These documents are bid documents for a Perform Site Prep for SPS (Sterile Processing) Equipment renovation project for the U.S. Department of Veterans Affairs in Fargo, North Dakota. The project involves comprehensive electrical, technology, and facility modifications for a medical equipment processing area, with key components including:

Electrical work features a mobile SPD (Sterile Processing Department) trailer with a 500kW diesel generator, temporary electrical distribution system, and complex power infrastructure modifications. Technology systems include relocating existing network infrastructure, installing new cable trays, information outlets, and wireless access points. The renovation encompasses detailed demolition and restoration plans for the lower level, with specific focus on preparing spaces for medical equipment like endoscope processors, sterilizers, and supporting infrastructure. The bid documents are dated January 2025, with detailed technical specifications covering electrical, technology, and facility system requirements across multiple drawing sheets.

View the file

Other files

File Type Posted
Attachment 0004d - PP-101 - PLUMBING PLANS - Lower Level Process Piping - 1 Page.pdf PDF
Attachment 0004i - Scope of Work Change Log - 1 Page.pdf PDF
Attachment 0004b - 17639 Narrative - Addendum 2 - 1 Page.pdf PDF
Attachment 0004g - 226719.16 - REVERSE-OSMOSIS WATER EQUIPMENT - 10 Pages.pdf PDF
Attachment 0004e - P-301 - PLUMBING RO FLOW DIAGRAM - 1 Page.pdf PDF
Attachment 0004c - 000110 TOC - 5 Pages.pdf PDF
Attachment 0004a - SOW - Perform Site Prep - Rev 3 - 12 Pages.pdf PDF
36C26325B0025 0004.docx DOCX document
Attachment 0004f - AAMI ST108-2023 Water for the processing of med devices - 102 Pages.pdf PDF
Attachment 0004h - 223111 - Water Softener - 10 Pages.pdf PDF
36C26325B0025 0003.docx DOCX document
Attachment 0002A - DBA Wage Rate ND20250013 August 28 2025 - 13 Pages.pdf PDF
36C26325B0025 0002.docx DOCX document
Attachment H - GI001 - 1 Page.pdf PDF
Attachment F - 092900 Gypsum Board - 8 Pages.pdf PDF
Attachment J - PP-103 - PLUMBING - PIPING - LOWER LEVEL RO TEMP TRAILER - 1 Page.pdf PDF
Attachment L - Site Visit Agenda - Site Prep for SPS Equipment - 2 Pages.pdf PDF
Attachment I - MH-104 - MECH LOWER LEVEL - HVAC - TEMPORARY TRAILER - 1 Page.pdf PDF
Attachment D - 074000 Siding Panels - 8 Pages.pdf PDF
Attachment M - Site Visit Sign-in Sheet 8-15-2025 - 1 Page.pdf PDF
Attachment E - 092216 Non-Structural Metal Framing - 8 Pages.pdf PDF
Attachment B - SOW - Perform Site Prep V2 - 9 Pages.pdf PDF
Attachment G - AS501 - 1 Page.pdf PDF
Attachment C - 17639 Narrative - Addendum 1 - 1 Page.pdf PDF
Attachment K - S401- FRAMING DETIALS - 1 Page.pdf PDF
Attachment A - 437-CSI-241 Site Prep Questions and Answers - 7 Pages.pdf PDF
36C26325B0025 0001.docx DOCX document
Attachment C3 - Drawings-R1_Part3 - 437-CIS-241 - 26 Pages.pdf PDF
Attachment B2 - SPEC VOL II-R1 - 437-CIS-241 - 960 Pages.pdf PDF
Attachment B1 - SPEC VOL I-R1 - 437-CIS-241 - 593 Pages.pdf PDF
Attachment C4 - Drawings-R1_Part4 - 437-CIS-241 - 21 Pages.pdf PDF
Attachment C2 - Drawings-R1_Part2 - 437-CIS-241 - 21 Pages.pdf PDF
Attachment D1 - DBA Wage Rate ND20250013 7 31 2025 - 437-CIS-241 - 12 Pages.pdf PDF
Attachment C1 - Drawings-R1_Part1 - 437-CIS-241 - 16 Pages.pdf PDF
Attachment E1 - Limitations on Subcontracting - 3 Pages.pdf PDF
Attachment A1 - Statement of Work - 437-CIS-241 - 10 Pages.pdf PDF
36C26325B0025_1.docx DOCX document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SYMMONS 7-102-1 MIXING

VALVE SET TO 95°F

SHUTOFF VALVE (TYP.)

PRESSURE GUAGE (TYP.)

PRESSURE REGULATOR (TYP.)

BALANCE VALVE

SET TO 0.3 GPM

NOTES:

1. ALL WATER PIPING AND ASSOCIATED VALVES/GUAGES ARE TO BE SUITABLE FOR POTABLE WATER

APPLICATIONS

1/2" HWC

1/2" CW

1/2" HW

PIPING ROUTED BEHIND WALL

FROM HERE UP TO CABINET

ABOVE UNIT

TEMP/PRESSURE COMBO

GUAGE

1/2 " T

W

TEMP/PRESSURE

COMBO GUAGE

FLOOR

DRAIN

NETWORK

OUTLET

PRESSURE

4" Ø

VE

NT

3/4 " I

A

NICKLE BRONZE ADJUSTABLE

STRAINER (FLUSH WITH

FINISHED FLOOR)

CEMENT BED

TILE FLOOR

CONCRETE FILL

STRUCTURAL SLAB

FLASHING

CLAMP WITH

WEEP HOLES

THREADED, CAULKED OR

NO-HUB CONNECTION

WATERPROOF

MEMBRANE

PROVIDE A METAL SUPPORT

PLATE WHEN DRAIN IS INSTALLED

IN AN EXISTING FLOOR - CAULK

AROUND DRAIN PRIOR TO

RE-GROUTING

CLAMP WATERPROOF

MEMBRANE INSIDE OF DRAIN

BODY TO DRAIN TO WEEP HOLES

NOTE:

SLOPE MEMBRANE LINER 2% TO DRAIN.

LOOSE GRAVEL

AT WEEP HOLES

3mm to 6mm SIZE

FAUCET SEE

SPECIFICATIONS

LAMINAR FLOW

CONTROL DEVICE

OFFSET

WASTE

TRAP

PARALLEL TO

WALL

LOOSE KEY

STOP

ESCUTCHEON

FINISHED FLOOR

[85 0m m] [200mm]

[26 9m m]

FO

R

FI

XT

UR

E

HE

IG

HT

S

SE

E

AR

CH

IT

EC

TU

RA

L D

RA

W

IN

GS

PROVIDE COVER FOR EXPOSED PIPING

NOTE:

8"

3/

4"

A

A

B B

SECTION A-A (BASE NOT POURED WITH SLAB)

SECTION A-A (BASE POURED WITH FLOOR SLAB)

PLAN

TYPICAL ANCHOR BOLT

NUT & WASHER

SECTION B-B

EQUIPMENT BASE PLATE

PROVIDE #3 BARS 12" [300mm]

O.C. EACH WAY IN THE BASE &

DOWEL BASE TO FLOOR

EQUIPMENT BASE PLATE

PROVIDE DOUBLE SLAB

REINFORCING IN BASE AREA

WELD HEAD TO PLATE OR BEND

OVER END 5D

FLOOR

PIPE SLEEVE (5D, 3" [75mm] MIN.)

ANCHOR BOLT

(TYP)

CONCRETE BASE

NOTE:

L & W DIMENSIONS SHALL BE 6" [150mm]

GREATER THAN THE EQUIPMENT BASE

PLATE.

[400mm]

5" M

IN

[12 5m m] 5"

M

IN

[12

5m m]

[25 mm

L/

L/

5D 1"

16"

TYPICAL ANCHOR BOLT

NUT & WASHER

2D

L

W

D

5D

THREADED ROD. (TYP.)

OVERSIZE HANGER TO ALLOW

LONGITUDINAL PIPE EXPANSION AND PIPE

INSULATION TO PASS THROUGH

UNBROKEN. (TYP.)

UNI-STRUT OR EQUIVALENT

HIGH DENSITY INSULATION INSERT OR, FOR

APPLICATIONS PERMITTED IN SPEC

SECTION (SECTION 22 05 11-PLUMBING),

STEEL SADDLE FILLED WITH INSULATION.

(TYP.)

THREADED ROD. (TYP.)

PIPE INSULATION (TYP.)

INSULATION SHIELD (TYP.)

INSULATION SHIELD

INSTALL CLAMP ON ALL

PIPES LESS THAN 4"Ø

THREADED ROD

INSULATION

CLEVIS HANGER

HIGH DENSITY INSULATION INSERT OR, FOR

APPLICATIONS PERMITTED IN SPEC SECTION

(SECTION 22 05 11-PLUMBING), STEEL

SADDLE FILLED WITH INSULATION.

1.

NOTES:

REFER TO SPECIFICATION SECTIONS SECTION 22 05 11 - PLUMBING.

EYEWASH BOWL

PUSH FLAG HANDLE

1.

NOTES:

EYEWASH PERFORMANCE AND ROUGH-IN SHALL MEET THE CURRENT VERSION OF ANSI Z358.1.

CEILING

1/2" TW

EYEWASH

IDENTIFICATION

SIGNS

FLOOR

SEE PLANS FOR

CONTINUATION.

WALL

SEE PLANS FOR VENT

CONTINUATION.

SEE FLOOR PLANS FOR

CONTINUATION.

1/2" CW

1/2" HW

NAVIGATOR S19-2000 EFX8

EMERGENCY MIXING VALVE

ALARM HORN

AND LIGHT

LOCKABLE SHUT OFF VALVE

2" SAN

CHECK VALVE

TEMPERATURE

GAUGE

WIRING TO HORN AND LIGHT

FLOW SWITCH

P-TRAP

1/2" HWCPOTABLE BALANCING VALVE

ASSEMBLY - 0.3 GPM

SIDE VIEW

PLAN VIEW

FINISHED FLOOR

OPERATING

END

DRAIN

STEAM CONNECTION

COLD WATER

STEAM

CONNECTION

DRAIN COLD

WATER

1/2" MPS

1-1/2" DRAIN TO

FLOOR DRAIN 1" CW

PLAN VIEW

WALL, TYP.

1/2" MPS WALL, TYP.

FINISHED

FLOOR

SIDE VIEW

1-1/2" DRAIN TO

FLOOR DRAIN

1" CW

1/2" HW

1/2" CW

1/2" RO

1/8" IA

1/2" MPS

1/2" MPC1-1/2" DRAIN

1/2" HW

1/2" CW

1/2 " R

O 1/8" IA

1/2" MPS

1/2" MPC

1-1/2" DRAIN

TO 4" FS

FINISHED FLOOR

WASHER/DISINFECTOR

WASHER/DISINFECTOR

TOP VIEW

FRONT VIEW

RO CW

RO

C

W HW

RO

VACUUM RELIEF VALVE.

WATTS N36 OR EQUAL.

EXPANSION

TANK

UNION (TYP.)

DRAIN

A.S.M.E. PRESSURE AND

TEMPERATURE RELIEF VALVE

THERMOMETER IN WELL (0-200˚F)

PIPE DIRECTLY OVER

FLOOR DRAIN

EQUIPMENT

PAD

ELECTRIC WATER

HEATER

HALF GRATEMINIMUM 1"

AIR GAP FINISHED FLOOR, VERIFY FLOOR

COVERING THICKNESS

INTERNAL DOME

STRAINER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

2882 106TH STREET

DES MOINES IA 50322

BID DOCUMENT SUBMISSION

C :\U se rs \S Fo rs be rg \D oc um en ts \1 -M E- R _s fo rs be rg 6U 6U 7.

rv t

1/ /2 :5 2:

A M

P-501

PLUMBING DETAILS PERFORM SITE PREP

FOR SPS EQUIPMENT

FARGO, ND

437-CSI-241

01/22/2025 KAH SEF

17639

NOT TO SCALE1 PIPE SUPPORT DETAIL

NOT TO SCALE2 EYEWASH DETAIL

NOT TO SCALE3 (01) ADVANTAGE PLUS (PASS-THRU) - ENDOSCOPE PROCESSOR

NOT TO SCALE4 (02) STERILIZER PIPING CONNECTION DETAIL

NOT TO SCALE5 (03) SMALL STERILIZER DETAIL

NOT TO SCALE6 (06) SINGLE CHAMBER WASHER DETAIL

NOT TO SCALE7 ELECTRIC WATER HEATER DETAIL

NOT TO SCALE8 FD-C DETAIL

NOT TO SCALE11 LAVATORY DETAIL

NOT TO SCALE10 CONCRETE PAD DETAIL

NOT TO SCALE9 FLOOR SINK DETAIL

Revisions: Date:

01/22/2025

(E) = EXISTING FIXTURE OR PIPING TO REMAIN.

SHEET SPECIFIC NOTE

HAND

SINK (E)

EMERGENCY

EYEWASH (E)

EMERGENCY

EYEWASH (E)

HAND

SINK (E)

HAND

SINK (E)

EMERGENCY

EYEWASH (E)

4" SAN (E)

4" SAN (E)

4" SAN (E)

4" SAN (E)

4" SAN

4" SAN

4" SAN 4" SAN

4" SAN

2" V (E)

2" V (E)

2" V (E)

2" V (E)

3" V (E) 2" V (E)

2" V (E)

2" V

2" V

2" V

1 1 /2"

V

4" SAN (E)

2" V (E)

2" V (E)

2" V (E)

FD (E)

FS (E)

FCO (E)

FCO (E)

4" SAN (E)

4" SAN (E)

2" SAN (E)

2" SAN (E)

2" SAN (E)

2" V1 1

/2" V

1 1 /2"

V

FD-C

FD-C

FD-S

FD-S

2" V

2" V

2" V

FD-S

FD-S

FD-S

FD-S

FD-S

FD-S

2" V

2" V

2" V

2" V

2" V

2" V

2" V

2" V

2" V

3" SAN

3" SAN

3" SAN

3" SAN

4" SAN

4" SAN

FCO (E)03

2" V

2" V

2" V

FD-S

FCO

FCO

1 1/2" V (E)

2" V

(E

3" V (E)

4" SAN (E)

2" SAN (E)

2" SAN (E)

P-408

P-708

2" V

2" V

2" V

2" V

3" SAN

3" SAN

4" (E

INDICATES THRU

FLOOR, TYP.

2" V

(E

3" SAN

2" V

FD-S

P-708

P-502

1 1 /2"

V 1 1 /2"

V 1-1/2" V

2" V (E)

3" SAN

4" SAN (E)

FCO (E)

2" SAN

2" V (E)

2" V (E)

P-502

P-708

4" SAN (E)

3" SAN

2" SAN

1 1/2" V

1 1/2"V 1 1 /2"V

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

2882 106TH STREET

DES MOINES IA 50322

BID DOCUMENT SUBMISSION

C :\U se rs \S Fo rs be rg \D oc um en ts \1 -M E- R _s fo rs be rg 6U 6U 7.

rv t

1/ /2 :5 2:

A M

P-701

SANITARY WASTE AND VENT RISER

DIAGRAMS

PERFORM SITE PREP

FOR SPS EQUIPMENT

FARGO, ND

437-CSI-241

01/22/2025 KAH SEF

17639

NOT TO SCALE1 SANITARY WASTE AND VENT RISER DIAGRAM

HAND

SINK (E)

EMERGENCY

EYEWASH (E)

1/2" (E)

MIXING VALVE (E)

HAND

SINK (E)

HAND

SINK (E)

CARTWASH (E)

EMERGENCY

EYEWASH (E)

1 1/4" CW (E)

1" HW (E)

1/2" HWC (E)

3/4" CW (E)

3/4"

1/2" CW

1/2" HW 1/2" HWC

1/2" HW

1/2" CW

1/2" HWC

1/2" HWC

1/2" HWC

1/2" HWC

1/2" HWC

1" HW 1 1/4" CW

3/4" CW

1 1/4" CW1" HW

1/2" HWC

1" CW1" HW

1/2" HWC

3/4"

3/4"

3/4"

3/4"

MT-1

MT-1

MODULATING

VALVE, TYP.

SHUT-OFF

VALVE, TYP.

1" C

W

1" C

W

1" C

W

1" C

W

1" C

W

1" C

W

1" H

W

1" H

W

1 1/4" CW

1" CW

1 1/4" CW

1" CW

3/4" CW

3/4" CW

1" HW

1" CW

1" 1"

2" CW2" HW

2" CW2" HW 2" CW

2" HW

1 CW"

1 1/2" CW

1 1/2" HW

HW

MATCH SIZES.

FIELD VERIFY

SIZES.

1 1/2" CW (E)

1 1/2" HW (E)

1 1/2" CW

1 1/2" HW 1 1/2"

1 1/4" CW1 1/4" HW

1" CW 1" HW

1 1/2" CW

1 1/4" HW

1" CW

1/2" HW

1/2" HWC

NOTE: ROUTE HWC

PIPING DOWN IN WALL

P-408 P-708

THERMOSTATIC

MIXING VALVE, TYP.

HW (E)

1/2" CW1/2" HW

1/2" CW1/2" HW

1/2" HWC

1/2" HWC1/2" HWC1/2" HW1/2" CW

1" HW1" CW

1/2" HWC

1 1/4"

1/2"

1/2"

1" CW (E)

(E) = EXISTING FIXTURE OR PIPING TO REMAIN.

NOTE:

MIXING

VALVE

1/2" CW

S2615

THERMOSTATIC

MIXING VALVE, TYP.

P-708

P-502

3" CW (E)

3" CW (E)

2 1/2" HW (E)

2 1/2" HW (E) 1 1/2" HWC (E)

1 1/2" HWC (E)

P-708 P-502

THERMOSTATIC

MIXING VALVE, TYP.

1/2" HWC3/4" CW

3/4" HW

2 1/2" CW (E)3/4" HWC (E)

2" HW (E)

3/4" HW 3/4" CW

1/2" HWC

2" CW (E)

1 1/2" HW (E)

3/4" HWC (E)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

2882 106TH STREET

DES MOINES IA 50322

BID DOCUMENT SUBMISSION

C :\U se rs \S Fo rs be rg \D oc um en ts \1 -M E- R _s fo rs be rg 6U 6U 7.

rv t

1/ /2 :5 2:

A M

P-702

DOMESTIC WATER RISER

DIAGRAMS

PERFORM SITE PREP

FOR SPS EQUIPMENT

FARGO, ND

437-CSI-241

01/22/2025 KAH SEF

17639

NOT TO SCALE1 DOMESTIC WATER RISER DIAGRAM

DRAWING TITLE

##" = 1'-0"

SPD

DRAWING/ DETAIL TITLE

NOTE:

DRAWING TITLE MAY

NOT APPEAR ON

LARGE SCALE DETAIL

DRAWINGS

DETAIL NUMBER

SECTION CUT SYMBOL

NORTH ARROW ENLARGED PLAN DETAIL

REFER TO THIS

SHEET FOR

ENLARGED

PLAN

ELECTRICAL LEGEND

NOTE: NOT ALL SYMBOLS ARE USED ON THIS PROJECT.

ELECTRICAL ABBREVIATIONS

ABBREVIATIONS USED ON DRAWINGS IN GENERAL ARE LISTED BELOW.

A AMPS

AC AIR CONDITIONING

AF AMP FRAME

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AHU AIR HANDLING UNIT

A.I.C. AMPS INTERRUPTING CAPACITY

ATS AUTOMATIC TRANSFER SWITCH

AT AMP TRIP

BRKR BREAKER

C CONDUIT

CATV CABLE ANTENNA TELEVISION

CKT CIRCUIT

CLG CEILING MOUNTED

CPT CONTROL POWER TRANSFORMER

CPU CENTRAL PROCESSING UNIT

CUH CABINET UNIT HEATER

Cu COPPER

DIA DIAMETER

DISTR DISTRIBUTION

E EXISTING TO REMAIN

EC ELECTRICAL CONTRACTOR

EF EXHAUST FAN

ELEC ELECTRICAL

EM

EMERGENCY LIGHTING WITH CONNECTION TO

EMERGENCY POWER SOURCE

EMT ELECTRICAL METALLIC TUBING

ER EXISTING TO BE REMOVED

EXP EXPLOSION PROOF

EWC ELECTRIC WATER COOLER

F FUSE

FAAP FIRE ALARM ANNUNCIATOR PANEL

FACP FIRE ALARM CONTROL PANEL

FAGAP FIRE ALARM GRAPHIC ANNUNCIATOR PANEL

FCU FAN COIL UNIT

FIXT LIGHT FIXTURE

FLUOR FLUORESCENT

FS FUSIBLE SWITCH

G GROUND

GFCI GROUND FAULT CIRCUIT INTERRUPTING PROTECTION

GRC GALVANIZED RIGID CONDUIT

HID HIGH INTENSITY DISCHARGE

HP HORSE POWER

IDF INTERMEDIATE DISTRIBUTION FRAME

IG ISOLATED GROUND

J JUNCTION BOX

KEC KITCHEN EQUIPMENT CONTRACTOR

KVA KILOVOLT AMPERE

KW KILOWATTS

LC LIGHTING CONTACTOR

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MDF MAIN DISTRIBUTION FRAME

MECH MECHANICAL

MLO MAIN LUG ONLY

MSB MAIN SWITCHBOARD

MTD MOUNTED

NAC NOTIFICATION APPLIANCE CIRCUIT

NEC NATIONAL ELECTRICAL CODE

NIC NOT IN CONTRACT

NL NIGHT LIGHT

NTS NOT TO SCALE

OC ON CENTER

PH PHASE

P POLE

PB PULL BOX

PC PHOTOELECTRIC CONTROL

PE PNEUMATIC/ELECTRIC

PNL PANEL

PVC POLYVINYL CHLORIDE

QR QUARTZ RESTRIKE

R RELOCATED

SW SWITCH

TCP TEMPERATURE CONTROL PANEL

TV TELEVISION

TVSS TRANSIENT VOLTAGE SURGE SUPPRESSOR

TYP TYPICAL

UH UNIT HEATER

UNO UNLESS NOTED OTHERWISE

UPS UNINTERRUPTIBLE POWER SUPPLY

V VOLTS

VAV VARIABLE AIR VOLUME

VFD VARIABLE FREQUENCY DRIVE

VIF VERIFY IN FIELD

VC VOLUME CONTROL

W WATTS OR WALL MOUNTED

WG WIRE GUARD

WP WEATHER PROOF TYPE DEVICE

XFMR TRANSFORMER

GENERAL SYMBOLS

CONDUIT CONCEALED ABOVE CEILING OR IN WALL WHEREVER POSSIBLE

CONDUIT CONCEALED BELOW SLAB OR GRADE

CONDUIT EXPOSED ON CEILING, WALL OR BAR JOIST FOR EXPOSED

HOME RUN TO PANELBOARD SHOWING CIRCUIT DESIGNATION,

INDICATING PANEL AND CIRCUIT BREAKER NUMBER WITHIN PANEL

POWER SYMBOLS

DUPLEX WALL RECEPTACLE

DUPLEX WALL RECEPTACLE ON BACKUP POWER

QUADRUPLEX RECEPTACLE

QUADRUPLEX RECEPTACLE LOCATED ABOVE COUNTER BACKSPLASH OR AS INDICATED.

ELECTRIC WATER COOLER GFCI RECEPTACLE. THE CONTRACTOR

SHALL VERIFY EXACT LOCATION OF WATER COOLER RECEPTACLE

WITH MANUFACTURERS DWGS.

DUPLEX RECEPTACLE WITH ISOLATED GROUND

SPECIAL PURPOSE OUTLET, AS NOTED ON PLANS OR SPECIFICATIONS

FLUSH FLOOR MOUNTED DUPLEX RECEPTACLE

FLOOR BOX, REFER TO FLOOR BOX SCHEDULE FOR ADDITIONAL

INFORMATION.

LIGHTING/ RECEPTACLE PANEL

DISTRIBUTION/ POWER PANEL

SURGE PROTECTION DEVICE

TRANSFORMER

MANUAL MOTOR STARTER SWITCH WITH THERMAL OVERLOAD

PROTECTION AND PILOT LIGHT

NON-FUSED DISCONNECT SWITCH

FUSED DISCONNECT SWITCH

MAGNETIC MOTOR STARTER

MAGNETIC MOTOR STARTER COMBINED WITH DISCONNECT SWITCH

PUSH PLATE FOR DOOR OPERATOR

CIRCUIT BREAKER

FUSIBLE SWITCH

SWITCH PROVIDED W/ MOTORIZED PROJECTION SCREEN, INSTALLED

AND WIRED BY ELECTRICAL

EMERGENCY POWER OFF, REFER TO PLANS FOR WIRING DETAILS.

VARIABLE FREQUENCY DRIVE; FURNISHED BY OTHERS, INSTALLED

BY ELECTRICAL CONTRACTOR

A-1

LIGHTING SYMBOLS

2' x 4' LED LIGHT FIXTURE

2' x 4' LED LIGHT FIXTURE WITH CONNECTION TO

EMERGENCY POWER SOURCE

1' x 4' LED LIGHT FIXTURE

1' x 4' LED LIGHT FIXTURE WITH CONNECTION TO

EMERGENCY POWER SOURCE

LED DOWNLIGHT FIXTURE

LED DOWNLIGHT FIXTURE WITH

CONNECTION TO EMERGENCY POWER SOURCE

WALL MOUNTED LIGHT FIXTURE

4' LED STRIP FIXTURE

EXIT LIGHT FIXTURE. SHADED AREA DENOTES SINGLE OR DOUBLE

FACE. DIRECTIONAL ARROWS AS SHOWN ON PLANS

EMERGENCY BATTERY PACK FIXTURE

POLE MOUNTED SITE LIGHT FIXTURE. NUMBER OF HEADS AS PER

DRAWINGS. (NOTE THAT ARROWS INDICATE DIRECTION FOR WHICH

OPTIMUM PHOTOMETRIC PERFORMANCE IS DESIRED. FIELD ROTATE

REFLECTOR ASSEMBLY IF REQUIRED.

GENERAL PURPOSE SINGLE POLE SWITCH EQUAL TO HUBBELL CSL120

DOUBLE POLE TOGGLE SWITCH EQUAL HUBBELL TO CSL220

GENERAL PURPOSE 3-WAY SWITCH EQUAL TO HUBBELL CSL320

GENERAL PURPOSE 4-WAY SWITCH EQUAL TO HUBBELL CSL420

GENERAL PURPOSE KEY-OPERATED SWITCH

GENERAL PURPOSE 3-WAY KEY-OPERATED SWITCH

GENERAL PURPOSE 4-WAY KEY-OPERATED SWITCH

GENERAL PURPOSE SWITCH WITH PILOT LIGHT

CONTACTOR

TIME CLOCK

ENLARGED PLAN NUMBER

VFD

EWC

N

SECTION NUMBER

SHEET WHERE SECTION IS

DRAWN

PROJECT

NORTH

TRUE

NORTH

T

PS

T

TC

C

H10

ELECTRICAL SYSTEM INDICATION

HEAVY LINE-

WEIGHT

INDICATES

NEW WORK

LIGHT LINE

WEIGHT-

INDICATES

EXISTING

EQUIPMENT OR

REFERENCED

INFORMATION

DASHED LINE-

EQUIPMENT OR

MATERIALS TO BE

DISCONNECTED

AND REMOVED

TEXT LEADER

NOTES BY SYMBOLDRAWING REVISION

SYMBOL

DRAWING REVISION

NUMBER

KEYED

NOTE NUMBER

INFORMATION TEXT

VAV-XX

EQUIPMENT TAG

IDENTIFICATION

REFERENCE E002 FOR

EQUIPMENT BRANCH CIRCUIT

REQUIREMENTS

DUPLEX RECEPTACLE WITH USB CONNECTION.

U

K

3K

4K

P

DUPLEX RECEPTACLE LOCATED ABOVE COUNTER BACKSPLASH OR AS INDICATED.

GFI DUPLEX WALL RECEPTACLE

GFIGFIGFI

OCCUPANCY SENSOR SWITCH EQUAL TO CURRENT NXSMDT

DIGITAL WALL SWITCH EQUAL TO CURRENT NXSWR

SIMPLEX WALL RECEPTACLE

IG

QUADRUPLEX RECEPTACLE ON BACKUP POWER

SPECIAL PURPOSE OUTLET ON BACKUP POWER, AS NOTED ON PLANS OR SPECIFICATIONS

FB-# PT-#

F

EPO

SIMPLEX WALL RECEPTACLE ON BACKUP POWER

2' x 2' LED LIGHT FIXTURE

2' x 2' LED LIGHT FIXTURE WITH CONNECTION TO

EMERGENCY POWER SOURCE

JUNCTION BOX

MOTOR; REFER TO PLANS FOR CIRCUITING AND PHASE.

JJ

J

WIREMOLD/ PLUGMOLD W/ ENTRANCE FITTING AS SPECIFIED AND

RECEPTACLES/ DEVICES AS INDICATED ON PLAN

CONNECT SYMBOL

D DIMMING SWITCH EQUAL TO LUTRON DIVA

S

S

S

S

S

S

S

S

S

W

SWITCHES - LINE VOLTAGE (120/277V)

(REFER TO SPECIFICATIONS AND LIGHTING SEQUENCE OF OPERATIONS FOR ADDITIONAL INFORMATION)

SWITCHES - LOW VOLTAGE (DIGITAL)

(REFER TO SPECIFICATIONS AND LIGHTING SEQUENCE OF OPERATIONS FOR ADDITIONAL INFORMATION)

S CEILING MOUNT OCCUPANCY SENSOR EQUAL TO CURRENT NXSMDT

PC EXTERIOR PHOTOCELL

L DAYLIGHT PHOTOSENSOR EQUAL TO CURRENT NXDS

LIGHTING WIRING DENOTING CONTROL ZONES. FIXTURES SHALL BE

CONTROLLED TOGETHER.

EXR EXISTING TO BE RELOCATED

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

2882 106TH STREET

DES MOINES IA 50322

BID DOCUMENT SUBMISSION

C U s e rs \A

W e b e r\ D o c u m e n ts

\1

-M E

-R a w e b e r9

S

.r v t

/2

/2

:4

:0

A

M

E-001

ELECTRICAL SYMBOLS,

ABBREVIATIONS, GENERAL NOTES

PERFORM SITE PREP

FOR SPS EQUIPMENT

FARGO, ND

437-CSI-241

01/22/2025 ATW JPC

17639

ELECTRICAL SHEET INDEX

E-001 ELECTRICAL SYMBOLS, ABBREVIATIONS, GENERAL NOTES

ES-101 ELECTRICAL SITE PLAN

ESR-101 ELECTRICAL SITE RESTORATION PLAN

ED-101 LOWER LEVEL - LIGHTING DEMOLITION PLAN

ED-102 LOWER LEVEL - POWER DEMOLITION PLAN

EL-101 LOWER LEVEL - LIGHTING PLAN

EP-101 LOWER LEVEL - POWER PLAN

EQ-101 LOWER LEVEL - EQUIPMENT POWER PLAN

E-501 ONE-LINE DIAGRAM & ELECTRICAL DETAILS

E-601 ELECTRICAL SCHEDULES

E-602 ELECTRICAL SCHEDULES

GRAND TOTAL: 11

Revisions: Date:

Andrew T. Weber s s s s

J

J

J

J

J

J

J J J

J

S

T-SPD-ATS

600A GENERATOR QUICK CONNECT

T-SPD-XFMR-500

T-SPD-DP

T-SPD-XFMR-30

T-SPD-PANEL

500kW MOBILE

GENERATOR

SAC-1

SAC-2

F@600A

REFER TO ONE-LINE DIAGRAM FOR

CONDUCTOR AND CONDUIT DETAILS.

ES1

ES2

ES3ES4ES5

ES6

ES7

ES8

ES9 ES9

EXR

ES10

RA

RA

RA

RA

RA

RA

RA

RA

RA

RA

RA

11 12 13 14 15

ES11

WPWP

SPD TRAILER

480V-3P/250A

T-SPD-DP-1,3,5

SPD TRAILER

480V-3P/250A

T-SPD-DP-2,4,6

STERIS HEATER PANEL

208V-2P/100A

T-SPD-PANEL-1,3

WP TEMP AHU

208V-2P/40A

T-SPD-PANEL-2,4

T-SPD-PANEL-5

A

A

MECH

BE-09

ES12

ES12ES12

RA

ES13

WH-1

480V-3P/150A

T-SPD-DP-8,10,12

VFD

P-2 480V-3P/20A

T-SPD-DP-13,15,17

ES14

EXISTING UNDERGROUND

25KV ELEC

EXISTING UNDERGROUND

25KV ELEC

EXISTING

UNDERGROUND

ELEC

EXISTING UNDERGROUND

4KV ELEC

EXISTING ELECTRICAL

MANHOLE 9 TO REMAIN

EXISTING UNDERGROUND

4KV ELEC

EXISTING

UNDERGROUND

ELEC

ES15

ES15

ES16

ES15

PROVIDE RMC TYPE CONDUIT WITH

CONDUIT SUPPORTS. REFER TO ONE-

LINE DIAGRAM FOR CONDUCTOR AND

CONDUIT DETAILS.

A B C D

EXR

EB

EB

ES19

HEAT TRACING

208V-2P/20A

T-SPD-PANEL-11,13

ES20

HEAT TRACING

208V-2P/20A

T-SPD-PANEL-10,12

HEAT TRACING

208V-2P/20A

T-SPD-PANEL-15,17

HEAT TRACING

208V-2P/20A

T-SPD-PANEL-7,9

ES17 ES18

(TYP 3.)

AUTO OPERATORS

T-SPD-PANEL-14

T-SPD-PANEL-8 LOCATION OF ARCHITECTURAL CHASE.

COORDINATE ROUTING OF CONDUITS

UNDER TEMP ENCLOSURE WITH ALL

TRADES.

12.2 15.2 IF

WP

ELECTRICAL SITE NOTES

1. UTILITIES SHOWN ARE INDICATED SCHEMATICALLY. CONTRACTORS SHALL VERIFY

ALL DEPTHS AND ALL LOCATIONS/DIMENSIONS PRIOR TO EXCAVATING. ALL

UTILITIES MAY NOT BE SHOWN.

2. REFER TO CIVIL DRAWINGS FOR ADDITIONAL INFORMATION ON EXISTING AND NEW

SITE CONDITIONS INCLUDING UTILITIES.

3. ALL UNDERGROUND UTILITIES, PIPING, ETC, SHALL BE LOCATED EXACTLY PRIOR TO

DIGGING.

4. ANY BACKFILL SHALL BE TAMPED AND COMPACTED TO PREVENT FUTURE

SETTLING. ALL EXCESS DIRT SHALL BE CLEARED FROM THE AREA AND DISPOSED

OF.

5. MECHANICAL AND ELECTRICAL CONTRACTORS SHALL REPAIR ALL DISTURBED

SURFACES SUCH AS SIDEWALKS, DRIVEWAYS, STREETS, GRASS, AND CONCRETE.

REPLACED SURFACES SHALL MATCH EXISTING.

ELECTRICAL SITE PLAN KEYED NOTES

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

ES1

CONNECT TO EXISTING 23.9kV SECTIONALIZING SWITCH. PROVIDE NEW 25E

FUSES AND ACCESSORIES REQUIRED FOR COMPLETE CONNECTION.

ES2

PROVIDE TEMPORARY 500kW DIESEL MOBILE GENERATOR AND TRAILER

WITH 480V, 3-PHASE OUTPUT. GENERATOR SHALL BE PROVIDED WITH 600A

ADJUSTABLE CIRCUIT BREAKER AND 50' QUICK CONNECT CABLES. REFER

TO SPECIFICATIONS FOR ADDITIONAL DETAILS. PROVIDE RENTAL

EQUIPMENT FOR DURATION OF CONSTRUCTION. COORDINATE ORDERING

WITH GENERAL CONTRACTOR AND ARRIVAL OF MOBILE SPD TRAILER.

ES3

PROVIDE 480V, 3P, 600A, FUSED, NEMA 3R DISCONNECT. COORDINATE

MOUNTING WITH TEMPORARY POST STRUCTURE.

ES4

PROVIDE 480V, 3P, 600A, AUTOMATIC TRANSFER SWITCH. PROVIDE RENTAL

FOR THE DURATION OF CONSTRUCTION. COORDINATE ORDERING WITH

GENERAL CONTRACTOR AND ARRIVAL OF MOBILE SPD TRAILER.

ES5

PROVIDE 480V, 600A, NEMA 3R GENERATOR QUICK CONNECT CABINET.

COORDINATE MOUNITNG WITH TEMPORARY POST STRUCTURE.

ES6

PROVIDE 480/277V, 600A RATED DISTRIBUTION PANEL WITH 600A MAIN

CIRCUIT BREAKER. PANEL SHALL BE NEMA 3R. REFER TO ONE-LINE

DIAGRAM FOR ADDITIONAL PANEL AND CIRCUITIING INFORMATION.

ES7

PROVIDE 30kVA, NEMA 3R TRANSFORMER WITH 480V DELTA PRIMARY AND

208/120V WYE SECONDARY. PROVIDE TEMPORARY UNISTRUT STRUCTURE

TO MOUNT TRANSFORMER LEVEL.

ES8

PROVIDE 208/120V, 100A PANEL WITH 30 SPACES. PANEL SHALL BE NEMA

3R RATED. REFER TO PANEL SCHEDULE FOR ADDITIONAL PANEL AND

CIRCUITING INFORMATION.

ES9

PROVIDE 480V, 400A RATED, NEMA 3R DISCONNECT. COORDINATE

ELECTRICAL CONNECTION WITH STERIS EQUIPMENT. PROVIDE TYPE #SO

CABLES TO DISCONNECTS. ROUTE UNDER TEMP ENCLOSURE. PROVIDE

CONDUIT SLEEVES AS REQUIRED.

ES13

FINAL CONDUIT ROUTING SHALL BE COORDINATED WITH ALL TRADES.

COORDINATE ALL REQUIRED CEILING REMOVAL AND CORE DRILLING WITH

GENERAL CONTRACTOR. DOWNTIME SHALL BE COORDINATED WITH

OWNER AND MAY OCCUR AT ANY TIME.

ES14

PROVIDE TEMPORARY 500KVA PAD-MOUNTED TRANSFORMER WITH 23.9KV

PRIMARY AND 480V SECONDARY. TRANSFORMER SHALL HAVE PRIMARY

SURGE ARRESTORS. PROVIDE RENTAL FOR DURATION OF CONSTRUCTION.

COORDINATE ORDERING WITH GENERAL CONTRACTOR AND ARRIVAL OF

MOBILE SPD TRAILER. COORDINATE CONDUIT STUB UP IN CONCRETE PAD

WITH GENERAL CONTRACTOR.

ES15

ACCESS CONTROL LOCATION. REFER TO LOW VOLTAGE DETAILS AND

ARCHITECTURAL SPECIFICATIONS FOR OPERATIONI AND FURTHER

ROUGH-IN/BIDDING INFORMATION. COORDINATE ALL DOOR HOLDS, CARD

READERS, AUTOMATIC OPERATORS, AND OTHER ACCESSORIES WITH

DESIGN TEAM PRIOR TO ROUGH-IN.

ES16

PROVIDE SURFACE MOUNTED RACEWAY TO NEW AUTOMATIC OPERATOR

PUSH PAD DOOR OPERATORS.

ES17

CONTRACTOR SHALL PROVIDE HEAT TRACE CONTROLLER AND INTALL ON

EXTERIOR OF PIPE ABOVE ACCESSIBLE CEILING. INSTALL SENSOR ON

EXTERIOR OF TEMPORARY ENCLOSURE. COORDINATE WITH MECHANICAL

AND FIRE PROTECTION CONTRACTOR.

ES18

INSTALL RAYCHEM SELF REGULATING HEATING CABLE MODEL NUMBER

5BTV2-CR 3W/FT OR EQUAL ON FIRE PROTECTION, HOT, AND COLD WATER

PIPING FROM TEMPORARY ENCLOSURE TO SPD TRAILER, APPOXIMATE

DISTANCE 40'. COORDINATE INSTALLATION WITH FIRE PROTECTION AND

MECHANICAL CONTRACTORS. PROVIDE ALL PARTS AND PIECES REQUIRED

FOR COMPLETE AND FUNCTIONAL INSTALLATION.

ES19

CONTRACTOR SHALL PROVIDE HEAT TRACE CONTROLLER AND INTALL ON

EXTERIOR OF WASTE WATER PIPE BELOW SPD TRAILER. INSTALL SENSOR

ON EXTERIOR OF TEMPORARY ENCLOSURE. COORDINATE WITH

MECHANICAL CONTRACTOR.

ES20

INSTALL RAYCHEM SELF REGULATING HEATING CABLE MODEL NUMBER

5BTV2-CR 3W/FT OR EQUAL ON WASTE WATER PIPING FROM SPD TRAILER

TO SEWER CONNECTION. TOTAL APPROXIMATE DISTANCE 20'.

COORDINATE INSTALLATION WITH MECHANICAL CONTRACTOR. PROVIDE

ALL PARTS AND PIECES REQUIRED FOR COMPLETE AND FUNCTIONAL

INSTALLATION.

ES10

EXISTING EXTERIOR WALL PACK SHALL BE REMOVED AND REINSTALLED

ON EXTERIOR OF TEMPORARY ENCLOSURE FOR THE DURATION OF

CONSTRUCTION. EXTEND EXISTING CIRCUIT TO NEW LOCATION.

COORDINATE PHASING WITH GENERAL CONTRACTOR.

ES11

COORDINATE ELECTRICAL CONNECTION WITH STERIS PROVIDED

ELECTRICAL PANEL SERVING HEATERS. 208V-1PH, 100A CIRCUIT SHALL BE

LANDED IN PANEL LUGS.

ES12

PROVIDE TEMPORARY FREE STANDING RACK TO MOUNT EQUIPMENT.

EXTERIOR RACK SHALL BE CONSTRUCTED FROM WOOD AND UNISTRUT

AND BE CAPABLE OF SUPPORTING ALL EQUIPMENT INDICATED.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

2882 106TH STREET

DES MOINES IA 50322

BID DOCUMENT SUBMISSION

C U s e rs \A

W e b e r\ D o c u m e n ts

\1

-M E

-R a w e b e r9

S

.r v t

/2

/2

:4

:1

A

M

ES-101

ELECTRICAL SITE PLAN PERFORM SITE PREP

FOR SPS EQUIPMENT

FARGO, ND

437-CSI-241

01/22/2025 ATW JPC

17639

1/8" = 1'-0"

ELECTRICAL TEMP SITE PLAN - SPD MOBILE TRAILER

B MANUAL ON/OFF LIGHTING SHALL OPERATE MANUAL ON/OFF VIA TOGGLE SWITCH(ES) N/A

A AUTO ON/OFF AUTO ON/OFF w/ CEILING MOUNTED SENSOR(S) AS INDICATED ON PLANS WITH WALL MOUNTED MANUAL OVERRIDE. 15 MINUTE...

TAG ACTIVATION DECRIPTION SCHEDULE

LIGHTING CONTROL - SEQUENCE OF OPERATION

Revisions: Date:

s s s s

J

J

J

J

J

J

J J J

J

J

S

ELECTRICAL SITE RESTORATION PLAN

KEYED NOTES

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

ESR1

DISCONNECT POWER TO TRANSFORMER AND PREPARE FOR REMOVAL.

REMOVE CONDUCTORS FROM SAC-2 AND CAP CONDUIT. PRIMARY

CONDUIT AND TRANSFORMER PAD SHALL REMAIN.

ESR2

DISCONNECT MOBILE GENERATOR FROM QUICK CONNECT CABINET.

REMOVE ATS, DISCONNECT, GENERATOR CABINET, ALL ASSOCIATED

CONDUCTORS, CONDUIT, CABLES, DISCONNECT, AND TEMPORARY

MOUNTING STRUCTURE.

ESR3

DISCONNECT POWER TO ALL LIGHTS, DOOR OPERATORS, AND DEVICES IN

TEMPORARY STRUCUTRE. REMOVE ALL DEVICES AND ASSOCIATED

CONDUCTORS AND CONDUITS.

ESR4

DISCONNECT AND REMOVE ALL EXTERIOR TEMPORARY ELECTRICAL

EQUIPMENT. REMOVE ALL MOUNTING STRUCTURE, ASSOCIATED RACEWAY

AND CONDUCTORS.

ESR5

DISCONNECT POWER TO PUMP VFD. REMOVE ALL ASSOCIATED RACEWAY

AND CONDUCTORS BACK TO EXERIOR TEMPORARY PANEL.

ESR6

DISCONNECT POWER TO WATER HEATER. REMOVE ALL ASSOCIATED

RACEWAY AND CONDUCTORS BACK TO EXTERIOR TEMPORARY PANEL.

ESR7

DISCONNECT POWER TO SPD TRAILER DISCONNECTS AND HEATERS.

REMOVE ALL ASSOCIATED CONDUCTORS, CONDUIT, TEMPORARY

STRUCTURE AND CABLES BACK TO SOURCE.

ESR8

EXTERIOR WALL PACK SHALL BE REMOVED AND REINSTALLED AT

PREVIOUS MOUNTING LOCATION WHEN TEMPORARY ENCLOSURE

REMOVED. REMOVE CIRCUIT BACK TO PREVIOUS LOCATION AND

RECONNECT FIXTURE. COORDINATE PHASING WITH GENERAL

CONTRACTOR.

ESR9

DISCONNECT AND REMOVE HEAT TRACING, CONTROLLER, AND ALL

ASSOCIATED RACEWAY AND CONDUCTORS.

10 11 12 13 14 15

T-SPD-XFMR-500

T-SPD-DP

T-SPD-XFMR-30

T-SPD-PANEL

ER 500kW

MOBILE

GENERATOR

SAC-1

SAC-2

EXR

MECH

BE-09

VFD

EXISTING UNDERGROUND

25KV ELEC

EXISTING UNDERGROUND

25KV ELEC

EXISTING

UNDERGROUND

ELEC

EXISTING UNDERGROUND

4KV ELEC

EXISTING ELECTRICAL

MANHOLE 9 TO REMAIN

EXISTING UNDERGROUND

4KV ELEC

EXISTING

UNDERGROUND

ELEC

ER

ER

ER

ER

ER

ERER

ER

ER

ER

ER

ER

ER

ER

ER

ER

ER

ER

ER

ER

ER ER

ER ER

ER ER

ER

ER

ER

ER

ER

T-SPD-ATS

ER

ER

ER

ER

ER

ER ER

ER

ESR1

ESR2

ESR3

ESR3

ESR4

ESR5

ESR6

ESR7

UNDERGROUND

CONDUIT TO REMAIN

A B EF

C D

A B C D

EXR

ESR8

ER

ER

ER

ER ER ER

ER ER

ER

12.2 15.2 IF

ESR9

ESR9

ER

ELECTRICAL SITE

RETORATION NOTES

1. COORDINDATE PHASING WITH ALL TRADES. REFER TO ARCHITECTURAL DRAWINGS

FOR PHASING DETAILS.

2. UTILITIES SHOWN ARE INDICATED SCHEMATICALLY. CONTRACTORS SHALL VERIFY

ALL DEPTHS AND ALL LOCATIONS/DIMENSIONS PRIOR TO EXCAVATING. ALL

UTILITIES MAY NOT BE SHOWN.

3. REFER TO CIVIL DRAWINGS FOR ADDITIONAL INFORMATION ON EXISTING AND NEW

SITE CONDITIONS INCLUDING UTILITIES.

4. ALL UNDERGROUND UTILITIES, PIPING, ETC, SHALL BE LOCATED EXACTLY PRIOR TO

DIGGING.

5. ANY BACKFILL SHALL BE TAMPED AND COMPACTED TO PREVENT FUTURE

SETTLING. ALL EXCESS DIRT SHALL BE CLEARED FROM THE AREA AND DISPOSED

OF.

6. MECHANICAL AND ELECTRICAL CONTRACTORS SHALL REPAIR ALL DISTURBED

SURFACES SUCH AS SIDEWALKS, DRIVEWAYS, STREETS, GRASS, AND CONCRETE.

REPLACED SURFACES SHALL MATCH EXISTING.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

2882 106TH STREET

DES MOINES IA 50322

BID DOCUMENT SUBMISSION

C U s e rs \A

W e b e r\ D o c u m e n ts

\1

-M E

-R a w e b e r9

S

.r v t

/2

/2

:4

:1

A

M

ESR-101

ELECTRICAL SITE RESTORATION

PLAN

PERFORM SITE PREP

FOR SPS EQUIPMENT

FARGO, ND

437-CSI-241

01/22/2025 ATW JPC

17639

1/8" = 1'-0"

ELECTRICAL SITE RESTORATION PLAN - SPD MOBILE TRAILER

ER

Revisions: Date:

S

S

S

S

S

S

S

S S S

S

S

S

S

S S

S

S

S

S

SS

SS

S

S

SS

S

S S

S

S S

SSSS

SS

SS

SS

SSS

S w

S

ELECTRICAL DEMOLITION

GENERAL NOTES

1. DEMOLITION DRAWINGS ARE BASED ON EXISTING AVAILABLE DRAWINGS AND FIELD

OBSERVATION. ELECTRICAL CONTRACTORS SHALL FIELD VERIFY THE SITE AND

INCLUDE ALL REQUIRED DEMOLITION IN THE BID.

2. ALL REQUIRED DEMOLITION MAY NOT BE INDICATED. IT IS THE INTENT OF THESE

DOCUMENTS THAT ALL MECHANICAL AND ELECTRICAL SYSTEMS (NOT TO BE

REUSED OR EXTENDED) BE REMOVED. COORDINATE WITH ARCHITECTURAL

DRAWINGS.

3. REMOVE ALL ELECTRICAL CONNECTIONS, WIRING, AND CONDUIT SERVING ALL

EQUIPMENT TO BE REMOVED.

4. MAINTAIN FIRE RATINGS OF WALLS AND FLOORS AFFECTED BY DEMOLITION.

5. REFER TO ARCHITECTURAL DRAWINGS FOR DETAILS ON FLOOR CUTTING AND

CEILING REMOVAL. CONTRACTOR SHALL COORDINATE WORK TO BE CONSISTENT

WITH SCOPE OF GENERAL CONTRACTOR'S DEMOLITION.

ELECTRICAL DEMOLITION PLAN KEYED

NOTES

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

ED1 NO ELECTRICAL DEMOLITION SCOPE IN THIS AREA.

ED2

REMOVE ALL LIGHT FIXTURES, LIGHTING CONTROLS, EMERGENCY

LIGHTING, RECEPTACLES, AND ELECTRICAL EQUIPMENT IN THIS AREA

UNLESS NOTED OTHERWISE OR NECESSARY FOR THE OPERATION OF

DEVICES OUTSIDE THE SCOPE OF REMODELING.

ED3

DISCONNECT AND STORE FOR RELOCATION IN NEW LOCATION AFTER

ARCHITECTURAL WORK HAS BEEN COMPELTED. SEE NEW WORK PLAN FOR

NEW LOCATIONS.

ED2

ED2

ED2

ER ER

ER ER

ER ER

ER ER

ER ER

ER ER

ER ER

ER ER

ER

ER

ER

ER

ER

ER

ER

ER

ER

ER

ER

ER

ERER

ER

ERER

ERER

ERER

ERER ERER

ERER

ERER

ERER

ERER

ERER

ERER

ERER

ER

ER

ER

E

EE

ER ER

ER ER

E

EE

EEEEEEE

EEEE

E

E

EEEEEEEE

EEEEEEEE

EEEEEEEE

EEEEEEEE

EEEEE

E E

E

E

E

E

E

E

E E

E

E E

E

E E E

E E E E E

E

E E E E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E E

E

E

E

E E

E

E

EE

E E

E E

E E

E E

E E

E E

E E

E ER

E

E

E

E E E E

ER

E

EXEX

EX

EX

E

E

EX

EX

E

ER

ER ER

E

E

E E E E

E E

EE

E E

EE

E E E

E E

E

E E E

E

E

E

E

E

E

E

E

E E

EEEE

E

E

ER

ER

E

ER

EXR

EXR

ED1

ED1

ED1

ED1

ED1

ED1

ER

ER

D.3

E E

ER

EXR

ED3

ED3

ED3

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

2882 106TH STREET

DES MOINES IA 50322

BID DOCUMENT SUBMISSION

C U s e rs \A

W e b e r\ D o c u m e n ts

\1

-M E

-R a w e b e r9

S

.r v t

/2

/2

:4

:1

A

M

ED-101

LOWER LEVEL - LIGHTING

DEMOLITION PLAN

PERFORM SITE PREP

FOR SPS EQUIPMENT

FARGO, ND

437-CSI-241

01/22/2025 ATW JPC

17639

1/8" = 1'-0"

LOWER LEVEL - LIGHTING DEMOLITION PLAN

N

O R

HT

Revisions: Date:

SS

S

SS

S

M T

S

M T

S M

T S

ELECTRICAL DEMOLITION

GENERAL NOTES

1. DEMOLITION DRAWINGS ARE BASED ON EXISTING AVAILABLE DRAWINGS AND FIELD

OBSERVATION. ELECTRICAL CONTRACTORS SHALL FIELD VERIFY THE SITE AND

INCLUDE ALL REQUIRED DEMOLITION IN THE BID.

2. ALL REQUIRED DEMOLITION MAY NOT BE INDICATED. IT IS THE INTENT OF THESE

DOCUMENTS THAT ALL MECHANICAL AND ELECTRICAL SYSTEMS (NOT TO BE

REUSED OR EXTENDED) BE REMOVED. COORDINATE WITH ARCHITECTURAL

DRAWINGS.

3. REMOVE ALL ELECTRICAL CONNECTIONS, WIRING, AND CONDUIT SERVING ALL

EQUIPMENT TO BE REMOVED.

4. MAINTAIN FIRE RATINGS OF WALLS AND FLOORS AFFECTED BY DEMOLITION.

5. REFER TO ARCHITECTURAL DRAWINGS FOR DETAILS ON FLOOR CUTTING AND

CEILING REMOVAL. CONTRACTOR SHALL COORDINATE WORK TO BE CONSISTENT

WITH SCOPE OF GENERAL CONTRACTOR'S DEMOLITION.

ELECTRICAL DEMOLITION PLAN KEYED

NOTES

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

ED1 NO ELECTRICAL DEMOLITION SCOPE IN THIS AREA.

ED2

REMOVE ALL LIGHT FIXTURES, LIGHTING CONTROLS, EMERGENCY

LIGHTING, RECEPTACLES, AND ELECTRICAL EQUIPMENT IN THIS AREA

UNLESS NOTED OTHERWISE OR NECESSARY FOR THE OPERATION OF

DEVICES OUTSIDE THE SCOPE OF REMODELING.

ED3

DISCONNECT AND STORE FOR RELOCATION IN NEW LOCATION AFTER

ARCHITECTURAL WORK HAS BEEN COMPELTED. SEE NEW WORK PLAN FOR

NEW LOCATIONS.

EB90W2

EB90W3

EC90W1

90W1 EB90W1

90W4

ES90C2

ER

E

ER

ER

E E

ER

ER

ER

ER ER

ER ER ER ER ER ER

ER

ER ER

ER

ER

ER

ER

ER

ER

ER ER

ER

ER

ERERERERER

ER

ER

ERER

ERER

ER ER

ER ER ER

ER

ER

ER

ER

ER ER

ER ER

ER

ER

ER

ER

ER ERER ER

ER

ERER ERER ER

ER

ER

E E E

E E

E

E

E

E

E

E E

E E E E

E

E

E

ER

ER

ER

ER

ER

ER

E

E

E E

E

ER

E

E E

E

E

E

E

E

E

E

E

ER

ER

EEEEE

EEEE

E

E

E E

E

E

E

E

EE

E

E E

E

E

E

E

E

E

E

E

E E

EE

E

E

EE

E

E

E

E

E E

E

E

E E

E

E

E

E

E

E

E

E

E

EE E E

E

E

E

E

E

E

E

E

E

E

E

E

E E EE

E

E

EE

EE

EE

E

E

E

E

E

E

E E E

E

EEE

E E E

E

ED2

ED2

E

ERER

ER

ER

ED1

ED1

ED1

ED1

ED1

E1

PREP/ ASEMBLY / STORAGE

BB-18C

OFFICE

BA-70

ER

ER

D.3

ER

ER

ER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

2882 106TH STREET

DES MOINES IA 50322

BID DOCUMENT SUBMISSION

C U s e rs \A

W e b e r\ D o c u m e n ts

\1

-M E

-R a w e b e r9

S

.r v t

/2

/2

:4

:1

A

M

ED-102

LOWER LEVEL - POWER

DEMOLITION PLAN

PERFORM SITE PREP

FOR SPS EQUIPMENT

FARGO, ND

437-CSI-241

01/22/2025 ATW JPC

17639

1/8" = 1'-0"

LOWER LEVEL - POWER DEMOLITION PLAN

N O R

HT

Revisions: Date:

M

TS

M

TS

M

TS

S

S S S

S

S

S

S

S S

S S

S

SS

SS

S

S

SS

S

S S

S

SS

SSSS

SS

SS

SS

SSS

S s s s s s s

S

S S

S

S s s s s w

S

S

LIGHTING GENERAL NOTES

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

REFER TO SPECIFICATION SECTION 26 0923 FOR ADDITIONAL DETAILS ASSOCIATED

WITH LIGHTING CONTROLS.

SURFACE RACEWAY SHALL NOT BE USED IN ANY FINISHED AREAS WITHOUT PRIOR

APPROVAL OF THE DESIGN TEAM.

INSTALL DEVICES SUCH THAT NO TWO DEVICES ON OPPOSITES SIDES OF THE

SAME WALL ARE WITHIN 6" OF EACH OTHER.

COORDINATE ALL DEVICES WITH ARCHITECTURAL PLANS AND CASEWORK.

ALL LIGHTING FIXTURES SHALL BE INSTALLED IN SUCH A WAY THAT DRIVERS ARE

ACCESSIBLE WITHOUT CUTTING OF CEILING. THE DESIGN TEAM SHALL BE NOTIFIED

IMMEDIATELY OF AREAS WHERE THIS IS NOT POSSIBLE.

ALL WALL-MOUNTED FIXTURES SHALL HAVE THEIR EXACT ROUGH-IN LOCATION

DETERMINED BY THE DESIGN TEAM PRIOR TO ROUGH-IN.

THE ELECTRICAL CONTRACTOR SHALL EXTEND AN "UNSWITCHED" HOT

CONDUCTOR FROM THE NEAREST LIFE SAFETY CIRCUIT TO EXIT SIGNS REQUIRED

FOR EMERGENCY EGRESS OPERATION.

CONTRACTOR SHALL PROVIDE A UL924 RATED TRANSFER DEVICE IN ALL AREAS

WHERE EMERGENCY EGRESS LIGHTING IS REQUIRED PER NFPA 101. LIGHTING

CONTROLS MANUFACTURER SHALL DETERMINE EXACT QUANTITIES WITH LIGHTING

CONTROL ZONES AND LAYOUTS.

UNLESS NOTED OTHERWISE BY DESIGNATED LIGHTING CONTROL ZONES,

SWITCHES SHOWN SHALL CONTROL ALL FIXTURES IN THE ROOM.

REFER TO ARCHITECTURAL ELEVATIONS AND REFLECTED CEILING PLANS FOR

THE SPECIFIC DEVICE ROUGH-IN AND PLACEMENT. ANY DEVIATIONS FROM THE

ARCHITECTURAL ELEVATIONS AND REFLECTED CEILING PLANS SHALL BE REVIEWED

AND APPROVED BY THE DESIGN TEAM PRIOR TO ROUGH-IN.

LIGHTING PLAN KEYED NOTES

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

L1 NO LIGHTING SCOPE IN THIS AREA.

L2 REINSTALL AFTER ARCHITECTURAL WORK HAS BEEN COMPLETED.

RECONNECT AND RESTORE TO ORIGINAL FUNCTIONALITY.

L3

EXTEND EXISTING 120V LIFE SAFETY BRANCH CIRCUIT FROM PANEL

ES90C2 TO NEW LIGHT FIXTURES IN THIS SPACE. PROVIDE UL924 DEVICES

AS REQUIRED TO BE CONTROLLED WITH LIGHTING IN THE SPACE.

EB90W2

90W1

EC90W1

EB90W3

EB90W1

90W4

ES90C2

E E

E E E E

EE E E

E E

E E

E E

E E

E

E

EE

E

EE

E

E E E

E E E E E

EEEEEEEE

E E E E E E E E

EEEEEEEE

E E E E E E E E

EEEEEE

E

E

E E E E E E E

E E

E E E

E

E

E

E

E

E

EE

E

E

E

EE

EE

E

E

EE

E

E E

EEEEE

E E E E E

EEEEEE

E E

EEEEEE

E

E

E

EE

EX EX

EX

FA

FA FA FA

FAFA

FA FA FA

FA

FA

FAFAFAFA

FAFA

FA FA FA FA FA

FAFAFAFA

FA

E

FA

A

A

A

A

E

L3

L3

L3

L3

FB

FB

B

EA

EA

L3 L3

L3

L3 L3

EXR

L1 L1

L1

L1

L1

L1

L3

PREP/ ASEMBLY / STORAGE

BB-18C

STERILIZERS

BB-20A

RECEIVING / DECONTAMINATION

BB-20

SCOPE PROCESSING

BB-20B

MECHANICAL

BA-70A

FB HAC

BA-70C

D.3

FB

A

A

FA

A

EXR

FA

EA

L3

E

EXR

L2

L4 L2

E

EC90W1-22

EC90W1-24

EA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

2882 106TH STREET

DES MOINES IA 50322

BID DOCUMENT SUBMISSION

C :\U se rs \A W eb er \D oc um en ts \1 -M E- R _a w eb er S4 6.

rv t

6/ /2 4:

:3

PM

EL-101

LOWER LEVEL - LIGHTING PLAN PERFORM SITE PREP

FOR SPS EQUIPMENT

FARGO, ND

437-CSI-241

01/22/2025 ATW JPC

17639

1/8" = 1'-0"1 LOWER LEVEL - LIGHTING PLAN

N O R HT

B MANUAL ON/OFF LIGHTING SHALL OPERATE MANUAL ON/OFF VIA TOGGLE SWITCH(ES) N/A

A AUTO ON/OFF w/ DIMMING AUTO ON/OFF w/ WALL MOUNTED AND/OR CEILING MOUNTED SENSOR(S) AS INDICATED ON PLANS. FIXTURES SHALL HAVE FULL DIMMING CONTROL. 15 MINUTE TIMEOUT

TAG ACTIVATION DECRIPTION SCHEDULE

LIGHTING CONTROL - SEQUENCE OF OPERATION

KEY PLAN

LOWER LEVEL

Revisions: Date:

M T

S

M T

S M

T S

J

J

ELECTRICAL GENERAL NOTES

1. ALL DEVICES, EQUIPMENT, FIXTURES, AND THE LIKE MUST BE GROUNDED BY USE

OF A PROPERLY SIZED GROUNDING CONDUCTOR. MECHANICAL AND ELECTRICAL

BONDS OF THE METALLIC RACEWAY SYSTEM SHALL BE MAINTAINED. GROUND AND

BOND PER NEC ARTICLE 250.

2. ELECTRICAL CONTRACTOR SHALL PROVIDE TAMPER RESISTANCE RECEPTACLES

PER NEC 406.12.

3. ALL DISCONNECTS ON MECHANICAL EQUIPMENT SHALL BE MOUNTED ON

STRUCTURE TO ALLOW REMOVAL OF THE EQUIPMENT FOR MAINTENANCE WITH A

MINIMUM OF WIRING WORK. VERIFY NEC CLEARANCE REQUIREMENTS ARE MET

PRIOR TO ROUGH-IN.

4. MAINTAIN SERVICE CLEARANCE AROUND MECHANICAL & ELECTRICAL EQUIPMENT.

DO NOT ROUTE PIPING OR CONDUIT IN CLEARANCE SPACE.

5. SURFACE RACEWAY SHALL NOT BE USED IN ANY FINISHED AREAS WITH PRIOR

APPROVAL FROM THE DESIGN TEAM.

6. ALL RECEPTACLE CIRCUITS SHALL HAVE DEDICATED NEUTRAL.

7. INSTALL DEVICES SUCH THAT NO TWO DEVICES ON OPPOSITE SIDES OF THE SAME

WALL ARE WITHIN 24" OF EACH OTHER.

8. PRIOR TO ROUGH-IN, COORDINATE ALL WALL DEVICES WITH FINAL CASEWORK

ELEVATIONS AND OTHER TRADES. CONFLICTS SHALL BE BROUGHT IMMEDIATELY TO

THE ATTENTION OF THE DESIGN TEAM.

9. ALL FLOOR BOXES SHALL HAVE THEIR EXACT ROUGH-IN LOCATIONS DETERMINED

BY THE DESIGN TEAM THROUGH DIMENSIONED DRAWINGS APPROVED BY THE

OWNER PRIOR TO ROUGH-IN. LOCATIONS SHOWN ARE FOR BIDDING PURPOSES

ONLY.

10. REFER TO TECH SHEETS FOR ADDITIONAL ROUGH-IN INFORMATION OF LOW

VOLTAGE DEVICES.

11. REFER TO ARCHITECTURAL ELEVATIONS AND REFLECTED CEILING PLANS FOR

THE SPECIFIC DEVICE ROUGH-IN AND PLACEMENT. ANY DEVIATIONS FROM THE

ARCHITECTURAL ELEVATIONS AND REFLECTED CEILING PLANS SHALL BE REVIEWED

AND APPROVED BY THE DESIGN TEAM PRIOR TO ROUGH-IN.

ELECTRICAL PLAN KEYED NOTES

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

E1 NO ELECTRICAL SCOPE IN THIS AREA.

E2

COORDINATE INSTALLATION OF RECEPTACLE WITH EQUIPMENT ACCESS

PANEL. COORDINATE WITH EQUIPMENT LOCATION AND REQUIREMENTS

PRIOR TO ROUGH-IN.

E3

EXTEND NEAREST 120V, NORMAL POWER CIRCUIT TO NEW DEVICE

LOCATION.

E4

COORDINATE EXACT TV/MONITOR DEVICE LOCATIONS WITH OWNER'S

DESIRED MOUNTING HEIGHT PRIOR TO ROUGH-IN. COORDINATE WITH

OWNER PROVIDED TV/MONITOR AND MOUNTING SYSTEM SO THAT

DEVICES AND CABLES ARE NEAT AND CONCEALED.

E5

PROVIDE (2) 3-INCH CONDUIT ABOVE CEILING FROM WASHER/DISINFECTOR

TO DOSING STATION LOCATION.

E6

COORDINATE EXACT INSTALLATION LOCATION OF WEATHERPROOF

SWITCH FOR CONVEYOR DISCONNECT.

E7

PROVIDE DUAL CHANNEL TELE-POWER POLE EQUAL TO LEGRAND 24DTP-4.

TELE-POWER POLE SHALL HAVE DEDICATED COMPARTMENTS FOR

ROUTING DATA CABLING AND POWER CONDUCTORS. FINISH SHALL BE

SELECTED AT TIME OF SUBMITTAL. PROVIDE (2) HOSPITAL GRADE DUPLEX

RECEPTACLES (RED) AND CM2 MODULE(S) FOR DATA TERMINATION.

COORDINATE EXACT INSTALLATION LOCATION WITH FURNITURE LOCATION

PRIOR TO ROUGH-IN.

EB90W2

90W1

EC90W1

EB90W3

EB90W1

90W4

ES90C2

E

E

E E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E

E

E

E E

E

E

E

E

E

E

E

E

E

E

EE

E

E E

E

E

E E E E

E

E

E

E

E

E

E E

E

E

E

E

E

E E E

E E E E E

E

E E

E

E

E

E

E

E

E

E E E E

E E E E

E

E

E

E

E E E

E E E

E E

E

E

E

E

E

E

EE EEEEEE

E

E

E

E

EE

E

E

E E

E

E E

E

E

E

E E

E

E

GFI

+56"

GFI

+56"

GFI

+56"

GFI

+56"

E

GFI

GFI

+54"

GFI

E E E

EC90W1-23

90W1-24

EC90W1-1

90W1-54

EC90W1-11

GFI

GFI GFI

GFI

GFI

+70"

GFI

+70"

GFI

EC90W1-17

90W1-54

EC90W1-16

E3

E4

E4

E

GFI

GFI

GFI

GFI

GFI

GFI

EC90W1-21

EC90W1-18

GFI GFI

E1 E1

E1

E1

E1

E1EC90W1-25

EC90W1-27

E7

E7

RECEIVING / DECONTAMINATION

BB-20

STERILIZERS

BB-20A

MECHANICAL

BA-70A

PREP/ ASEMBLY / STORAGE

BB-18C

SCOPE PROCESSING

BB-20B

EC90W1-29

HAC

BA-70C

D.3

GFI

GFI

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

2882 106TH STREET

DES MOINES IA 50322

BID DOCUMENT SUBMISSION

C U s e rs \A

W e b e r\ D o c u m e n ts

\1

-M E

-R a w e b e r9

S

.r v t

/2

/2

:4

:2

A

M

EP-101

LOWER LEVEL - POWER PLAN PERFORM SITE PREP

FOR SPS EQUIPMENT

FARGO, ND

437-CSI-241

01/22/2025 ATW JPC

17639

1/8" = 1'-0"1

LOWER LEVEL - POWER PLAN

N

O R HT

Revisions: Date:

T

S

M T

S M

T S

J JJ

J

J J S S

SS

J J J J

J J

J

S S

J

EB90W2

90W1

EC90W1

EB90W3

EB90W1

90W4

E E

+92" +92"

GFI

WP WP

WP WP

+84"

E2 E2

GFI

SONIC WASHER

208V-3P/30A

EB90W2-8,10,12

SONIC WASHER

208V-3P/35A

EB90W2-44,46,48

STERILIZER

EB90W2-21

WASHER

208V-3P/50A

EB90W2-7,9,11

WASHER

208V-3P/50A

EB90W2-13,15,17

CONVEYOR

EB90W1-35

STERILIZER

208V-3P/20A

EB90W2-38,40,42

STERILIZER

208V-3P/20A

EB90W2-37,39,41

STERILIZER

90W1-39

STERILIZER

90W1-37

STERILIZER

EB90W3-37

STERILIZER

EB90W3-39

EB90W3-42

MEDIVATOR

EB90W3-19

MEDIVATOR

EB90W3-21

DRYING CABINET

EB90W3-41

E

RO-1

120V-1P/20A

EB90W3-27

RO-2

120V-1P/20A

EB90W3-29

E1

EC90W1-11E1

E1

E1

E1

E1

E6 E6 E5

RECEIVING / DECONTAMINATION

BB-20

STERILIZERS

BB-20A

MECHANICAL

BA-70A

PREP/ ASEMBLY / STORAGE

BB-18C

SCOPE PROCESSING

BB-20B

HAC

BA-70C

D.3

P-1 120V-1P/20A

EB90W3-31

INNOWAVE

EC90W1-20

+56"

GFI

WP

WP

ELECTRICAL GENERAL NOTES

1. ALL DEVICES, EQUIPMENT, FIXTURES, AND THE LIKE MUST BE GROUNDED BY USE

OF A PROPERLY SIZED GROUNDING CONDUCTOR. MECHANICAL AND ELECTRICAL

BONDS OF THE METALLIC RACEWAY SYSTEM SHALL BE MAINTAINED. GROUND AND

BOND PER NEC ARTICLE 250.

2. ELECTRICAL CONTRACTOR SHALL PROVIDE TAMPER RESISTANCE RECEPTACLES

PER NEC 406.12.

3. ALL DISCONNECTS ON MECHANICAL EQUIPMENT SHALL BE MOUNTED ON

STRUCTURE TO ALLOW REMOVAL OF THE EQUIPMENT FOR MAINTENANCE WITH A

MINIMUM OF WIRING WORK. VERIFY NEC CLEARANCE REQUIREMENTS ARE MET

PRIOR TO ROUGH-IN.

4. MAINTAIN SERVICE CLEARANCE AROUND MECHANICAL & ELECTRICAL EQUIPMENT.

DO NOT ROUTE PIPING OR CONDUIT IN CLEARANCE SPACE.

5. SURFACE RACEWAY SHALL NOT BE USED IN ANY FINISHED AREAS WITH PRIOR

APPROVAL FROM THE DESIGN TEAM.

6. ALL RECEPTACLE CIRCUITS SHALL HAVE DEDICATED NEUTRAL.

7. INSTALL DEVICES SUCH THAT NO TWO DEVICES ON OPPOSITE SIDES OF THE SAME

WALL ARE WITHIN 24" OF EACH OTHER.

8. PRIOR TO ROUGH-IN, COORDINATE ALL WALL DEVICES WITH FINAL CASEWORK

ELEVATIONS AND OTHER TRADES. CONFLICTS SHALL BE BROUGHT IMMEDIATELY TO

THE ATTENTION OF THE DESIGN TEAM.

9. ALL FLOOR BOXES SHALL HAVE THEIR EXACT ROUGH-IN LOCATIONS DETERMINED

BY THE DESIGN TEAM THROUGH DIMENSIONED DRAWINGS APPROVED BY THE

OWNER PRIOR TO ROUGH-IN. LOCATIONS SHOWN ARE FOR BIDDING PURPOSES

ONLY.

10. REFER TO TECH SHEETS FOR ADDITIONAL ROUGH-IN INFORMATION OF LOW

VOLTAGE DEVICES.

11. REFER TO ARCHITECTURAL ELEVATIONS AND REFLECTED CEILING PLANS FOR

THE SPECIFIC DEVICE ROUGH-IN AND PLACEMENT. ANY DEVIATIONS FROM THE

ARCHITECTURAL ELEVATIONS AND REFLECTED CEILING PLANS SHALL BE REVIEWED

AND APPROVED BY THE DESIGN TEAM PRIOR TO ROUGH-IN.

ELECTRICAL PLAN KEYED NOTES

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

E1 NO ELECTRICAL SCOPE IN THIS AREA.

E2

COORDINATE INSTALLATION OF RECEPTACLE WITH EQUIPMENT ACCESS

PANEL. COORDINATE WITH EQUIPMENT LOCATION AND REQUIREMENTS

PRIOR TO ROUGH-IN.

E3

EXTEND NEAREST 120V, NORMAL POWER CIRCUIT TO NEW DEVICE

LOCATION.

E4

COORDINATE EXACT TV/MONITOR DEVICE LOCATIONS WITH OWNER'S

DESIRED MOUNTING HEIGHT PRIOR TO ROUGH-IN. COORDINATE WITH

OWNER PROVIDED TV/MONITOR AND MOUNTING SYSTEM SO THAT

DEVICES AND CABLES ARE NEAT AND CONCEALED.

E5

PROVIDE (2) 3-INCH CONDUIT ABOVE CEILING FROM WASHER/DISINFECTOR

TO DOSING STATION LOCATION.

E6

COORDINATE EXACT INSTALLATION LOCATION OF WEATHERPROOF

SWITCH FOR CONVEYOR DISCONNECT.

E7

PROVIDE DUAL CHANNEL TELE-POWER POLE EQUAL TO LEGRAND 24DTP-4.

TELE-POWER POLE SHALL HAVE DEDICATED COMPARTMENTS FOR

ROUTING DATA CABLING AND POWER CONDUCTORS. FINISH SHALL BE

SELECTED AT TIME OF SUBMITTAL. PROVIDE (2) HOSPITAL GRADE DUPLEX

RECEPTACLES (RED) AND CM2 MODULE(S) FOR DATA TERMINATION.

COORDINATE EXACT INSTALLATION LOCATION WITH FURNITURE LOCATION

PRIOR TO ROUGH-IN.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

2882 106TH STREET

DES MOINES IA 50322

BID DOCUMENT SUBMISSION

C U s e rs \A

W e b e r\ D o c u m e n ts

\1

-M E

-R a w e b e r9

S

.r v t

/2

/2

:4

:3

A

M

EQ-101

LOWER LEVEL - EQUIPMENT

POWER PLAN

PERFORM SITE PREP

FOR SPS EQUIPMENT

FARGO, ND

437-CSI-241

01/22/2025 ATW JPC

17639

1/8" = 1'-0"

LOWER LEVEL - EQUIPMENT POWER PLAN

Revisions: Date:

S9610 PREP-PACK TABLE 5 120/1 15A N/A

S2636 INNOWAVE ECO ULTRASONIC CLEANER 2.6 GAL 1 208/3 24A HARD WIRED

S2635 INNOWAVE PCF SCONIC IRRIGATOR 20 LUMEN CAPACITY 2 208/3 24A N/A

S2627 ADVANTAGE PLUS PASS-THRU ENDOSCOPE REPROCESSING 2 120/1 15A N/A

S2615 TROPHON 1 120/1 15A N/A

S1905 STERIS AUTOMATIC PASS-THROUGH WINDOW 2 120/1 15A 1/2" NPT

S0942 WASHER/DISINFECTOR CHEMICAL HOLDERS 2 3" CONDUIT FROM WASHER/DISINFECTOR TO CHEMICAL HOLDERS

S0941 WASHER/DISINFECTOR-LOAD UNLOAD CONVEYOR 2 120/1 15A 1/2"

S0940 AMSCO WASHER/DISINFECTOR 2 120/1 N/A N/A

S0091 RACK RETURN 1 120/1 15A NEMA 5-15

S0045 AMSCO 400 SMALL STEAM STERILIZER 2 120/1 2A N/A

120/1 3A N/A

S0042 AMSCO 400 MEDIUM STEAM STERILIZER 2

208/3 8A N/A

# EQUIPMENT NAME QTY VOLTAGE/PHASE MCA CONNECTION TYP NOTE

EX XCEL SOURCE #3

23.9kV

M

80E

EX 25KV SERVICE

DISCONNET SWITCHGEAR

WITH METERING

SS-NORTH

80E

M

BLDG 38

PULL BOX

METERING

CABLE

METERING

CABLE

EX 25KV SERVICE

DISCONNET SWITCHGEAR

WITH METERING

SS-SOUTH

EX XCEL SOURCE #4

23.9kV

EX 25KV

SECTIONALIZING

SWITCH

SAC-2

EX 25KV

SECTIONALIZING

SWITCH

SAC-1

25E

25E

25E

25E

500kVA

PAD-MOUNTED

TRANSFOMER

23.9kV : 480V

600/3

600A DISCONNECT

480V, 3-POLE

NEMA 3R

F @ 600A

T-SPD ATS

600A ATS

NEMA 3R

3-POLE

N E

L

600A-3P [100%]

500kW DIESEL POWERED

PORTABLE GENERATOR

(480Y/277V, 3PH, 4W)50' CAM-LOK

CABLES

600/3

600A, 600V, 3P

NEMA 3R

CAM-LOK QUICK

CONNECT CABINET

250A-3P

250A-3P

600/3

600/3

250/3

250/3

400A RATED, 600V, 3-POLE

NEMA 3R DISCONNECT

400A RATED, 600V, 3-POLE

NEMA 3R DISCONNECT

250/3

250/3

J

J

SPD MOBILE

TRAILER

SPD MOBILE

TRAILER

MAX 50' DISTANCE.

T-SPD-DP

600A, 3PH, 4W

22,000A SCCR

NEMA 3R

PROVIDE NEW

40A FUSES

60A-3P

SPD

50A-3P

50/3 100/4

T-SPD-XFMR

30 kVA

480V: 208Y/120V

NEMA 3R

T-SPD PANEL ER1

150A-3P

150/3

200A RATED, 600V, 3-POLE

NEMA 1 DISCONNECT

150/3 J 90kW EH-1

ER2

(3) 2/0 AWG, (1) 2/0 AWG

25KV CONDUCTORS

4" PVC SCH-80 CONDUIT

20A-3P

20/3 VFD 20/3 J P-2

ELECTRICAL RISER GENERAL

NOTES

1.

2.

3.

4.

5.

6.

REFER TO [SITE PLAN CXXX AND] ELECTRICAL PLAN [EXXX] FOR ADDITIONAL

REQUIREMENTS AND RESPONSIBILITIES.

ELECTRICAL POWER OUTAGES, IF REQUIRED, SHOULD BE STRATEGICALLY

MINIMIZED AND SCHEDULED CLOSELY WITH OWNER. CHANGEOVERS COULD BE

REQUIRED TO OCCUR AT ANY HOUR.

MAINTAIN ALL SERVICE CLEARANCES REQUIRED BY THE NEC.

INSTALL ALL CONDUCTORS AS PER MANUFACTURER'S RECOMMENDATIONS.

ELECTRICAL CONTRACTOR SHALL PROVIDE CONDUCTOR LENGTHS AND BREAKERS

MANUFACTURER INFORMATION TO THE DESIGN TEAM FOR SELECTIVE

COORDINATION PER NEC 700.28. NECESSARY DEVICES SHALL HAVE THE ABILITY TO

BE SELECTIVELY COORDINATED.

ELECTRICAL SERVICE LAYOUT MAY VARY FROM WHAT IS SHOWN ON PLANS BASED

ON MANUFACTURER PROVIDING THE SYSTEM. ELECTRICAL CONTRACTOR IS

RESPONSIBLE FOR FITTING SYSTEM PROVIDED INTO SPACE SHOWN ON PLANS.

ELECTRICAL RISER KEYED NOTES

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

ER1 REFER TO PANEL SCHEDULE FOR ADDITIONAL DETAILS.

ER2

PROVIDE TEMPORARY 500KVA PAD-MOUNTED TRANSFORMER WITH 23.9KV

PRIMARY AND 480V SECONDARY. TRANSFORMER SHALL HAVE PRIMARY

SURGE ARRESTORS. PROVIDE RENTAL FOR DURATION OF CONSTRUCTION.

COORDINATE ORDERING WITH GENERAL CONTRACTOR AND ARRIVAL OF

MOBILE SPD TRAILER.

COPPER CONDUCTOR

AND CONDUIT SIZING CHART

CONDUCTORS (THWN-2) CONDUIT PARALLEL

RUNSPHASE NEUTRAL GROUND EMT SCH 80

15/4 (3) #12 AWG #12 AWG #12 AWG 1/2" 3/4" 1

20/4 (3) #12 AWG #12 AWG #12 AWG 1/2" 3/4" 1

25/4 (3) #10 AWG #10 AWG #10 AWG 1/2" 3/4" 1

30/4 (3) #10 AWG #10 AWG #10 AWG 1/2" 3/4" 1

35/4 (3) #8 AWG #8 AWG #10 AWG 3/4" 1" 1

40/4 1

45/4 1

50/4 1

60/4 (3) #4 AWG #4 AWG #10 AWG 1

70/4 (3) #4 AWG #4 AWG #8 AWG 1-1/4" 1-1/4" 1

80/4 1

90/4 (3) #2 AWG #2 AWG #8 AWG 1

100/4 1

(3) #2 AWG #2 AWG #6 AWG 1

(3) #1 AWG #1 AWG #6 AWG 1-1/2" 2" 1

(3) 1/0 AWG 1/0 AWG #6 AWG 2" 1

(3) 2/0 AWG 2/0 AWG #6 AWG 1

(3) 3/0 AWG 3/0 AWG #6 AWG 1

(3) 4/0 AWG 4/0 AWG #4 AWG 1

(3) 250 MCM 250 MCM #4 AWG 3" 1

(3) 350 MCM 350 MCM #4 AWG 3" 1

(3) 500 MCM 500 MCM #3 AWG 3" 3-1/2" 1

(3) 3/0 AWG 3/0 AWG #3 AWG 2" 2-1/2" 2

(3) 4/0 AWG 4/0 AWG #2 AWG 2

3/4" 1"

1" 1"

1" 1"

(3) #8 AWG #8 AWG #10 AWG

(3) #6 AWG #6 AWG #10 AWG

(3) #6 AWG #6 AWG #10 AWG

(3) #3 AWG #3 AWG #8 AWG 1-1/4" 1-1/4"

1-1/4" 1-1/4"

1-1/4" 1-1/4"(3) #2 AWG #2 AWG #8 AWG

110/4

125/4

150/4

175/4

200/4

225/4

250/4

300/4

350/4

400/4

450/4

500/4

600/4

1-1/4" 1-1/2"

2"

2" 2"

2" 2-1/2"

2-1/2"2-1/2"

2-1/2"

3"

2-1/2"2-1/2"

(3) 250 MCM 250 MCM #2 AWG 3"2-1/2"

(3) 350 MCM 350 MCM #1 AWG 3" 3"

1-1/4" 1-1/4"

COPPER CONDUCTOR

AND CONDUIT SIZING CHART

CONDUCTORS (THWN-2) CONDUIT PARALLEL

RUNSPHASE NEUTRAL GROUND EMT SCH 80

15/3 (3) #12 AWG #12 AWG 1/2" 3/4" 1

20/3 (3) #12 AWG #12 AWG 1/2" 3/4" 1

25/3 (3) #10 AWG #10 AWG 1/2" 3/4" 1

30/3 (3) #10 AWG #10 AWG 1/2" 3/4" 1

35/3 (3) #8 AWG #10 AWG 3/4" 1" 1

40/3 1

45/3 1

50/3 1

60/3 (3) #4 AWG #10 AWG 1

70/3 (3) #4 AWG #8 AWG 1-1/4" 1-1/4" 1

80/3 1

90/3 (3) #2 AWG #8 AWG 1

100/3 1

(3) #2 AWG #6 AWG 1

(3) #1 AWG #6 AWG 1-1/2" 2" 1

(3) 1/0 AWG #6 AWG 2" 1

(3) 2/0 AWG #6 AWG 1

(3) 3/0 AWG #6 AWG 1

(3) 4/0 AWG #4 AWG 1

(3) 250 MCM #4 AWG 3" 1

(3) 350 MCM #4 AWG 3" 1

(3) 500 MCM #3 AWG 3" 3-1/2" 1

(3) 3/0 AWG #3 AWG 2" 2-1/2" 2

(3) 4/0 AWG #2 AWG 2

3/4" 1"

1" 1"

1" 1"

(3) #8 AWG #10 AWG

(3) #6 AWG #10 AWG

(3) #6 AWG #10 AWG

(3) #3 AWG #8 AWG 1-1/4" 1-1/4"

1-1/4" 1-1/4"

1-1/4" 1-1/4"(3) #2 AWG #8 AWG

110/3

125/3

150/3

175/3

200/3

225/3

250/3

300/3

350/3

400/3

450/3

500/3

600/3

1-1/4" 1-1/2"

2"

2" 2"

2" 2-1/2"

2-1/2"2-1/2"

2-1/2"

3"

2-1/2"2-1/2"

(3) 250 MCM #2 AWG 3"2-1/2"

(3) 350 MCM #1 AWG 3" 3"

1-1/4" 1-1/4"

GENERAL NOTES:

1. INTEGRAL GALVANIZED LIPPED STEEL MOUNTING CHANNEL LONGER THAN 915mm (36") SHALL BE INSTALLED WITH A CENTER SUPPORT ROD. SUPPORT RODS SHALL NOT BE

GREATER THAN 457mm (18") APART.

2. FASTEN THREADED ROD TO STRUCTURE BY APPROVED METHOD PER SPECIFICATION 26 05 33, RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS. FIELD VERIFY EXACT

CONDITIONS.

3. FOR TRAPEZE INSTALLATIONS IN SEISMIC AREAS REFER TO SPECIFICATION SECTION 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS.

CONDUIT CLAMP.

SIZE AS

REQUIRED

INTEGRAL

GALVANIZED LIPPED

STEEL MOUNTING

CHANNEL

REFER TO PLANS

FOR QUANTITY &

SIZE OF CONDUITS

LOCKING SQUARE

WASHER & LOCKNUT

9.52mm (3/8") MIN

GALVANIZED THREADED

ROD, TYP.

WASHER & LOCKNUT

INTEGRAL

GALVANIZED LIPPED

STEEL MOUNTING

CHANNEL

LOCKING SQUARE

WASHER & LOCKNUT

9.52mm (3/8") MIN

GALVANIZED THREADED

ROD, TYP.

INTEGRAL GALVANIZED

LIPPED STEEL

MOUNTING CHANNEL

LENGTH AS REQUIRED

GENERAL NOTE:

1. INSTALL IN ACCORDANCE WITH MANUFACTURER'S MOUNTING INSTRUCTIONS AND USING THE RECOMMENDED MOUNTING

HARDWARE.

CEILING HANGER

WIRE

DRYWALL

CEILING CROSS

TEE, TYP.

DRYWALL

CEILING CROSS

TEE, TYP.

GYPSUM BOARD

WIRE TIE THROUGH

MOUNTING CHANNEL

& CROSS BEAM,

TYP.

HANGER WIRE & MOUNTING CHANNEL

ATTACHED TO STRUCTURE REFER TO

SPECIFICATION SECTION 26 51 00

INTEGRAL GALVANIZED

LIPPED STEEL MOUNTING

CHANNEL

JUNCTION

BOX

LOCKING

SQUARE

WASHER & NUT

6.35mm (1/4")

SCREW

FIXTURE WHIP FROM JUNCTION

BOX (1,829mm (6') LONG MAX)

CEILING MAIN

BEAM

WIRE TIE THROUGH

MOUNTING CHANNEL

& CROSS BEAM,

TYP.

CEILING

MAIN BEAM

12" = 1'-0"3 CONDUIT TRAPEZE MOUNTING DETAIL

12" = 1'-0"2 EXIT SIGN MOUNTING DETAIL - GYPBOARD CEILING

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

2882 106TH STREET

DES MOINES IA 50322

BID DOCUMENT SUBMISSION

C :\U se rs \A W eb er \D oc um en ts \1 -M E- R _a w eb er S4 6.

rv t

6/ /2 4:

:3

PM

E-501

ONE-LINE DIAGRAM & ELECTRICAL

DETAILS

PERFORM SITE PREP

FOR SPS EQUIPMENT

FARGO, ND

437-CSI-241

01/22/2025 ATW JPC

17639

1 ONE-LINE DIAGRAM - MOBILE SPD TRAILER

Revisions: Date:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

2882 106TH STREET

DES MOINES IA 50322

BID DOCUMENT SUBMISSION

C U s e rs \A

W e b e r\ D o c u m e n ts

\1

-M E

-R a w e b e r9

S

.r v t

/2

/2

:4

:3

A

M

E-601

ELECTRICAL SCHEDULES PERFORM SITE PREP

FOR SPS EQUIPMENT

FARGO, ND

437-CSI-241

01/22/2025 ATW JPC

17639

CIRCUIT KEY NOTES: A = ARC FAULT E=EXISTING G=GFI H=HANDLE LOCK ST=SHUNT TRIP

*TOTAL DEMAND CALCS SUBTRACT ANY REDUNDANT LOAD AND THE SMALLER OF ANY NONCOINCIDENT HVAC LOADS.