Attachment J - PP-103 - PLUMBING - PIPING - LOWER LEVEL RO TEMP TRAILER - 1 Page.pdf

PDF 307 KB Posted

Attached to
Z1DA--437-CIS-241, SPS Site Prep 36C263-25-AP-2425
Solicitation number
36C26325B0025
Issued by

About this file

This document is a Plumbing Plan - Process Piping drawing for a U.S. Department of Veterans Affairs (VA) project located in Fargo, North Dakota. The drawing details the lower-level process piping configuration for a temporary trailer, specifically focusing on routing Reverse Osmosis (RO) and Hot Water RO piping. The plan includes specific installation instructions such as routing pipes through architectural chases, connecting to trailer water connections, using caulk for water-tight exterior wall penetrations, and ensuring new piping is installed above existing pipes. The project number is 437-CSI-241, with the drawing issued on 01/22/2025 and an Addendum-1 dated 8/26/2025, indicating ongoing design refinements. The drawing is prepared by Anderson consulting for the VA Office of Construction and Facilities Management, with the drawing scale set at 1 1/8" = 1'-0".

View the file

Other files

File Type Posted
Attachment 0004d - PP-101 - PLUMBING PLANS - Lower Level Process Piping - 1 Page.pdf PDF
Attachment 0004i - Scope of Work Change Log - 1 Page.pdf PDF
Attachment 0004b - 17639 Narrative - Addendum 2 - 1 Page.pdf PDF
Attachment 0004g - 226719.16 - REVERSE-OSMOSIS WATER EQUIPMENT - 10 Pages.pdf PDF
Attachment 0004e - P-301 - PLUMBING RO FLOW DIAGRAM - 1 Page.pdf PDF
Attachment 0004c - 000110 TOC - 5 Pages.pdf PDF
Attachment 0004a - SOW - Perform Site Prep - Rev 3 - 12 Pages.pdf PDF
36C26325B0025 0004.docx DOCX document
Attachment 0004f - AAMI ST108-2023 Water for the processing of med devices - 102 Pages.pdf PDF
Attachment 0004h - 223111 - Water Softener - 10 Pages.pdf PDF
36C26325B0025 0003.docx DOCX document
Attachment 0002A - DBA Wage Rate ND20250013 August 28 2025 - 13 Pages.pdf PDF
36C26325B0025 0002.docx DOCX document
Attachment H - GI001 - 1 Page.pdf PDF
Attachment F - 092900 Gypsum Board - 8 Pages.pdf PDF
Attachment L - Site Visit Agenda - Site Prep for SPS Equipment - 2 Pages.pdf PDF
Attachment I - MH-104 - MECH LOWER LEVEL - HVAC - TEMPORARY TRAILER - 1 Page.pdf PDF
Attachment D - 074000 Siding Panels - 8 Pages.pdf PDF
Attachment M - Site Visit Sign-in Sheet 8-15-2025 - 1 Page.pdf PDF
Attachment E - 092216 Non-Structural Metal Framing - 8 Pages.pdf PDF
Attachment B - SOW - Perform Site Prep V2 - 9 Pages.pdf PDF
Attachment G - AS501 - 1 Page.pdf PDF
Attachment C - 17639 Narrative - Addendum 1 - 1 Page.pdf PDF
Attachment K - S401- FRAMING DETIALS - 1 Page.pdf PDF
Attachment A - 437-CSI-241 Site Prep Questions and Answers - 7 Pages.pdf PDF
36C26325B0025 0001.docx DOCX document
Attachment C3 - Drawings-R1_Part3 - 437-CIS-241 - 26 Pages.pdf PDF
Attachment B2 - SPEC VOL II-R1 - 437-CIS-241 - 960 Pages.pdf PDF
Attachment B1 - SPEC VOL I-R1 - 437-CIS-241 - 593 Pages.pdf PDF
Attachment C4 - Drawings-R1_Part4 - 437-CIS-241 - 21 Pages.pdf PDF
Attachment C2 - Drawings-R1_Part2 - 437-CIS-241 - 21 Pages.pdf PDF
Attachment D1 - DBA Wage Rate ND20250013 7 31 2025 - 437-CIS-241 - 12 Pages.pdf PDF
Attachment C1 - Drawings-R1_Part1 - 437-CIS-241 - 16 Pages.pdf PDF
Attachment E1 - Limitations on Subcontracting - 3 Pages.pdf PDF
Attachment A1 - Statement of Work - 437-CIS-241 - 10 Pages.pdf PDF
Attachment C5 - Drawings-R1_Part5 - 437-CIS-241 - 20 Pages.pdf PDF
36C26325B0025_1.docx DOCX document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1098 11 12 13 14 15

ST-3 ET-1

P-2

CORE DRILL

C W

E

HP-1

1" RO

1" R

O

1" R

O

WH-1

1/

2" R

O

1/

2" H

W R

O

1/

2" H

W R

O

1/

2" R

O

1/

2" H

W R

O

1/

2" R

O

1 1/2" RO

1 1/2" HWRO

1 1/2" RO

1 1/2" HWRO

1/

2" H

W R

O

1/

2" R

O

1 1/2" HWRO

1 1/2" RO

1 1/2" RO

BE-09

MECH

BE-24

LINNEN

BE-25

MECH

BE-27

MECH

BD-47

ENG

BD-43

GEMS

BD-41

EM-MNG

BD-39

ENG

BD-37

ENG

STAIR

T-01A

VESTIBULE

T-01

CONNECTION

TEMP TRAILER

BD-50

ENGINEERING

BD-45

ENG

TEMPORARY SPS

MOBILE TRAILER

STERIS

STORAGE

CONTAINER

BUILDING 53

M-501

A B C D

4" SAN 4" SAN TO BE ROUTED TO SEWER

BENEATH TRAILER. SEE CIVIL

PLANS FOR CONTINUATION.

12.2 15.29.2 IF

HEAT TRACE HWRO AND RO PIPING

FROM TRAILER CONNECTIONS TO

10 FT WITHIN THE BUILDING

CORE DRILL

1. ALL NEW AND TEMPORARY PIPING MUST BE INSTALLED ABOVE EXISTING PIPES.

PLUMBING GENERAL NOTES:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

2882 106TH STREET

DES MOINES IA 50322

BID DOCUMENT SUBMISSION

C U s e rs \K

Q u a m e n

\D o c u m e n ts

\1

-M

E -R k q u a m e n K

P N

.r v t

/2

/2

:3

:2

P

M

PP-103

PLUMBING PLAN - PROCESS PIPING

- LOWER LEVEL RO TEMPORARY

TRAILER

PERFORM SITE PREP

FOR SPS EQUIPMENT

FARGO, ND

437-CSI-241

01/22/2025 KAH SEF

17639

1/8" = 1'-0"

PLUMBING PLAN - PROCESS PIPING - LOWER LEVEL RO TEMPORARY TRAILER

KEY PLAN

LOWER LEVEL

1 ROUTE RO AND HOT WATER RO PIPING DOWN IN ARCHITECT

PROVIDED CHASE AND INTO INSULATED PIPE CHASE UNDER THE

BRIDGE. EXTEND AND CONNECT RO AND HOT WATER RO PIPING TO

TRAILER WATER CONNECTIONS. FIELD VERIFY TRAILER WATER

CONNECTIONS.

ROUTE RO AND HOT WATER RO PIPING DOWN TO AND THROUGH

WINDOW OPENING. PIPING TO RISE UP INTO BRIDGE CEILING SPACE.

USE CAULK TO CREATE A WATER TIGHT SEAL AROUND PIPE

PENETRATION ON EXTERIOR WALL.

COORDINATE FINAL PIPE ROUTING WITH ALL OTHER TRADES PRIOR

TO BID AND DURING CONSTRUCTION, TYP..

SEE DETAILS BA-70A MECHANICAL ROOM AND BE-09 MECHANICAL

ROOM ON SHEET P-301 FOR MORE INFORMATION IN THIS AREA.

NOT USED

MECHANICAL KEY NOTES:

Revisions: Date:

ADDENDUM - 1 (AD-1) 8/26/2025

AD-1

Sheets
MH-104 - MECHANICAL LOWER LEVEL - HVAC - TEMPORARY TRAILER
PP-103 - PLUMBING PLAN - PROCESS PIPING - LOWER LEVEL RO TEMPORARY TRAILER

File details come from the government source that posted it. Updated .