOBILE
TRAILER
MAX 50' DISTANCE.
T-SPD-DP
600A, 3PH, 4W
22,000A SCCR
NEMA 3R
PROVIDE NEW
40A FUSES
60A-3P
SPD
50A-3P
50/3 100/4
T-SPD-XFMR
30 kVA
480V: 208Y/120V
NEMA 3R
T-SPD PANEL ER1
150A-3P
150/3
200A RATED, 600V, 3-POLE
NEMA 1 DISCONNECT
150/3 J 90kW EH-1
ER2
(3) 2/0 AWG, (1) 2/0 AWG
25KV CONDUCTORS
4" PVC SCH-80 CONDUIT
20A-3P
20/3 VFD 20/3 J P-2
ELECTRICAL RISER GENERAL
NOTES
1.
2.
3.
4.
5.
6.
REFER TO [SITE PLAN CXXX AND] ELECTRICAL PLAN [EXXX] FOR ADDITIONAL
REQUIREMENTS AND RESPONSIBILITIES.
ELECTRICAL POWER OUTAGES, IF REQUIRED, SHOULD BE STRATEGICALLY
MINIMIZED AND SCHEDULED CLOSELY WITH OWNER. CHANGEOVERS COULD BE
REQUIRED TO OCCUR AT ANY HOUR.
MAINTAIN ALL SERVICE CLEARANCES REQUIRED BY THE NEC.
INSTALL ALL CONDUCTORS AS PER MANUFACTURER'S RECOMMENDATIONS.
ELECTRICAL CONTRACTOR SHALL PROVIDE CONDUCTOR LENGTHS AND BREAKERS
MANUFACTURER INFORMATION TO THE DESIGN TEAM FOR SELECTIVE
COORDINATION PER NEC 700.28. NECESSARY DEVICES SHALL HAVE THE ABILITY TO
BE SELECTIVELY COORDINATED.
ELECTRICAL SERVICE LAYOUT MAY VARY FROM WHAT IS SHOWN ON PLANS BASED
ON MANUFACTURER PROVIDING THE SYSTEM. ELECTRICAL CONTRACTOR IS
RESPONSIBLE FOR FITTING SYSTEM PROVIDED INTO SPACE SHOWN ON PLANS.
ELECTRICAL RISER KEYED NOTES
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
ER1 REFER TO PANEL SCHEDULE FOR ADDITIONAL DETAILS.
ER2
PROVIDE TEMPORARY 500KVA PAD-MOUNTED TRANSFORMER WITH 23.9KV
PRIMARY AND 480V SECONDARY. TRANSFORMER SHALL HAVE PRIMARY
SURGE ARRESTORS. PROVIDE RENTAL FOR DURATION OF CONSTRUCTION.
COORDINATE ORDERING WITH GENERAL CONTRACTOR AND ARRIVAL OF
MOBILE SPD TRAILER.
COPPER CONDUCTOR
AND CONDUIT SIZING CHART
CONDUCTORS (THWN-2) CONDUIT PARALLEL
RUNSPHASE NEUTRAL GROUND EMT SCH 80
15/4 (3) #12 AWG #12 AWG #12 AWG 1/2" 3/4" 1
20/4 (3) #12 AWG #12 AWG #12 AWG 1/2" 3/4" 1
25/4 (3) #10 AWG #10 AWG #10 AWG 1/2" 3/4" 1
30/4 (3) #10 AWG #10 AWG #10 AWG 1/2" 3/4" 1
35/4 (3) #8 AWG #8 AWG #10 AWG 3/4" 1" 1
40/4 1
45/4 1
50/4 1
60/4 (3) #4 AWG #4 AWG #10 AWG 1
70/4 (3) #4 AWG #4 AWG #8 AWG 1-1/4" 1-1/4" 1
80/4 1
90/4 (3) #2 AWG #2 AWG #8 AWG 1
100/4 1
(3) #2 AWG #2 AWG #6 AWG 1
(3) #1 AWG #1 AWG #6 AWG 1-1/2" 2" 1
(3) 1/0 AWG 1/0 AWG #6 AWG 2" 1
(3) 2/0 AWG 2/0 AWG #6 AWG 1
(3) 3/0 AWG 3/0 AWG #6 AWG 1
(3) 4/0 AWG 4/0 AWG #4 AWG 1
(3) 250 MCM 250 MCM #4 AWG 3" 1
(3) 350 MCM 350 MCM #4 AWG 3" 1
(3) 500 MCM 500 MCM #3 AWG 3" 3-1/2" 1
(3) 3/0 AWG 3/0 AWG #3 AWG 2" 2-1/2" 2
(3) 4/0 AWG 4/0 AWG #2 AWG 2
3/4" 1"
1" 1"
1" 1"
(3) #8 AWG #8 AWG #10 AWG
(3) #6 AWG #6 AWG #10 AWG
(3) #6 AWG #6 AWG #10 AWG
(3) #3 AWG #3 AWG #8 AWG 1-1/4" 1-1/4"
1-1/4" 1-1/4"
1-1/4" 1-1/4"(3) #2 AWG #2 AWG #8 AWG
110/4
125/4
150/4
175/4
200/4
225/4
250/4
300/4
350/4
400/4
450/4
500/4
600/4
1-1/4" 1-1/2"
2"
2" 2"
2" 2-1/2"
2-1/2"2-1/2"
2-1/2"
3"
2-1/2"2-1/2"
(3) 250 MCM 250 MCM #2 AWG 3"2-1/2"
(3) 350 MCM 350 MCM #1 AWG 3" 3"
1-1/4" 1-1/4"
COPPER CONDUCTOR
AND CONDUIT SIZING CHART
CONDUCTORS (THWN-2) CONDUIT PARALLEL
RUNSPHASE NEUTRAL GROUND EMT SCH 80
15/3 (3) #12 AWG #12 AWG 1/2" 3/4" 1
20/3 (3) #12 AWG #12 AWG 1/2" 3/4" 1
25/3 (3) #10 AWG #10 AWG 1/2" 3/4" 1
30/3 (3) #10 AWG #10 AWG 1/2" 3/4" 1
35/3 (3) #8 AWG #10 AWG 3/4" 1" 1
40/3 1
45/3 1
50/3 1
60/3 (3) #4 AWG #10 AWG 1
70/3 (3) #4 AWG #8 AWG 1-1/4" 1-1/4" 1
80/3 1
90/3 (3) #2 AWG #8 AWG 1
100/3 1
(3) #2 AWG #6 AWG 1
(3) #1 AWG #6 AWG 1-1/2" 2" 1
(3) 1/0 AWG #6 AWG 2" 1
(3) 2/0 AWG #6 AWG 1
(3) 3/0 AWG #6 AWG 1
(3) 4/0 AWG #4 AWG 1
(3) 250 MCM #4 AWG 3" 1
(3) 350 MCM #4 AWG 3" 1
(3) 500 MCM #3 AWG 3" 3-1/2" 1
(3) 3/0 AWG #3 AWG 2" 2-1/2" 2
(3) 4/0 AWG #2 AWG 2
3/4" 1"
1" 1"
1" 1"
(3) #8 AWG #10 AWG
(3) #6 AWG #10 AWG
(3) #6 AWG #10 AWG
(3) #3 AWG #8 AWG 1-1/4" 1-1/4"
1-1/4" 1-1/4"
1-1/4" 1-1/4"(3) #2 AWG #8 AWG
110/3
125/3
150/3
175/3
200/3
225/3
250/3
300/3
350/3
400/3
450/3
500/3
600/3
1-1/4" 1-1/2"
2"
2" 2"
2" 2-1/2"
2-1/2"2-1/2"
2-1/2"
3"
2-1/2"2-1/2"
(3) 250 MCM #2 AWG 3"2-1/2"
(3) 350 MCM #1 AWG 3" 3"
1-1/4" 1-1/4"
GENERAL NOTES:
1. INTEGRAL GALVANIZED LIPPED STEEL MOUNTING CHANNEL LONGER THAN 915mm (36") SHALL BE INSTALLED WITH A CENTER SUPPORT ROD. SUPPORT RODS SHALL NOT BE
GREATER THAN 457mm (18") APART.
2. FASTEN THREADED ROD TO STRUCTURE BY APPROVED METHOD PER SPECIFICATION 26 05 33, RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS. FIELD VERIFY EXACT
CONDITIONS.
3. FOR TRAPEZE INSTALLATIONS IN SEISMIC AREAS REFER TO SPECIFICATION SECTION 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS.
CONDUIT CLAMP.
SIZE AS
REQUIRED
INTEGRAL
GALVANIZED LIPPED
STEEL MOUNTING
CHANNEL
REFER TO PLANS
FOR QUANTITY &
SIZE OF CONDUITS
LOCKING SQUARE
WASHER & LOCKNUT
9.52mm (3/8") MIN
GALVANIZED THREADED
ROD, TYP.
WASHER & LOCKNUT
INTEGRAL
GALVANIZED LIPPED
STEEL MOUNTING
CHANNEL
LOCKING SQUARE
WASHER & LOCKNUT
9.52mm (3/8") MIN
GALVANIZED THREADED
ROD, TYP.
INTEGRAL GALVANIZED
LIPPED STEEL
MOUNTING CHANNEL
LENGTH AS REQUIRED
GENERAL NOTE:
1. INSTALL IN ACCORDANCE WITH MANUFACTURER'S MOUNTING INSTRUCTIONS AND USING THE RECOMMENDED MOUNTING
HARDWARE.
CEILING HANGER
WIRE
DRYWALL
CEILING CROSS
TEE, TYP.
DRYWALL
CEILING CROSS
TEE, TYP.
GYPSUM BOARD
WIRE TIE THROUGH
MOUNTING CHANNEL
& CROSS BEAM,
TYP.
HANGER WIRE & MOUNTING CHANNEL
ATTACHED TO STRUCTURE REFER TO
SPECIFICATION SECTION 26 51 00
INTEGRAL GALVANIZED
LIPPED STEEL MOUNTING
CHANNEL
JUNCTION
BOX
LOCKING
SQUARE
WASHER & NUT
6.35mm (1/4")
SCREW
FIXTURE WHIP FROM JUNCTION
BOX (1,829mm (6') LONG MAX)
CEILING MAIN
BEAM
WIRE TIE THROUGH
MOUNTING CHANNEL
& CROSS BEAM,
TYP.
CEILING
MAIN BEAM
12" = 1'-0"3 CONDUIT TRAPEZE MOUNTING DETAIL
12" = 1'-0"2 EXIT SIGN MOUNTING DETAIL - GYPBOARD CEILING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106TH STREET
DES MOINES IA 50322
BID DOCUMENT SUBMISSION
C :\U se rs \A W eb er \D oc um en ts \1 -M E- R _a w eb er S4 6.
rv t
6/ /2 4:
:3
PM
E-501
ONE-LINE DIAGRAM & ELECTRICAL
DETAILS
PERFORM SITE PREP
FOR SPS EQUIPMENT
FARGO, ND
437-CSI-241
01/22/2025 ATW JPC
17639
1 ONE-LINE DIAGRAM - MOBILE SPD TRAILER
Revisions: Date:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106TH STREET
DES MOINES IA 50322
BID DOCUMENT SUBMISSION
C U s e rs \A
W e b e r\ D o c u m e n ts
\1
-M E
-R a w e b e r9
S
.r v t
/2
/2
:4
:3
A
M
E-601
ELECTRICAL SCHEDULES PERFORM SITE PREP
FOR SPS EQUIPMENT
FARGO, ND
437-CSI-241
01/22/2025 ATW JPC
17639
CIRCUIT KEY NOTES: A = ARC FAULT E=EXISTING G=GFI H=HANDLE LOCK ST=SHUNT TRIP
*TOTAL DEMAND CALCS SUBTRACT ANY REDUNDANT LOAD AND THE SMALLER OF ANY NONCOINCIDENT HVAC LOADS.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .