Attachment 0004b - 17639 Narrative - Addendum 2 - 1 Page.pdf

PDF 185 KB Posted

Attached to
Z1DA--437-CIS-241, SPS Site Prep 36C263-25-AP-2425
Solicitation number
36C26325B0025
Issued by

About this file

This document is an Instructions to Contractor Addendum #2 for the Preform Site Prep for SPS Equipment project at the Fargo VAMC (Veterans Affairs Medical Center) in Fargo, North Dakota, with project number 437-CSI-241. The addendum details specific revisions to drawings and specifications, including the addition of a second water softener and updates to drawing notes and technical specifications related to reverse-osmosis water equipment.

The key changes involve modifications to two drawings (PP-101 and P-301) and three specification sections (00 01 00 Table of Contents, 22 67 19.16 Reverse-Osmosis Water Equipment, and a new section 22 31 11 Water Softener). Specific updates include adding keyed notes for RO dead legs to equipment, updating the mechanical room flow diagram, and revising sections 2.1.D and 2.4.A of the reverse-osmosis water equipment specification. The addendum was issued by Anderson on September 08, 2025, and distributed to multiple recipients.

View the file

Other files

File Type Posted
Attachment 0004d - PP-101 - PLUMBING PLANS - Lower Level Process Piping - 1 Page.pdf PDF
Attachment 0004i - Scope of Work Change Log - 1 Page.pdf PDF
Attachment 0004g - 226719.16 - REVERSE-OSMOSIS WATER EQUIPMENT - 10 Pages.pdf PDF
Attachment 0004e - P-301 - PLUMBING RO FLOW DIAGRAM - 1 Page.pdf PDF
Attachment 0004c - 000110 TOC - 5 Pages.pdf PDF
Attachment 0004a - SOW - Perform Site Prep - Rev 3 - 12 Pages.pdf PDF
36C26325B0025 0004.docx DOCX document
Attachment 0004f - AAMI ST108-2023 Water for the processing of med devices - 102 Pages.pdf PDF
Attachment 0004h - 223111 - Water Softener - 10 Pages.pdf PDF
36C26325B0025 0003.docx DOCX document
Attachment 0002A - DBA Wage Rate ND20250013 August 28 2025 - 13 Pages.pdf PDF
36C26325B0025 0002.docx DOCX document
Attachment H - GI001 - 1 Page.pdf PDF
Attachment F - 092900 Gypsum Board - 8 Pages.pdf PDF
Attachment J - PP-103 - PLUMBING - PIPING - LOWER LEVEL RO TEMP TRAILER - 1 Page.pdf PDF
Attachment L - Site Visit Agenda - Site Prep for SPS Equipment - 2 Pages.pdf PDF
Attachment I - MH-104 - MECH LOWER LEVEL - HVAC - TEMPORARY TRAILER - 1 Page.pdf PDF
Attachment D - 074000 Siding Panels - 8 Pages.pdf PDF
Attachment M - Site Visit Sign-in Sheet 8-15-2025 - 1 Page.pdf PDF
Attachment E - 092216 Non-Structural Metal Framing - 8 Pages.pdf PDF
Attachment B - SOW - Perform Site Prep V2 - 9 Pages.pdf PDF
Attachment G - AS501 - 1 Page.pdf PDF
Attachment C - 17639 Narrative - Addendum 1 - 1 Page.pdf PDF
Attachment K - S401- FRAMING DETIALS - 1 Page.pdf PDF
Attachment A - 437-CSI-241 Site Prep Questions and Answers - 7 Pages.pdf PDF
36C26325B0025 0001.docx DOCX document
Attachment C3 - Drawings-R1_Part3 - 437-CIS-241 - 26 Pages.pdf PDF
Attachment B2 - SPEC VOL II-R1 - 437-CIS-241 - 960 Pages.pdf PDF
Attachment B1 - SPEC VOL I-R1 - 437-CIS-241 - 593 Pages.pdf PDF
Attachment C4 - Drawings-R1_Part4 - 437-CIS-241 - 21 Pages.pdf PDF
Attachment C2 - Drawings-R1_Part2 - 437-CIS-241 - 21 Pages.pdf PDF
Attachment D1 - DBA Wage Rate ND20250013 7 31 2025 - 437-CIS-241 - 12 Pages.pdf PDF
Attachment C1 - Drawings-R1_Part1 - 437-CIS-241 - 16 Pages.pdf PDF
Attachment E1 - Limitations on Subcontracting - 3 Pages.pdf PDF
Attachment A1 - Statement of Work - 437-CIS-241 - 10 Pages.pdf PDF
Attachment C5 - Drawings-R1_Part5 - 437-CIS-241 - 20 Pages.pdf PDF
36C26325B0025_1.docx DOCX document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

13605 1st Avenue North Suite 100, Plymouth, MN 55441 P 763.412.4000 F 763.412.4090 ae-mn.com

INSTRUCTIONS TO CONTRACTOR

Addendum #2

September 08, 2025

Preform Site Prep for SPS Equipment

Fargo VAMC

Fargo, ND

Project # 437-CSI-241

The Contents of this Revision alter and amend the original drawings and specifications:

Drawings:

1. Drawing PP-101

a. Added keyed notes for all RO dead legs to equipment.

b. Added second water softener.

2. Drawing P-301

a. Updated BA-70A Mechanical room flow diagram to show second water softener.

Specifications:

1. Specifications 00 01 00 Table of Contents

a. Revision: Added specification section 22 31 11 Water Softener

2. Specification 226719.16 Reverse-Osmosis Water Equipment

a. Revision: Updated section 2.1.D

b. Revision: Updated section 2.4.A

3. Specification 22 31 11 Water Softener

a. Revision: Added section 22 31 11

ATTACHMENTS:

DRAWINGS: PP-101, P-301

SPECIFICATIONS: 00 01 00, 22 67 19.16, 22 31 11

ISSUED BY ANDERSON: TO, GB, EW, JU, KQ, EW, AW

File details come from the government source that posted it. Updated .