Attachment C2 - Drawings-R1_Part2 - 437-CIS-241 - 21 Pages.pdf
PDF 10 MB Posted
- Solicitation number
- 36C26325B0025
About this file
This document is a comprehensive set of architectural and structural drawings for a VA project (Project Number 437-CSI-241) involving site preparation for a Mobile Sterile Processing (SPS) Equipment installation at the Fargo VA Healthcare System in North Dakota. The drawings detail the demolition, site preparation, structural framing, and enclosure construction for temporarily housing a mobile sterile processing trailer, including specific plans for lower level floor modifications, demolition, reflected ceiling plans, interior elevations, and building sections.
Key technical details include constructing a wood-framed weatherproof enclosure connecting the mobile trailer to the existing facility, demolishing exterior site elements like retaining walls and concrete ramps, preparing a concrete pad for the trailer, and extending mechanical, plumbing, electrical, fire protection, and technology systems. The project involves renovating the SPS Decontamination/Receiving and Prep/Pack Assembly areas, with specific attention to structural modifications, wall removals, ceiling work, and integration of the temporary mobile trailer infrastructure. The documents are dated 1/22/2025 and provide comprehensive architectural and engineering specifications for the VA project.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUT WIDTHS - TYPICAL
CONTRACTOR TO VERIFY SLAB
S301
________________________________________________________________________________ TYP.
PASSAGE/
ANTE ROOM
BA-44
S-3
MACHINE
BB-21
OFFICE
BA-70
RECEIVING/
DECONTAMINATION
BB-20
SCOPE
PROCESSING
BB-20B
STERILIZERS
BB-20A
PREP/
ASSEMBLY/
STORAGE
BB-18C
MECHANICAL
BA-70A
CORRIDOR
C006
HAC
BA-70B
CONTRACTOR TO VERIFY SLAB
CUT WIDTHS - TYPICAL
S301
TYP.
PASSAGE/
ANTE ROOM
BA-44
S-3
MACHINE
BB-21
OFFICE
BA-70
RECEIVING/
DECONTAMINATION
BB-20
SCOPE
PROCESSING
BB-20B
STERILIZERS
BB-20A
PREP/
ASSEMBLY/
STORAGE
BB-18C
MECHANICAL
BA-70A
CORRIDOR
C006
HAC
BA-70B
A B C D
8'
1/
2"
6'
0"
5' - 0"
5' - 0"
S301
EXISTING RETAINING
WALL - VERIFY
EXISTING RETAINING
WALL - VERIFY
1 1
KEYNOTES:
1 NEW RETAINING WALL SHALL BE CONSTRUCTED
USING THE EXISTING RETAINING BLOCK ON SITE. SEE
CIVIL DRAWINGS FOR SPECIFICATIONS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTSOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
BID DOCUMENT SUBMISSION
FULLY SPRINKLERED
C U s e rs \J
B u e rm a n n \D o c u m e n ts \1
S
R
V T jb u e rm a n n S
R X
R
.r v t
/1
/2
:4
:4
P
M
SLAB CUTTING PLAN PERFORM SITE PREP FOR SPS
EQUIPMENT
FARGO, ND
1/22/2025 EW JB
437-CSI-241 S102
437-CSI-241
1. VERIFY ALL DIMENSIONS WITH CIVIL & ARCHITECTURAL DRAWINGS.
2. SEE S001 FOR GENERAL STRUCTURAL NOTES.
3. REMOVE & REPLACE CONCRETE SLAB ON GRADE AND EXCAVATE FOR
PLUMBING AS REQUIRED. IF DEEP TRENCHES ARE REQUIRED,
CONTRACTOR SHALL ASSUME MINIMUM OF 4 FOOT WIDE SLAB REMOVAL
AND TRENCH WIDTHS. CONTRACTOR SHALL USE TRENCH BOXES OR
HAND SHORING TO PREVENT SOIL STABILITY CONCERNS & OVER
EXCAVATION. IF BOTTOM OF TRENCH IS LOWER THAN BOTTOM OF ANY
EXISTING FOOTINGS IT NEEDS TO BE A MINIMUM OF 2:1 SLOPE AWAY
FROM BOTTOM EDGE OF EXISTING FOOTING. SEE DETAIL 1/S301 FOR
CONCRETE SLAB REPLACEMENT.
4. = EXTENT OF SLAB REMOVAL. VERIFY.
5. SEE PD-101 FOR THE "PLUMBING UNDERGROUND - SANITARY DEMOLITION
PLAN". THIS IS TO BE COORDINATED WITH 1/S102.
6. SEE PL-101 FOR THE "PLUMBING LOWER LEVEL - UNDERGROUND
SANITARY PLAN". THIS IS TO BE COORDINATED ON 2/S102
7. PLAN 3/S102 - "STOOP RESTORATION PLAN", SHALL OCCUR ONCE THE
TEMPORARY ENCLOSURE IS DONE BEING USED AND THE SITE IS
BROUGHT BACK TO ORGINAL CONDITIONS.
SHEET NOTES:
2882 106TH STREET
DES MOINES IA 50322
1/8" = 1'-0"1
SLAB CUTTING PLAN - PLUMBING UNDERGROUND - SANITARY DEMOLITION PLAN
0 8' 16'4' 1/8" = 1'-0"2
SLAB CUTTING PLAN - PLUMBING LOWER LEVEL - UNDERGROUND SANITARY PLAN
0 8' 16'4'
1/4" = 1'-0"
STOOP RESTORATION PLAN
0 8' 16'4'
Revisions: Date:
1-22-2025
EXISTING WALL
TEMPORARY SPS TRAILER
SEE ARCH
A B C ED F
S401
S401
S401
S401
S401
S401
S401
S401
S401
S401
S401
S401
S401
________________________________________________________________________________5'
0"
5' - 0"
TYP @ EXT.
8' - 0 1/4" 4' - 3 3/4" 7' - 0 1/4" 5' - 6 1/2" 2 7/16"
24' - 10 3/4"
8'
1/
2"
6'
0"
1/ 2"
TYP. @
EXTERIOR
SW1
SW2
SEE ARCH
SW1
SW1
TYP. @
EXTERIOR
SW1
SW1
'-4
O .C
3/
4" x
1/ 4"
L V
L F
LO
O
R J
O
IS
T S
B
'-4
O .C
2x
F
LO
O R
J O
IS
T
S
'-0
O .C
2x
F
LO
O R
J O
IS
T
S
TYP. @
EXTERIOR
SW1
SW1
HD2
HD2
HD2
HD2
HD1
HD1
HD1
HD1
HD1
HD1
HD1
HD1
1/
2"
NEW RETAINING WALL -
SEE CIVIL DRAWINGS
FOR SPECIFICATIONS
12' - 6 3/4"
EXISTING RETAINING
WALL - VERIFY
NEW RETAINING WALL -
SEE CIVIL DRAWINGS FOR
SPECIFICATIONS
EXISTING RETAINING
WALL - VERIFY
(1'-0" MIN. @ BASE)
SEE CIVIL
KEYNOTES:
1 RAMP TO BE BUILT ON TOP OF FLOOR DECK WITH
2-2x8 RAMP JOISTS @ 2'-0" O.C. THE MAXIMUM SPAN OF THE 2-2x8 JOIST IS 8'-0". PROVIDE 2x STUD WALL TO REDUCE SPAN OF 2-2x8 RAMP JOISTS. SEE ARCH
FOR SLOPE AND DIMENSIONS. S.D. 17/S401, 18/S401,
19/S401.
2 MECH/ELEC PENETRATION - SEE ARCH FOR FINAL
LOCATION.
3 2x12 FLOOR JOIST SHALL FRAME INTO "B1" WITH
SIMPSON "LUS28" FACEMOUNT HANGER.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTSOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
BID DOCUMENT SUBMISSION
FULLY SPRINKLERED
C U s e rs \J
B u e rm a n n \D o c u m e n ts \1
S
R
V T jb u e rm a n n S
R X
R
.r v t
/1
/2
:4
:4
P
M
SECOND FLOOR FRAMING PLAN PERFORM SITE PREP FOR SPS
EQUIPMENT
FARGO, ND
1/22/2025 EW JB
437-CSI-241 S201
437-CSI-241
1. VERIFY ALL DIMENSIONS WITH CIVIL & ARCHITECTURAL DRAWINGS.
2. SEE SHEET S001 FOR GENERAL STRUCTURAL NOTES.
3. B# / H# - BEAM / HEADER MARK - SEE BEAM / HEADER SCHEDULE ON THIS
SHEET.
4. SW# - SHEAR WALL TYPE MARK (BELOW) - SEE SHEARWALL SCHEDULE
ON THIS SHEET.
5. ALL STRUCTURAL BEARING "INTERIOR" & "EXTERIOR" STUD WALLS SHALL
BE 2x6 DFL-#2 OR BETTER @ 1'-4" O.C. (U.O.N.) WITH DFL-#2 OR BETTER
DOUBLE TOP PLATE & SOLE PLATE.
6. FLOOR SHEATHING TO BE 3/4", TONGUE & GROOVE, APA RATED
SHEATHING WITH A 48/24 SPAN RATING.
7. HD# - HOLDOWN MARK - SEE HOLDOWN SCHEDULE ON THIS SHEET.
8. FINAL LOCATION OF TEMPORARY SPS TRAILER SHALL BE FIELD VERIFIED.
FINAL DIMENSIONS OF WOOD TEMPORY ENCLOUSURE WILL CHANGE
BASED ON TRAILER LOCATION. NOTIFY STRUCTURAL ENGINEER IF
ROOF/FLOOR JOIST SPANS INCREASE.
9. ALL LUMBER SHALL BE FIRE-RETARDANT LUMBER.
SHEET NOTES:
1/4" = 1'-0"
SPS TRAILER ENCLOSURE - LOWER LEVEL FRAMING PLAN
0 4' 8'2'
2882 106TH STREET
DES MOINES IA 50322
Schedule - Shearwall MARK SHEATHING # OF SIDES PERIMETER NAILING SOLE PLATE FASTENING ANCHOR BOLT FASTENING
SW1 7/16" RATED 1 0.131" DIA. x 2 1/2 @ 6" O.C. 2 - ROWS 0.162" DIA. x 3 1/2" @ 1'-0" O.C. 5/8" DIA. @ 4'-0" O.C.
SW2 7/16" RATED 1 0.131" DIA. x 2 1/2 @ 4" O.C. 2 - ROWS 0.162" DIA. x 3 1/2" @ 8" O.C. 5/8" DIA. @ 3'-0" O.C.
Schedule - Beams & Headers
MARK BEAM / HEADER SIZE
JACK
STUD #
KING
STUD #
COMMENTS
B1 2 - 2x12 -- -- S.D. 2/S401
H1 3 - 2x8 2 1 S.D 3/S401
H2 3 - 2x10 2 1 S.D. 3/S401
SHEARWALL SCHEDULE NOTES:
1. FASTENERS SHALL BE A MINIMUM 0.131" DIA. x 2 1/2' COMMON OR GALVANIZED (HOTDIPPED) BOX
NAILS OR #10 SCREWS.
2. BACK ALL PANEL EDGES WITH 2x BLOCKING MINIMUM.
3. GYPSUM & RATED SHEATHING PANEL EDGES TO BE FASTENED AS NOTED. INTERMEDIATE
SUPPORTS SHALL BE FASTENED @ 1'-0" O.C.
4. WHERE PANELS ARE APPLIED ON 2 - SIDES OF WALL PANEL JOISTS SHALL BE OFFSET TO FALL
ON DIFFERENT FRAMING MEMBERS. ALTERNATIVLEY WHERE PANEL JOINTS CAN NOT BE
STAGGERED THE WIDTH OF THE FACE OF FRAMING MEMBERS SHALL BE 3" NOMINAL OR
GREATER AT ADJOINING PANEL EDGES WITH PANEL EDGE NAILING STAGGERED.
5. 7/16" RATED SHEATHING SHALL BE EXPOSURE NO.1, WITH A 24/16 SPAN RATING. 19/32" RATED
SHEATHING SHALL BE EXPOSURE NO. 1, WITH A 32/16 SPAN RATING.
6. SHEATHING TO EXTEND FROM THE FLOOR TO THE FLOOR OR ROOF SHEATHING ABOVE.
7. AS A BASIS OF DESIGN, ANCHOR BOLTS FOR SHEARWALLS SHALL BE SIMPSON "TITEN HD"
SCREW ACNHORS WITH A MINIMUM OF 3 1/4" EMBED U.O.N.
8. AS A BASIS OF DESIGN, 2x6 WALLS SHALL HAVE SIMPOSN "BPS 5/8-6" BEARING PLATE WASHER AT
EACH ANCHOR BOLT.
BEAM / HEADER SCHEDULE NOTES:
1. PROVIDE SIMPSON "LUS28-2" FACEMOUNT HANGER AT EACH END OF "B1".
"B1" SHALL FRAME INTO FLOOR JOISTS AT BOTH SIDES.
Schedule - Holdowns
MARK HOLDOWN TYPE
ANCHOR
POST SIZE
ANCHOR
BOLT SIZE
"E" MINIMUM
EMBED DEPTH
COMMENTS
HD1 1 - SIMPSON DTT2Z 2 - 2x6 1/2" DIA. 6" S.D. 5/S301
HD2 1 - SIMPSON HDU8 3 - 2x6 7/8" DIA. 6" S.D. 5/S301
HOLDOWN SCHEDULE NOTES:
1. ALL ANCHOR POSTS TO BE DF-L. #2 GRADE U.O.N.
2. ALL "HD" HOLDOWN ANCHOR BOLTS MAY BE INJECTION ADHESIVE ANCHORS U.O.N.
3. ANCHOR BOLT NUTS TO BE SNUG TIGHT PLUS 1/2 TURN.
4. PROVIDE 3" x 3" x .229" WASHER BETWEEN SILL PLATE & NUT @ ALL HOLDOWN ANCHORS.
TEMPORARY
SPS TRAILER - SEE ARCH.
A B C ED F
EXISTING WALL
S401
S401
S401
S401
S401
S401
S401
S401
S401
S401
'-4
O .C
2x
R O
O F
J O
IS
T
S
S401
SW1
SW1
SEE ARCH
TYP. @
EXTERIOR
SW1
TYP. @
EXTERIOR
SW1
'-4
O .C
3/
4" x
1/ 4"
L V
L R
O O
F J
O
IS
T S
H
H
JO
IS
T S
'-4
O .C
3/
4" x
1/ 4"
L V
L R
O O
F
TYP. @
EXTERIOR
SW1
SW2
SW1
TYP. @
EXTERIOR
SW1
TYP. @
EXTERIOR
SW1
8' - 0 1/4" 4' - 3 3/4" 7' - 0 1/4" 5' - 6 1/2"
24' - 10 3/4"
2 7/16"
8'
1/
2"
6'
0"
1/ 2"
H
H
4' - 0"
4' - 0"
4' - 0 1/2"
4' - 0"
KEYNOTES:
1 AREA OF SHADED REGION IS A SLOPED ROOF AWAY
FROM THE EXISTING BUILDING. SEE ARCH FOR ROOF
SLOPE. ROOF SLOPE SHALL BE ACHIEVED BY
UTILIZING 2x FRAMING RUNNING PERPENDICULAR
OVER THE TOP OF ROOF SHEATHING AND ROOF
JOISTS. - S.D. 1/S402
2 1 - SIMPSON "CS16" STRAP x 8'-0" LONG. S.D. 2/S402
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTSOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
BID DOCUMENT SUBMISSION
FULLY SPRINKLERED
C U s e rs \J
B u e rm a n n \D o c u m e n ts \1
S
R
V T jb u e rm a n n S
R X
R
.r v t
/1
/2
:4
:5
P
M
ROOF FRAMING PLAN PERFORM SITE PREP FOR SPS
EQUIPMENT
FARGO, ND
1/22/2025 EW JB
437-CSI-241 S202
437-CSI-241
1. VERIFY ALL DIMENSIONS WITH CIVIL & ARCHITECTURAL DRAWINGS.
2. SEE SHEET S001 FOR GENERAL STRUCTURAL NOTES.
3. B# / H# - BEAM / HEADER MARK - SEE BEAM / HEADER SCHEDULE ON
SHEET S201.
4. SW# - SHEAR WALL TYPE MARK (BELOW) - SEE SHEARWALL SCHEDULE
ON SHEET S201.
5. ALL STRUCTURAL BEARING "INTERIOR" & "EXTERIOR" STUD WALLS SHALL
BE 2x6 DFL-#2 OR BETTER @ 1'-4" O.C. (U.O.N.) WITH DFL-#2 OR BETTER
DOUBLE TOP PLATE & SOLE PLATE.
6. ROOF SHEATHING TO BE 1/2" APA RATED SHEATHING WITH A 32/16 SPAN
RATING.
7. FINAL LOCATION OF TEMPORARY SPS TRAILER SHALL BE FIELD VERIFIED.
FINAL DIMENSIONS OF WOOD TEMPORY ENCLOUSURE WILL CHANGE
BASED ON TRAILER LOCATION. NOTIFY STRUCTURAL ENGINEER IF
ROOF/FLOOR JOIST SPANS INCREASE.
8. ALL LUMBER SHALL BE FIRE-RETARDANT LUMBER.
SHEET NOTES:
1/4" = 1'-0"
SPS TRAILER ENCLOSURE - ROOF FRAMING PLAN
0 4' 8'2'
2882 106TH STREET
DES MOINES IA 50322
SLAB ON GRADE
SEE PLAN & CIVIL
2x STUD WALL
SEE PLAN
2x TREATED PLATE W/ 5/8" DIA.
SIMPSON "TITEN-HD" SCREW
ANCHORS @ 4'-0" O.C., EMBED
3 1/4" MINIMUM, U.O.N.
EXTERIOR WALL
SHEATHING SEE PLAN &
SHEARWALL SCHEDULE
NOTES:
1. WHERE SLAB ON GRADE EXTENDS BEYOND STOOP SLAB HOLD STOOP SLAB
BACK 2" AND PROVIDE 3/4" DIA. x 1'-6" SMOOTH ROD @ 1'-0" O.C. PROVIDE SLEEVE
FOR ROD OR WRAP & TAPE WITH BUILDING FELT.
2. PROVIDE L4x4x1/4" W/ 1/2" DIA. SCREW ANCHORS @ 1'-0" O.C. (2 - ANCHORS MIN.), EMBED 3 1/2" MIN.
3. SEE CIVIL RESTORATION PLAN FOR LOCATION OF NEW STOOP @ EXISTING
BUILDING.
3" CLR.
TYP.
DWL. TO MATCH @
EACH VERT.
4 @ 1'-0" O.C. EACH
WAY
8"
4 DWL. 9" x 15" @ 2'-0" O.C.
S.D. NOTE 1
CONC. SLAB OVER 1 1/2", TYPE "C", 20 GA.
(GALV.) DECK W/ 3" BRG. @ EACH END,
OVER 3" VOID. REINF. W/ 4 @ 1'-0" O.C.
EACH WAY. SLOPE SLAB 1/4"/FOOT.
SEE PLAN
EXIST. FTG. & FDN.
WALL VERIFY
EXIST. SLAB ON
GRADE VERIFY
WALL BEYOND SEE
PLAN
5 1/2"
S.D. NOTE 2
1'
0"
1' - 8"
2 - #5 LONGITUDINAL
INFILL AND REPLACE CONCRETE SLAB ON GRADE
AND REINF. W/ #4 @ 1'-0" O.C. EACH WAY
NOTES: 1. SEE PLUMBING DRAWINGS FOR EXACT PLUMBING LOCATIONS
2. SEE STANDARD SPECIFICATION FOR BACK FILL AND
COMPACTION REQUIREMENTS
EYE BOLT
SEE PLAN
SLAB ON GRADE
SEE PLAN
EMBED
SEE PLAN
STRAP BY TRAILER
SUPPLIER
ANCHOR POINT @ TRAILER
FIELD LOCATE
TEMPORARY SPS TRAILER
SEE ARCH
SLAB ON GRADE
SEE PLAN & CIVIL
HOLDOWN SEE PLAN AND
SCHEDULE
FLOOR SHEATHING
SEE PLAN
ANCHOR POST SEE
HOLDOWN SCHEDULE
HOLDOWN ANCHOR SEE
PLAN AND SCHEDULE
2x NON-TREATED PLATE
"E" = EMBED DEPTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTSOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
BID DOCUMENT SUBMISSION
FULLY SPRINKLERED
C U s e rs \J
B u e rm a n n \D o c u m e n ts \1
S
R
V T jb u e rm a n n S
R X
R
.r v t
/1
/2
:4
:5
P
M
FOOTING & FOUNDATION DETAILS PERFORM SITE PREP FOR SPS
EQUIPMENT
FARGO, ND
1/22/2025 EW JB
437-CSI-241 S301
437-CSI-241
2882 106TH STREET
DES MOINES IA 50322
1" = 1'-0"S301
3 WALL @ SLAB CONN. DETAIL
1/2" = 1'-0"S301
4 STOOP @ EXIST. DETAIL
1" = 1'-0"S301
1 CONC. SLAB ON GRADE REPAIR DETAIL
1" = 1'-0"S301
2 TEMPORARY TRAILER TIE-DOWN DETAIL
1" = 1'-0"S301
5 HOLDOWN DETAIL
T.O. SHEATHING
EL. = SEE ARCH.
T.O. SHEATHING
EL. = SEE ARCH.
1 - 2x6 KING
STUD @ EACH
END U.O.N.
2 - 0.131" DIA. x 3"
NAILS
PER STUD
2 - 8d DIA. NAILS
PER STUD
3 - 0.131" DIA. x 3"
NAILS
@ EACH 2x6
PLATE
1 - 2x6 @ TOP & BOT.
PLATE FASTEN W/
2 - 0.131" DIA. x 3"
NAILS @ 10" O.C.
SEE PLAN FOR
OF JACK STUDS
HEADER SEE
SCHEDULE
A
S401
1 - 2x6 @ TOP & BOT.
PLATE FASTEN W/
2 - 0.131" DIA. x 3"
NAILS @ 10" O.C.
FILL AIR SPACE
W/ INSULATION
HEADER SEE
SCHEDULE
2 MEMBERS 3 MEMBERS 4 MEMBERS
NOTE:
2 & 3 PLY MEMBERS SHALL BE FASTENED TOGETHER WITH 3 - ROWS
OF 0.148" DIA. x 3 1/4" NAILS @ 1'-0" O.C., 4 PLY MEMBERS SHALL BE
FASTENED WITH 2 - ROWS 1/2" DIA. BOLTS @ 1'-0" O.C.
2"
2"
PLACE SPLICE
OVER STUD
8 - 0.148" DIA. x 3" NAILS
@ 2" O.C. STAGGERED
@ EACH SIDE OF SPLICE
TYPICAL
4'-0"
2" MIN.2" MIN. 2" MIN.2" MIN.
2x ROOF JOIST
SEE PLAN
EXTERIOR SHEATHING
SEE PLAN & SHEAR WALL
SCHEDULE
SIMPSON "H2.5" TIE
@ EA. ROOF JOIST
2x STUD WALL
SEE PLAN
DOUBLE TOP PLATE
2x BLOCKING BTWN. EA.
ROOF JOIST; SKIP EVERY
3RD BAY. PROVIDE 0.162" DIA.
x 3 1/2" NAIL @ 8" O.C.
2x4 BLOCKING W/ 0.162" DIA. x 3 1/2" NAIL @ 8" O.C.
CONT. 2x RIBBON
ROOF SHEATHING
SEE PLAN
SEE ARCH
SEE ARCH.1 - SIMPSON "CS16"
STRAP x 2'-0" LONG
CENTERED AT EA. SPLICE.
2x4 BLOCKING W/ 0.162" DIA. x 3 1/2"
NAIL @ 8" O.C.
ROOF SHEATHING
SEE PLAN
DOUBLE TOP
PLATE
2x STUD WALL
SEE PLAN
2x BLOCKING BTWN. EA.
2x12; SKIP EVERY 3RD BAY.
PROVIDE 0.162" x 3 1/2"
NAILS @ 8" O.C.
EXTERIOR WALL SHEATHING
SEE PLAN & SHEARWALL
SCHEDULE
CONT. 2x RIBBON
SIMPSON "H1" TIE
@ EA. 2x12
2x ROOF JOIST
SEE PLAN
2x12 @ 2'-0" O.C.
SEE ARCH
SIMPSON "LUS" HANGER
@ EA. 2x12
2x ROOF JOIST
SEE PLAN
EXTERIOR SHEATHING
SEE PLAN & SHEAR WALL
SCHEDULE
SIMPSON "H2.5" TIE
@ EA. ROOF JOIST
2x STUD WALL
SEE PLAN
DOUBLE TOP PLATE
2x BLOCKING BTWN. EA.
ROOF JOIST; SKIP EVERY
3RD BAY. PROVIDE 0.162" DIA.
x 3 1/2" NAIL @ 8" O.C.
2x4 BLOCKING W/ 0.162" DIA. x 3 1/2" NAIL @ 8" O.C.
CONT. 2x RIBBON
ROOF SHEATHING
SEE PLAN
SEE ARCH
SEE ARCH.
VER.
2 7/16"
TEMPORARY SPS
MOBILE TRAILER
VERIFY
2x ROOF JOIST
SEE PLAN
SEE ARCH.
SIMPSON "H2.5" TIE
@ EA. ROOF JOIST
2x STUD WALL
SEE PLAN
DOUBLE TOP PLATE
CONNECT OVERLAPPING
2x ROOF JOISTS W/ 4 - 0.148" DIA x 3" NAILS
ROOF SHEATHING
SEE PLAN
SEE ARCH
2x ROOF JOIST
SEE PLAN
2x ROOF JOIST
SEE PLAN
EXTERIOR WALL SHEATHING
SEE PLAN & SHEARWALL
SCHEDULE
SIMPSON "H2.5" TIE
@ EA. ROOF JOIST
2x STUD WALL
SEE PLAN
DOUBLE TOP PLATE
ROOF SHEATHING
SEE PLAN
SEE ARCH
VERIFY
EXISTING BUILDING
2" MAX
ARCH VERIFY
CONT. 2x RIBBON
2x BLOCKING BTWN. EA.
ROOF JOIST; SKIP EVERY
3RD BAY. PROVIDE 0.162"
DIA. x 3 1/2" NAIL @ 8" O.C.
2x4 BLOCKING W/ 0.162" DIA. x 3 1/2" NAIL @ 8" O.C.
FLOOR SHEATHING
SEE PLAN
DOUBLE TOP
PLATE
2x STUD WALL
SEE PLAN
EXTERIOR WALL SHEATHING
SEE PLAN & SHEARWALL
SCHEDULE
CONT. 2x RIBBON
2x STUD WALL SEE
PLAN
FLOOR JOIST
SEE PLAN
2 - ROWS 0.162" x 3 1/2"
NAILS @ EA. FLOOR JOIST
FLOOR SHEATHING
SEE PLAN
DOUBLE TOP
PLATE
2x STUD WALL
SEE PLAN
EXTERIOR WALL SHEATHING
SEE PLAN & SHEARWALL
SCHEDULE
2x STUD WALL SEE
PLAN
FLOOR JOIST
SEE PLAN
2 - ROWS 0.162" x 3 1/2"
NAILS @ 1'-4" O.C. FLOOR SHEATHING
SEE PLAN
DOUBLE TOP
PLATE
2x STUD WALL
SEE PLANEXTERIOR WALL SHEATHING
SEE PLAN & SHEARWALL
SCHEDULE
CONT. 2x RIBBON
2x STUD WALL SEE
PLAN
FLOOR JOIST
SEE PLAN
2 - ROWS 0.162" x 3 1/2"
NAILS @ EA. FLOOR JOIST
VER.
2 7/16"TEMPORARY TRAILER
VERIFY.
FLOOR SHEATHING
SEE PLAN
DOUBLE TOP
PLATE
2x STUD WALL
SEE PLAN
EXTERIOR WALL SHEATHING
SEE PLAN & SHEARWALL
SCHEDULE
CONT. 2x RIBBON
2x STUD WALL SEE
PLAN
FLOOR JOIST
SEE PLAN
2 - ROWS 0.162" x 3 1/2"
NAILS @ EA. FLOOR JOIST
EXISTING RETAINING WALL
VERIFY.
EXISTING CONC.
SIDEWALK VERIFY.
FLOOR SHEATHING SHALL
EXTEND PAST WD. FRAMING
AND REST @ EXISTING CONC.
SIDEWALK
EXTERIOR WALL SHEATHING
SEE PLAN & SHEARWALL
SCHEDULE
NOTE: FLOOR SHEATHING @ EXTERIOR SHALL BE TREATED.
2x BLOCKING BTWN. EA.
ROOF JOIST; SKIP EVERY
3RD BAY. PROVIDE 0.162"
DIA. x 3 1/2" NAIL @ 8" O.C.
2x4 BLOCKING W/ 0.162" DIA. x 3 1/2" NAIL @ 8" O.C.
1'-0" MAX.
PLASTIC SHIMS
UNDERNEATH FLOOR
SHEATHING TO PROVIDE
FULL BEARING AT EXISTING
RETAINING WALL.
FLOOR SHEATHING
SEE PLAN
DOUBLE TOP
PLATE
2x STUD WALL
SEE PLANEXTERIOR WALL SHEATHING
SEE PLAN & SHEARWALL
SCHEDULE
CONT. 2x RIBBON
2x STUD WALL SEE
PLAN
2x FLOOR JOIST
SEE PLAN
2 - ROWS 0.162" x 3 1/2" NAILS @ EA. 2x FLOOR
JOIST
SEE ARCH
VERIFY
EXISTING BUILDING
FLOOR SHEATHING
SEE PLAN
DOUBLE TOP
PLATE
2x STUD WALL
SEE PLAN
SEE ARCH
2x STUD WALL SEE
PLAN
2x FLOOR JOIST
SEE PLAN
2 - ROWS 0.162" x 3 1/2"
NAILS @ EA. FLOOR JOIST
2x FLOOR JOIST
SEE PLAN
CONNECT OVERLAPPING
2x FLOOR JOISTS W/ 4 -
0.148" DIA x 3" NAILS
2x FLOOR JOIST
SEE PLAN
FLOOR SHEATHING
SEE PLAN
VERIFY
EXISTING BUILDING
2x12 LEDGER W/ 2-ROWS -
5/8" DIA. SIMPSON "TITEN-
HD" SCREW ANCHORS @
2'-0" O.C. EMBED = 4" (MIN.)
4" MIN.
SIMPSON "LUS"
HANGER @ EA.
END OF EA. 2x6
2x6 @ 2'-0" O.C.
2x STUD WALL WHERE
APPLIES SEE PLAN
EXTERIOR WALL SHEATHING
SEE PLAN & SHEARWALL
SCHEDULE
2 - ROWS 0.162" x 3 1/2" NAILS @ EA. 2x6
FLOOR SHEATHING
SEE PLAN
DOUBLE TOP
PLATE
2-2x8 RAMP JOISTS @ 2'-0" O.C.
WALL SHEATHING TO MATCH
"SW1" CRITERIA SEE
SHEARWALL SCHEDULE
CONT. 2x12 LEDGER W/ 3-ROWS 0.216" DIA. x 4 1/2" WOOD SCREWS @ EA. 2x STUD
2x STUD WALL SEE
PLAN
2x FLOOR JOIST
SEE PLAN
CONT. 2x10 LEDGER W/ 6 - ROWS 0.216" DIA x 4 1/2" WOOD SCREWS @ EA. 2x STUD
2x FLOOR JOIST
SEE PLAN
FLOOR SHEATHING
SEE PLAN
1 1/2" TYP.
FLOOR SHEATHING
SEE PLAN
SIMPSON "U26-2" FACEMOUNT
HANGER @ EA. RAMP JOIST
2 - 2x8 RAMP
JOISTS @ 2'-0"
O.C. - TYP.
WALL SHEATHING TO MATCH
"SW1" CRITERIA
SEE SHEARWALL SCHEDULE
FLOOR SHEATHING
SEE PLAN
2x STUD WALL
SEE PLAN
DOUBLE TOP PLATE
ATTACH OVERLAPPING
RAMP JOISTS TOGETHER
W/ 4 - 0.216" DIA x 4 1/2"
WOOD SCREWS
2-2x FLOOR JOIST
SEE PLAN - TYP.
2 - 0.162" DIA. x 3 1/2" NAILS @ EA. 2x6
SIMPSON "LUS"
HANGER @ EA.
END OF EA. 2x6 2x6 @ 2'-0" O.C.
NOTE:
1) THE MAXIMUM SPAN OF THE 2-2x8 RAMP JOIST IS 8'-0"
PROVIDE 2x STUD WALL AS SHOWN IN THIS DETAIL TO REDUCE SPACE OF 2-2x8 RAMP JOISTS.
S.D. 2/S401 FOR
ASSEMBLY
2 - 2x8 RAMP
JOISTS @ 2'-0"
O.C. - TYP.
CONT. 2x6 W/ 2 - 0.162" DIA.
x 3 1/2" NAILS @ EA. 2x6
FLOOR SHEATHING
SEE PLAN
2-2x FLOOR JOIST
SEE PLAN - TYP.
SIMPSON "A34"
CLIP @ EA. 2x8
RAMP JOIST
2x6 @ 2'-0" O.C.
SIMPSON "LUS"
HANGER @ EA.
END OF EA. 2x6
S.D. 2/S401 FOR
ASSEMBLY
2x ROOF JOIST
SEE PLAN
ROOF SHEATHING
SEE PLANVERIFY
EXISTING BUILDING
DOUBLE TOP
PLATE
2x STUD WALL
SEE PLANEXTERIOR WALL SHEATHING
SEE PLAN & SHEARWALL
SCHEDULE
2" MAX
ARCH VERIFY
2x ROOF JOIST
SEE PLAN
ROOF SHEATHING
SEE PLAN
VERIFY
EXISTING BUILDING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTSOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
BID DOCUMENT SUBMISSION
FULLY SPRINKLERED
C U s e rs \J
B u e rm a n n \D o c u m e n ts \1
S
R
V T jb u e rm a n n S
R X
R
.r v t
/1
/2
:4
:5
P
M
FRAMING DETAILS PERFORM SITE PREP FOR SPS
EQUIPMENT
FARGO, ND
1/22/2025 EW JB
437-CSI-241 S401
437-CSI-241
2882 106TH STREET
DES MOINES IA 50322
1" = 1'-0"S401
3 HEADER DETAIL
1 1/2" = 1'-0"
SECTION "A"
1" = 1'-0"S401
2 WOOD BEAM ASSEMBLY DETAIL
1" = 1'-0"S401
1 TYP. TOP PLATE SPLICE DETAIL
1" = 1'-0"S401
4 ROOF JOIST CONN. DETAIL
1" = 1'-0"S401
5 ROOF END WALL DETAIL
1" = 1'-0"S401
6 ROOF JOIST CONN. DETAIL
1" = 1'-0"S401
7 ROOF JOIST CONN. DETAIL
1" = 1'-0"S401
8 ROOF JOIST CONN. DETAIL
1" = 1'-0"S401
10 FLOOR JOIST CONN. DETAIL
1" = 1'-0"S401
11 FLOOR JOIST CONN. DETAIL
1" = 1'-0"S401
12 FLOOR JOIST CONN. DETAIL 1" = 1'-0"S401
13 FLOOR JOIST CONN. DETAIL
1" = 1'-0"S401
14 FLOOR JOIST CONN. DETAIL 1" = 1'-0"S401
15 FLOOR JOIST CONN. DETAIL
1" = 1'-0"S401
16 ROOF JOIST CONN. DETAIL
1" = 1'-0"S401
17 FLOOR JOIST CONN. DETAIL
1" = 1'-0"S401
18 RAMP JOIST CONN. DETAIL
1" = 1'-0"S401
19 RAMP JOIST CONN. DETAIL
1" = 1'-0"S401
9 ROOF JOIST CONN. DETAIL
1" = 1'-0"S401
20 ROOF JOIST CONN. DETAIL
2x12 DORMER
JOIST SEE PLAN
CONT. 2x6 W/ 2 - 0.162" DIA.
x 3 1/2" NAILS @ EA. 2x6
ROOF SHEATHING
SEE PLAN
2-2x ROOF JOIST
SEE PLAN - TYP.
SIMPSON "A34"
CLIP @ EA. 2x12
RAMP JOIST
2x6 @ 2'-0" O.C.
SIMPSON "LUS"
HANGER @ EA.
END OF EA. 2x6
S.D. 2/S401 FOR
ASSEMBLY
2x ROOF JOIST
SEE PLAN
ROOF SHEATHING
SEE PLAN
DOUBLE TOP
PLATE
2x STUD WALL
SEE PLANEXTERIOR WALL SHEATHING
SEE PLAN & SHEARWALL
SCHEDULE
2x BLOCKING BTWN. EA.
ROOF JOIST; SKIP EVERY
3RD BAY. PROVIDE 0.162"
DIA. x 3 1/2" NAIL @ 8" O.C.
2x4 BLOCKING W/ 0.162" DIA. x 3 1/2" NAIL @ 8" O.C.
SEE ARCH
2" MAX
ARCH VERIFY
VERIFY
EXISTING BUILDING
2x STUD WALL
SEE PLAN
EXTERIOR WALL SHEATHING
MATCH SW1 CRITERIA
CONT. 2x RIBBON
SIMPSON "H2.5" @
EA. DORMER JOIST
DOUBLE TOP PLATE
2x12 DORMER JOIST
SEE PLAN
2 - ROWS 0.216" x 4 1/2"
WOOD SCREWS @ 1'-4" O.C.
SIMPSON STRAP SEE PLAN ROOF SHEATHING
SEE PLAN
CONT. 2x6 BLOCKING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTSOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
BID DOCUMENT SUBMISSION
FULLY SPRINKLERED
C U s e rs \J
B u e rm a n n \D o c u m e n ts \1
S
R
V T jb u e rm a n n S
R X
R
.r v t
/1
/2
:4
:5
P
M
FRAMING DETAILS PERFORM SITE PREP FOR SPS
EQUIPMENT
FARGO, ND
1/22/2025 EW JB
437-CSI-241 S402
437-CSI-241
2882 106TH STREET
DES MOINES IA 50322
1" = 1'-0"S402
1 DORMER JOIST FRAMING DETAIL
1" = 1'-0"S402
2 DRAG STRUT DETAIL
1-22-20251-22-2025
7 8 9.2 10 11 12 13 14 15
DE4
DE1
DE1
DE1
DE1
DE3
DE6
DE2
DE2
DE1
DE3
DE3
DE3
DE8
DE5 DE8
DE8
DE14
DE14
DE15
DE15
DE7
SEE MEP FOR WORK IN THIS AREA
SEE MEP
FOR
WORK IN
THIS AREA
DE16
DE2
DE14
DE3
DE18
DE5
DE18
DE18
DE18
DE3
DE18
DE19
DE19
DE20 DE20
DE20
DE18DE18
DE20
DE19
DE20 DE20
DE19
DE19
REMOVE AND REINSTALL
SINK , PUSH PAD, AND HAND
SANITIZER . SEE FLOOR
PLAN
DE7
DE15
DE5
DE5
DE15
DE7
DE15 DE22
DE22
DE23
DE21
DE5
DE5DE15
FEC (E)
FEC (E)
FEC (E)
DE24
DE25
DE26
DE26
DE26
DE26
DE26
FEC (E)
DE27 DE27
DE5
DO NOT CUT FLOOR
AT SHOWER.
BB-20
RECEIVING /
DECONTAMINATION
BA-44
PASSAGE/
ANTE ROOM
BA-44A
WOMANS
LOCKER
BA-44B
MENS
LOCKER
BB-21
CART LIFT
S-3
MACHINE
BA-40
STORAGE
BB-18A
MANUAL
CART WASH
BB-18B
CART WASH
BB-15
CLEAN
STORAGE
BB-15B
MEN'S
LOCKER
BB-15B1
TOILET
BA-30
IRM HUB
C004
PASSAGE
BB-15A
WOMEN'S
LOCKER
BB-15A1
TOILET
BB-16B
CLERK
BB-16A
CLERK
C002
CORRIDOR
BA-35
MEN'S
BA-37
HVAC
BA-41
MECHANICAL
BA-43
BREAK
ROOM
BB-18C
PREP/
ASEMBLY /
STORAGE
BB-20A
STERILIZERS
BB-18E
LOW TEMP
STERILIZERS
C006
CORRIDOR
BA-45
OFFICE
S-1
STAIRS
28G
MECHANICAL
S-2
STAIR
STAIR
BA-69
CONFREENCE
ROOM
BA-39
WOMEN'S
DEMOLITION GENERAL NOTES
1. CONTRACTOR MUST COORDINATE ALL DEMOLITION WORK, PHASING AND
SEQUENCING WITH THE OWNER. ANY INFORMATION REGARDING SEQUENCING
PROVIDED IN THESE DOCUMENTS IS FOR ARCHITECT - OWNER PLANNING
PURPOSES ONLY, UNLESS NOTED OTHERWISE.
2. CONTRACTOR MUST BE RESPONSIBLE FOR COORDINATING WITH ALL TRADES FOR
THE DEMOLITION WORK REQUIRED FOR THIS PROJECT.
3. WHERE PARTITIONS ARE INDICATED TO BE REMOVED, REMOVE PARTITION ALONG
WITH ALL ITEMS CONTAINED WITHIN, INCLUDING DOORS, FRAMES, HARDWARE,
SIDELIGHTS, WINDOWS, MECHANICAL AND ELECTRICAL EQUIPMENT, ETC. TO
STRUCTURE ABOVE, UNLESS NOTED OTHERWISE.
4. WHERE FLOOR FINISH IS INDICATED TO BE DEMOLISHED, REMOVE FINISH TO
FLOOR SLAB AS REQUIRED AND PREPARE SLAB SURFACE FOR SCHEDULED
FINISHES WITHIN AREA TO BE REMODELED, UNLESS NOTED OTHERWISE. SEE FINISH
SCHEDULE FOR EXISTING FLOOR FINISHES TO REMAIN UNDISTURBED.
5. WHERE CEILING IS INDICATED TO BE DEMOLISHED, REMOVE CEILING SUSPENSION
SYSTEM ALONG WITH ALL ASSOCIATED MECHANICAL AND ELECTRICAL ITEMS,
UNLESS NOTED OTHERWISE. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR
EXTENT OF CONDUIT, PIPING AND DUCTWORK DEMOLITION WITHIN AREA TO BE
REMODELED.
6. WHERE INDICATED, REMOVE ALL WALL/PARTITION EXISTING FINISHES AND
PREPARE THE SURFACES FOR SCHEDULED FINISHES, SEE FINISH SCHEDULE FOR
FINISHES.
7. ALL DISTURBED AREAS, WALLS, PARTITIONS, FLOORS, ETC, DAMAGED BY
DEMOLITION WORK MUST BE PATCHED TO MATCH ADJACENT AREA.
8. OWNER RESERVES THE RIGHT OF FIRST REFUSAL OF ALL SALVAGED ITEMS SUCH
AS: DOORS, LIGHT FIXTURES, PLUMBING FIXTURES ETC.
9. SALVAGED ITEMS SCHEDULED FOR REUSE MUST BE CLEANED, RESTORED AND/OR
REFINISHED TO LIKE NEW CONDITION, UNLESS NOTED OTHERWISE.
10. DO NOT REMOVE ANY EXISTING STRUCTURAL SUPPORT MEMBERS SUCH AS
COLUMNS, BEAMS, JOISTS, LOAD-BEARING PARTITIONS ETC, UNTIL ADEQUATE
PERMANENT OR TEMPORARY SUPPORT IS IN PLACE. ALL EXISTING STRUCTURAL
MEMBERS MUST BE ADEQUATELY PROTECTED, COORDINATE WITH STRUCTURAL
ENGINEER.
11. SEE STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS FOR RELATED
DEMOLITION AND PREP WORK.
12. WALL AND CEILING MOUNTED ITEMS SHOWN DASHED, SUCH AS WALL CABINETS,
SHELVING, CUBICLE CURTAIN TRACKS, PROJECTION SCREENS ETC, MUST BE
REMOVED, UNLESS NOTED OTHERWISE.
13. WITHIN ALL EXISTING ROOMS/SPACES RECEIVING SCHEDULED FLOOR, OR WALL,
OR CEILING FINISHES, REMOVE ALL EXISTING FLOOR, OR WALL, OR CEILING
FINISHES DOWN TO THE SUBSTRATE. INCLUDE THE REMOVAL OF ALL ITEMS
LOCATED WITHIN THE EXISTING FINISH REMOVALS UNO PATCH AND PREP ALL
SUBSTRATES TO RECEIVE SCHEDULED FINISHES. FOR ADDITIONAL INFORMATION,
SEE KEYNOTED ITEMS, FINISH PLANS AND/OR SCHEDULES, STRUCTURAL,
MECHANICAL AND ELECTRICAL.
DEMOLITION PLAN SYMBOLS
EXISTING WALL TO
REMAIN
WALL OR
PARTITION TO BE
REMOVED
EXISTING DOOR
AND FRAME TO
REMAIN
KEY NOTE
A
GRIDLINE
NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN
EXISTING DOOR
AND FRAME TO BE
DEMOLISHED
DASHED LINE
INDICATES ITEM TO
BE REMOVED (UNO)
DE10
DEMOLITION PLAN KEYED NOTES
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
DE1 EQUIPMENT TO BE REMOVED BY VA'S VENDOR. GC TO COORDINATE MEP
DISCONNECTIONS
DE2 REMOVE GYP BD AND METAL STUD FURRING
DE3 REMOVE PARTITIONS, DOORS AND DOOR FRAME, SHOWN DASHED
DE4 REMOVE AND SALVAGE SYSTEMS FURNITURE
DE5
SAW CUT FLOOR AS REQUIRED FOR UNDERFLOOR PIPE REMOVAL AND
INSTALLATION. SEE MECHANICAL & STRUCTURAL FOR AREA AND EXTENT
OF FLOOR REMOVAL.
DE6
REMOVE PORTION OF GYP BD AND METAL STUD WALL AND WALL
PROTECTION AS REQUIRED FOR EQUIPMENT INSTALLATION. SEE PLANS
FOR ADDITIONAL INFORMATION
DE7 REMOVE PORTION OF GYP BD AND METAL STUD PARTITION AS REQUIRED
FOR DOOR INSTALLATION.
DE8
REMOVE ENTIRE SUSPENDED GYP BD CEILING AND ACCESS HATCHES.
SALVAGE ACCESS HATCHES FOR REINSTALLATION. SEE REFLECTED
CEILING PLAN FOR ADDITIONAL INFORMATION.
DE9 REMOVE DOOR, FRAME TO REMAIN. SALVAGE DOOR FOR REINSTALLATION
DE10 REMOVE PORTION OF CHAIN LINK FENCE. SEE CIVIL
DE11 REMOVE PORTION OF CONCRETE WALK AND/OR RAMP. SEE CIVIL
DE12 REMOVE PORTION OF CONC BLOCK RETAINING WALL. SALVAGE FOR
REINSTALLATION. SEE CIVIL.
DE13 REMOVE ENTIRE WINDOW. SALVAGE FOR REINSTALLATION.
DE14 REMOVE GYP BD ONE SIDE OF PARTITION FOR MECHANICAL DEMOLITION.
SEE MEP PLANS FOR ADDITIONAL INFORMATION.
DE15
REMOVE PORTION OF ACT CEILING SYSTEM AND ALL MEP ITEMS AS
REQUIRED FOR WORK IN THIS AREA. SEE PLANS AND MEP FOR ADDITIONAL
INFORMATION
DE16 REMOVE DOOR, FRAME AND HARDWARE. SALVAGE FOR REINSTALLATION
IN NEW LOCATION. SEE PLANS FOR ADDITIONAL INFORMATION
DE17 REMOVE SPLASH BLOCK AND PORTION OF METAL DOWNSPOUT AS
REQUIRED FOR WORK IN THIS AREA. SALVAGE FOR REINSTALLATION.
DE18 SAW CUT AND REMOVE CAST IN PLACE TERRAZZO COVE BASE, AT
PARTITION TO BE REMOVED. GRIND FLUSH WITH EXISTING FLOOR.
DE19
REMOVE CRASH RAIL, HIGH AND LOW, AND RIGID WALL COVERING AND ALL
ASSOCIATED TRIM. PREP WALL FOR FINISHES AS SCHEDULED. SEE FLOOR
PLANS AND ELEVATIONS FOR ADDITIONAL INFORMATION
DE20 PLUMBING FIXTURE TO BE REMOVED. SEE PLUMBING FOR ADDITIONAL
INFORMATION
DE21 REMOVE STAINLESS STEEL CABINET. SALVAGE FOR REINSTALLATION IN
DIFFERENT LOCATION. SEE PLANS FOR ADDITIONAL INFORMATION
DE22 REMOVE PORTION OF VCT AS REQUIRED FOR WORK IN THIS AREA. SEE
PLAN FOR ADDITIONAL WORK.
DE23 REMOVE PORTION OF CARPET TILE AS REQUIRED FOR WORK IN THIS
AREA. SEE PLAN FOR ADDITIONAL WORK.
DE24 REMOVE BENCH AND COAT HOOKS. SALVAGE FOR REINSTALLATION
DE25 REMOVE AND SALVAGE CORNER GUARD FOR REINSTALLATION
DE26 REMOVE GYP BD ONE SIDE OF PARTITION FOR ELECTRICAL WORK IN THIS
AREA. SEE MEP PLANS FOR ADDITIONAL INFORMATION.
DE27
REMOVE CRASH RAIL, HIGH AND LOW, RIGID WALL COVERING AND ALL
ASSOCIATED TRIM, AND CORNER GUARDS FROM EXISTING COLUMN. PREP
FOR FINISHES AS SCHEDULED. SEE SHEET AF101 FOR ADDITIONAL
INFORMATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106TH STREET
DES MOINES IA 50322
BID DOCUMENT SUBMISSION
C U s e rs
\c z u p a n \D o c u m e n ts
\1
-A -R c z u p a n J A
M E
X .r v t
/2
/2
:5
:4
P
M
AD101-A
LOWER LEVEL DEMOLITION PLAN
-AREA A
PERFORM SITE PREP
FOR SPS EQUIPMENT
FARGO, ND
437-CSI-241
1/22/2025 JLU GJB
17639
3/16" = 1'-0"2 LOWER LEVEL DEMOLITION PLAN - SPS
KEY PLAN
LOWER LEVEL
DEMOLITION GENERAL NOTES
1. CONTRACTOR MUST COORDINATE ALL DEMOLITION WORK, PHASING AND
SEQUENCING WITH THE OWNER. ANY INFORMATION REGARDING SEQUENCING
PROVIDED IN THESE DOCUMENTS IS FOR ARCHITECT - OWNER PLANNING
PURPOSES ONLY, UNLESS NOTED OTHERWISE.
2. CONTRACTOR MUST BE RESPONSIBLE FOR COORDINATING WITH ALL TRADES FOR
THE DEMOLITION WORK REQUIRED FOR THIS PROJECT.
3. WHERE PARTITIONS ARE INDICATED TO BE REMOVED, REMOVE PARTITION ALONG
WITH ALL ITEMS CONTAINED WITHIN, INCLUDING DOORS, FRAMES, HARDWARE,
SIDELIGHTS, WINDOWS, MECHANICAL AND ELECTRICAL EQUIPMENT, ETC. TO
STRUCTURE ABOVE, UNLESS NOTED OTHERWISE.
4. WHERE FLOOR FINISH IS INDICATED TO BE DEMOLISHED, REMOVE FINISH TO
FLOOR SLAB AS REQUIRED AND PREPARE SLAB SURFACE FOR SCHEDULED
FINISHES WITHIN AREA TO BE REMODELED, UNLESS NOTED OTHERWISE. SEE FINISH
SCHEDULE FOR EXISTING FLOOR FINISHES TO REMAIN UNDISTURBED.
5. WHERE CEILING IS INDICATED TO BE DEMOLISHED, REMOVE CEILING SUSPENSION
SYSTEM ALONG WITH ALL ASSOCIATED MECHANICAL AND ELECTRICAL ITEMS,
UNLESS NOTED OTHERWISE. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR
EXTENT OF CONDUIT, PIPING AND DUCTWORK DEMOLITION WITHIN AREA TO BE
REMODELED.
6. WHERE INDICATED, REMOVE ALL WALL/PARTITION EXISTING FINISHES AND
PREPARE THE SURFACES FOR SCHEDULED FINISHES, SEE FINISH SCHEDULE FOR
FINISHES.
7. ALL DISTURBED AREAS, WALLS, PARTITIONS, FLOORS, ETC, DAMAGED BY
DEMOLITION WORK MUST BE PATCHED TO MATCH ADJACENT AREA.
8. OWNER RESERVES THE RIGHT OF FIRST REFUSAL OF ALL SALVAGED ITEMS SUCH
AS: DOORS, LIGHT FIXTURES, PLUMBING FIXTURES ETC.
9. SALVAGED ITEMS SCHEDULED FOR REUSE MUST BE CLEANED, RESTORED AND/OR
REFINISHED TO LIKE NEW CONDITION, UNLESS NOTED OTHERWISE.
10. DO NOT REMOVE ANY EXISTING STRUCTURAL SUPPORT MEMBERS SUCH AS
COLUMNS, BEAMS, JOISTS, LOAD-BEARING PARTITIONS ETC, UNTIL ADEQUATE
PERMANENT OR TEMPORARY SUPPORT IS IN PLACE. ALL EXISTING STRUCTURAL
MEMBERS MUST BE ADEQUATELY PROTECTED, COORDINATE WITH STRUCTURAL
ENGINEER.
11. SEE STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS FOR RELATED
DEMOLITION AND PREP WORK.
12. WALL AND CEILING MOUNTED ITEMS SHOWN DASHED, SUCH AS WALL CABINETS,
SHELVING, CUBICLE CURTAIN TRACKS, PROJECTION SCREENS ETC, MUST BE
REMOVED, UNLESS NOTED OTHERWISE.
13. WITHIN ALL EXISTING ROOMS/SPACES RECEIVING SCHEDULED FLOOR, OR WALL,
OR CEILING FINISHES, REMOVE ALL EXISTING FLOOR, OR WALL, OR CEILING
FINISHES DOWN TO THE SUBSTRATE. INCLUDE THE REMOVAL OF ALL ITEMS
LOCATED WITHIN THE EXISTING FINISH REMOVALS UNO PATCH AND PREP ALL
SUBSTRATES TO RECEIVE SCHEDULED FINISHES. FOR ADDITIONAL INFORMATION,
SEE KEYNOTED ITEMS, FINISH PLANS AND/OR SCHEDULES, STRUCTURAL,
MECHANICAL AND ELECTRICAL.
DEMOLITION PLAN SYMBOLS
EXISTING WALL TO
REMAIN
WALL OR
PARTITION TO BE
REMOVED
EXISTING DOOR
AND FRAME TO
REMAIN
KEY NOTE
A
GRIDLINE
NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN
EXISTING DOOR
AND FRAME TO BE
DEMOLISHED
DASHED LINE
INDICATES ITEM TO
BE REMOVED (UNO)
DE10
DEMOLITION PLAN KEYED NOTES
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
DE1 EQUIPMENT TO BE REMOVED BY VA'S VENDOR. GC TO COORDINATE MEP
DISCONNECTIONS
DE2 REMOVE GYP BD AND METAL STUD FURRING
DE3 REMOVE PARTITIONS, DOORS AND DOOR FRAME, SHOWN DASHED
DE4 REMOVE AND SALVAGE SYSTEMS FURNITURE
DE5
SAW CUT FLOOR AS REQUIRED FOR UNDERFLOOR PIPE REMOVAL AND
INSTALLATION. SEE MECHANICAL & STRUCTURAL FOR AREA AND EXTENT
OF FLOOR REMOVAL.
DE6
REMOVE PORTION OF GYP BD AND METAL STUD WALL AND WALL
PROTECTION AS REQUIRED FOR EQUIPMENT INSTALLATION. SEE PLANS
FOR ADDITIONAL INFORMATION
DE7 REMOVE PORTION OF GYP BD AND METAL STUD PARTITION AS REQUIRED
FOR DOOR INSTALLATION.
DE8
REMOVE ENTIRE SUSPENDED GYP BD CEILING AND ACCESS HATCHES.
SALVAGE ACCESS HATCHES FOR REINSTALLATION. SEE REFLECTED
CEILING PLAN FOR ADDITIONAL INFORMATION.
DE9 REMOVE DOOR, FRAME TO REMAIN. SALVAGE DOOR FOR REINSTALLATION
DE10 REMOVE PORTION OF CHAIN LINK FENCE. SEE CIVIL
DE11 REMOVE PORTION OF CONCRETE WALK AND/OR RAMP. SEE CIVIL
DE12 REMOVE PORTION OF CONC BLOCK RETAINING WALL. SALVAGE FOR
REINSTALLATION. SEE CIVIL.
DE13 REMOVE ENTIRE WINDOW. SALVAGE FOR REINSTALLATION.
DE14 REMOVE GYP BD ONE SIDE OF PARTITION FOR MECHANICAL DEMOLITION.
SEE MEP PLANS FOR ADDITIONAL INFORMATION.
DE15
REMOVE PORTION OF ACT CEILING SYSTEM AND ALL MEP ITEMS AS
REQUIRED FOR WORK IN THIS AREA. SEE PLANS AND MEP FOR ADDITIONAL
INFORMATION
DE16 REMOVE DOOR, FRAME AND HARDWARE. SALVAGE FOR REINSTALLATION
IN NEW LOCATION. SEE PLANS FOR ADDITIONAL INFORMATION
DE17 REMOVE SPLASH BLOCK AND PORTION OF METAL DOWNSPOUT AS
REQUIRED FOR WORK IN THIS AREA. SALVAGE FOR REINSTALLATION.
DE18 SAW CUT AND REMOVE CAST IN PLACE TERRAZZO COVE BASE, AT
PARTITION TO BE REMOVED. GRIND FLUSH WITH EXISTING FLOOR.
DE19
REMOVE CRASH RAIL, HIGH AND LOW, AND RIGID WALL COVERING AND ALL
ASSOCIATED TRIM. PREP WALL FOR FINISHES AS SCHEDULED. SEE FLOOR
PLANS AND ELEVATIONS FOR ADDITIONAL INFORMATION
DE20 PLUMBING FIXTURE TO BE REMOVED. SEE PLUMBING FOR ADDITIONAL
INFORMATION
DE21 REMOVE STAINLESS STEEL CABINET. SALVAGE FOR REINSTALLATION IN
DIFFERENT LOCATION. SEE PLANS FOR ADDITIONAL INFORMATION
DE22 REMOVE PORTION OF VCT AS REQUIRED FOR WORK IN THIS AREA. SEE
PLAN FOR ADDITIONAL WORK.
DE23 REMOVE PORTION OF CARPET TILE AS REQUIRED FOR WORK IN THIS
AREA. SEE PLAN FOR ADDITIONAL WORK.
DE24 REMOVE BENCH AND COAT HOOKS. SALVAGE FOR REINSTALLATION
DE25 REMOVE AND SALVAGE CORNER GUARD FOR REINSTALLATION
DE26 REMOVE GYP BD ONE SIDE OF PARTITION FOR ELECTRICAL WORK IN THIS
AREA. SEE MEP PLANS FOR ADDITIONAL INFORMATION.
DE27
REMOVE CRASH RAIL, HIGH AND LOW, RIGID WALL COVERING AND ALL
ASSOCIATED TRIM, AND CORNER GUARDS FROM EXISTING COLUMN. PREP
FOR FINISHES AS SCHEDULED. SEE SHEET AF101 FOR ADDITIONAL
INFORMATION
DE13
DE12
DE11
DE11 DE10
DE15
DE15
DE15
DE15
SEE MEP
FOR
WORK IN
THIS AREA
RAMP UP
EX
IS
TI
NG
P
IP
IN
G
RA
M
P
UP
FENCE
SEE CIVIL, STRUCTURAL & ELECTRICAL
PLANS FOR ADDITIONAL WORK IN THIS
AREA
BUILDING 53
EXISTING
MANHOLE/ PIPING.
SEE CIVIL
AD101-B
DE17
DE4
LIMITS OF CONSTRUCTION
LIMITS OF CONSTRUCTION LIMITS OF CONSTRUCTION
BE-28
LOADING
DOCK
BE-27
MECH
BE-25
MECH
BE-24
LINNEN
STAIR
BD-47
ENG
BD-45
ENG
BD-43
GEMS
BD-41
EM-MNG
BD-50
ENGINEERING
BD-50B
ENG CHIEF
BD-42
ENG CONF
BD-39
ENG
BD-37
ENG
BD-35
ENG BD-36
SAFETY
BD-38
EEO
BD-40
FSAFETY
BE-20
Room
58A
CORRIDOR
CORRIDOR
BE-09
MECH
BE-29
MECH
EXISTING FLOOR AND WALL TO REMAIN
EXISTING EXTERIOR DOOR
REMOVE CONCRETE
WALK/SLAB
REMOVE CONCRETE WALLS
AND REINFORCING
SAW CUT CONCRETE WALLS
AND REINFORCING AS
REQUIRED
1/8" = 1'-0"2 LOWER LEVEL DEMOLITION PLAN - SITE / ENGINEERING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106TH STREET
DES MOINES IA 50322
BID DOCUMENT SUBMISSION
C U s e rs
\c z u p a n \D o c u m e n ts
\1
-A -R c z u p a n J A
M E
X .r v t
/2
/2
:5
:4
P
M
AD101-B
LOWER LEVEL DEMOLITION PLAN
-AREA B
PERFORM SITE PREP
FOR SPS EQUIPMENT
FARGO, ND
437-CSI-241
1/22/2025 JLU GJB
17639
0 8' 16'4'
KEY PLAN
LOWER LEVEL
3/4" = 1'-0"1 DEMOLITION SECTION - STOOP
T-01
TEMP
TRAILER
CONNECTION
STAIR
BE-28
LOADING
DOCK
BE-27
MECH
BE-25
MECH
BE-24
LINNEN
BD-47
ENG
BD-45
ENG
BD-43
GEMS
BD-41
EM-MNG
BD-50
ENGINEERING
BD-50B
ENG CHIEF
BD-50A
A CHIEF
BD-42
ENG CONF
BD-39
ENG
BD-37
ENG
BD-35
ENG
BD-36
SAFETY
BD-38
EEO
BD-40
FSAFETY
BE-20
LINNEN
58A
CORRIDOR
T-01A
VESTIBULE
BE-29
MECH
CORRIDOR
BE-30
STORAGE
BE-34
PHARMACY
STORAGE
BE-09
MECH
BD-90
EQUIPMENT
DE3
DE3
DE3
REMOVE TEMPORARY ENCLOSURE IN ITS
ENTIRETY. INCLUDING WALLS, DOORS,
FLOOR, RAMP/RAILING, CEILING AND ROOF.
RAMP UP
RA
M
P
UP
FENCE
BUILDING 53
SAW CUT AND REMOVED PORTION
OF CONCRETE PAD. SEE CIVIL
REMOVE CONCRETE BARRIERS. SEE CIVIL
EXISTING PROPANE TANK. PROTECT DURING CONSTRUCTION.
LIMITS OF CONSTRUCTION
LIMITS OF CONSTRUCTION LIMITS OF CONSTRUCTION
DE12
DE12
REMOVE SPD TRAILER AND SUPPY CONTAINER.
REMOVED EMBEDED EYE BOLT.
REMOVED EMBEDED EYE BOLT.
DEMOLITION GENERAL NOTES
1. CONTRACTOR MUST COORDINATE ALL DEMOLITION WORK, PHASING AND
SEQUENCING WITH THE OWNER. ANY INFORMATION REGARDING SEQUENCING
PROVIDED IN THESE DOCUMENTS IS FOR ARCHITECT - OWNER PLANNING
PURPOSES ONLY, UNLESS NOTED OTHERWISE.
2. CONTRACTOR MUST BE RESPONSIBLE FOR COORDINATING WITH ALL TRADES FOR
THE DEMOLITION WORK REQUIRED FOR THIS PROJECT.
3. WHERE PARTITIONS ARE INDICATED TO BE REMOVED, REMOVE PARTITION ALONG
WITH ALL ITEMS CONTAINED WITHIN, INCLUDING DOORS, FRAMES, HARDWARE,
SIDELIGHTS, WINDOWS, MECHANICAL AND ELECTRICAL EQUIPMENT, ETC. TO
STRUCTURE ABOVE, UNLESS NOTED OTHERWISE.
4. WHERE FLOOR FINISH IS INDICATED TO BE DEMOLISHED, REMOVE FINISH TO
FLOOR SLAB AS REQUIRED AND PREPARE SLAB SURFACE FOR SCHEDULED
FINISHES WITHIN AREA TO BE REMODELED, UNLESS NOTED OTHERWISE. SEE FINISH
SCHEDULE FOR EXISTING FLOOR FINISHES TO REMAIN UNDISTURBED.
5. WHERE CEILING IS INDICATED TO BE DEMOLISHED, REMOVE CEILING SUSPENSION
SYSTEM ALONG WITH ALL ASSOCIATED MECHANICAL AND ELECTRICAL ITEMS,
UNLESS NOTED OTHERWISE. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR
EXTENT OF CONDUIT, PIPING AND DUCTWORK DEMOLITION WITHIN AREA TO BE
REMODELED.
6. WHERE INDICATED, REMOVE ALL WALL/PARTITION EXISTING FINISHES AND
PREPARE THE SURFACES FOR SCHEDULED FINISHES, SEE FINISH SCHEDULE FOR
FINISHES.
7. ALL DISTURBED AREAS, WALLS, PARTITIONS, FLOORS, ETC, DAMAGED BY
DEMOLITION WORK MUST BE PATCHED TO MATCH ADJACENT AREA.
8. OWNER RESERVES THE RIGHT OF FIRST REFUSAL OF ALL SALVAGED ITEMS SUCH
AS: DOORS, LIGHT FIXTURES, PLUMBING FIXTURES ETC.
9. SALVAGED ITEMS SCHEDULED FOR REUSE MUST BE CLEANED, RESTORED AND/OR
REFINISHED TO LIKE NEW CONDITION, UNLESS NOTED OTHERWISE.
10. DO NOT REMOVE ANY EXISTING STRUCTURAL SUPPORT MEMBERS SUCH AS
COLUMNS, BEAMS, JOISTS, LOAD-BEARING PARTITIONS ETC, UNTIL ADEQUATE
PERMANENT OR TEMPORARY SUPPORT IS IN PLACE. ALL EXISTING STRUCTURAL
MEMBERS MUST BE ADEQUATELY PROTECTED, COORDINATE WITH STRUCTURAL
ENGINEER.
11. SEE STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS FOR RELATED
DEMOLITION AND PREP WORK.
12. WALL AND CEILING MOUNTED ITEMS SHOWN DASHED, SUCH AS WALL CABINETS,
SHELVING, CUBICLE CURTAIN TRACKS, PROJECTION SCREENS ETC, MUST BE
REMOVED, UNLESS NOTED OTHERWISE.
13. WITHIN ALL EXISTING ROOMS/SPACES RECEIVING SCHEDULED FLOOR, OR WALL,
OR CEILING FINISHES, REMOVE ALL EXISTING FLOOR, OR WALL, OR CEILING
FINISHES DOWN TO THE SUBSTRATE. INCLUDE THE REMOVAL OF ALL ITEMS
LOCATED WITHIN THE EXISTING FINISH REMOVALS UNO PATCH AND PREP ALL
SUBSTRATES TO RECEIVE SCHEDULED FINISHES. FOR ADDITIONAL INFORMATION,
SEE KEYNOTED ITEMS, FINISH PLANS AND/OR SCHEDULES, STRUCTURAL,
MECHANICAL AND ELECTRICAL.
DEMOLITION PLAN SYMBOLS
EXISTING WALL TO
REMAIN
WALL OR
PARTITION TO BE
REMOVED
EXISTING DOOR
AND FRAME TO
REMAIN
KEY NOTE
A
GRIDLINE
NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN
EXISTING DOOR
AND FRAME TO BE
DEMOLISHED
DASHED LINE
INDICATES ITEM TO
BE REMOVED (UNO)
DE10
DEMOLITION PLAN KEYED NOTES
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
DE1 EQUIPMENT TO BE REMOVED BY VA'S VENDOR. GC TO COORDINATE MEP
DISCONNECTIONS
DE2 REMOVE GYP BD AND METAL STUD FURRING
DE3 REMOVE PARTITIONS, DOORS AND DOOR FRAME, SHOWN DASHED
DE4 REMOVE AND SALVAGE SYSTEMS FURNITURE
DE5
SAW CUT FLOOR AS REQUIRED FOR UNDERFLOOR PIPE REMOVAL AND
INSTALLATION. SEE MECHANICAL & STRUCTURAL FOR AREA AND EXTENT
OF FLOOR REMOVAL.
DE6
REMOVE PORTION OF GYP BD AND METAL STUD WALL AND WALL
PROTECTION AS REQUIRED FOR EQUIPMENT INSTALLATION. SEE PLANS
FOR ADDITIONAL INFORMATION
DE7 REMOVE PORTION OF GYP BD AND METAL STUD PARTITION AS REQUIRED
FOR DOOR INSTALLATION.
DE8
REMOVE ENTIRE SUSPENDED GYP BD CEILING AND ACCESS HATCHES.
SALVAGE ACCESS HATCHES FOR REINSTALLATION. SEE REFLECTED
CEILING PLAN FOR ADDITIONAL INFORMATION.
DE9 REMOVE DOOR, FRAME TO REMAIN. SALVAGE DOOR FOR REINSTALLATION
DE10 REMOVE PORTION OF CHAIN LINK FENCE. SEE CIVIL
DE11 REMOVE PORTION OF CONCRETE WALK AND/OR RAMP. SEE CIVIL
DE12 REMOVE PORTION OF CONC BLOCK RETAINING WALL. SALVAGE FOR
REINSTALLATION. SEE CIVIL.
DE13 REMOVE ENTIRE WINDOW. SALVAGE FOR REINSTALLATION.
DE14 REMOVE GYP BD ONE SIDE OF PARTITION FOR MECHANICAL DEMOLITION.
SEE MEP PLANS FOR ADDITIONAL INFORMATION.
DE15
REMOVE PORTION OF ACT CEILING SYSTEM AND ALL MEP ITEMS AS
REQUIRED FOR WORK IN THIS AREA. SEE PLANS AND MEP FOR ADDITIONAL
INFORMATION
DE16 REMOVE DOOR, FRAME AND HARDWARE. SALVAGE FOR REINSTALLATION
IN NEW LOCATION. SEE PLANS FOR ADDITIONAL INFORMATION
DE17 REMOVE SPLASH BLOCK AND PORTION OF METAL DOWNSPOUT AS
REQUIRED FOR WORK IN THIS AREA. SALVAGE FOR REINSTALLATION.
DE18 SAW CUT AND REMOVE CAST IN PLACE TERRAZZO COVE BASE, AT
PARTITION TO BE REMOVED. GRIND FLUSH WITH EXISTING FLOOR.
DE19
REMOVE CRASH RAIL, HIGH AND LOW, AND RIGID WALL COVERING AND ALL
ASSOCIATED TRIM. PREP WALL FOR FINISHES AS SCHEDULED. SEE FLOOR
PLANS AND ELEVATIONS FOR ADDITIONAL INFORMATION
DE20 PLUMBING FIXTURE TO BE REMOVED. SEE PLUMBING FOR ADDITIONAL
INFORMATION
DE21 REMOVE STAINLESS STEEL CABINET. SALVAGE FOR REINSTALLATION IN
DIFFERENT LOCATION. SEE PLANS FOR ADDITIONAL INFORMATION
DE22 REMOVE PORTION OF VCT AS REQUIRED FOR WORK IN THIS AREA. SEE
PLAN FOR ADDITIONAL WORK.
DE23 REMOVE PORTION OF CARPET TILE AS REQUIRED FOR WORK IN THIS
AREA. SEE PLAN FOR ADDITIONAL WORK.
DE24 REMOVE BENCH AND COAT HOOKS. SALVAGE FOR REINSTALLATION
DE25 REMOVE AND SALVAGE CORNER GUARD FOR REINSTALLATION
DE26 REMOVE GYP BD ONE SIDE OF PARTITION FOR ELECTRICAL WORK IN THIS
AREA. SEE MEP PLANS FOR ADDITIONAL INFORMATION.
DE27
REMOVE CRASH RAIL, HIGH AND LOW, RIGID WALL COVERING AND ALL
ASSOCIATED TRIM, AND CORNER GUARDS FROM EXISTING COLUMN. PREP
FOR FINISHES AS SCHEDULED. SEE SHEET AF101 FOR ADDITIONAL
INFORMATION
1/8" = 1'-0"1 LOWER LEVEL DEMOLITION PLAN - SITE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106TH STREET
DES MOINES IA 50322
BID DOCUMENT SUBMISSION
C U s e rs
\c z u p a n \D o c u m e n ts
\1
-A -R c z u p a n J A
M E
X .r v t
/2
/2
:5
:4
P
M
AD101-R
LOWER LEVEL DEMOLITION PLAN
-AREA B RESTORATION
PERFORM SITE PREP
FOR SPS EQUIPMENT
FARGO, ND
437-CSI-241
1/22/2025 JLU GJB
17639
0 8' 16'4'
KEY PLAN
UPUP
BB-18C
PREP/ ASEMBLY /
STORAGE
C006
CORRIDOR
BA-72
MECHANICAL
STAIR
BB-18E
LOW TEMP STERILIZERS
BB-15
CLEAN STORAGE
BB-20B
SCOPE PROCESSING
BA-42
STORAGE
BB-20
RECEIVING /
DECONTAMINATION
BB-21
CART LIFT S-3 MACHINE
BA-44B
MENS LOCKERBA-44
PASSAGE/ ANTE ROOM
BA-44A
WOMANS LOCKER
BB-20A
STERILIZERS
C002
CORRIDOR
BA-35
MEN'S
BA-37
HAC
BA-39
WOMEN'S
BA-41
MECHANICAL
BA-43
BREAK ROOM
BA-30
IRM HUB
STAIRS
BB-15B
MEN'S LOCKER
BB-16A
CLERK
BB-16B
CLERK
BB-15A
WOMEN'S LOCKER
BB-15A1
TOILET
BB-15B1
TOILET
BB-18B
CART WASH
BB-18A
MANUAL CART WASH
BA-70
OFFICE
BA-69
CONFREENCE ROOM
STAIR
BA-45
OFFICE
BA-70A
MECHANICAL
C004
PASSAGE
BB-12
PASSAGE
C001
CORRIDOR
BB-32
CHIEF SPD
BB-34
MECHANICAL
BB-30
ASSIST CHIEF SPD
BB-24
BREAK OUT
BB-34A
UPS
C008
CART LIFT S-4 MACHINE
BB-76
STAFF LOUNGE
BB-26
Room
BB-22
Room
BB-27
PHARMACY CHIEFBB-28
PHARMACY
BB-31
PHARMACY
BB-75
PHARMACY RECEIVING
BB-80
IN-PATIENT PHARMACY
BA-09
SOLED LINNEN
BA-10
BLDG-9 SWITCHGEAR
BA-65
OFFICE
T-01
TEMP TRAILER
CONNECTION
STAIR
BE-28
LOADING DOCK
BE-27
MECH
BE-25
MECH
BE-24
LINNEN
BD-47
ENG
BD-45
ENG
BD-43
GEMS
BD-41
EM-MNG
BD-50
ENGINEERING
BD-50B
ENG CHIEF
BD-50A
A CHIEF
BD-42
ENG CONF
BD-39
ENG
BD-37
ENG
BD-35
ENG
BD-33
MS
BD-31
ENG
BD-34
PRODUCTION
BD-36
SAFETY
BD-38
EEO
BD-40
FSAFETY
BD-11
WD-PROP
BD-05
BD-10A
BE-20
LINNEN
BE-10
MAIL ROOM
58A
CORRIDOR
T-01A
VESTIBULE
BB-09
TANK ROOM
BB-10
ENG/VAEA
BA-07
SPS STORAGE
BA-05
ENVO MGMT
BA-03
EMS
BA-08
BLDG 9 EMERG GEN
BA-01B
EMERG GEN BLDG 46
BA-01A
SWITCH GEAR BLDG 46
BA-01
MECHANICAL
STAIR BE-29
MECH
CORRIDOR
BE-30
STORAGE
BE-34
PHARMACY STORAGE
BE-09
MECH
BE-07
Room
BE-08
Room
BD-92
Room
BD-90
EQUIPMENT
BD-95
BREAKROOM
BD-80
STORAGE
BD-91
Room
ELEVATOR
BE-02
Room
AREA A, SHEET -
AREA B, SHEET -
/1 AS101-A
/2 AS101-B
BA-70C
HAC
BA-70B
ANTE ROOM
BD-02
TELECOM
BD-04
BREAK ROOM BD-06
TR
BD-08
STORAGE
BD-10
TOILET
BA-44C
HAC
GENERAL NOTES
1. THE ARCHITECTURAL DRAWINGS SHOW PRINCIPAL AREAS AND LIMITS OF
CONSTRUCTION WHERE WORK MUST BE ACCOMPLISHED UNDER THIS CONTRACT.
INCIDENTAL WORK MAY BE NECESSARY IN AREAS NOT SHOWN ON ARCHITECTURAL
DRAWINGS DUE TO CHANGES AFFECTING ELECTRICAL, MECHANICAL, PLUMBING AND
OTHER SYSTEMS. THIS INCIDENTAL WORK MUST BE PART OF THIS CONTRACT.
INSPECT THESE AREAS TO ASCERTAIN WORK REQUIRED AND PERFORM THE WORK
IN ACCORDANCE OF CONTRACT REQUIREMENTS.
2. PROVIDE FIREPROOFING TO THE RATING REQUIRED AS INDICATED IN THE LIFE
SAFETY PLAN, CODE SUMMARY AND PER NFPA ON STRUCTURAL STEEL ELEMENTS.
3. DO NOT SCALE DRAWINGS. NOTIFY ARCHITECT IMMEDIATELY OF ANY
DISCREPANCIES.
4. PATCH OPENINGS CUT THOUGH RATED CONSTRUCTION WITH MATERIALS
COMPATIBLE WITH EXISTING ASSEMBLY TO RESTORE INTEGRITY OF THE RATING.
RESTORE FINISHES OF DISTURBED AREAS TO LIKE NEW CONDITION.
5. GENERAL CONTRACTOR TO CHECK MECHANICAL DRAWINGS FOR EXISTING PIPES
AND DUCTS FURRED IN WALLS. VERIFY SIZE AND LOCATION WITH MECHANICAL
CONTRACTOR PRIOR TO PROCEEDING WITH REMODELING.
6. RESTORE EXISTING FIREPROOFING TO RATINGS INDICATED ON LIFE SAFETY PLANS
WITH MATERIALS TO MATCH EXISTING.
7. AT LOCATIONS WHERE EXISTING FIRESTOPPING IS REQUIRED TO BE ALTERED,
REMOVE EXISTING FIRESTOPPING SYSTEM IN ITS ENTIRETY AND REPLACE FIRE
STOPPING SYSTEM WITH NEW FIRESTOPPING MATERIALS THAT MEET THE RATING
REQUIREMENTS OF THE PENETRATION.
8. DIMENSIONS OF EQUIPMENT ARE THOSE OF THE BASIS-OF-DESIGN EQUIPMENT.
VERIFY DIMENSIONS OF ACTUAL EQUIPMENT BEING PROVIDED TO COORDINATE
SPACE REQUIREMENTS.
9. VERIFY DIMENSIONS OF MECHANICAL OR ELECTRICAL EQUIPMENT PRIOR TO
FABRICATING SUPPORTS FOR THE EQUIPMENT.
10. PATCH AREAS DISTURBED OR MODIFIED BY THIS WORK WITH MATERIALS TO
MATCH EXISTING ADJACENT SURFACES OR SCHEDULED FINISHES AND TO A LIKE
NEW CONDITION.
11. PROVIDE ACCESS PANELS WHERE INDICATED ON DRAWINGS AND WHERE
DESCRIBED IN SPECIFICATIONS SECTION 08 31 13. COORDINATE LOCATIONS AND
SIZES REQUIRED (24" X 24" MINIMUM) WITH MECHANICAL, PLUMBING, ELECTRICAL
AND TECHNOLOGY SUBCONTRACTORS.
12. ABBREVIATIONS AND SYMBOLS OF ARCHITECTURAL, STRUCTURAL, MECHANICAL,
AND ELECTRICAL MAY VARY BY DISCIPLINE. SEE RESPECTIVE DISCIPLINE SECTIONS
AND/OR DRAWINGS FOR DEFINITIONS.
13. AT MECHANICAL AND ELECTRICAL EQUIPMENT ROOMS, PROVIDE 3/4" FIRE
RETARDANT TREATED (FRT) PLYWOOD SURFACE ON SCHEDULED PARTITION FOR
SURFACE MOUNTED FIXTURES AND EQUIPMENT, PAINT WITH TWO LAYER OF
INTUMESCENT PAINT AND TOP COAT WITH GLOSS WHITE. UNLESS NOTED
OTHERWISE. DO NOT PAINT OVER FRT LABEL.
14. EVALUATE INTEGRITY OF EXISTING LIFE SAFETY RATED PARTITION ASSEMBLIES
INDICATED BY SYMBOLS ON THE LIFE SAFETY PLAN(S) WITHIN THE PROJECT SCOPE
INCLUDING PENETRATIONS THOUGH ASSEMBLY AND BASE AND HEAD OF ASSEMBLY.
WHERE GAPS OR DEFICIENCIES ARE FOUND, RESTORE INTEGRITY OF EXISTING
ASSEMBLIES WITH MATERIAL NECESSARY TO MEET REQUIRED RATING OF THE
ASSEMBLIES.
15. DEFINITIONS OF COMMON TERMS.
• FURNISH: TO SUPPLY AND DELIVER TO THE SITE, READY FOR INSTALLATION
• INSTALL: TO PLACE INTO POSITION SERVICE OR USE
• PROVIDE: TO FURNISH AND INSTALL
FLOOR PLAN SYMBOLS
EXISTING WALL TO
REMAIN
WALL
EXISTING DOOR
AND FRAME TO
REMAIN
DOOR
INTERIOR
BORROWED LIGHT
101B
101A
8'-0" DIMENSION LINE,
NOMINAL
8'-0" EXTENDED
DIMENSION LINE,
NOMINAL
AE2111A
INTERIOR
ELEVATION
INDICATOR TAG
2B
AE2O1
EXTERIOR
ELEVATION
INDICATOR TAG
1A
203 EQUIPMENT TAG
100 FLOOR SPOT
ELEVATIONWALL TAG
OFFICE
ROOM NAME AND
NUMBER
AE501
1A
DETAIL REFERENCE
TAG
AE2O1
EXTERIOR SECTION
REFERENCE TAG
1A
AE2O1
INTERIOR SECTION
REFERENCE TAG
1A
KEY NOTE
A
GRIDLINE
REVISION TAG
PR01
REVISION CLOUD
NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN
FP10
B3
CURTIAN WALL TAG
OR
WINDOW TAG
CW1 W3OR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106TH STREET
DES MOINES IA 50322
BID DOCUMENT SUBMISSION
C U s e rs
\c z u p a n \D o c u m e n ts
\1
-A -R c z u p a n J A
M E
X .r v t
/2
/2
:5
:4
P
M
AS100
LOWER LEVEL FLOOR
PLAN-OVERALL
PERFORM SITE PREP
FOR SPS EQUIPMENT
FARGO, ND
437-CSI-241
1/22/2025 JLU GJB
17639
3/64" = 1'-0"1 LOWER LEVEL FLOOR PLAN - AREA A
GENERAL NOTES
1. THE ARCHITECTURAL DRAWINGS SHOW PRINCIPAL AREAS AND LIMITS OF
CONSTRUCTION WHERE WORK MUST BE ACCOMPLISHED UNDER THIS CONTRACT.
INCIDENTAL WORK MAY BE NECESSARY IN AREAS NOT SHOWN ON ARCHITECTURAL
DRAWINGS DUE TO CHANGES AFFECTING ELECTRICAL, MECHANICAL, PLUMBING AND
OTHER SYSTEMS. THIS INCIDENTAL WORK MUST BE PART OF THIS CONTRACT.
INSPECT THESE AREAS TO ASCERTAIN WORK REQUIRED AND PERFORM THE WORK
IN ACCORDANCE OF CONTRACT REQUIREMENTS.
2. PROVIDE FIREPROOFING TO THE RATING REQUIRED AS INDICATED IN THE LIFE
SAFETY PLAN, CODE SUMMARY AND PER NFPA ON STRUCTURAL STEEL ELEMENTS.
3. DO NOT SCALE DRAWINGS. NOTIFY ARCHITECT IMMEDIATELY OF ANY
DISCREPANCIES.
4. PATCH OPENINGS CUT THOUGH RATED CONSTRUCTION WITH MATERIALS
COMPATIBLE WITH EXISTING ASSEMBLY TO RESTORE INTEGRITY OF THE RATING.
RESTORE FINISHES OF DISTURBED AREAS TO LIKE NEW CONDITION.
5. GENERAL CONTRACTOR TO CHECK MECHANICAL DRAWINGS FOR EXISTING PIPES
AND DUCTS FURRED IN WALLS. VERIFY SIZE AND LOCATION WITH MECHANICAL
CONTRACTOR PRIOR TO PROCEEDING WITH REMODELING.
6. RESTORE EXISTING FIREPROOFING TO RATINGS INDICATED ON LIFE SAFETY PLANS
WITH MATERIALS TO MATCH EXISTING.
7. AT LOCATIONS WHERE EXISTING FIRESTOPPING IS REQUIRED TO BE ALTERED,
REMOVE EXISTING FIRESTOPPING SYSTEM IN ITS ENTIRETY AND REPLACE FIRE
STOPPING SYSTEM WITH NEW FIRESTOPPING MATERIALS THAT MEET THE RATING
REQUIREMENTS OF THE PENETRATION.
8. DIMENSIONS OF EQUIPMENT ARE THOSE OF THE BASIS-OF-DESIGN EQUIPMENT.
VERIFY DIMENSIONS OF ACTUAL EQUIPMENT BEING PROVIDED TO COORDINATE
SPACE REQUIREMENTS.
9. VERIFY DIMENSIONS OF MECHANICAL OR ELECTRICAL EQUIPMENT PRIOR TO
FABRICATING SUPPORTS FOR THE EQUIPMENT.
10. PATCH AREAS DISTURBED OR MODIFIED BY THIS WORK WITH MATERIALS TO
MATCH EXISTING ADJACENT SURFACES OR SCHEDULED FINISHES AND TO A LIKE
NEW CONDITION.
11. PROVIDE ACCESS PANELS WHERE INDICATED ON DRAWINGS AND WHERE
DESCRIBED IN SPECIFICATIONS SECTION 08 31 13. COORDINATE LOCATIONS AND
SIZES REQUIRED (24" X 24" MINIMUM) WITH MECHANICAL, PLUMBING, ELECTRICAL
AND TECHNOLOGY SUBCONTRACTORS.
12. ABBREVIATIONS AND SYMBOLS OF ARCHITECTURAL, STRUCTURAL, MECHANICAL,
AND ELECTRICAL MAY VARY BY DISCIPLINE. SEE RESPECTIVE DISCIPLINE SECTIONS
AND/OR DRAWINGS FOR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .