Attachment 0004d - PP-101 - PLUMBING PLANS - Lower Level Process Piping - 1 Page.pdf

PDF 866 KB Posted

Attached to
Z1DA--437-CIS-241, SPS Site Prep 36C263-25-AP-2425
Solicitation number
36C26325B0025
Issued by

About this file

This document is a plumbing plan drawing (PP-101) for a VA (U.S. Department of Veterans Affairs) project located in Fargo, ND, focusing on process piping for a lower-level Reverse Osmosis (RO) water system. The drawing details the layout and routing of RO water piping for various medical equipment and areas, including a cart wash, sterilizers, processing spaces, and mechanical rooms. The plan includes specific piping connections, sizes (ranging from 1/2" to 2-1/2"), and key notes about routing piping to within 0'-7" of device connections with a maximum deadleg length of 7-1/2".

The drawing lists multiple equipment pieces to be installed by others, such as an Advantage Plus Pass-Thru Endoscope Reprocessing system, AMSCO steam sterilizers, a washer/disinfector with conveyor, reprocessing sinks, and specialized medical devices like an Innowave PCF Sconic Irrigator. The project is fully sprinklered and is part of the VA's Office of Construction and Facilities Management, with the bid documents dated 01/22/2025 and an Addendum-2 issued on 9/8/2025. The drawing provides detailed plumbing plans for site preparation of SPS (Sterile Processing System) equipment.

View the file

Other files

File Type Posted
Attachment 0004i - Scope of Work Change Log - 1 Page.pdf PDF
Attachment 0004b - 17639 Narrative - Addendum 2 - 1 Page.pdf PDF
Attachment 0004g - 226719.16 - REVERSE-OSMOSIS WATER EQUIPMENT - 10 Pages.pdf PDF
Attachment 0004e - P-301 - PLUMBING RO FLOW DIAGRAM - 1 Page.pdf PDF
Attachment 0004c - 000110 TOC - 5 Pages.pdf PDF
Attachment 0004a - SOW - Perform Site Prep - Rev 3 - 12 Pages.pdf PDF
36C26325B0025 0004.docx DOCX document
Attachment 0004f - AAMI ST108-2023 Water for the processing of med devices - 102 Pages.pdf PDF
Attachment 0004h - 223111 - Water Softener - 10 Pages.pdf PDF
36C26325B0025 0003.docx DOCX document
Attachment 0002A - DBA Wage Rate ND20250013 August 28 2025 - 13 Pages.pdf PDF
36C26325B0025 0002.docx DOCX document
Attachment H - GI001 - 1 Page.pdf PDF
Attachment F - 092900 Gypsum Board - 8 Pages.pdf PDF
Attachment J - PP-103 - PLUMBING - PIPING - LOWER LEVEL RO TEMP TRAILER - 1 Page.pdf PDF
Attachment L - Site Visit Agenda - Site Prep for SPS Equipment - 2 Pages.pdf PDF
Attachment I - MH-104 - MECH LOWER LEVEL - HVAC - TEMPORARY TRAILER - 1 Page.pdf PDF
Attachment D - 074000 Siding Panels - 8 Pages.pdf PDF
Attachment M - Site Visit Sign-in Sheet 8-15-2025 - 1 Page.pdf PDF
Attachment E - 092216 Non-Structural Metal Framing - 8 Pages.pdf PDF
Attachment B - SOW - Perform Site Prep V2 - 9 Pages.pdf PDF
Attachment G - AS501 - 1 Page.pdf PDF
Attachment C - 17639 Narrative - Addendum 1 - 1 Page.pdf PDF
Attachment K - S401- FRAMING DETIALS - 1 Page.pdf PDF
Attachment A - 437-CSI-241 Site Prep Questions and Answers - 7 Pages.pdf PDF
36C26325B0025 0001.docx DOCX document
Attachment C3 - Drawings-R1_Part3 - 437-CIS-241 - 26 Pages.pdf PDF
Attachment B2 - SPEC VOL II-R1 - 437-CIS-241 - 960 Pages.pdf PDF
Attachment B1 - SPEC VOL I-R1 - 437-CIS-241 - 593 Pages.pdf PDF
Attachment C4 - Drawings-R1_Part4 - 437-CIS-241 - 21 Pages.pdf PDF
Attachment C2 - Drawings-R1_Part2 - 437-CIS-241 - 21 Pages.pdf PDF
Attachment D1 - DBA Wage Rate ND20250013 7 31 2025 - 437-CIS-241 - 12 Pages.pdf PDF
Attachment C1 - Drawings-R1_Part1 - 437-CIS-241 - 16 Pages.pdf PDF
Attachment E1 - Limitations on Subcontracting - 3 Pages.pdf PDF
Attachment A1 - Statement of Work - 437-CIS-241 - 10 Pages.pdf PDF
Attachment C5 - Drawings-R1_Part5 - 437-CIS-241 - 20 Pages.pdf PDF
36C26325B0025_1.docx DOCX document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RO-1

R O

-2

ST-1

P-1

WS-1

CF-1

ST-2

DI-1

DI-2

1/ 2"

T W

1/ 2"

R O

1/2" RO

1/2" TW

1 1/4" RO

1" R

O

1/

2" C

W

2" H

W

1/

4" T

W

1/ 4"

T W

1 1/4" TW

MIXING

VALVE

REFER TO SHEET P301

FOR PIPING DIAGRAMS

AND EQUIPMENT

DESCRIPTION

BB-70A

MECHANICAL

C006

CORRIDOR

TIE INTO EXISTING

HW & CW LINES

1 1/4" RO

1 1/4" TW1/

2"

T W

EXISTING RO WATER UP

TO GLASS WASHER ON

SECOND FLOOR

SEE SHEET

PP-101

FOR BLOWUP

4FU2FU 4FU 2FU

8FU 8FU

03 02

S2615

1/

4" R

O

1/

4" R

O

1/ 4"

R O

1/ 2"

R O

1/2" RO

1 1/4" RO

1 1/4" RO

1 1/4" RO

1/

4" R

O 1 1/

4" R

O

1" RO

1/

4" R

O

1 1/4" RO

1 1/4" RO

ROUTE TO CART WASH CONNECTION(S)

1/

4" R

O

1/ 2"

R O

1" RO

1" R

O 1"

R O

3/4" RO

3/4" RO

1/2" RO

BB-18B

CART WASH

MANUAL

BB-21

S-3 MACHINE

CART LIFT

BB-20A

STERILIZERS

BB-20B

PROCESSING

SCOPE

BB-18C

STORAGE

PREP/ ASSEMBLY/

BB-18E

STERILIZERS

LOW TEMP

BB-18B

CART WASH

BB-20

DECONTAMINATION

RECEIVING /

BB-70A

MECHANICAL

C006

CORRIDOR

BA-70

OFFICE

BA-44B

LOCKER

MENS

BA-44A

LOCKER

WOMENS

BA-44A

ANTE ROOM

PASSAGE/

BA-42

OFFICE

C002

CORRIDOR

C002

CORRIDOR

CONNECT NEW RO PIPING

TO EXISTING RO SYSTEM

ONCE NEW RO SYSTEM IS

READY FOR CHANGE OVER

ONCE NEW RO SYSTEM IS

READY FOR CHANGE OVER

DISCONNECT EXISTING RO

PIPING AND CAP.

1/2" RO

EQUIPMENT BY OTHERS:

THESE LIST APPLIES TO ALL MECHANICAL SHEETS, INCLUDING BUT NOT

LIMITED TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION,

PIPING AND TEMPERATURE CONTROL.

ADVANTAGE PLUS PASS-THRU ENDOSCOPE REPROCESSING

AMSCO 400 MEDIUM STEAM STERILIZER

AMSCO 400 SMALL STEAM STERILIZER

STERIS AUTOMATIC PASS-THROUGH WINDOW

WASHER/DISINFECTOR - LOAD UNLOAD CONVEYOR

RACK RETURN

AMSCO 50 REPROCESSING SINK - 3 BAY, LEFT TO RIGHT

INNOWAVE PCF SCONIC IRRIGATOR 20 LUMEN CAPACITY

AMSCO 50 REPROCESSING SINK - 3 BAY, RIGHT TO LEFT

ASTRA TEE PROBE

TROPHON

S2615

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

2882 106TH STREET

DES MOINES IA 50322

BID DOCUMENT SUBMISSION

C

U s e rs \s fo rs b e rg

\D o c u m e n ts \1

-M

E -R s fo rs b e rg

U

U

.r v t

/5

/2

:0

:5

P M

PP-101

PLUMBING PLANS - PROCESS

PIPING - LOWER LEVEL RO - SPS

PERFORM SITE PREP

FOR SPS EQUIPMENT

FARGO, ND

437-CSI-241

01/22/2025 KAH SEF

17639

KEY PLAN

LOWER LEVEL

1/2" = 1'-0"2

LOWER LEVEL - ENLARGED RO MECH ROOM

1/4" = 1'-0"1

PLUMBING PLANS - PROCESS PIPING - LOWER LEVEL RO WATER SPS

Revisions: Date:

ADDENDUM - 2 (AD-2) 9/8/2025

KEY NOTES

AD-2

1. ROUTE RO PIPING DOWN TO WITHIN 0'-7" OF THE DEVICE

CONNECTION. THE DEADLEG LENGTH OF THE PIPING SHALL

NOT BE ANY LONGER THAN 7-1/2".

X

AD-2

AD-2

AD-2

Sheets
P-301 - PLUMBING RO FLOW DIAGRAM
PP-101 - PLUMBING PLANS - PROCESS PIPING - LOWER LEVEL RO - SPS

File details come from the government source that posted it. Updated .