AMEND 0005 SAN_JUAN_PHASE_III.pdf

PDF 159 KB Posted

Attached to
Design-Build USCG Hurricane Rebuild San Juan Phase III West/Central
Solicitation number
70Z04722R43000001
Issued by

View the file

Other files

File Type Posted
AMEND_012_RFP3 PRICE PROPOSAL FORM rev2.pdf PDF
AMEND 012 SAN_JUAN_PHASE_III.pdf PDF
AMEND 0011_Exchange Trailer - Sales Area.pdf PDF
AMEND 0011 SAN_JUAN_PHASE_III.pdf PDF
AMEND 011_Exchange Trailer -Storage Room.pdf PDF
AMEND 010 SAN JUAN PHASE III.pdf PDF
AMEND 010_RFP3 PRICE PROPOSAL FORM revised.pdf PDF
AMEND_009_ Revised Drawings - West Amendment 9.pdf PDF
AMEND_009_SAN_JUAN_PHASE_III.pdf PDF
AMEND_009_ Space Criteria Sheets - Buildings 117 and 118.pdf PDF
AMEND_009_Attachment G - San Juan_Phasing Diagrams.pdf PDF
AMEND 0008 SAN JUAN PHASE III.pdf PDF
AMEND_007_10878158_AD_104_rev1.pdf PDF
AMEND_007_10878158_A101_rev1.pdf PDF
AMEND_007_SAN_JUAN_PHASE_III.pdf PDF
AMEND 006 SAN_JUAN_PHASE_III_1.pdf PDF
AMEND_0004_10878158-E-001.pdf PDF
AMEND_0004_10878158-A-112.pdf PDF
AMEND_0004_10878158-E-003.pdf PDF
AMEND_0004_Wage Determination.pdf PDF
AMEND 0004_SAN_JUAN_PHASE_III.pdf PDF
AMEND_0004_10878158-G-001.pdf PDF
AMEND_0003_Attachment L-Part 3 of 3-As-Built Reference Drawings.pdf PDF
AMEND 003 SAN JUAN PHASE III.pdf PDF
AMEND_0003_Attachment K - Final Geotechnical Report and Soil Sampling Report.pdf PDF
AMEND_0003_Space Criteria Sheet H112 General Storage.pdf PDF
AMEND_0003_10878158C102-rev1.pdf PDF
AMEND_003_Attachment L-Part 2 of 3-As-Built Reference Drawings.pdf PDF
AMEND 0003_10878158C101_rev1.pdf PDF
AMEND 0003_Wage_Determination_PR20220001 01072022.pdf PDF
AMEND_0003_Attachment L-Part 1 of 3-As-Built Reference Drawings.pdf PDF
AMEND 0002 SAN JUAN PHASE III.pdf PDF
AMEND 0001.pdf PDF
RFP W-10878158 Appendix A - ComputerGenDrwgs.pdf PDF
Attachment H - BESEP Base and Sector San Juan 03AUG21.pdf PDF
TO Announcement San Juan_Phase III_Final_1.pdf PDF
Attachment A - Drawings.pdf PDF
RFP W-10878158 Appendix B - ElectDeliv.pdf PDF
Attachment G - San Juan_Phasing diagrams 2.pdf PDF
10878158 - Final Specifications.pdf PDF
Wage Determination.pdf PDF
Attachment B - Space Criteria Sheets 10_06_21.pdf PDF
Attachment C - BFR 10_06_21.pdf PDF
RFP W-10878158 Appendix D - Design Narrative.pdf PDF
RFP W-10878158 Appendix C - Adept File Naming.pdf PDF
Attachment J - CSTO Electric Vehicle Support Equipment.pdf PDF
Attachment I - CSTO Advanced Metering Infrastructure .pdf PDF
Attachment F - US Coast Guard Public Address.pdf PDF
Attachment E - US_Coast_Guard_ISP_Cabling_Standards.pdf PDF
Attachment D - Final ACM and LBP Survey_ Base San Juan.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

DESIGN-BUILD USCG HURRICANE REBUILD SAN JUAN PHASE III WEST SAN JUAN, PUERTO RICO

THIS AMENDMENT IS ISSUED ONLY TO THOSE OFFEROR UNDER THE NATIONAL MULTIPLE AWARD

CONSTRUCTION IDIQ CONTRACT (NMACC II) USCG DEPARTMENT OF HOMELAND SECURITY

(SEE CONTINUATION SHEET)

NA

Contracting Division USCG, Facilities Design and Construction Center 5505 Robin Hood Road, Suite K Norfolk, VA 23513-2431

NA

70Z04722R43000001

1 2

3/22/2022

01/28/2022

Amendment 0005 70Z04722R43000001

SOLICITATION NO. 70Z04722R43000001 IS AMENDED AS FOLLOWS:

THE PROPOSAL DUE DATE IS CHANGED FROM MARCH 24, 2022 TO APRIL 19, 2022.

END OF AMENDMENT

FAILURE TO ACKNOWLEDGE AMENDMENTS MAY BE CAUSE OF

REJECTION OF OFFER