These bid documents are for a U.S. Department of Veterans Affairs (VA) project to perform site preparation for Sterile Processing (SPS) equipment at the VA medical facility in Fargo, North Dakota. The project involves installing a temporary SPS trailer and connecting enclosure, with construction phased across four main stages: 1) RO water system and room construction, 2) site preparation and trailer delivery/setup, 3) SPS construction, and 4) temporary trailer removal and site restoration. The project requires careful infection control measures, with construction categorized as medium to highest risk depending on the phase, necessitating stringent containment and negative air pressure protocols. The site work includes demolition, utility connections, concrete pad installation, and temporary infrastructure to support the trailer, with a targeted completion timeline in early 2025.
The bid documents comprehensively detail the project's technical requirements, including civil, structural, architectural, mechanical, electrical, and plumbing specifications. Key consultants include IMEG and Anderson Engineering, with the project focusing on minimal disruption to the existing VA facility operations. The construction will involve temporary barriers, careful phasing, and coordination to maintain hospital functionality. The project number is 437-CSI-241, with bid documents issued on 1/22/2025, and the site located at 2101 Elm Street North in Fargo. The estimated project duration appears to span several months, with multiple phase transitions requiring VA inspection and approval before proceeding to subsequent stages.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
TEMPORARY SPD TRAILER
AND ECLOSURE
SPS PROJECT AREA
TEMPORARY SPD TRAILER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROJECT NAME:
SITE ADDRESS:
VA PROJECT NUMBER:
OWNER AND CONSULTANTS:
VICINITY MAP:
DESIGNER OF RECORD
SITE MAP: PROJECT AREA:
2882 106TH STREET
DES MOINES IA 50322
BID DOCUMENT SUBMISSION
C U s e rs
\c z u p a n \D o c u m e n ts
\1
-A -R c z u p a n J A
M E
X .r v t
/2
/2
:5
:1
P
M
GI000
COVER SHEET PERFORM SITE PREP FOR SPS
EQUIPMENT
FARGO, ND
437-CSI-241
1/22/2025 JLU GJB
PERFORM SITE PREP FOR SPS EQUIPMENT
2101 ELM STREET NORTH; FARGO, ND 58102
437-CSI-241
17639
VA COR:
CONTACT:
ADDRESS:
PHONE:
ROONEY VILLEGAS
2101 ELM STREET NORTH
FARGO, ND 85102
701-232-3241
ARCHITECT:
NAME:
ADDRESS:
CONTACT:
ANDERSON ENGINEERING OF MN, LLC
13605 1ST AVE NORTH, SUITE 100
PLYMOUTH, MN 55441
JESSE ULLAND
PHONE: 763-412-4000
STRUCTURAL ENGINEER:
NAME:
ADDRESS:
CONTACT:
ANDERSON ENGINEERING OF MN, LLC
13605 1ST AVE NORTH, SUITE 100
PLYMOUTH, MN 55441
ADAM ADAMS
PHONE: 701-850-8901
MECHANICAL ENGINEER:
NAME:
ADDRESS:
CONTACT:
ANDERSON ENGINEERING OF MN, LLC
13605 1ST AVE NORTH, SUITE 100
PLYMOUTH, MN 55441
KEITH HOMSTAD
PHONE: 701-850-8902
FIRE PROTECTION ENGINEER
NAME:
ADDRESS:
CONTACT:
IMEG
2882 106TH STREET
DES MOINES, IA 50322
DELLAN LLEWELLYN
PHONE: 515-334-7921
ELECTRICAL ENGINEER:
NAME:
ADDRESS:
CONTACT:
ANDERSON ENGINEERING OF MN, LLC
13605 1ST AVE NORTH, SUITE 100
PLYMOUTH, MN 55441
WILLIAM HAAS
PHONE: 330-518-0474
TECHNOLOGY DESIGNER
NAME:
ADDRESS:
CONTACT:
IMEG
855 GRANDVIEW AVENUE, SUITE 300
COLUMBUS, OH 43215
CRAIG BUCHHOLZ
PHONE: 614-443-1178 EX 223
CIVIL ENGINEER:
NAME:
ADDRESS:
CONTACT:
ANDERSON ENGINEERING OF MN, LLC
13605 1ST AVE NORTH, SUITE 100
PLYMOUTH, MN 55441
ERIC SAUTBINE
PHONE: 763-412-4062
Revisions: Date:
█ ISSUED
NOT ISSUED
ISSUED FOR REFERENCE ONLY
ISSUED AS NOTED
R
N
SHEET ABBREVIATION AND NUMBERING
AS 1 1 1 - A
DI
SC
IP
LI
NE
D
ES
IG
NA
TO
R
SH
EE
T
TY
PE
D
ES
IG
NA
TO
R
FL
O
O R
LE
VE
L
SH
EE
T G
RO
UP
IN
G
AR
EA
AE 111-01
ARCHITECTURAL ELEMENTS, PLAN, FIRST LEVEL, FLOOR PLAN, ZONE 1
QH 1 1 0 - B
DI
SC
IP
LI
NE
D
ES
IG
NA
TO
R
SH
EE
T
TY
PE
D
ES
IG
NA
TO
R
FL
O
O R
LE
VE
L
SH
EE
T G
RO
UP
IN
G
AR
EA
QH110-01
EQUIPMENT HOSPITAL, PLAN, FIRST LEVEL, ZONE 1
DISCIPLINE
DESIGNATOR
SHEET TYPE
DESIGNATOR
FLOOR
LEVEL
SHEET
GROUPING
GC - GENERAL CONTRACT
GI - GENERAL INFORMATION
AC - ARCHITECTURAL RCP
AD - ARCHITECTURAL DEMOLITION
AS - ARCHITECTURAL
AF - ARCHITECTURAL FINISHES
IF - INTERIOR FURNISHINGS
IN - INTERIOR DESIGN
QC - EQUIPMENT LAUNDRY
QF - EQUIPMENT FOOD SERVICE
QH - EQUIPMENT HOSPITAL
QL - EQUIPMENT LABORATORY
0 - GENERAL
1 - PLANS
2 - ELEVATIONS
3 - SECTIONS
4 - LARGE SCALE VIEWS
5 - DETAILS
6 - SCHEDULES & DIAGRAMS
0 - LOWER LEVEL
1 - FIRST LEVEL
2 - SECOND LEVEL
3 - THIRD LEVEL
4 - FOURTH LEVEL
GENERAL:
00-10 - TITLE SHEET, NOTES,
ABBREVIATIONS, SYMBOLS,
SCHEDULES
PLANS:
1 - LEVEL FLOOR PLAN
2 - DIMENSION PLAN
ELEVATIONS:
01-10 - EXTERIOR ELEVATIONS
11-19 - INTERIOR ELEVATION
SECTIONS:
01-10 - BUILDING SECTIONS
11-19 - WALL SECTIONS
20-29 -STAIR SECTIONS & PLANS
DETAILS:
01-19 - EXTERIOR PLAN DETAILS
20-29 - EXTERIOR SECTION DETAILS
30-39 - ROOF DETAILS
40-49 - INTERIOR PLAN DETAILS
50-59 - INTERIOR SECTION DETAILS
60-69 - CEILING DETAILS
PLANS ONLY
AE 5 0 1
DI
SC
IP
LI
NE
D
ES
IG
NA
TO
R
SH
EE
T
TY
PE
D
ES
IG
NA
TO
R
SH
EE
T G
RO
UP
IN
G
AE 501
ARCHITECTURAL ELEMENTS, EXTERIOR PLAN DETAILS
AF 6 7 0
DI
SC
IP
LI
NE
D
ES
IG
NA
TO
R
SH
EE
T
TY
PE
D
ES
IG
NA
TO
R
SH
EE
T G
RO
UP
IN
G
AF 670
ARCHITECTURAL FINISHES, FINISH SCHEDULE
MATERIAL LEGEND
EXISTING
NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN
BRICK
BRICK
CONCRETE
GYPSUM BOARD
GRAVEL / FILL
PLYWOOD
EARTH
PLAN & SECTION SECTION
ELEVATION
NEW CONSTRUCTION
CMU
RIGID INSULATION
SPRAY FOAM
STONE
WOOD - HORIZONTAL
WOOD - VERTICAL
FIRE PROOFING
CMU
CONCRETE
METAL
MORTAR NET
SOLID SURFACE
STONE
BATT INSULATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106TH STREET
DES MOINES IA 50322
BID DOCUMENT SUBMISSION
C U s e rs
\g b a rb a ri
\D o c u m e n ts
\1
-A -R
G io v a n n i- B a rb a ri .r v t
/3
/2
:4
:4
A
M
GI001
SHEET INDEX PERFORM SITE PREP
FOR SPS EQUIPMENT
FARGO, ND
437-CSI-241
1/22/2025 JLU GJB
17639
SHEET INDEX - ARCHITECTURAL
SHEET NO. SHEET TITLE BI
D
DO
CU
M
EN
TS
1/
/2
AD101-A LOWER LEVEL DEMOLITION PLAN -AREA A █
AD101-B LOWER LEVEL DEMOLITION PLAN -AREA B █
AD101-R LOWER LEVEL DEMOLITION PLAN -AREA B RESTORATION █
AS100 LOWER LEVEL FLOOR PLAN-OVERALL █
AS101-A LOWER LEVEL FLOOR PLAN - AREA A █
AS102-A LOWER LEVEL DIMENSION PLAN - AREA A █
AS101-B LOWER LEVEL FLOOR PLAN - AREA B █
AC101-A LOWER LEVEL REFLECTED CEILING PLAN - AREA A █
AC101-B LOWER LEVEL REFLECTED CEILING PLAN - AREA B █
AS101-R LOWER LEVEL PLAN -AREA B RESTORATION █
AS103 ROOF PLAN - AREA B █
AS201 EXTERIOR ELEVATIONS █
AS211 INTERIOR ELEVATIONS █
AS212 INTERIOR ELEVATIONS █
AS301 BUILDING SECTIONS - TEMP TRAILER ENCLOSURE █
AS311 WALL SECTIONS - TEMP ENCLOSURE █
AS312 WALL SECTIONS - TEMP ENCLOSURE █
AS501 EXTERIOR PLAN DETAILS █
AS520 EXTERIOR SECTION DETAILS █
AS530 ROOF DETAILS █
AS540 INTERIOR PLAN DETAILS █
AS550 INTERIOR SECTION DETAILS █
AS601 WALL & PARTITION TYPES AND DETAILS █
AS602 DOOR SCHEDULE AND ELEVATIONS █
AS640 MOUNTING HEIGHTS █
SHEET INDEX - INTERIOR
SHEET NO. SHEET TITLE BI
D
DO
CU
M
EN
TS
1/
/2
AF101 LOWER LEVEL FINISH PLAN █
AF102 LOWER LEVEL FINISH PLAN - TEMP TRAILER █
AF600 MATERIAL AND ROOM FINISH SCHEDULE AND DETAILS █
AW111 LOWER LEVEL WAYFINDING PLAN - AREA A █
AW112 LOWER LEVEL WAYFINDING PLAN - TEMP TRAILER - AREA B █
AW601 SIGNAGE DETAILS █
SHEET INDEX - EQUIPMENT
SHEET NO. SHEET TITLE BI
D
DO
CU
M
EN
TS
1/
/2
QH101-A LOWER LEVEL EQUIPMENT PLAN - AREA A █
SHEET INDEX - MECHANICAL
SHEET NO. SHEET TITLE BI
D
DO
CU
M
EN
TS
1/
/2
M-001 MECHANICAL SYMBOLS, ABBREVIATIONS, GENERAL NOTES █
MD-101 MECHANICAL LOWER LEVEL - HVAC DEMO PLAN █
MD-102 MECHANICAL LOWER LEVEL - STEAM DEMO PLAN █
MH-101 MECHANICAL LOWER LEVEL - HVAC PLAN █
MH-102 MECHANICAL LOWER LEVEL - HVAC PRESSURE PLAN █
MH-103 MECHANICAL LOWER LEVEL - HVAC - SUROUNDING TAB █
MP-101 MECHANICAL PLAN - LOWER LEVEL STEAM PIPING █
M-301 MECHANICAL PIPING - STEAM FLOW DIAGRAM █
M-501 MECHANICAL DETAILS █
M-601 MECHANICAL SCHEDULES █
SHEET INDEX - PLUMBING
SHEET NO. SHEET TITLE BI
D
DO
CU
M
EN
TS
1/
/2
P-001 PLUMBING SYMBOLS, ABBREVIATIONS, GENERAL NOTES █
P-002 PLUMBING RO PHASING PLAN █
PD-101 PLUMBING UNDERGROUND - SANITARY DEMOLITION PLAN █
PD-102 PLUMBING LOWER LEVEL - RO AND DOMESTIC WATER DEMO PLANS █
PD-103 PLUMBING LOWER LEVEL - VENT AND AIR DEMO PLAN █
PL-101 PLUMBING LOWER LEVEL - UNDERGROUND SANITARY PLAN █
PL-102 PLUMBING LOWER LEVEL - DOMESTIC WATER PLANS █
PL-103 PLUMBING LOWER LEVEL - VENT AND AIR PLAN █
PP-101 PLUMBING PLANS - PROCESS PIPING - LOWER LEVEL RO - SPS █
PP-102 PLUMBING PLAN - PROCESS PIPING - LOWER LEVEL RO CORRIDOR █
PP-103 PLUMBING PLAN - PROCESS PIPING - LOWER LEVEL RO TEMPORARY TRAILER █
P-301 PLUMBING RO FLOW DIAGRAM █
P-501 PLUMBING DETAILS █
P-701 SANITARY WASTE AND VENT RISER DIAGRAMS █
P-702 DOMESTIC WATER RISER DIAGRAMS █
SHEET INDEX - ELECTRICAL
SHEET NO. SHEET TITLE BI
D
DO
CU
M
EN
TS
1/
/2
E-001 ELECTRICAL SYMBOLS, ABBREVIATIONS, GENERAL NOTES █
ES-101 ELECTRICAL SITE PLAN █
ESR-101 ELECTRICAL SITE RESTORATION PLAN █
ED-101 LOWER LEVEL - LIGHTING DEMOLITION PLAN █
ED-102 LOWER LEVEL - POWER DEMOLITION PLAN █
EL-101 LOWER LEVEL - LIGHTING PLAN █
EP-101 LOWER LEVEL - POWER PLAN █
EQ-101 LOWER LEVEL - EQUIPMENT POWER PLAN █
E-501 ONE-LINE DIAGRAM & ELECTRICAL DETAILS █
E-601 ELECTRICAL SCHEDULES █
E-602 ELECTRICAL SCHEDULES █
SHEET INDEX - TECHNOLOGY
SHEET NO. SHEET TITLE BI
D
DO
CU
M
EN
TS
1/
/2
T000 TECHNOLOGY COVERSHEET █
TD101 LOWER LEVEL DEMOLITION PLAN - TECHNOLOGY █
T001 SITE PLAN - TECHNOLOGY █
T101 LOWER LEVEL FLOOR PLAN - TECHNOLOGY █
T200 TECHNOLOGY ENLARGEMENT PLANS █
T500 TECHNOLOGY SCHEDULES █
SHEET INDEX - GENERAL
SHEET NO. SHEET TITLE BI
D
DO
CU
M
EN
TS
1/
/2
GI000 COVER SHEET █
GI001 SHEET INDEX █
GI002 ABBREVIATIONS █
GI101 LOWER LEVEL LIFE SAFETY PLAN - AREA A █
GI102 LOWER LEVEL LIFE SAFETY PLAN - AREA B █
GC100 ICRA & PCRA NOTES AND CATEGORIES █
GC101 LOWER LEVEL PHASING PLAN - OVERALL █
GC102-A LOWER LEVEL INFECTION CONTROL PLAN - AREA A █
GC102-B LOWER LEVEL INFECTION CONTROL PLAN - AREA B █
SHEET INDEX - FIRE ALARM & PROTECTION
SHEET NO. SHEET TITLE BI
D
DO
CU
M
EN
TS
1/
/2
FS 000 FIRE PROTECTION COVERSHEET █
FSD 101 LOWER LEVEL DEMOLITION PLAN - FIRE PROTECTION █
FS 001 SPS TRAILER FLOOR PLAN - FIRE PROTECTION █
FS 101 LOWER LEVEL FLOOR PLAN - FIRE PROTECTION █
FS 500 FIRE PROTECTION DETAILS █
FA000 ELECTRICAL SYSTEMS COVERSHEET █
FA101 SPS TRAILER FLOOR PLAN - FIRE ALARM █
FA102 LOWER LEVEL FLOOR PLAN - FIRE ALARM █
SHEET INDEX - CIVIL
SHEET NO. SHEET TITLE BI
D
DO
CU
M
EN
TS
1/
/2
V-101 EXISTING SURVEY █
CD101 DEMO PLAN █
CS101 SITE PLAN █
CG101 GRADING, UTILITY & EROSION CONTROL PLAN █
C-101 SITE DETAILS █
SHEET INDEX - STRUCTURAL
SHEET NO. SHEET TITLE BI
D
DO
CU
M
EN
TS
1/
/2
S001 STRUCTURAL NOTE SHEET █
S101 FOOTING & FOUNDATION PLAN █
S102 SLAB CUTTING PLAN █
S201 SECOND FLOOR FRAMING PLAN █
S202 ROOF FRAMING PLAN █
S301 FOOTING & FOUNDATION DETAILS █
S401 FRAMING DETAILS █
S402 FRAMING DETAILS █
ARCHITECTURAL ABBREVIATIONS
A/C
A/C UNIT
A/E
AAMA
AAP
AB
ABC
ACC
ACI
ACT
ACS DR
ACS FLR
ACS PNL
ACST
AD
ADA
ADC
ADDL
ADDN
ADH
ADJ
ADMIN
AFF
AFG
AFS
AGC
AGGR
AHJ
AHR
AHU
AIA
AISC
ALT
ALT NO
ALUM
AMT
ANOD
ANSI
ANT
AP
APA
APC
APPD
APPROX
AR
ARCH
ASB
ASI
ASKLR
ASPH
ASSN
ASTM
ATCH
ATM
AUTO
AUX
AV
AVG
AW
AWI
AWPA
AWS
B PL
BAT
BD
BD FT
BEV
BHMA
BI FLD DR
BITUM
BKG
BLD
BLDG
BM
BOT
BRCG
BRDG
BRDG JST
BRG
BRG PL
BRKT
BRZ
BSMT
BTWN
BUR
C CONC
C TO C
CAB
CAC
CB
CBB
CCD
CCTV
CCW
CD
CEM
CEM PLAS
CER
CF
CF/CI
CF/OI
CFLG
CFMF
CG
CGSFU
CH
CHEM
CHFR
CHK
CI
CIP
CIR
CIRC
CJ
CL
CLDG
CLG
CLR
CM
CMU
AIR CONDITION
AIR CONDITIONING UNIT
ARCHITECT/ENGINEER
AMERICAN ARCHITECTURAL MANUFACTURERS ASSN
ALARM ANNUNCIATOR PANEL
ANCHOR BOLT
AGGREGATE BASE COURSE
ACCESSIBLE
AMERICAN CONCRETE INSTITUTE
ACOUSTICAL CEILING TILE
ACCESS DOOR
ACCESS FLOOR
ACCESS PANEL
ACOUSTIC
AREA DRAIN
AMERICANS WITH DISABILITIES ACT
AUTOMATIC DOOR CLOSER
ADDITIONAL
ADDITION
ADHESIVE
ADJACENT, ADJOINING, OR ADJUSTABLE
ADMINISTRATION
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
ABOVE FINISHED SLAB
ASSOCIATED GENERAL CONTRACTORS
AGGREGATE
AUTHORITY HAVING JURISDICTION
ANCHOR
AIR HANDLING UNIT
AMERICAN INSTITUTE OF ARCHITECTS
AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ALTERNATE
ALTERNATE NUMBER
ALUMINUM
AMOUNT
ANODIZE
AMERICAN NATIONAL STANDARDS INSTITUTE
ANTENNA
ACCESS PANEL
AMERICAN PLYWOOD ASSOCIATION
ARCHITECTURAL PRECAST CONCRETE
APPROVED
APPROXIMATE
AS REQUIRED
ARCHITECT
ASBESTOS
ARCHITECT'S SUPPLEMENTAL INSTRUCTION
AUTOMATIC SPRINKLER
ASPHALT
ASSOCIATION
AMERICAN SOCIETY FOR TESTING AND MATERIALS
ATTACHMENT
AUTOMATIC TELLER MACHINE
AUTOMATIC
AUXILIARY
AUDIO VISUAL
AVERAGE
ACID WASTE
ARCHITECTURAL WOODWORKING INSTITUTE
AMERICAN WOOD PRESERVERS' ASSOCIATION
AMERICAN WELDING SOCIETY
BASE PLATE
BATTEN
BOARD
BOARD FEET (FOOT)
BEVEL
BUILDER'S HARDWARE MANUFACTURER'S ASSOCIATION
BIFOLDING DOORS
BITUMINOUS
BACKING
BUILD
BUILDING
BEAM OR BENCHMARK
BOTTOM
BRACING
BRIDGING
BRIDGING JOIST
BEARING
BEARING PLATE
BRACKET
BRONZE
BASEMENT
BETWEEN
BUILT-UP ROOFING
CAST CONCRETE
CENTER TO CENTER
CABINET
CEILING ATTENUATION CLASS
CATCH BASIN OR CORNER BEAD
CEMENTITIOUS (BACKER) BOARD
CONSTRUCTION CHANGE DIRECTIVE
CLOSED CIRCUIT TELEVISION
COUNTERCLOCKWISE
CONSTRUCTION DOCUMENTS OR CONTRACT DOCUMENTS
CEMENT
CEMENT PLASTER
CERAMIC
CONTRACTOR FURNISHED
CONTRACTOR FURNISHED/CONTRACTOR INSTALLED
CONTRACTOR FURNISHED/OWNER INSTALLED
COUNTERFLASHING
COLD-FORMED METAL FRAMING
CORNER GUARD
CERAMIC GLAZED STRUCTURAL FACING UNITS
COAT HOOK
CHEMICAL
CHAMFER
CHECK
CAST IRON
CAST-IN-PLACE
CIRCLE
CIRCULAR
CONSTRUCTION JOINT OR CONTROL JOINT
CENTER LINE
CLADDING
CEILING
CLEAR
CONSTRUCTION MANAGEMENT
CONCRETE MASONRY UNIT
CNR
CNTR
CRTP
CO
CO2
COL
COM
COMB
COMM
COMP
CONC
CONC FLR
COND
CONF
CONN
CONSTR
CONT
CONTR
COORD
CORR
CPM
CPRS
CR
CRS
CRSI
CSB
CSG
CSI
CSK
CSMT
CSWK
CTG
CTR
CTRL
CTV
CU FT
CU IN
CU YD
CURT
CYL
CYL L
D
DAT
DBL
DBL GLZ
DCS
DP
DEG
DEL
DEMO
DEPT
DET
DF
DIA
DIAG
DIFF
DIM
DIR
DISP
DIST
DIV
DL
DOC
DR
DR CL
DR FR
DR OPNG
DS
DSGN
DW
DWG
E
EA
EFF
EFS
EIFS
EJ
EL
ELAST
ELEC
ELEC DR OP
ELEV
EMER
EMER SHR
ENCL
ENGR
ENVIR
EO
EPA
EPDM
EPO
EPS
EQ
EQL SP
EQUIP
EQUIV
ERD
ESC
ESMT
ESP
EST
ETC
EW
EWC
EWS
EXH
EXIST
EXP
EXP BT
EXST GR
EXT
EXT GR
CORNER
COUNTER
COUNTERTOP
CARBON MONOXIDE
CARBON DIOXIDE
COLUMN
COMMON
COMBINATION, COMBINED
COMMUNICATION
COMPONENT
CONCRETE
CONCRETE FLOOR
CONDENSER OR CONDITION
CONFERENCE
CONNECT
CONSTRUCTION
CONTINUE
CONTRACTOR
COORDINATE
CORRIDOR
CRITICAL PATH METHOD
COMPRESSIBLE
CARD READER
COLD ROLLED STEEL
CONCRETE REINFORCING STEEL INSTITUTE
CONCRETE SPLASH BLOCK
CASING
CONSTRUCTION SPECIFICATIONS INSTITUTE
COUNTER SUNK
CASEMENT
CASEWORK
COATING
CENTER
CONTROL
CABLE TELEVISION
CUBIC FEET
CUBIC INCH
CUBIC YARD
CURTAIN
CYLINDER
CYLINDER LOCK
DEPTH OR PENNY (NAIL)
DATUM
DOUBLE
DOUBLE GLAZE
DIAPER CHANGING STATION
DECORATIVE PANEL
DEGREE
DELETE
DEMOLITION
DEPARTMENT
DETAIL
DRINKING FOUNTAIN
DIAMETER
DIAGONAL
DIFFERENCE OR DIFFUSER
DIMENSION
DIRECTION
DISPENSER
DISTANCE
DIVIDE OR DIVISION
DEAD LOAD
DOCUMENT
DOOR, DRAIN, DRESSING ROOM, OR DRIVE
DOOR CLOSER
DOOR FRAME
DOOR OPENING
DOWNSPOUT
DESIGN
DISHWASHER
DRAWING
EAST
EACH
EFFICIENCY
EXTERIOR FINISH SYSTEM
EXTERIOR INSULATION AND FINISH SYSTEM
EXPANSION JOINT
ELEVATION
ELASTOMERIC
ELECTRIC
ELECTRIC DOOR OPENER
ELEVATOR
EMERGENCY
EMERGENCY SHOWER
ENCLOSURE
ENGINEER
ENVIRONMENT
ELECTRICAL OUTLET
ENVIRONMENTAL PROTECTION AGENCY
ETHYLENE PROPYLENE DIENE MONOMER
EMERGENCY POWER OFF
EXPANDED POLYSTYRENE BOARD (INSULATION)
EQUAL
EQUALLY SPACED
EQUIPMENT
EQUIVALENT
EXISTING ROOF DRAIN
ESCAPE OR ESCUTCHEON
EASEMENT
ESPECIALLY
ESTIMATE
AND SO FORTH OR ET CETERA
EACH WAY
ELECTRIC WATER COOLER
EYE WASH STATION
EXHAUST
EXISTING
EXPANSION OR EXPOSED
EXPANSION BOLT
EXISTING GRADE
EXTERIOR, EXTERNAL, OR EXTINGUISHER
EXTERIOR GRADE
F
FA
FAB
FAC
FACIL
FAS
FAS BD
FCU
FCO
FCTY
FD
FDC
FDTN
FE
FEC
FF
FF EL
FF&E
FHC
FHP
FIG
FIL
FIN
FIN FLR
FIN GR
FIN WD
FIXT
FL
FLASH
FLDG
FLEX
FLG
FLR
FLR FIN
FLR SK
FLUOR
FLUOR FIX
FM
FM-G
FO
FOC
FOF
FOM
FOS
FOUNT
FOW
FP
FR
FR SNK
FREQ
FRMG
FRP
FRZ
FS
FSB
FSTNR
FT
FTG
FURG
FURN
FUT
FVC
GA
GAL
GALV
GALV STL
GB
GC
GD
GDR
GEN
GFRC
GFRG
GFRP
GI
GL
GL BLK
GLU LAM
GP
GR FL
GRAN
GRTG
GSB
GSM
GSU
GT
GUAR
GUT
GYP
GYP BD
GYP PLAS
H
HAZ MAT
HB
HC
HCWD
HDBD
HDO
HDR
HDW
HDWD
HEPA
HEX
HGR
HM
HMD
HMDF
HMF
HNDRL
HO
HORIZ
HOSP
HP
HPD
HPDL
HQ
HS
HSE
HSKPG
FAHRENHEIT OR FEMALE
FIRE ALARM
FABRIC
FACTOR
FACILITY
FASCIA
FASCIA BOARD
FAN COIL UNIT
FLOOR CLEANOUT
FACTORY
FLOOR DRAIN
FIRE DEPARTMENT CONNECTION
FOUNDATION
FIRE EXTINGUISHER
FIRE EXTINGUISHER CABINET
FINISH FACE
FINISH FLOOR ELEVATION
FURNITURE, FIXTURE, AND EQUIPMENT
FIRE HOSE CABINET
FULL HEIGHT PARTITION
FIGURE
FILLET
FINISH
FINISH FLOOR
FINISH GRADE
FINISH WOOD
FIXTURE
FLOORLINE
FLASHING
FOLDING
FLEXIBLE
FLOORING
FLOOR
FLOOR FINISH
FLOOR SINK
FLUORESCENT
FLUORESCENT FIXTURE
FACTORY MUTUAL
FACTORY MUTUAL GLOBAL
FINISHED OPENING
FACE OF CONCRETE OR FACE OF CURB
FACE OF FINISH
FACE OF MASONRY
FACE OF SLAB OR FACE OF STUD
FOUNTAIN
FACE OF WALL
FIRE PROTECTION OR FIREPROOF
FIRE RATING, FIRE RESISTANT, OR FRAME
FLUSHING RIM SINK
FREQUENCY
FRAMING
FIBERGLASS REINFORCED PLASTIC
FREEZER
FEDERAL SPECIFICATION
FOLDING SHOWER BENCH
FASTENER
FEET OR FOOT
FOOTING
FURRING
FURNISH OR FURNITURE
FUTURE
FIRE VALVE CABINET
GAGE OR GYPSUM ASSOCIATION
GALLON
GALVANIC OR GALVANIZED
GALVANIZED STEEL
GRAB BAR
GENERAL CONTRACTOR
GUARD
GUARD RAIL
GENERAL OR GENERATOR
GLASS-FIBER-REINFORCED CONCRETE
GLASS-FIBER-REINFORCED GYPSUM
GLASS-FIBER-REINFORCED PLASTIC
GALVANIZED IRON
GLASS
GLASS BLOCK
GLUED LAMINATED WOOD
GRAB BAR
GROUND FLOOR
GRANITE
GRATING
GYPSUM SHEATHING BOARD
GALVANIZED SHEET METAL
GLAZED STRUCTURAL UNIT
GROUT
GUARANTEE
GUTTER
GYPSUM
GYPSUM BOARD
GYPSUM PLASTER
HIGH OR HUMIDISTAT
HAZARDOUS MATERIALS
HOSE BIBB
HOLLOW CORE
HOLLOW CORE WOOD DOOR
HARDBOARD
HIGH DENSITY OVERLAY
HEADER
HARDWARE
HARDWOOD
HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HEXAGON
HANGER
HOLLOW METAL
HOLLOW METAL DOOR
HOLLOW METAL DOOR AND FRAME
HOLLOW METAL FRAME
HANDRAIL
HOLD OPEN
HORIZONTAL
HOSPITAL
HIGH PRESSURE
HYGIENE PRODUCT DISPOSAL
HIGH PRESSURE DECORATIVE LAMINATE
HEADQUARTERS
HEAT-STRENGTHENED (GLASS) OR HIGH STRENGTH
HOUSE
HOUSEKEEPING
HST
HSS
HT
HVAC
HVY
HW
HYD
HYDR
IAQ
IBC
IC
ICW
ID
ID NO
ILLUM
INCL
IND
INFO
INSUL
INT
INTL
IWH
JAN
KD
KIT
KO
KPL
LAB
LAD
LAM
LAM GL
LAU
LAV
LBR
LBS
LCS
LD BRG
LDR
LED
LF
LIB
LIN
LIQ
LKR
LKR RM
LL
LMST
LRG
LRV
LS
LT
LT GA
LT WT
LTG
LTNG
LVD
LVR
LWC
LWIC
LYR
MACH
MACH RM
MAINT
MAN
MATL
MATV
MAX
MBD
MCB
MD
ME
MEAS
MECH
MECH RM
MED
MEK
MEMB
MEMO
MEZZ
MF
MFD
MFG
MFR
MFR REC
MGT
MIC
MID
MIL STD
MIN
MIR
MISC
MIT
MKR
ML
MLDG
MLWK
mm
MO
MOD
MOD BIT
MON
MOPR
MR
MS
MTD
MTG
MTL
MULL
MW
MWP
HOIST
HOLLOW STRUCTURAL STEEL
HEIGHT
HEATING, VENTILATING, AND AIR CONDITIONING
HEAVY
HOT WATER
HYDRANT
HYDRAULIC
INDOOR AIR QUALITY
INTERNATIONAL BUILDING CODE
INFECTION CONTROL
INFECTION CONTROL WALL
INSIDE DIAMETER
IDENTIFICATION NUMBER
ILLUMINATION
INCLUDED
INDEPENDENT OR INDUSTRIAL
INFORMATION
INSULATION
INTERIOR
INTERNATIONAL
INSTANTANEOUS WATER HEATER
JANITOR
KILN DRIED OR KNOCKED DOWN
KITCHEN
KNOCKOUT
KICKPLATE
ANGLE
LABORATORY
LADDER
LAMINATE
LAMINATED GLASS
LAUNDRY
LAVATORY
LUMBER
POUND
LOCKABLE CHARTING STATION/MED CABINET
LOAD-BEARING
LEADER
LIGHT EMITTING DIODE
LINEAR FEET (FOOT)
LIBRARY
LINEAR
LIQUID
LOCKER
LOCKER ROOM
LEAD LINED
LIMESTONE
LARGE
LOUVERED ROOF VENT
LIGHT SWITCH
LIGHT
LIGHT GAGE
LIGHTWEIGHT
LIGHTING
LIGHTNING
LOUVERED
LOUVER
LIGHTWEIGHT CONCRETE
LIGHTWEIGHT INSULATING CONCRETE
LAYER
MACHINE
MACHINE ROOM
MAINTENANCE
MANUAL
MATERIAL
MASTER ANTENNA TELEVISION SYSTEM
MAXIMUM
MARKER BOARD
METAL CORNER BEAD
DECK
MECHANICAL ENGINEER
MEASURE
MECHANICAL
MECHANICAL ROOM
MEDICAL, MEDIUM
METHYL ETHYL KETONE
MEMBRANE
MEMORANDUM
MEZZANINE
MILL FINISH
MANUFACTURED
MANUFACTURING
MANUFACTURER
MANUFACTURER'S RECOMMENDATION
MANAGEMENT
MICROPHONE
MIDDLE
MILITARY STANDARD
MINIMUM
MIRROR
MISCELLANEOUS
MITER
MARKER
METAL LATH
MOLDING (MOULDING)
MILLWORK
MILLIMETER
MASONRY OPENING
MODEL, MODIFY OR MODULE
MODIFIED BITUMEN
MONITOR
MOP RACK
MOISTURE RESISTANT
MOP SINK
MOUNTED
MOUNTING
METAL
MULLION
MICROWAVE
MEMBRANE WATERPROOFING
N
NA
NAT
NATL
NC
NCOMBL
NEC
NEG
NEMA
NEUT
NFC
NFPA
NIC
NO
NOM
NR
NRC
NRCA
NRP
NS
NUM
O/O O
OA
OC
OCC
OCT
OD
OD
OF/CI
OFD
OFF
OF/OI
OH
OH DR
OPH
OPNG
OPP
OPR
OPT
OR
ORD
ORG
ORIG
ORN
OSHA
OUT
OZ
P
PAR
PARA
PART
PAT
PB
PBD
PC
PCA
PCC
PCCP
PCD
PCF
PCP
PCT
PED
PEN
PEND
PERF
PERIM
PERP
PHAR
PHOTO
PKG
PL
PL GL
PLAM
PLAS
PLBG
PLYWD
PMTL
PNEU
PNL
PO
POLY
PP
PR
PRCST
PREFAB
PREFIN
PRELIM
PREP
PRESS
PREV
PRKG
PRMLD
PROJ
PROP
PSF
PSI
PT
PTD
PTN
PTS
PVC
PVG
PWR
QA
QC
QRY
QTR
QTY
QUAD
QUAL
R
RA
RAD
RBM
RBR
NORTH
NOT APPLICABLE
NATURAL
NATIONAL
NOISE CRITERIA OR NURSE CALL
NONCOMBUSTIBLE
NATIONAL ELECTRICAL CODE
NEGATIVE
NATIONAL ELECTRICAL MANUFACTURERS ASSN
NEUTRAL
NATIONAL FIRE CODE
NATIONAL FIRE PROTECTION ASSOCIATION
NOT IN CONTRACT
NUMBER
NOMINAL
NOISE REDUCTION
NOISE REDUCTION COEFFICIENT
NATIONAL ROOFING CONTRACTORS ASSOCIATION
NONREMOVABLE
NARROW STILE
NUMERAL
OUT TO OUT
OXYGEN
OUTSIDE AIR OR OVERALL
ON CENTER
OCCUPY
OCTAGON
OUTSIDE DIAMETER, OUTSIDE DIMENSION
OUTSIDE DIAMETER/OUTSIDE DIMENSION
OWNER FURNISHED/CONTRACTOR INSTALLED
OVERFLOW DRAIN
OFFICE
OWNER FURNISHED/OWNER INSTALLED
OVERHANG
OVERHEAD (COILING) DOOR
OPPOSITE HAND
OPENING
OPPOSITE
OPERABLE
OPTIONAL
OPERATING ROOM OR OUTSIDE RADIUS
ORDNANCE OR OVERFLOW ROOF DRAIN
ORGANIC
ORIGINAL
ORNAMENTAL
OCCUPATIONAL SAFETY AND HEALTH ADMINSTRATION
OUTLET
OUNCE
PAINT
PARALLEL OR PARAPET
PARAGRAPH
PARTIAL
PATTERN
PUSHBUTTON
PARTICLEBOARD
PIECE, POLYCARBONATE OR PORTLAND CEMENT
PORTLAND CEMENT ASSOCIATION
PRECAST CONCRETE
CONCRETE PAVEMENT
PAPER CUP DISPENSER
POUNDS PER CUBIC FOOT
PORTLAND CEMENT PLASTER
PRIVACY CURTAIN TRACK
PEDESTAL
PENETRATE
PENDANT
PERFORATED
PERIMETER
PERPENDICULAR
PHARMACY
PHOTOGRAPH
PACKAGE
PROPERTY LINE
PLATE GLASS
PLASTIC LAMINATE
PLASTER OR PLASTIC
PLUMBING
PLYWOOD
PAINTED METAL
PNEUMATIC
PANEL
POST OFFICE, PURCHASE ORDER
POLYETHYLENE (PLASTIC)
PUSH PLATE
PAIR
PRECAST
PREFABRICATE
PREFINISH
PRELIMINARY
PREPARATION
PRESSURE
PREVIOUS
PARKING
PREMOLDED
PROJECT
PROPERTY
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
PORCELAIN TILE OR PRESSURE TREATED
PAPER TOWEL DISPENSER
PARTITION
PNEUMATIC TUBE STATION
POLYVINYL CHLORIDE (PLASTIC)
PAVING
POWER
QUALITY ASSURANCE
QUALITY CONTROL
QUARRY
QUARTER
QUANTITY
QUADRANT
QUALITY
RADIUS OR RISER
RETURN AIR
RADIATOR
REINFORCED BRICK MASONRY
RUBBER
RC
RCP
RCVR
RD
REC
RECD
RECPT
RECT
REF
REFR
REG
REINF
REP
REPL
REQ
REQD
RET
REV
RFG
RFI
RFP
RFS
RL
RLG
RM
RM LT
RND
RO
ROW
RS
RSV
RT
RV
RVS
RWL
S
SA
SALV
SAMP
SAN
SB
SBS
SBSTR
SC
SCH
SCHED
SCHEM
SCP
SCRN
SCT
SCWD
SD
SDG
SECT
SEG
SEL
SEP
SF
SFTWD
SGD
SGL
SHR
SHR HD
SHRD
SHT
SHTHG
SHV
SIM
SJ
SJI
SK
SKLT
SLDG
SLNT
SM
SMK
SND INS
SPEC
SPKLR
SPKR
SPLY
SPR
SQ
SQ IN
SQ YD
SST
ST
STC
STD
STIF
STL JST
STL LNTL
STL PL
STL RF DK
STL TB
STL TR
STNLS
STOR
STR
STRUCT
STRUCT STL
SUB
SURF
SUSP
SUSP CLG
SW
SWDR
SYM
SYNTH
SYS
REMOTE CONTROL
REFLECTED CEILING PLAN
RECEIVER
ROAD OR ROOF DRAIN
RECESSED
RECEIVED
RECEPTACLE
RECTANGLE
REFERENCE OR REFRIGERATOR
REFRACTORY, REFRIGERATION
REGISTER
REINFORCE
REPAIR
REPLACE
REQUIRE
REQUIRED
RETURN
REVISION
ROOFING
REQUEST FOR INFORMATION
REQUEST FOR PROPOSAL
ROOM FINISH SCHEDULE
ROOF LEADER
RAILING
ROOM
NURSE CALL LIGHT/ROOM LIGHT
ROUND
ROUGH OPENING
RIGHT OF WAY
ROUGH SAWN
RESILIENT SHEET VINYL
RIGHT
ROOF VENT
REVERSE
RAIN WATER LEADER
SOLID SURFACE
SUPPLY AIR
SALVAGE
SAMPLE
SANITARY
SPLASH BLOCK
STYRENE BUTADIEN STYRENE
SUBSTRATE
SHARPS CONTAINER
SCHOOL
SCHEDULE
SCHEMATIC
SCUPPER
SCREEN
SHOWER CURTAIN TRACK
SOLID CORE WOOD DOOR
SMOKE DETECTOR/SOAP DISPENSER
SIDING
SECTION
SEGMENT
SELECT
SEPARATE
SQUARE FOOT (FEET)
SOFTWOOD
SLIDING GLASS DOOR
SINGLE
SHOWER
SHOWER HEAD
SHOWER DRAIN
SHEET
SHEATHING
SHELVING
SIMILAR
SCORED JOINT
STEEL JOIST INSTITUTE
SKETCH
SKYLIGHT
SLIDING
SEALANT
SHEET METAL
SMOKE
SOUND INSULATION
SPECIFICATION
SPRINKLER
SPEAKER
SUPPLY
SINGLE PLY ROOF SYSTEM
SQUARE
SQUARE INCH
SQUARE YARD
STAINLESS STEEL
STAIRS OR STREET
SOUND TRANSMISSION CLASS
STANDARD
STIFFENER
STEEL JOIST
STEEL LINTEL
STEEL PLATE
STEEL ROOF DECK
STEEL TUBE
STEEL TRUSS
STAINLESS
STORAGE
STRINGERS
STRUCTURAL
STRUCTURAL STEEL
SUBSTITUTE
SURFACE
SUSPEND
SUSPENDED CEILING
SWITCH
SWING DOOR
SYMBOL
SYNTHETIC
SYSTEM
T T&M
TB
TBD
TECH
TEL
TEMP
THERM
THK
THRES
THRU
THRUOUT
TMPD
TMPD GL
TN
TO
TO FDN
TOB
TOM
TOP
TOS
TOW
TPD
TRANS
TRTD
TS
TSTAT
TV
TYP
U
UC
UGND
UL
ULT
UNFIN
UNO
UPS
UR
UTIL
UV
VAC
VAR
VEH
VENT
VERT
VEST
VFD
VIC
VID
VIF
VNR
VOC
VOL
VR
VTR
W/ W/O
WBL
WC
WD
WDW
WF
WFR
WFS
WH
WHSE
WP
WPM
WR
WS
WSCT
WT
X BRACE
XPS
YD
TREAD OR THERMOSTAT
TIME AND MATERIALS
TOWEL BAR
TACK BOARD
TECHNICAL
TELEPHONE
TEMPERATURE OR TEMPORARY
THERMAL
THICKNESS
THRESHOLD
THROUGH
THROUGHOUT
TEMPERED
TEMPERED GLASS
TRUE NORTH
TOP OF ___
TOP OF FOUNDATION
TOP OF BEAM
TOP OF MASONRY
TOP OF PARAPET
TOP OF STEEL
TOP OF WALL
TOILET PAPER DISPENSER
TRANSOM
TREATED
TUBE STEEL
THERMOSTAT
TELEVISION
TYPICAL
HEAT TRANSFER COEFFICIENT
UNDERCUT
UNDERGROUND
UNDERWRITERS LABORATORIES
ULTIMATE
UNFINISH
UNLESS NOTED OTHERWISE
UNINTERRUPTIBLE POWER SUPPLY
URINAL
UTILITY
ULTRAVIOLET
VACUUM
VARIES
VEHICLE
VENTILATION
VERTICAL
VESTIBULE
VARIABLE FREQUENCY DRIVE
VICINITY
VIDEO
VERIFY IN FIELD
VENEER
VOLATILE ORGANIC COMPOUND
VOLUME
VAPOR RETARDER
VENT THROUGH ROOF
WITH
WITHOUT
WOOD BLOCKING
WATER CLOSET
WOOD
WINDOW
WIDE FLANGE
WOOD FRAME
WOOD FURRING STRIPS
WATER HEATER
WAREHOUSE
WATERPROOFING
WATERPROOF MEMBRANE
WEATHER RESISTANT
WEATHERSTRIP OR WALL SCONCE
WAINSCOT
WEIGHT OR WINDOW TREATMENT
CROSS BRACE
EXTRUDED POLYSTYRENE BOARD
YARD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106TH STREET
DES MOINES IA 50322
BID DOCUMENT SUBMISSION
C U s e rs
\c z u p a n \D o c u m e n ts
\1
-A -R c z u p a n J A
M E
X .r v t
/2
/2
:5
:2
P
M
GI002
ABBREVIATIONS PERFORM SITE PREP
FOR SPS EQUIPMENT
FARGO, ND
437-CSI-241
1/22/2025 Checker Author 17639
NOYES
APPLICABLE REGULATIONS
GENERAL TYPE OF PROJECT
NFPA NATIONAL FIRE CODES (EXCEPTION: NFPA 5000 & 900)
2022 FGI GUIDELINES
2024 NFPA 101 (LIFE SAFETY CODE)
ABA STANDARDS (2015) (ABAAS)
2024 IBC
REMODEL
ADDITION
NEW BUILDING
PROJECT DESCRIPTION
CODE SUMMARY
REMODELING AND SITE PREP FOR EQUIPMENT REPLACEMET IN
THE STERILE PROCESSING DEPARTMENT. SITE PREPERATION
FOR TEMPORARY STERILE PROCESSING DEPARTMNET TRAILER
AND CONNECTING ENCLOUSRE FROM TRAILER TO BUILDING.
VA BARRIER FREE DESIGN STANDARD (PG-18-13)
NOYESAUTHORITIES HAVING JURISDICTION (AHJ's)
THE JOINT COMMISSION (JC)
U.S. DEPARTMENT OF VETERANS AFFAIRS (VA)
TESTRATING (HRS)
EXTERIOR DOORS AND WINDOWS
SHAFTS AND EXIT PASSAGEWAYS
OTHER
ROOF CONSTRUCTION
PRIME & SEC. FLOOR BEAMS, JOISTS
FLOOR/CEILING ASSEMBLY
FLOOR CONSTRUCTION
INTERIOR
NON-BEARING WALLS AND PARTITIONS
BEARING WALLS
COLUMNS
GIRDERS
TRUSSES
ROOF/CEILING ASSEMBLY
EXTERIOR
INTERIOR BEARING WALLS
EXTERIOR BEARING WALLS
STRUCTURAL FRAME
AREA SEPARATIONS / FIRE WALLS
FIRE-RESISTIVE REQUIREMENTS
TYPE(S) OF CONSTRUCTION
CONSTRUCTION TYPE(S)
SEE LIFE SAFETY PLANS
See Life Safety Plans
2 ASTM E136
0 NA
NA
(NAPA 220 TABLE 4.1.1) II (222)
OSHA STANDARDS
VA SEISMIC DESIGN REQUIREMENTS H-18-8
NATIONAL ELECTRIC CODE (NEC)
ASME BOILER AND PRESSURE VESSEL CODE
ASME CODE FOR PRESSURE PIPING
BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE,
AMERICAN CONCRETE INSTITUTE AND COMETARY (ACI 318)
MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE
FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL
BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
ENERGY POLICY ACT OF 2005 (EPAct)
DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS
FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE
RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL
BUILDINGS, 10 CFR PARTS 433,434 AND 435
FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE
BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)
EXECUTIVE ORDER 14057
THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED
IN THE GENERAL REQUIREMENTS SECTION 01010 OF THE VA
MASTER CONSTRUCTION SPECIFICATION
VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE
STANDARD 62.1-2004
SAFETY STANDARD FOR REFRIGERATION SYSTEMS - ASHRAE
STANDARD 15 -2007
VA FIRE PROTECTION DESIGN MANUAL
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA
NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER
GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL)
AREAS OF REFUGE REQUIRED
MEANS OF EGRESS CAPACITY (width in inches)
EGRESS
34"
NOYES
ACCESSIBLE MEANS OF EGRESS ("MOE") REQUIRED
ELEVATOR REQUIRED AS MEANS OF EGRESS
NOYES
(Section 8.3)
CHANGE OF OCCUPANCY?
BUSINESS
SEPARATED OCCUPANCIES?
FIRE BARRIER RATING(S) SEE LIFE SAFETY PLANS
OCCUPANCY CLASSIFICATION(S)
OCCUPANCIES
(If Remodeling)
2018 LSC (TABLE 6.1.14.1)
(LSC CH 12-42)
VA PHYSICAL SECURITY AND RESILIENCE DESIGN MANUAL (PSRDM)
ASTM E136
ASTM E136
ASTM E136
ASTM E136
ASTM E136
ASTM E136
ASTM E136
ASTM E136
(NAPA 220 TABLE 4.1.1) V (000)
SPS AREA AND MAIN HOSPITAL
TEMPORARY TRAILER CONNECTOR
TESTRATING (HRS)
EXTERIOR DOORS AND WINDOWS
SHAFTS AND EXIT PASSAGEWAYS
OTHER
ROOF CONSTRUCTION
PRIME & SEC. FLOOR BEAMS, JOISTS
FLOOR/CEILING ASSEMBLY
FLOOR CONSTRUCTION
INTERIOR
NON-BEARING WALLS AND PARTITIONS
BEARING WALLS
COLUMNS
GIRDERS
TRUSSES
ROOF/CEILING ASSEMBLY
EXTERIOR
INTERIOR BEARING WALLS
EXTERIOR BEARING WALLS
STRUCTURAL FRAME
See Life Safety Plans
0 NA
NA
SPS & MAIN HOSPITAL II(222)
FIRE-RESISTIVE REQUIREMENTS
TEMP TRAILER CONNECTOR V(000)
NA
NA
NA
NA
NA
NA
NA
NA
BB-20
RECEIVING /
DECONTAMINATION
BA-44
PASSAGE/
ANTE ROOM
BA-44A
WOMANS
LOCKER
BA-44B
MENS
LOCKER
BB-21
CART LIFT
S-3
MACHINE
BA-42
STORAGE
BB-18A
MANUAL
CART WASH
BB-18B
CART WASH
BB-15
CLEAN
STORAGE
BB-15B
MEN'S
LOCKER
BB-15B1
TOILET
BA-30
IRM HUB
C004
PASSAGE
BB-15A
WOMEN'S
LOCKER
BB-15A1
TOILET
BB-12
PASSAGE
BB-16B
CLERK
BB-16A
CLERK
C002
CORRIDOR
BA-35
MEN'S
BA-37
HAC
BA-39
WOMEN'S
BA-41
MECHANICAL
C001
CORRIDOR
BB-18C
PREP/
ASEMBLY /
STORAGEBB-18E
LOW TEMP
STERILIZERS
C006
CORRIDOR
BA-43
BREAK
ROOM
STAIRS
BA-72
MECHANICAL
STAIR
BB-20A
STERILIZERS
BB-20B
SCOPE
PROCESSING
ALL PARTITIONS TO SPAN FROM
FLOOR TO UNDERSIDE OF DECK
ABOVE AND BE SEALED TOP AND
BOTTOM WITH FIRE CAULK
BB-34
MECHANICAL
C008
CART LIFT
S-4
MACHINE
BB-34A
UPS
BB-24
BREAK OUT
BB-30
ASSIST
CHIEF SPD
BB-76
STAFF
LOUNGE
BB-26
Room
BB-22
Room
BB-27
PHARMACY
CHIEFBB-28
PHARMACYBB-31
PHARMACY
BB-75
PHARMACY
RECEIVING
BB-80
IN-PATIENT
PHARMACY
BA-09
SOLED
LINNEN
BA-10
BLDG-9
SWITCHGEAR
BA-45
OFFICE
STAIR
BA-69
CONFREENCE
ROOM
BA-70
OFFICE
BA-65
OFFICE
BA-70A
MECHANICAL
EXIT
EX
IT
EX
IT
FEC
FEC
FEC
FEC
EX
IT
TRAVEL DISTANCE
130'-6"
TRAVEL DISTANCE
91'-4"
TRAVEL DISTANCE
143'-7"
TRAVEL DISTANCE
203'-2"
TRAVEL DISTANCE
60'-9"
BA-70B
ANTE ROOM
BA-70C
HAC
BA-44C
HAC
FEC (E)
FEC (E)
FEC (E)
FEC (E)
LIFE SAFETY SYMBOLS
SMOKE TIGHT
ASSEMBLY
1 HOUR FIRE
BARRIER
2 HOUR FIRE
BARRIER
3 HOUR FIRE
BARRIER
1 HOUR FIRE &
SMOKE BARRIER
2 HOUR FIRE &
SMOKE BARRIER
3 HOUR FIRE &
SMOKE BARRIER
HE
TRAVEL DISTANCE
100'-10"
TRAVEL DISTANCE
EA
EDEXIT EXIT
HORIZONTAL EXIT
EXIT DISCHARGE
EXIT ACCESS
FIRE
EXTINGUISHER
FE
FIRE
EXTINGUISHER
CABINET
FEC
LIMITS OF
CONSTRUCTION
SMOKE
COMPARTMENT
BOUNDARY
HEALTH CARE
SUITE
NOTE: NOT ALL SYMBOLS MY BE USED ON EACH PLAN
OCCUPANCY
SEPARATION
SHAFT
ADJACENT SYMBOLS SHOW PARTITION RATING AND
DAMPER REQUIREMENTS
HAZARDOUS USE
ADJACENT SYMBOLS SHOW PARTITION RATING.
OPENINGS REQUIRE CLOSER & LATCH
EXIT PASSAGEWAY
RATE AS STAIR
ALL OPENINGS TO BE RATED AS STAIR SHAFT
CORRIDOR
WALLS TO LIMIT THE TRANSFER OF SMOKE
ADJUNCT CORRIDOR or PSYCHIATRIC AREA or CONSTRUCTED WITH MIN. 4'-0" CLEAR
WITH (PER CHAPTER 19)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106TH STREET
DES MOINES IA 50322
BID DOCUMENT SUBMISSION
C U s e rs
\c z u p a n \D o c u m e n ts
\1
-A -R c z u p a n J A
M E
X .r v t
/2
/2
:5
:3
P
M
GI101
LOWER LEVEL LIFE SAFETY PLAN -
AREA A
PERFORM SITE PREP
FOR SPS EQUIPMENT
FARGO, ND
437-CSI-241
1/22/2025 GJB
17639
1/8" = 1'-0"1 LOWER LEVEL LIFE SAFETY PLAN
NOTE:
• MOBILE ICRA CONTAINMENT SYSTEMS WILL NEED TO BE USED IN
AREAS OF WORK THAT ARE OUTSIDE OF THE INDICATED ICRA /
CONSTRUCTION BARRIER LOCATIONS. SEE MEPT DRAWINGS FOR
ADDITIONAL AREAS OF WORK.
• SEE SHEET GC100 FOR INFECTION CONTROL RISK ASSESSMENT &
PRE-CONSTRUCTION RISK ASSESSMENT NOTES AND CATEGORIES
• SEE SHEET GC101 FOR PHASING INFORMATION
• CEILING TILE MUST BE REPLACED AT THE END OF EACH SHIFT FOR
WORK OUTISDE OF CONSTRUCION BARRIERS. IF TILES CAN BE
REPLACED THE SPRINKLER SYSTEM MAY BE CONSIDERED OUT OF
SERVICE IN THSES AREAS AND A 1 HOUR RATED CONCTRUCION
BARRIER WILL BE REQUIRED.
ICRA / 1 HOUR - CONSTRUCTION
BARRIER LOCATIOND
O O
R
0 8' 16'4'
T-01
TEMP
TRAILER
CONNECTION
STAIR
BE-28
LOADING
DOCK
BE-27
MECH
BE-25
MECH
BD-47
ENG
BD-45
ENG
BD-43
GEMS
BD-41
EM-MNG
BD-50
ENGINEERING
BD-50B
ENG CHIEF
BD-50A
A CHIEF
BD-42
ENG CONF
T-01A
VESTIBULE
EA
EX
IT
EX
IT
EXITEXIT
EXIT
STAIR BE-29
MECH
CORRIDOR
BE-30
STORAGE
BE-34
PHARMACY
STORAGE
BE-24
LINNEN
BD-39
ENG
BD-37
ENG
BD-35
ENG
BD-36
SAFETY
BD-38
EEO
BD-40
FSAFETY
BD-10A
BE-20
LINNEN
BE-10
MAIL ROOM
58A
CORRIDOR
BD-10A
BE-09
MECH
BE-07
Room
EXIT
EXIT
BD-92
Room
BD-90
EQUIPMENT
BD-95
BREAKROOM
BD-80
STORAGE
BD-91
Room
FEC
EA
EA
FE
FE
FE
BD-34
PRODUCTION
BD-33
MS
BD-31
ENGBD-11
WD-PROP
BD-05
TR
AV
EL
D
IS
TA
NC
E
'-3
TRAVEL DISTANCE
47'-7" TR
AV
EL
D
IS
TA
NC
E
'-5
TR
AV
EL
D
IS
TA
NC
E
'-0
TR
AV
EL
D
IS
TA
NC
E
'-0
TR
AV
EL
D
IS
TA
NC
E
'-5
TR
AV
EL
D
IS
TA
NC
E
0'
-0
STERIS
STORAGE
CONTAINER
5k
W M
O
BL
E G
EN
ER
AT
O
R -S
EE
EL
EC
TR
IC
AL
BUISNESS OCCUPANCY
TYPE V(000)
TYPE II(222)
2 HOUR FIRE WALL SEPERATION
EXISTING BUISNESS OCCUPANCY
EXISTING BUISNESS
OCCUPANCY
FE
NOYES
APPLICABLE REGULATIONS
GENERAL TYPE OF PROJECT
NFPA NATIONAL FIRE CODES (EXCEPTION: NFPA 5000 & 900)
2022 FGI GUIDELINES
2024 NFPA 101 (LIFE SAFETY CODE)
ABA STANDARDS (2015) (ABAAS)
2024 IBC
REMODEL
ADDITION
NEW BUILDING
PROJECT DESCRIPTION
CODE SUMMARY
REMODELING AND SITE PREP FOR EQUIPMENT REPLACEMET IN
THE STERILE PROCESSING DEPARTMENT. SITE PREPERATION
FOR TEMPORARY STERILE PROCESSING DEPARTMNET TRAILER
AND CONNECTING ENCLOUSRE FROM TRAILER TO BUILDING.
VA BARRIER FREE DESIGN STANDARD (PG-18-13)
NOYESAUTHORITIES HAVING JURISDICTION (AHJ's)
THE JOINT COMMISSION (JC)
U.S. DEPARTMENT OF VETERANS AFFAIRS (VA)
TESTRATING (HRS)
EXTERIOR DOORS AND WINDOWS
SHAFTS AND EXIT PASSAGEWAYS
OTHER
ROOF CONSTRUCTION
PRIME & SEC. FLOOR BEAMS, JOISTS
FLOOR/CEILING ASSEMBLY
FLOOR CONSTRUCTION
INTERIOR
NON-BEARING WALLS AND PARTITIONS
BEARING WALLS
COLUMNS
GIRDERS
TRUSSES
ROOF/CEILING ASSEMBLY
EXTERIOR
INTERIOR BEARING WALLS
EXTERIOR BEARING WALLS
STRUCTURAL FRAME
AREA SEPARATIONS / FIRE WALLS
FIRE-RESISTIVE REQUIREMENTS
TYPE(S) OF CONSTRUCTION
CONSTRUCTION TYPE(S)
SEE LIFE SAFETY PLANS
See Life Safety Plans
2 ASTM E136
0 NA
NA
(NAPA 220 TABLE 4.1.1) II (222)
OSHA STANDARDS
VA SEISMIC DESIGN REQUIREMENTS H-18-8
NATIONAL ELECTRIC CODE (NEC)
ASME BOILER AND PRESSURE VESSEL CODE
ASME CODE FOR PRESSURE PIPING
BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE,
AMERICAN CONCRETE INSTITUTE AND COMETARY (ACI 318)
MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE
FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL
BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
ENERGY POLICY ACT OF 2005 (EPAct)
DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS
FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE
RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL
BUILDINGS, 10 CFR PARTS 433,434 AND 435
FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE
BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)
EXECUTIVE ORDER 14057
THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED
IN THE GENERAL REQUIREMENTS SECTION 01010 OF THE VA
MASTER CONSTRUCTION SPECIFICATION
VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE
STANDARD 62.1-2004
SAFETY STANDARD FOR REFRIGERATION SYSTEMS - ASHRAE
STANDARD 15 -2007
VA FIRE PROTECTION DESIGN MANUAL
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA
NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER
GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL)
AREAS OF REFUGE REQUIRED
MEANS OF EGRESS CAPACITY (width in inches)
EGRESS
34"
NOYES
ACCESSIBLE MEANS OF EGRESS ("MOE") REQUIRED
ELEVATOR REQUIRED AS MEANS OF EGRESS
NOYES
(Section 8.3)
CHANGE OF OCCUPANCY?
BUSINESS
SEPARATED OCCUPANCIES?
FIRE BARRIER RATING(S) SEE LIFE SAFETY PLANS
OCCUPANCY CLASSIFICATION(S)
OCCUPANCIES
(If Remodeling)
2018 LSC (TABLE 6.1.14.1)
(LSC CH 12-42)
VA PHYSICAL SECURITY AND RESILIENCE DESIGN MANUAL (PSRDM)
ASTM E136
ASTM E136
ASTM E136
ASTM E136
ASTM E136
ASTM E136
ASTM E136
ASTM E136
(NAPA 220 TABLE 4.1.1) V (000)
SPS AREA AND MAIN HOSPITAL
TEMPORARY TRAILER CONNECTOR
TESTRATING (HRS)
EXTERIOR DOORS AND WINDOWS
SHAFTS AND EXIT PASSAGEWAYS
OTHER
ROOF CONSTRUCTION
PRIME & SEC. FLOOR BEAMS, JOISTS
FLOOR/CEILING ASSEMBLY
FLOOR CONSTRUCTION
INTERIOR
NON-BEARING WALLS AND PARTITIONS
BEARING WALLS
COLUMNS
GIRDERS
TRUSSES
ROOF/CEILING ASSEMBLY
EXTERIOR
INTERIOR BEARING WALLS
EXTERIOR BEARING WALLS
STRUCTURAL FRAME
See Life Safety Plans
0 NA
NA
SPS & MAIN HOSPITAL II(222)
FIRE-RESISTIVE REQUIREMENTS
TEMP TRAILER CONNECTOR V(000)
NA
NA
NA
NA
NA
NA
NA
NA
LIFE SAFETY SYMBOLS
SMOKE TIGHT
ASSEMBLY
1 HOUR FIRE
BARRIER
2 HOUR FIRE
BARRIER
3 HOUR FIRE
BARRIER
1 HOUR FIRE &
SMOKE BARRIER
2 HOUR FIRE &
SMOKE BARRIER
3 HOUR FIRE &
SMOKE BARRIER
HE
TRAVEL DISTANCE
100'-10"
TRAVEL DISTANCE
EA
EDEXIT EXIT
HORIZONTAL EXIT
EXIT DISCHARGE
EXIT ACCESS
FIRE
EXTINGUISHER
FE
FIRE
EXTINGUISHER
CABINET
FEC
LIMITS OF
CONSTRUCTION
SMOKE
COMPARTMENT
BOUNDARY
HEALTH CARE
SUITE
NOTE: NOT ALL SYMBOLS MY BE USED ON EACH PLAN
OCCUPANCY
SEPARATION
SHAFT
ADJACENT SYMBOLS SHOW PARTITION RATING AND
DAMPER REQUIREMENTS
HAZARDOUS USE
ADJACENT SYMBOLS SHOW PARTITION RATING.
OPENINGS REQUIRE CLOSER & LATCH
EXIT PASSAGEWAY
RATE AS STAIR
ALL OPENINGS TO BE RATED AS STAIR SHAFT
CORRIDOR
WALLS TO LIMIT THE TRANSFER OF SMOKE
ADJUNCT CORRIDOR or PSYCHIATRIC AREA or CONSTRUCTED WITH MIN. 4'-0" CLEAR
WITH (PER CHAPTER 19)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2882 106TH STREET
DES MOINES IA 50322
BID DOCUMENT SUBMISSION
C U s e rs
\c z u p a n \D o c u m e n ts
\1
-A -R c z u p a n J A
M E
X .r v t
/2
/2
:5
:3
P
M
GI102
LOWER LEVEL LIFE SAFETY PLAN -
AREA B
PERFORM SITE PREP
FOR SPS EQUIPMENT
FARGO, ND
437-CSI-241
1/22/2025 JLU GJB
17639
1/8" = 1'-0"1 LOWER LEVEL LIFE SAFETY PLAN
0 8' 16'4'
NOTE:
• MOBILE ICRA CONTAINMENT SYSTEMS WILL NEED TO BE USED IN
AREAS OF WORK THAT ARE OUTSIDE OF THE INDICATED ICRA /
CONSTRUCTION BARRIER LOCATIONS. SEE MEPT DRAWINGS FOR
ADDITIONAL AREAS OF WORK.
• SEE SHEET GC100 FOR INFECTION CONTROL RISK ASSESSMENT &
PRE-CONSTRUCTION RISK ASSESSMENT NOTES AND CATEGORIES
• SEE SHEET GC101 FOR PHASING INFORMATION
• CEILING TILE MUST BE REPLACED AT THE END OF EACH SHIFT FOR
WORK OUTISDE OF CONSTRUCION BARRIERS. IF TILES CAN BE
REPLACED THE SPRINKLER SYSTEM MAY BE CONSIDERED OUT OF
SERVICE IN THSES AREAS AND A 1 HOUR RATED CONCTRUCION
BARRIER WILL BE REQUIRED.
ICRA / 1 HOUR - CONSTRUCTION
BARRIER LOCATIOND
O O
R
PHASE 1: RO WATER SYSTEM AND ROOM CONSTRUCTION
INFECTION CONTROL RISK ASSESSMENT (ICRA) BY
PROJECT AREA USE AND PHASE
CONSTRUCTION ACTIVITY CATEGORY:
PATIENT RISK CATEGORY:
INFECTION PREVENTION AND CONTROL MEASURE:
CATEGORY B
MEDIUM RISK
LEVEL OF PRECAUTION - II
PHASE 2A: SITE PREPARATION
SEE PCRA RISK ASSESSMENT
PHASE 2B: SPD TRAILER DELIVERY AND SET-UP
SEE PCRA RISK ASSESSMENT
PHASE 2C: SPD TRAILER ENCLOSURE AND MEPT CONNECTION
SEE PCRA RISK ASSESSMENT
PHASE 3: SPS CONSTRUCTION
CONSTRUCTION ACTIVITY CATEGORY:
PATIENT RISK CATEGORY:
CATEGORY D
HIGHEST RISK
LEVEL OF PRECAUTION - IVINFECTION PREVENTION AND CONTROL MEASURE:
PHASE 4: SPD TRAILER & ENCLOSURE REMOVAL AND SITE WORK
SEE PCRA RISK ASSESSMENT
PHASE 1: RO WATER SYSTEM
SEE ICRA RISK ASSESSMENT
PHASE 2A : SITE PREP
CONSTRUCTION ACTIVITY TYPE - LARGE-SCALE
PHASE 2B : TRAILER DELIVERY AND CONFECTION
CONSTRUCTION ACTIVITY TYPE - LARGE-SCALE
PHASE 2C : TRAILER CONNECTING ENCLOSURE
CONSTRUCTION ACTIVITY TYPE - LARGE-SCALE
PHASE 3 : SPS CONSTRUCTION
SEE ICRA RISK ASSESSMENT
PHASE 4 : SITE REMEDIATION - TRAILER REMOVAL
CONSTRUCTION ACTIVITY TYPE - LARGE-SCALE
PRE-CONSTRUCTION RISK ASSESSMENT (PCRA) BY
PROJECT AREA USE AND PHASE
PRE-CONSTRUCTION RISK ASSESSMENT (PCRA)
INSPECTION / UPKEEP:
• WORK CAN BE COMPLETED IN A SINGLE SHIFT, NOT TO EXCEED 10 HOURS.
• PATIENTS, EMPLOYEES AND/OR VISITORS MAY BE IN THE AREA DEPENDING ON THE ACTIVITY.
• WORK THAT DOES NOT CREATE DUST OR DEBRIS.
• WORK THAT DOES NOT CREATE VAPORS OR FUMES.
• REMOVAL OF CEILING TILE OR ACCESS TO MECHANICAL OR ELECTRICAL CHASE FOR VISUAL
INSPECTION THAT WILL NOT IMPAIR FIRE SAFETY SYSTEMS AND ARE LIMITED TO 1 TILE PER 50 SQUARE FEET WITH LIMITED EXPOSURE TIME (NOT TO EXCEED AN HOUR FOR EACH TILE) WITHIN THE
SHIFT.
• MINOR INTERIOR UPDATES (E.G., REPLACING FLOOR OR CEILING TILES, CARPENTRY WORK TO INCLUDE HANGING SIGNAGE, AND PAINTING WITH HAND TOOLS) THAT DO NOT CREATE VIBRATION OR
NOISE.
• LIMITED BUILDING SYSTEM MAINTENANCE THAT DOES NOT REQUIRE LOCK OUT TAG OUT (LOTO)
SUCH AS PLUMBING ON POTABLE SYSTEMS LIMITED TO FAUCET REPLACEMENT, STEAM TRAP
REPLACEMENT ETC. AND ELECTRICAL WORK SUCH AS REPLACEMENT OF BULBS, RECEPTACLES, OR
SWITCHES.
1. IMMEDIATELY REPLACE ANY CEILING TILE, CLOSE ACCESS PANELS,
ETC., UPON COMPLETION OF WORK.
2. SITE VISITS OF CONSTRUCTION AREA ARE REQUIRED WEEKLY BY
MEMBER OF MULTI-DISCIPLINARY TEAM. SITE VISITS WILL BE
DOCUMENTED ON STANDARD CHECKLIST.
3. SITE SPECIFIC SAFETY PLAN, TASK HAZARD ANALYSIS, AND HAZARD
COMMUNICATION REQUIRED TO BE PROVIDED BY THE CONTRACTOR
AND APPROVED WHERE A CONTACT IS IN PLACE. FOR INTERNAL
WORK THE SHOP INVOLVED MUST WORK WITH SAFETY TO ENSURE
PROPER PRECAUTIONS ARE IN PLACE.
4. MUST ADDRESS IDENTIFIED HAZARDS AND CONTROLS THAT WILL BE
IMPLEMENTED TO ENSURE MINIMAL IMPACT TO PATIENTS, EMPLOYEES,
CONTRACTORS AND FACILITY.
5. COMMUNICATION AND COORDINATION PLAN FOR ALL AFFECTED
AREAS
ACTIVITY TYPE AND DESCRIPTION CONTROL MEASURES
SMALL SCALE CONSTRUCTION:
• PROLONGED WORK THAT MAY TAKE LONGER THAN A SINGLE SHIFT BUT NOT EXCEEDING SIX
MONTHS.
• PATIENTS AND EMPLOYEES ARE NOT TO BE IN THE AREA UNTIL ACTIVITY IS COMPLETED.
• WORK THAT CREATES SOME NOISE AND VIBRATION DUE TO POWER TOOL USE.
• SELECTIVE DEMOLITION/REMOVAL OF PREEXISTING FLOOR COVERING, CASEWORK, LAY-IN
CEILING, OR OTHER ARCHITECTURAL ELEMENTS THAT MAY
• DISTURB ASBESTOS, LEAD OR SILICA
• CREATE THE POTENTIAL FOR FALLING OBJECTS
• CREATE VIBRATION AND/OR NOISE IN EXCESS OF 80 DB(A) IN SURROUNDING AREAS.
• CAUSE PENETRATIONS IN FIRE OR SMOKE BARRIER
• PLUMBING WORK SUCH AS THE INSTALLATION OF NEW SINKS, SHOWERS AND TOILETS AND
ASSOCIATED PLUMBING THAT REQUIRES UTILITY OUTAGES OR WORK ON THE STEAM SYSTEM
THAT MAY REQUIRE:
• LOTO
• THE USE OF COMPRESSED GAS CYLINDERS
• ELECTRICAL WORK SUCH AS INSTALLATION OF CONDUIT AND WIRE FOR LIGHTING, RECEPTACLES AND SWITCHES FOR AN AREA, THE INSTALLATION OF CONDUIT AND WIRE FOR NEW DEVICES SUCH
AS TERMINAL UNITS, FANS ETC. ELECTRICAL WORK SUCH AS INSTALLATION OF
CABLING/WIRING/CONDUIT FOR A SINGLE DEVICE, INSTALLATION OF NEW DEVICE SUCH AS A LIGHT
FIXTURE THAT REQUIRE LOTO.
• AIR HANDLER AND/OR FAN SHUTDOWN/STARTUP AND HVAC WORK SUCH AS REPLACEMENT OF A
SINGLE DIFFUSER, SINGLE TERMINAL UNIT, A SINGLE DEVICE AND THE INSTALLATION OF
DUCTWORK, DIFFUSERS, AND TERMINAL UNITS FOR AN AREA THAT MAY REQUIRE:
• WORK ON LADDERS
• RIGGING, HOISTING OR LIFTING OF EQUIPMENT OR MATERIALS OVERHEAD
• MODIFICATION OF EXISTING FIRE ALARM AND SUPPRESSION SYSTEMS REQUIRING SYSTEM
OUTAGES AND ILSMS OR OBSTRUCTION OF EXITS AND OR IMPACT ON CORRIDORS.
• ARCHITECTURAL, STRUCTURAL, OR ANY OTHER WORK THAT MAY CAUSE VAPORS OR FUMES SUCH
AS:
• ROOFING WORK
• FLOORING WORK
• PAINTING OR OTHER LARGE-SCALE USE OF SUCH SUBSTANCES.
LARGE SCALE CONSTRUCTION:
• WORK EXCEEDING 6 MONTHS IN DURATION.
• PATIENTS AND EMPLOYEES ARE NOT TO BE IN THE AREA UNTIL ACTIVITY IS COMPLETED.
• EXCAVATION OR HEAVY EQUIPMENT USE TAKING PLACE
• DIG SAFE REQUIRED UTILITY LOCATION
• TRENCH SAFETY
• DUST CONTROL PLAN
• EQUIPMENT EXHAUST, NOISE, VIBRATION
• CONFINED SPACE ENTRY REQUIRED (PERMIT REQUIRED OR NOT)
• REQUIRES CRANE WORK
O GENERAL CRANE WORK
O LIFT OVER BUILDINGS
• INCLUDES ELEVATED WORK
• ROOF WORK, FALL PROTECTION
• WINDOW WORK, SCAFFOLDING AND FALL PROTECTION
• ODOR CONTROL
• WELDING, CUTTING OR USE OF TORCHES REQUIRING BURN PERMITS
• DEMOLITION OF BUILDING COMPONENTS AND INFRASTRUCTURE INCLUDING REMOVAL OF MULTIPLE
DOORS, WALLS, FRAMING, CEILINGS, FLOORING, PIPING, ELECTRICAL AND HVAC THAT MAY
• REQUIRE ASBESTOS, LEAD OR SILICA ABATEMENT
• CREATE THE POTENTIAL FOR FALLING OBJECTS
• CREATE VIBRATION AND/OR NOISE IN EXCESS OF 90 DB(A) IN SURROUNDING AREAS.
• CAUSE BREACHES TO FIRE OR SMOKE BARRIER
• THE INSTALLATION BUILDING COMPONENTS SUCH AS NEW WALLS, CEILINGS AND DOORS INCLUDING FRAMING, DRYWALL AND ASSOCIATED PLASTER WORK THAT REQUIRES TRANSPORT OF SIGNIFICANT
MATERIALS THROUGH BUILDING AND UP ELEVATORS I.E., WEIGHT LIMITS OF FLOORS AND
ELEVATORS
• PLUMBING WORK REQUIRING LOTO AND SYSTEM SHUTDOWN AND STARTUP SUCH AS THE
INSTALLATION OF:
• NEW MEDICAL GAS SYSTEMS,
• STEAM/HEATING HOT WATER, CONDENSATE SYSTEMS,
• POTABLE WATER AND SANITARY DRAINAGE, MULTIPLE SINKS, SHOWERS AND TOILET
INCLUDING ASSOCIATED PLUMBING.
• ELECTRICAL WORK SUCH AS INSTALLATION OF ELECTRICAL FEEDERS, DISTRIBUTION PANELS, CONDUIT AND WIRE FOR LIGHTING, RECEPTACLES AND SWITCHES FOR AN AREA, THE INSTALLATION OF CONDUIT AND WIRE FOR NEW DEVICES SUCH AS TERMINAL UNITS, FANS ETC. REQUIRING LOTO
AND SYSTEM ISOLATION.
• INSTALLATION OF FIRE ALARM AND SUPPRESSION SYSTEMS REQUIRING OUTAGES OF THOSE
SYSTEMS AND ILSMS OR CLOSURE OF EXITS/CORRIDORS
• MECHANICAL WORK SUCH AS THE INSTALLATION OF AIR HANDLING EQUIPMENT, ASSOCIATED
DUCTWORK, DIFFUSERS, HEAT EXCHANGERS, TERMINAL UNITS AND CONTROLS REQUIRING LIFTING
AND SUPPORT OF EQUIPMENT AND SYSTEMS.
ALL CONTROL MEASURES IN THE ROW ABOVE AND THE FOLLOWING:
1. HAZARD COMMUNICATION CHEMICAL INVENTORY REQUIRED TO BE
PROVIDED BY THE CONTRACTOR AND APPROVED.
2. WHERE CONSTRUCTION, RENOVATION AND MAINTENANCE ARE DONE
IN AN ACCREDITED FACILITY, AND ILSM ASSESSMENT IS REQUIRED TO
BE DONE AND ILSMS PUT INTO PLACE IN ACCORDANCE WITH TJC
LS.01.02.01 AND THE LOCAL FACILITY POLICY INCLUDING FIRE WATCH IF
NECESSARY. STAFF IS TRAINED AND THE ILSM IS VERIFIED REGULARLY
3. HOT WORK OR BURN PERMITS IN PLACE AND STAFF TRAINED
4. LOTO PROCEDURES IN PLACE AND STAFF TRAINED ON THEIR USE
5. SITE VISITS WILL BE REVIEWED USING THE CRITERIA IN STANDARDIZED
GUIDE.
6. DAILY INSPECTIONS OF THE SITE ARE TO BE CONDUCTED BY THE
GENERAL CONTRACTOR OR SHOP SUPERVISOR AND DOCUMENTED ON
THEIR DAILY LOG.
ALL CONTROL MEASURES IN THE TWO ROWS ABOVE AND THE
FOLLOWING ACTIVITY HAZARD ANALYSES AND CONTROL PLANS (Y=YES /
N=NO):
1. EXCAVATION SAFETY PLAN IN PLACE: N
2. DUST CONTROL PLAN IN PLACE: Y
3. POLLUTION PREVENTION PLAN IN PLACE; Y
4. DIG SAFE PAPER WORK IN PLACE: N
5. CRANE LIFT PLAN IN PLACE: N
A. CRANE PLACEMENT
B. CRANE SWING
C. CRANE LOAD EVALUATION
6. FALL PROTECTION PLAN IN PLACE AND STAFF TRAINED: Y
7. CONFINED ENTRY PLAN IN PLACE AND STAFF TRAINED: N
CONSTRUCTION INFECTION CONTROL RISK ASSESSMENT (ICRA)
CATEGORY
A
INSPECTION AND/OR FACILITY UPKEEP GENERALLY DEFINED AS FOLLOWS:
• WORK CAN BE COMPLETED IN A SINGLE SHIFT, NOT TO EXCEED 10 HOURS.
• PATIENTS AND/OR EMPLOYEES MAY BE IN THE AREA DEPENDING ON THE ACTIVITY.
• WORK THAT DOES NOT CREATE DUST OR DEBRIS.
• REMOVAL OF CEILING TILE OR ACCESS TO MECHANICAL OR ELECTRICAL CHASE FOR VISUAL INSPECTION LIMITED TO 1 TILE PER 50 SQUARE FEET
WITH LIMITED EXPOSURE TIME (NOT TO EXCEED AN HOUR FOR EACH TILE) WITHIN THE SHIFT.
• MINOR INTERIOR UPDATES (E.G., REPLACING FLOOR OR CEILING TILES, CARPENTRY WORK TO INCLUDE HANGING SIGNAGE, AND PAINTING
WITHOUT SANDING) THAT DO NOT CREATE DUST OR DEBRIS.
• LIMITED BUILDING SYSTEM MAINTENANCE SUCH AS PLUMBING ON POTABLE SYSTEMS LIMITED TO FAUCET REPLACEMENT ETC. AND ELECTRICAL
WORK SUCH AS REPLACEMENT OF BULBS, RECEPTACLES, OR SWITCHES
GENERAL MAINTENANCE AND REPAIR WORK GENERALLY DEFINED AS FOLLOWS:
• PROLONGED INSPECTION AND WORK THAT MAY TAKE LONGER THAN A SINGLE SHIFT BUT NOT EXCEEDING A WEEK.
• PATIENTS AND EMPLOYEES ARE NOT TO BE IN THE AREA UNTIL ACTIVITY IS COMPLETED.
• WORK THAT CREATES MINIMAL DUST AND DEBRIS.
• INTERIOR FINISH OR SURFACE REPAIRS, UPDATES, OR MODIFICATIONS SUCH AS REPAIR OF FIREWALL'S AND BARRIERS, AND NEW FLOORING THAT
PRODUCES MINIMAL DUST AND DEBRIS. CONTROLLED SANDING ACTIVITIES (E.G., WET OR DRY SANDING) THAT PRODUCE MINIMAL DUST AND
DEBRIS.
• PLUMBING WORK SUCH AS INSTALLATION OR REPLACEMENT OF A SINGLE FIXTURE OR PIPING FOR A SINGLE FIXTURE. ANY WORK ON SANITARY
PLUMBING INCLUDING SNAKING OF DRAINS.
• ELECTRICAL WORK SUCH AS INSTALLATION OF CABLING/WIRING/CONDUIT FOR A SINGLE DEVICE, INSTALLATION OF NEW DEVICE SUCH AS A LIGHT
FIXTURE THAT PRODUCES MINIMAL DUST AND DEBRIS.
• AIR HANDLER AND/OR FAN SHUTDOWN/STARTUP AND HVAC WORK SUCH AS REPLACEMENT OF A SINGLE DIFFUSER, SINGLE TERMINAL UNIT OR A
SINGLE DEVICE THAT PRODUCES MINIMAL DUST AND DEBRIS.
SMALL-SCALE CONSTRUCTION, RENOVATION, OR MAINTENANCE GENERALLY DEFINED AS FOLLOWS:
• WORK REQUIRING LONGER THAN A SINGLE WEEK TO COMPLETE BUT NOT EXCEEDING 6 MONTHS.
• PATIENTS AND EMPLOYEES ARE NOT TO BE IN THE AREA UNTIL ACTIVITY IS COMPLETED.
• DEMOLITION/REMOVAL OF PREEXISTING FLOOR COVERING, CASEWORK, LAY-IN CEILING, OR OTHER ARCHITECTURAL ELEMENTS.
• DEMOLITION/REMOVAL OF MORE THAN 32 FT2 OF DRYWALL/FRAMING, HARD CEILINGS, AND DOORS/FRAMING AND MINIMAL INFRASTRUCTURE SUCH
AS ELECTRICAL CIRCUITS AND BRANCH PIPING.
• INSTALLATION OF NEW WALLS, CEILINGS AND DOORS INCLUDING FRAMING, DRYWALL/PLASTER AND ASSOCIATED WORK.
• PLUMBING WORK SUCH AS THE INSTALLATION OF NEW SINKS, SHOWERS AND TOILETS AND ASSOCIATED PLUMBING.
• SHUT DOWN OF SECTIONS OF POTABLE WATER SYSTEMS.
• ELECTRICAL WORK SUCH AS INSTALLATION OF CONDUIT AND WIRE FOR LIGHTING, RECEPTACLES AND SWITCHES FOR AN AREA, THE INSTALLATION
OF CONDUIT AND WIRE FOR NEW DEVICES SUCH AS TERMINAL UNITS, FANS ETC.
• MODIFICATION OF EXISTING FIRE ALARM AND SUPPRESSION SYSTEMS.
• MECHANICAL WORK SUCH AS THE INSTALLATION OF DUCTWORK, DIFFUSERS, AND TERMINAL UNITS FOR AN AREA.
LEVEL I
1. PERFORM WORK ACTIVITY IN A MANNER THAT DOES NOT CREATE DUST.
2. IMMEDIATELY REPLACE ANY CEILING TILE, CLOSE ACCESS PANELS, ETC., UPON COMPLETION OF WORK.
3. ANY MATERIALS AND EQUIPMENT BEING BROUGHT INTO THE FACILITY MUST BE FREE OF CONTAMINANTS AND LOOSE MATERIAL.
CATEGORY
B
CATEGORY
C
CATEGORY
D
LARGE-SCALE CONSTRUCTION, RENOVATION, OR MAINTENANCE GENERALLY DEFINED AS FOLLOWS:
• WORK EXCEEDING 6 MONTHS IN DURATION.
• PATIENTS AND EMPLOYEES ARE NOT TO BE IN THE AREA UNTIL ACTIVITY IS COMPLETED.
• LARGE-SCALE DEMOLITION OF BUILDING COMPONENTS AND INFRASTRUCTURE INCLUDING REMOVAL OF MULTIPLE DOORS, WALLS, FRAMING, CEILINGS, FLOORING, PIPING, ELECTRICAL AND HVAC.
• THE INSTALLATION BUILDING COMPONENTS SUCH AS NEW WALLS, CEILINGS AND DOORS INCLUDING FRAMING, DRYWALL AND ASSOCIATED
PLASTER WORK.
• PLUMBING WORK SUCH AS THE INSTALLATION OF:
• NEW MEDICAL GAS SYSTEMS,
• STEAM/HEATING HOT WATER, CONDENSATE SYSTEMS,
• MULTIPLE SINKS, SHOWERS AND TOILETS INCLUDING ASSOCIATED PLUMBING.
• SHUTDOWN OF POTABLE WATER, STEAM/HEATING HOT WATER, CONDENSATE, AND MEDICAL GAS SYSTEMS.
• ELECTRICAL WORK SUCH AS INSTALLATION OF ELECTRICAL FEEDERS, DISTRIBUTION PANELS, CONDUIT AND WIRE FOR LIGHTING, RECEPTACLES
AND SWITCHES FOR AN AREA, THE INSTALLATION OF CONDUIT AND WIRE FOR NEW DEVICES SUCH AS TERMINAL UNITS, FANS ETC.
• INSTALLATION OF FIRE ALARM AND SUPPRESSION SYSTEMS.
• ELECTRICAL SHUTDOWN OF MULTIPLE PANELS.
• MECHANICAL WORK SUCH AS THE INSTALLATION OF AIR HANDLING EQUIPMENT, ASSOCIATED DUCTWORK, DIFFUSERS, HEAT EXCHANGERS, TERMINAL UNITS AND CONTROLS.
CONSTRUCTION, RENOVATION AND / OR MAINTENANCE ACTIVITY CATEGORY
PATIENT RISK CATEGORY
LOW RISK
NON-PATIENT CARE AREAS SUCH AS:
MEDIUM RISK
PATIENT CARE SUPPORT AREAS
SUCH AS:
HIGH RISK
PATIENT CARE AREAS SUCH AS:
HIGH RISK
PROCEDURAL, INVASIVE, STERILE
SUPPORT AND HIGHLY
COMPROMISED PATIENT CARE
AREAS SUCH AS:
• ALL TRANSPLANT UNITS
• ALL INTENSIVE CARE UNITS
• ALL ONCOLOGY UNITS AND
• CHEMOTHERAPY/INFUSION
CENTERS
• OR THEATERS AND RESTRICTED
AREAS
• HEMODIALYSIS UNITS
• PROCEDURAL ROOMS*
• PHARMACY COMPOUNDING AREA
• STERILE PROCESSING
DEPARTMENT – CLEAN SIDE
• TRANSFUSION SERVICES
• IMAGING SUITES –
INTERVENTIONAL IMAGING
• DEDICATED ISOLATION
WARDS/UNITS FOR INFECTIOUS
DISEASES
• PUBLIC HALLWAYS AND
GATHERING AREAS NOT IN
CLINICAL AREAS
• OFFICE AREAS NOT IN CLINICAL
AREAS
• BREAK ROOMS NOT IN CLINICAL
AREAS
• BATHROOMS OR LOCKER ROOMS
NOT IN CLINICAL AREAS
• MECHANICAL/ELECTRICAL ROOMS
NOT IN CLINICAL AREAS
• WAITING AREAS
• CLINICAL ENGINEERING
(BIOMEDICAL)
• MATERIALS MANAGEMENT
• STERILE PROCESSING
DEPARTMENT – DIRTY SIDE
• KITCHEN, CAFETERIA, GIFT SHOP,
COFFEE SHOP, AND FOOD KIOSKS
• PATIENT CARE ROOMS AND
AREAS, INCLUDING SPINAL CORD
INJURY UNITS
• ALL ACUTE CARE UNITS,
INCLUDING MENTAL HEALTH
• ALL OUTPATIENT UNITS AND
CLINICS
• EMERGENCY DEPARTMENT
• COMMUNITY LIVING CENTERS,
DOMICILIARIES, AND TRANSITIONAL
RESIDENCES
• EMPLOYEE HEALTH
• PHARMACY – GENERAL WORK
ZONE
• MEDICATION ROOMS AND CLEAN
UTILITY ROOMS
• IMAGING SUITES – DIAGNOSTIC
IMAGING
• LABORATORY
LEVEL OF INFECTION PREVENTION AND CONTROL PRECAUTIONS
LOW RISK
MEDIUM RISK
HIGH RISK
HIGHEST RISK
A B C D
I II III IV
I II III IV
I II IV IV
II III IV IV
REQUIRED INFECTION PREVENTION AND CONTROL MEASURES, BY LEVEL OF PRECAUTIONS
LEVEL OF
PRECAUTION
CONTROL MEASURES
LEVEL II
ALL CONTROL MEASURES IN LEVEL I AND THE FOLLOWING:
1. PROVIDE ACTIVE MEANS TO CONTROL AIRBORNE DUST FROM DISPERSING INTO OCCUPIED AREAS AND/OR WATER MIST SURFACE TO CONTROL