Attachment 0004i - Scope of Work Change Log - 1 Page.pdf

PDF 26 KB Posted

Attached to
Z1DA--437-CIS-241, SPS Site Prep 36C263-25-AP-2425
Solicitation number
36C26325B0025
Issued by

About this file

This document is a Scope of Work Change Log detailing modifications to a contract involving a VA (Veterans Affairs) sterilization equipment project at the Fargo VA facility. Key changes include updates to superintendent requirements, water testing standards (AAMI ST 108), equipment specifications, and training provisions. Significant modifications involve changing generator and transformer rental responsibilities to the contractor, adding detailed equipment and trailer dimensions, and specifying that equipment vendors must provide one day of hands-on sterilizer equipment training for VA SPS staff. The changes appear to refine technical specifications, clarify contractor responsibilities, and ensure compliance with specific healthcare equipment standards.

View the file

Other files

File Type Posted
Attachment 0004d - PP-101 - PLUMBING PLANS - Lower Level Process Piping - 1 Page.pdf PDF
Attachment 0004b - 17639 Narrative - Addendum 2 - 1 Page.pdf PDF
Attachment 0004g - 226719.16 - REVERSE-OSMOSIS WATER EQUIPMENT - 10 Pages.pdf PDF
Attachment 0004e - P-301 - PLUMBING RO FLOW DIAGRAM - 1 Page.pdf PDF
Attachment 0004c - 000110 TOC - 5 Pages.pdf PDF
Attachment 0004a - SOW - Perform Site Prep - Rev 3 - 12 Pages.pdf PDF
36C26325B0025 0004.docx DOCX document
Attachment 0004f - AAMI ST108-2023 Water for the processing of med devices - 102 Pages.pdf PDF
Attachment 0004h - 223111 - Water Softener - 10 Pages.pdf PDF
36C26325B0025 0003.docx DOCX document
Attachment 0002A - DBA Wage Rate ND20250013 August 28 2025 - 13 Pages.pdf PDF
36C26325B0025 0002.docx DOCX document
Attachment H - GI001 - 1 Page.pdf PDF
Attachment F - 092900 Gypsum Board - 8 Pages.pdf PDF
Attachment J - PP-103 - PLUMBING - PIPING - LOWER LEVEL RO TEMP TRAILER - 1 Page.pdf PDF
Attachment L - Site Visit Agenda - Site Prep for SPS Equipment - 2 Pages.pdf PDF
Attachment I - MH-104 - MECH LOWER LEVEL - HVAC - TEMPORARY TRAILER - 1 Page.pdf PDF
Attachment D - 074000 Siding Panels - 8 Pages.pdf PDF
Attachment M - Site Visit Sign-in Sheet 8-15-2025 - 1 Page.pdf PDF
Attachment E - 092216 Non-Structural Metal Framing - 8 Pages.pdf PDF
Attachment B - SOW - Perform Site Prep V2 - 9 Pages.pdf PDF
Attachment G - AS501 - 1 Page.pdf PDF
Attachment C - 17639 Narrative - Addendum 1 - 1 Page.pdf PDF
Attachment K - S401- FRAMING DETIALS - 1 Page.pdf PDF
Attachment A - 437-CSI-241 Site Prep Questions and Answers - 7 Pages.pdf PDF
36C26325B0025 0001.docx DOCX document
Attachment C3 - Drawings-R1_Part3 - 437-CIS-241 - 26 Pages.pdf PDF
Attachment B2 - SPEC VOL II-R1 - 437-CIS-241 - 960 Pages.pdf PDF
Attachment B1 - SPEC VOL I-R1 - 437-CIS-241 - 593 Pages.pdf PDF
Attachment C4 - Drawings-R1_Part4 - 437-CIS-241 - 21 Pages.pdf PDF
Attachment C2 - Drawings-R1_Part2 - 437-CIS-241 - 21 Pages.pdf PDF
Attachment D1 - DBA Wage Rate ND20250013 7 31 2025 - 437-CIS-241 - 12 Pages.pdf PDF
Attachment C1 - Drawings-R1_Part1 - 437-CIS-241 - 16 Pages.pdf PDF
Attachment E1 - Limitations on Subcontracting - 3 Pages.pdf PDF
Attachment A1 - Statement of Work - 437-CIS-241 - 10 Pages.pdf PDF
Attachment C5 - Drawings-R1_Part5 - 437-CIS-241 - 20 Pages.pdf PDF
36C26325B0025_1.docx DOCX document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work Change Log

Page 1: Removed Construction Period Additional Duties – does not pertain to Construction Page 2: Added “The superintendent shall be on-site with his subcontractors at all times….”

Page 2: Added “Review Specifications 01 33 23 for standard VA review period” Page 3 to 5: Added AAMI ST 108 in accordance to OHE/HEFP guidance Page 5: Changed to “AAMI ST108 standards” Added additional information and table Page 6: Changed #1 for generator and transformer to be (Contractor – rental) Page 6: Changed 7. “Water requirements must meet the minimum AAMI ST108 water requirements. The hot, cold and RO water supplied by the VA must be tested if it meets these requirements. The Contractor must read the water requirements of the trailer.”

Page 6-7: Added equipment list, Added Trailer Dimensions Page 7: Changed “All work and tests should be completed and verified…” Page 8: Added 2. GC must coordinate with the vendor to have the equipment disconnected before construction starts.

Page 8: Changed to #8 “Installation of SPS Equipment…” Page 9: Changed to #10 “Testing results shall be submitted to SPS Chief, COR and Biomed.”

Page 10: removed “The vendor must be able to provide professional certification….”

Page 10: Changed “The equipment vendor and trailer vendor shall provide a minimum of one day (8 hours) hands-on sterilizer equipment user training on-site at the Fargo VA for VA SPS staff.”