This document is a plumbing plan drawing (PP-101) for a VA (U.S. Department of Veterans Affairs) project located in Fargo, ND, focusing on process piping for a lower-level Reverse Osmosis (RO) water system. The drawing details the layout and routing of RO water piping for various medical equipment and areas, including a cart wash, sterilizers, processing spaces, and mechanical rooms. The plan includes specific piping connections, sizes (ranging from 1/2" to 2-1/2"), and key notes about routing piping to within 0'-7" of device connections with a maximum deadleg length of 7-1/2".
The drawing lists multiple equipment pieces to be installed by others, such as an Advantage Plus Pass-Thru Endoscope Reprocessing system, AMSCO steam sterilizers, a washer/disinfector with conveyor, reprocessing sinks, and specialized medical devices like an Innowave PCF Sconic Irrigator. The project is fully sprinklered and is part of the VA's Office of Construction and Facilities Management, with the bid documents dated 01/22/2025 and an Addendum-2 issued on 9/8/2025. The drawing provides detailed plumbing plans for site preparation of SPS (Sterile Processing System) equipment.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RO-1
R O
-2
ST-1
P-1
WS-1
CF-1
ST-2
DI-1
DI-2
1/ 2"
T W
1/ 2"
R O
1/2" RO
1/2" TW
1 1/4" RO
1" R
O
1/
2" C
W
2" H
W
1/
4" T
W
1/ 4"
T W
1 1/4" TW
MIXING
VALVE
REFER TO SHEET P301
FOR PIPING DIAGRAMS
AND EQUIPMENT
DESCRIPTION
BB-70A
MECHANICAL
C006
CORRIDOR
TIE INTO EXISTING
HW & CW LINES
1 1/4" RO
1 1/4" TW1/
2"
T W
EXISTING RO WATER UP
TO GLASS WASHER ON
SECOND FLOOR
SEE SHEET
PP-101
FOR BLOWUP
4FU2FU 4FU 2FU
8FU 8FU
03 02
S2615
1/
4" R
O
1/
4" R
O
1/ 4"
R O
1/ 2"
R O
1/2" RO
1 1/4" RO
1 1/4" RO
1 1/4" RO
1/
4" R
O 1 1/
4" R
O
1" RO
1/
4" R
O
1 1/4" RO
1 1/4" RO
ROUTE TO CART WASH CONNECTION(S)
1/
4" R
O
1/ 2"
R O
1" RO
1" R
O 1"
R O
3/4" RO
3/4" RO
1/2" RO
BB-18B
CART WASH
MANUAL
BB-21
S-3 MACHINE
CART LIFT
BB-20A
STERILIZERS
BB-20B
PROCESSING
SCOPE
BB-18C
STORAGE
PREP/ ASSEMBLY/
BB-18E
STERILIZERS
LOW TEMP
BB-18B
CART WASH
BB-20
DECONTAMINATION
RECEIVING /
BB-70A
MECHANICAL
C006
CORRIDOR
BA-70
OFFICE
BA-44B
LOCKER
MENS
BA-44A
LOCKER
WOMENS
BA-44A
ANTE ROOM
PASSAGE/
BA-42
OFFICE
C002
CORRIDOR
C002
CORRIDOR
CONNECT NEW RO PIPING
TO EXISTING RO SYSTEM
ONCE NEW RO SYSTEM IS
READY FOR CHANGE OVER
ONCE NEW RO SYSTEM IS
READY FOR CHANGE OVER
DISCONNECT EXISTING RO
PIPING AND CAP.
1/2" RO
EQUIPMENT BY OTHERS:
THESE LIST APPLIES TO ALL MECHANICAL SHEETS, INCLUDING BUT NOT
LIMITED TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION,
PIPING AND TEMPERATURE CONTROL.
ADVANTAGE PLUS PASS-THRU ENDOSCOPE REPROCESSING
AMSCO 400 MEDIUM STEAM STERILIZER
AMSCO 400 SMALL STEAM STERILIZER
STERIS AUTOMATIC PASS-THROUGH WINDOW
WASHER/DISINFECTOR - LOAD UNLOAD CONVEYOR
RACK RETURN
AMSCO 50 REPROCESSING SINK - 3 BAY, LEFT TO RIGHT
INNOWAVE PCF SCONIC IRRIGATOR 20 LUMEN CAPACITY
AMSCO 50 REPROCESSING SINK - 3 BAY, RIGHT TO LEFT
ASTRA TEE PROBE
TROPHON
S2615
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106TH STREET
DES MOINES IA 50322
BID DOCUMENT SUBMISSION
C
U s e rs \s fo rs b e rg
\D o c u m e n ts \1
-M
E -R s fo rs b e rg
U
U
.r v t
/5
/2
:0
:5
P M
PP-101
PLUMBING PLANS - PROCESS
PIPING - LOWER LEVEL RO - SPS
PERFORM SITE PREP
FOR SPS EQUIPMENT
FARGO, ND
437-CSI-241
01/22/2025 KAH SEF
17639
KEY PLAN
LOWER LEVEL
1/2" = 1'-0"2
LOWER LEVEL - ENLARGED RO MECH ROOM
1/4" = 1'-0"1
PLUMBING PLANS - PROCESS PIPING - LOWER LEVEL RO WATER SPS
Revisions: Date:
ADDENDUM - 2 (AD-2) 9/8/2025
KEY NOTES
AD-2
1. ROUTE RO PIPING DOWN TO WITHIN 0'-7" OF THE DEVICE
CONNECTION. THE DEADLEG LENGTH OF THE PIPING SHALL
NOT BE ANY LONGER THAN 7-1/2".
X
AD-2
AD-2
AD-2
| Sheets |
| P-301 - PLUMBING RO FLOW DIAGRAM |
| PP-101 - PLUMBING PLANS - PROCESS PIPING - LOWER LEVEL RO - SPS |
File details come from the government source that posted it. Updated .