Attachment C - BFR 10_06_21.pdf

PDF 229 KB Posted

Attached to
Design-Build USCG Hurricane Rebuild San Juan Phase III West/Central
Solicitation number
70Z04722R43000001
Issued by

View the file

Other files

File Type Posted
AMEND_012_RFP3 PRICE PROPOSAL FORM rev2.pdf PDF
AMEND 012 SAN_JUAN_PHASE_III.pdf PDF
AMEND 0011_Exchange Trailer - Sales Area.pdf PDF
AMEND 0011 SAN_JUAN_PHASE_III.pdf PDF
AMEND 011_Exchange Trailer -Storage Room.pdf PDF
AMEND 010 SAN JUAN PHASE III.pdf PDF
AMEND 010_RFP3 PRICE PROPOSAL FORM revised.pdf PDF
AMEND_009_ Revised Drawings - West Amendment 9.pdf PDF
AMEND_009_SAN_JUAN_PHASE_III.pdf PDF
AMEND_009_ Space Criteria Sheets - Buildings 117 and 118.pdf PDF
AMEND_009_Attachment G - San Juan_Phasing Diagrams.pdf PDF
AMEND 0008 SAN JUAN PHASE III.pdf PDF
AMEND_007_10878158_AD_104_rev1.pdf PDF
AMEND_007_10878158_A101_rev1.pdf PDF
AMEND_007_SAN_JUAN_PHASE_III.pdf PDF
AMEND 006 SAN_JUAN_PHASE_III_1.pdf PDF
AMEND 0005 SAN_JUAN_PHASE_III.pdf PDF
AMEND_0004_10878158-E-001.pdf PDF
AMEND_0004_10878158-A-112.pdf PDF
AMEND_0004_10878158-E-003.pdf PDF
AMEND_0004_Wage Determination.pdf PDF
AMEND 0004_SAN_JUAN_PHASE_III.pdf PDF
AMEND_0004_10878158-G-001.pdf PDF
AMEND_0003_Attachment L-Part 3 of 3-As-Built Reference Drawings.pdf PDF
AMEND 003 SAN JUAN PHASE III.pdf PDF
AMEND_0003_Attachment K - Final Geotechnical Report and Soil Sampling Report.pdf PDF
AMEND_0003_Space Criteria Sheet H112 General Storage.pdf PDF
AMEND_0003_10878158C102-rev1.pdf PDF
AMEND_003_Attachment L-Part 2 of 3-As-Built Reference Drawings.pdf PDF
AMEND 0003_10878158C101_rev1.pdf PDF
AMEND 0003_Wage_Determination_PR20220001 01072022.pdf PDF
AMEND_0003_Attachment L-Part 1 of 3-As-Built Reference Drawings.pdf PDF
AMEND 0002 SAN JUAN PHASE III.pdf PDF
AMEND 0001.pdf PDF
RFP W-10878158 Appendix A - ComputerGenDrwgs.pdf PDF
Attachment H - BESEP Base and Sector San Juan 03AUG21.pdf PDF
TO Announcement San Juan_Phase III_Final_1.pdf PDF
Attachment A - Drawings.pdf PDF
RFP W-10878158 Appendix B - ElectDeliv.pdf PDF
Attachment G - San Juan_Phasing diagrams 2.pdf PDF
10878158 - Final Specifications.pdf PDF
Wage Determination.pdf PDF
Attachment B - Space Criteria Sheets 10_06_21.pdf PDF
RFP W-10878158 Appendix D - Design Narrative.pdf PDF
RFP W-10878158 Appendix C - Adept File Naming.pdf PDF
Attachment J - CSTO Electric Vehicle Support Equipment.pdf PDF
Attachment I - CSTO Advanced Metering Infrastructure .pdf PDF
Attachment F - US Coast Guard Public Address.pdf PDF
Attachment E - US_Coast_Guard_ISP_Cabling_Standards.pdf PDF
Attachment D - Final ACM and LBP Survey_ Base San Juan.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base San Juan Hurricane Rebuild West and Central Locations

Project No. 10878158 USCG Base San Juan, PR

Attachment C Basic Facility Requirements (BFR)

Building Type: Multi-Mission

Space Name

NSF

Allowance UM QTY

PNA

Total Notes

Space Components Health: Medical and Dental Offices

PVT MEDICAL/DENTAL OFFICER 96 SF 4 384 SF 3 Providers + 1 incoming

PVT 2ND LINE SUPERVISOR 96 SF 2 192 SF

PVT Family Advocacy Specialist 96 SF 1 96 SF Seperate Suite from Health PVT Victom Advocate (new position) 96 SF 1 96 SF Seperate Suite from Health Tricare Representative Office 96 SF 1 96 SF OO Health Safe Worklife Balance 72 SF 1 72 SF Seperate Suite from Health OO Workstations-2 Dental, 4 HS3, 2 HS2, 1 HS1, 1 Nurse 48 SF 10 480 SF 2 dental, 4 HS3, 2 HS2, 1 HS1, 1 Nurse, front desk Reception Desk 96 SF 1 96 SF *included in other section 0 SF 1 0 SF eye ear exam *Open Office Circulation (25%) 162 SF

Common COM MEETING SPACE - MEDIUM (12-16 PN) 15 SF/PN 12 180 SF combine with break area COM Break Room and Prep Area (>35PN) 96 SF 1 96 SF merge with conf room COM OFFICE EQUIPMENT 144 SF 2 288 SF One front of house; one in back

COM SEATED WAITING AREA (12 NSF PER AVERAGE # VISITO 12 SF/PN 12 144 SF

COM LETTER/LEGAL/LATERAL FILE (EA) 12 EA 2 24 SF

Medical Outpatient Care w/ Audio Large Treatment Room 175 SF 1 175 SF Acute Care Exam Rooms (five rooms per doctor) 120 SF 4 480 SF Operate with 2 exam rooms / doctor Physical Exam Room 240 SF 1 240 SF Includes eye/ear exam equipment

Medical Physical Exam EKG Room 120 SF 1 120 SF Patient's Toilet 50 SF 1 50 SF

Medical Emergency Care Emergency Room and/or Minor Surgery Room 240 SF 1 240 SF combine with large treatment room. 2 beds

Medical Diagnostic Support Laboratory 240 SF 1 240 SF Venipuncture 120 SF 1 120 SF Specimen Toilet 50 SF 1 50 SF Laboratory Technician's Office and Files 75 SF 1 75 SF Vaccine Storage 75 SF 1 75 SF

Medical X-Ray ADD IN Radiographic Room 300 SF 1 300 SF X-Ray Control Room 120 SF 1 120 SF

Medical and Dental Supply Medical / Dental Storage 145 SF 2 290 SF 1 Dental, 1 Medical Medical and Dental Records Storage 120 SF 1 120 SF

Central Sterilization Biohazardous Holding Area 30 SF 1 30 SF Oxygen Storage 30 SF 1 30 SF

Medical/Dental Sterilization 120 SF 1 120 SF Clean workroom, sterile storage, decontamnation, dirty hold

Sterilization Room 120 SF 1 120 SF General sterilization (combine with above) Dental

Dental X-Ray 120 SF 1 120 SF

Dental Operatory/Exam (two rooms assigned per dentist) 120 SF 2 240 SF Two operatories per dentist. One needs isolated ventilation

Prophylaxis Operatory 120 SF 1 120 SF Dental Lab 24 SF 1 24 SF *Cannot be adjacent to sterilization

Pharmacy Stand-up Work Area 120 SF 1 120 SF Counseling Alcove 24 SF 1 24 SF

Secured Storage 120 SF 2 240 SF *Extra storage for emergency / remote location Issue 60 SF 1 60 SF [19] Dispensing/Tech work station

Working Inventory 120 SF 1 120 SF Require additional space because of remote location

SUBTOTAL HEALTH NSF 6,469 SF

55%

SUBTOTAL HEALTH GSF 10,027 SF

BASIC FACILITY REQUIREMENTS (BFR)

Base San Juan, Puerto Rico

This BFR covers the requirement for the Health Services (Medical & Dental) as part of the Hurricane Maria/Irma reconstitution project. The new facility will also include spaces for the Barber and MWR functions.

NTG Multiplier (Medical / Dental Clinic)

NSF

Allowance UM QTY

PNA

Total Notes

Morale, Recreation, and Welfare Barber

Barber Shop - single chair with wash station 196 SF 1 196 SF Waiting Area 12 SF 4 48 SF Unisex Restroom 50 SF 1 50 SF

MWR

OO STANDARD WORKSTATION 72 SF 3 216 SF 3 workstations with 2 computers, file cab, lockers Storage 100 SF 1 100 SF Caged storage for sporting gear MWR Kayak storage 300 SF 1 300 SF First floor storage

SUBTOTAL MWR NSF 910 SF

25%

SUBTOTAL MWR GSF 1,138 SF

FACILITY SUPPORT

Building Support Building Support

C4IT Telecommunications Room 200 SF 1 200 SF 10

MEP 1860 SF 1 1,860 SF

Vestibule 100 SF 1 100 SF Elevator Lobby 250 SF 2 500 SF General Building Storage (PPE) 150 SF 1 150 SF Janitor's Closet 50 SF 1 50 SF First Floor Parking, drive aisle 300 SF 20 6,000 SF 7800

Personnel Support Personnel Support

Toilets Male 200 SF 1.00 200 SF 13 Total PN Toilets Female 200 SF 1.00 200 SF 13 Total PN Nursing Mothers Room 96 SF 1 96 SF Seated Waiting Area (12 SF per average number of visitors) 12 SF/PN 12 144 SF Locker - standard size 8 SF/PN 9 72 SF Non-managerial personnel

FACILITY SUPPORT AND ADJUSTMENTS

SPACE COMPONENTS 11,164 SF

SUBTOTAL HEALTH GSF 10,027 SF

SUBTOTAL MWR GSF 1137.5

FACILITY SUPPORT COMPONENTS 9,572 SF

Building Support 8,860 SF

Personnel Support 712 SF

Total Gross Area 20,736 SF

MULTIPLIERS AND ADJUSTMENTS 3,301 SF

Facility Support Multiplier 12% 2,488 SF

Thicker Exterior Walls 2.0% 464 SF YES

Interior Masonry Wall Thickness 1.5% 0 SF NO

Multi-Function Buildings 1.5% 348 SF YES

TOTAL BUILDING REQUIREMENT 24,038 SF

NTG Multiplier (Admin)

Space Name NSF Allowance UM QTY

PNA

Total Notes

Space Components

Base Ops Shipping and Receiving

Shipping and Receiving Area 440 SF 1 440 SF Supply Receiving Area 260 SF 1 260 SF Loading Area 200 SF 1 200 SF

Central Mail Distribution Central Mail / Distribution 200 SF 1 200 SF Contracts & Procurement - Admin Offices 24 SF 5 120 SF *Open Office Circulation (25%) 30 SF

SUBTOTAL BASE OPS NSF 1,250 SF

25%

SUBTOTAL BASE OPS GSF 1,563 SF

FACILITY SUPPORT

Building Support Building Support

Receiving Vestibule 100 SF 1 100 SF

MEP 100 SF 1 100 SF

Personnel Support Personnel Support

None 0 SF

BASIC FACILITY REQUIREMENTS (BFR)

Base San Juan, Puerto Rico

This BFR covers the requirement for shipping, receiving, and mail distribution in Building 117. It also includes some offices from Base Operations (Contracting & Procurement).

NTG Multiplier

FACILITY SUPPORT AND ADJUSTMENTS

SPACE COMPONENTS 1,563 SF

SUBTOTAL BASE OPS GSF 1,563 SF

FACILITY SUPPORT COMPONENTS 200 SF

Building Support 200 SF

Personnel Support 0 SF

Total Gross Area 1,763 SF

MULTIPLIERS AND ADJUSTMENTS 143 SF

Facility Support Multiplier 6% 106 SF

Thicker Exterior Walls 2.0% 37 SF YES

Interior Masonry Wall Thickness 1.5% 0 SF NO

Multi-Function Buildings 1.5% 0 SF NO

TOTAL BUILDING REQUIREMENT 1,906 SF

Allowance UM QTY

PNA

Total Notes

Space Components

Guard House Security Offices

CSO Office 96 SF 1 96 SF COM MEETING SPACE - MICRO (1-3 PN) 20 SF/PN 3 60 SF Adjacent to or included in CSO office space

Common Security Material 60 SF 1 60 SF

SUBTOTAL GUARD HOUSE NSF 216 SF

25%

SUBTOTAL GUARD HOUSE GSF 270 SF

FACILITY SUPPORT

Building Support Building Support

MEP 60 SF 1 60 SF

Personnel Support Personnel Support

Unisex Toilet 25 SF 1 25 SF

FACILITY SUPPORT AND ADJUSTMENTS

SPACE COMPONENTS 270 SF

SUBTOTAL GUARD HOUSE GSF 270 SF

FACILITY SUPPORT COMPONENTS 85 SF

Building Support 60 SF

Personnel Support 25 SF

Total Gross Area 355 SF

MULTIPLIERS AND ADJUSTMENTS 21 SF

Facility Support Multiplier 6% 21 SF

Thicker Exterior Walls 2.0% 0 SF NO

Interior Masonry Wall Thickness 1.5% 0 SF NO

Multi-Function Buildings 1.5% 0 SF NO

TOTAL BUILDING REQUIREMENT 376 SF

BASIC FACILITY REQUIREMENTS (BFR)

Base San Juan, Puerto Rico

This BFR covers the requirement for the CSO office and functions as part of the Hurricane Maria/Irma Reconstitution project.

Allowance UM QTY

PNA

Total Notes

Space Components

Tiki Bar Interior

Servery/Supplies 235 SF 1 235 SF

SUBTOTAL TIKI INTERIOR NSF 235 SF

25%

SUBTOTAL TIKI INTERIOR GSF 294 SF

FACILITY SUPPORT

Building Support Building Support

MEP 100 SF 0 0 SF

Janitor's Closet 50 SF 0 0 SF

Personnel Support Personnel Support

ADA Unisex toilet 70 SF 1 70 SF

Outdoor Covered Patio Space Outdoor Covered Patio Space

Covered patio 750 SF 1 750 SF

FACILITY SUPPORT AND ADJUSTMENTS

SPACE COMPONENTS 294 SF

SUBTOTAL TIKI INTERIOR GSF 294 SF

FACILITY SUPPORT COMPONENTS 820 SF

Building Support 0 SF

Personnel Support 70 SF Outdoor Covered Patio Space 750 SF

Total Gross Area 1,114 SF

MULTIPLIERS AND ADJUSTMENTS 4 SF

Facility Support Multiplier 6% 4 SF *Does not apply to Covered Patio

Thicker Exterior Walls 2.0% 0 SF NO

Interior Masonry Wall Thickness 1.5% 0 SF NO

Multi-Function Buildings 1.5% 0 SF NO

TOTAL BUILDING REQUIREMENT 1,118 SF (368 SF Facility Space, 750 SF Outdoor Patio)

BASIC FACILITY REQUIREMENTS (BFR)

Base San Juan, Puerto Rico

This BFR covers the requirement for replacement of the Tiki Bar as part of the Hurricane Maria/Irma Reconstitution project.

Allowance UM QTY

PNA

Total Notes

Space Components

Exchange Sales Floor & Registers 775 SF 1 775 SF Warehouse, Desk, Break area 250 SF 1 250 SF

SUBTOTAL EXCHANGE NSF 1,025 SF

25%

SUBTOTAL EXCHANGE GSF 1,281 SF

FACILITY SUPPORT

Building Support Building Support

Janitor's Closet 25 SF 1 25 SF

Personnel Support Personnel Support

Unisex Toilet 50 SF 1 50 SF

FACILITY SUPPORT AND ADJUSTMENTS

SPACE COMPONENTS 1,281 SF

SUBTOTAL EXCHANGE GSF 1,281 SF

FACILITY SUPPORT COMPONENTS 75 SF

Building Support 25 SF

Personnel Support 50 SF

Total Gross Area 1,356 SF

MULTIPLIERS AND ADJUSTMENTS 110 SF

Facility Support Multiplier 6% 81 SF

Thicker Exterior Walls 2.0% 29 SF YES

Interior Masonry Wall Thickness 1.5% 0 SF NO

Multi-Function Buildings 1.5% 0 SF NO

TOTAL BUILDING REQUIREMENT 1,466 SF

BASIC FACILITY REQUIREMENTS (BFR)

Base San Juan, Puerto Rico

This BFR covers the requirement for a small exchange facility in Building 124. The SFSM does not contain guidance for an exchange; this BFR is an estimate of required spaces required to support on-site personnel.

NTG Multiplier (Sector)

Allowance UM QTY

PNA

Total Notes

Space Components

CGIS

Offices

PVT CGIS AGENT-IN-CHARGE (AIC) 96 SF 1 96 SF

PVT CGIS SUPERVISOR 96 SF 1 96 SF

OO CGIS WORKSTATIONS 48 SF 6 288 SF

*Open Office Circulation (25%) 72 SF

Common

COM MEETING SPACE - SMALL (4-6 PN) 18 SF 8 144 SF

COM BREAK ROOM (<35 PN) 78 SF 1 78 SF Combine with conference space

COM ADMINISTRATIVE STORAGE 100 SF 1 100 SF

Special

EVIDENCE ROOM 100 SF 1 100 SF

SAFE 20 SF 1 20 SF

INTERVIEW ROOM & FINGERPRINT 130 SF 1 130 SF

HOLDING CELL 80 SF 1 80 SF

Locker - full size for gear 18 SF/PN 10 180 SF Incl for all staff

Armory

WEAPONS/AMMO STORAGE 150 SF 1 150 SF

SUBTOTAL CGIS NSF 1,534 SF

25%

SUBTOTAL CGIS GSF 1,918 SF

FACILITY SUPPORT

Building Support Building Support

MEP 100 SF 1 100 SF

Telecommunications Room 60 SF 1 60 SF Janitor's Closet 25 SF 1 25 SF

Personnel Support Personnel Support

Toilets Male 100 SF 1.00 100 SF 5.36 TOTAL PN Toilets Female 50 SF 1.00 50 SF 2.64 TOTAL PN Shower Male 75 SF 1 75 SF 5.36 TOTAL PN Shower Female 75 SF 1 75 SF 2.64 TOTAL PN Seated Waiting Area (12 SF per average number of visitors) 12 SF/PN 2 24 SF

FACILITY SUPPORT AND ADJUSTMENTS

SPACE COMPONENTS 1,918 SF

SUBTOTAL CGIS GSF 1,918 SF

FACILITY SUPPORT COMPONENTS 509 SF

Building Support 185 SF

Personnel Support 324 SF

Total Gross Area 2,427 SF

MULTIPLIERS AND ADJUSTMENTS 197 SF

Facility Support Multiplier 6% 146 SF

Thicker Exterior Walls 2.0% 51 SF YES

Interior Masonry Wall Thickness 1.5% 0 SF NO

Multi-Function Buildings 1.5% 0 SF NO

TOTAL BUILDING REQUIREMENT 2,624 SF

NTG Multiplier (Sector)

BASIC FACILITY REQUIREMENTS (BFR)

Base San Juan, Puerto Rico

This BFR covers the requirement for CGIS as part of the Hurricane Maria/Irma reconstitution project. The BFR assumes CGIS as a stand alone function in existing Building 125.

NSF

Allowance UM QTY

PNA

Total Notes

Space Components Personnel Support Department Personnel Support Department

PVT Department Head (LT) 96 SF 1 96 SF

PVT SUPERVISOR WO 96 SF 1 96 SF

PVT SUPERVISOR YN Div CHIEF 96 SF 2 192 SF

OO YN 72 SF 6 432 SF

Open Office Circulation (25%) 108 SF

Education Service PVT Education Service Officer ESO 96 SF 1 96 SF OO Testing Stations 12 SF 3 36 SF Testing Toilet 50 SF 1 50 SF Open Office Circulation (25%) 9 SF

Transportation Officer PVT Transportation Officer (G6) 96 SF 1 96 SF Walk in services

Common COM LETTER/LEGAL/LATERAL FILE (EA) 12 SF 3 36 SF 1 per section

COM BREAK ROOM (<35 PN) 72 SF 1 72 SF

COM ADMINISTRATIVE STORAGE 100 SF 1 100 SF

COM OFFICE EQUIPMENT 72 SF 1 72 SF

SUBTOTAL PERSONNEL SUPPORT NSF 1,491 SF

25%

SUBTOTAL PERSONNEL SUPPORT GSF 1,864 SF

Base Command Base Command

PVT COMMANDING OFFICER 168 SF 1 168 SF

PRVT EXECUTIVE OFFICER 120 SF 1 120 SF

PVT Command Senior Chief 120 SF 1 120 SF OO Assistant 48 SF 1 48 SF Open Office Circulation (25%) 12 SF

Common

COM LETTER/LEGAL/LATERAL FILE (EA) 12 SF 6 72 SF

COM PLAN/CHART FILE (EA) 48 SF 1 48 SF

COM MEETING SPACE - MICRO (1-3 PN) 20 SF 1 20 SF CO's office COM MEETING SPACE - MEDIUM (12-16 PN) 15 SF 16 240 SF Combine with Break Room COM BREAK ROOM (<35 PN) 72 SF 1 72 SF Combine with Meeting Space

COM ADMINISTRATIVE STORAGE 100 SF 1 100 SF

COM SEATED WAITING AREA (12 NSF PER AVERAGE # VISITO 12 SF 4 48 SF

SUBTOTAL BASE COMMAND NSF 1,068 SF

25%

SUBTOTAL BASE COMMAND GSF 1,335 SF

BASIC FACILITY REQUIREMENTS (BFR)

Base San Juan, Puerto Rico

This BFR covers the requirement for Base Command in Building 126 as part of the Hurricane Maria/Irma reconstitution project. Building 126 will also contain space for the Personnel Support Department and the Chaplain and Attorney's offices.

NSF

Allowance UM QTY

PNA

Total Notes

Chaplain & Attorney from Sector

PVT CHAPLAIN 96 SF 1 96 SF

PVT ATTORNEY /ALI 96 SF 1 96 SF

COM MEETING SPACE - MICRO (1-3 PN) 20 SF 4 80 SF For confidentiality: Small consultation area (40 SF) incorporated into in each office

SUBTOTAL CHAPLAIN/ATTY NSF 272 SF

NTG Multiplier 25%

SUBTOTAL CHAPLAIN/ATTY GSF 340 SF

FACILITY SUPPORT

Building Support Building Support

C4IT Telecommunications Room 70 SF 1 70 SF 10 Will depend on alternative selection.

MEP 200 SF 1 200 SF

Vestibule 50 SF 1 50 SF Janitor's Closet 50 SF 1 50 SF

Personnel Support Personnel Support

Toilet Unisex 50 SF 1.00 50 SF

FACILITY SUPPORT AND ADJUSTMENTS

SPACE COMPONENTS 3,539 SF

SUBTOTAL PERSONNEL SUPPORT GSF 1,864 SF

SUBTOTAL BASE COMMAND GSF 1,335 SF

SUBTOTAL CHAPLAIN/ATTY GSF 340

FACILITY SUPPORT COMPONENTS 420 SF

Building Support 370 SF

Personnel Support 50 SF

Total Gross Area 3,959 SF

MULTIPLIERS AND ADJUSTMENTS 384 SF

Facility Support Multiplier 6% 238 SF

Thicker Exterior Walls 2.0% 84 SF YES

Interior Masonry Wall Thickness 1.5% 63 SF YES

Multi-Function Buildings 1.5% 0 SF NO

TOTAL BUILDING REQUIREMENT 4,343 SF

Allowance UM QTY

PNA

Total Notes

Space Components

Guard House Security Offices

Supervisor's Office 96 SF 1 96 SF Guard Booth/Sentry 50 SF 2 100 SF Guard Room (size per person) 48 SF 3 144 SF Reception / Pass Counter 100 SF 1 100 SF Security Equipment Room (CCTV) 72 SF 1 72 SF

Common Waiting Area 50 SF 1 50 SF

COM BREAK ROOM - MICRO 48 SF 1 48 SF

Weapon's Safe 120 SF 1 120 SF Equipment Storage 120 SF 1 120 SF Lockers/Gear Storage 18 SF 6 108 SF

SUBTOTAL GUARD HOUSE NSF 958 SF

25%

SUBTOTAL GUARD HOUSE GSF 1,198 SF

FACILITY SUPPORT

Building Support Building Support

MEP 200 SF 1 200 SF

Janitor's Closet 40 SF 1 40 SF

Personnel Support Personnel Support

Unisex Toilet 50 SF 1 50 SF

FACILITY SUPPORT AND ADJUSTMENTS

SPACE COMPONENTS 1,198 SF

SUBTOTAL GUARD HOUSE GSF 1,198 SF

FACILITY SUPPORT COMPONENTS 290 SF

Building Support 240 SF

Personnel Support 50 SF

Total Gross Area 1,488 SF

MULTIPLIERS AND ADJUSTMENTS 144 SF

Facility Support Multiplier 6% 89 SF

Thicker Exterior Walls 2.0% 32 SF YES

Interior Masonry Wall Thickness 1.5% 24 SF YES

Multi-Function Buildings 1.5% 0 SF NO

TOTAL BUILDING REQUIREMENT 1,632 SF

BASIC FACILITY REQUIREMENTS (BFR)

Base San Juan, Puerto Rico

This BFR covers the requirement for a new Guard House near the gate. This BFR was prepared as part of the Hurricane Maria/Irma Reconsitition project.

HEALTH_1
Mail Shipping 117
CSO 118
Tiki 119
CGExchange 124
CGIS 125
Base Command 126
Guard House