Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Amendment 007 70Z04722R43000001 Of 5 010878158, Base San Juan Hurricane Rebuild Phase III West/Central, Amendment 007
The proposal due date of April 19, 2022 remains unchanged.
SOLICITATION NO. 70Z04722R43000001 IS AMENDED AS FOLLOWS:
Drawings:
DELETE: Drawing AD-104
REPLACE WITH: Drawing AD-104 rev1
DELETE: Drawing A-101
REPLACE WITH: Drawing A-101 rev1
Section 01800 Paragraph 1.7 Architectural Design Building 117, Shipping & Receiving and Mail Distribution, after last bullet
INSERT:
• For existing doors to remain: Remove and replace latch/locksets and install new according to this section. The balance of the existing door hardware shall remain (closers, door stops, hinges, etc.).
Building 119, Waterfront Club, after last bullet
INSERT:
• For existing doors to remain: Remove and replace latch/locksets and install new according to this section. The balance of the existing door hardware shall remain (closers, door stops, hinges, etc.).
Building 124, Exchange, after last bullet
INSERT:
• For existing doors to remain: Remove and replace latch/locksets and install new according to this section. The balance of the existing door hardware shall remain (closers, door stops, hinges, etc.).
Building 125, Coast Guard Investigative Services (CGIS) after last bullet
INSERT:
• For existing doors to remain: Remove and replace latch/locksets and install new according to this section. The balance of the existing door hardware shall remain (closers, door stops, hinges, etc.).
Building 126, Base Command, after last bullet
INSERT:
Of 5
• For existing doors to remain: Remove and replace latch/locksets and install new according to this section. The balance of the existing door hardware shall remain (closers, door stops, hinges, etc.).
Section 01800 Paragraph 1.7.13.2.1 Wall Systems DELETE: entire text of paragraph REPLACE WITH: Interior partitions shall be masonry block painted - minimum 8" wide units extending to roof deck. Concrete masonry units shall comply with ASTM C129, Standard Specification for Non-load bearing Concrete Masonry Units.
Section 01800 Paragraph 1.7.17.2.1 Wall Systems DELETE: entire text of paragraph REPLACE WITH: Interior partitions shall be masonry block painted - minimum 6" wide units extending to 9'-0" a.f.f. Provide bull-nose units for all exposed exterior corners.
Concrete masonry units shall comply with ASTM C129, Standard Specification for Non-load bearing Concrete Masonry Units.
Section 01800 Paragraph 1.7.19.4 Wall Protection DELETE: paragraph 1.7.19.4
Section 01800 Paragraph 1.7.24.2 Wall Protection DELETE: paragraph 1.7.24.2
Section 01800 Paragraph 1.7.30.3 Wall Protection DELETE: paragraph 1.7.30.3
Section 01800 Paragraph 1.7.33.3.1 Wall Systems DELETE: Provide Type IR where impact resistance is needed.
Section 01800 Paragraph 1.7.35.3 Wall Protection DELETE: paragraph 1.7.35.3
Section 01800 Paragraph 1.12.6.1 Base Command: Space Cooling and Ventilation:
DELETE: the seven bullets and their text
REPLACE WITH:
• CU-1: Room 126-102A, Room 126-102B, Room 126-105.
• CU-2: Room 126-107, Room 126-108, Room 126-109, Room 126-110, Room 126-
111.
• CU-3: Room 126-104, Room 126-114, Room 126-115.
• CU-4: Room 126-206, Room 126-208.
• CU-5: Room 126-201, Room 126-212, Room 126-213.
• CU-6: Room 126-203, Room 126-205.
• CU-7: Room 126-106.
Of 5
END OF AMENDMENT LANGUAGE
Responses to Questions Regarding Solicitation 70Z04722R43000001:
1. Please confirm that the Executive Order requiring Project Labor Agreements (PLA) on Federal projects does not apply, and that this project is therefore not subject to any PLA.
RESPONSE: The Executive Order requiring Project Labor Agreements (PLA) on Federal projects does not apply and is not subject to any PLA regarding this procurement.
2 Specification 01800 Paragraph 1.7 - various subparagraphs related to door hardware -please confirm that the hardware on existing doors to remain do not require new hardware replacement.
RESPONSE: No. Intent is for the existing doors to remain to have latch/locksets removed and replaced with new and balance of the existing door hardware shall remain (closers, door stops, hinges, etc.). See amendment for Specification 01800 Paragraph
1.7 Building 117, 119, 124, 125, 126.
3 Specification 01800 Paragraph 1.7 - various subparagraphs related to door hardware -please clarify whether all hardware on exterior doors must be stainless steel, or if only the hinges must be stainless steel.
RESPONSE: Only hinges on exterior doors are to be stainless steel.
4 Specification 01800 Paragraph 1.7.35.3.1 requires stainless steel corner guards, whereas Paragraph 1.19.77.3 requires heavy duty extruded plastic with a continuous extruded aluminum retainer piece. Please clarify which paragraph governs.
RESPONSE: Section 1.19.77.3 governs. See amendment for Specification 01800 Paragraphs 1.7.19.4, 1.7.24.2, 1.7.30.3, and 1.7.35.3.
5 Specification 01800 Paragraph 1.12.6 lists various proposed zones for Building 126. The room numbers listed do not match any of the room numbers shown on the RFP concept drawing A102. Please clarify.
RESPONSE: See amendment for Specification 01800 Paragraph 1.12.6.1 for corrected zones.
6 Specification 01800 Paragraph 1.7.17.2.1 requires Holding Room and Corridor walls adjacent to the Lobby/ Waiting Room to be Type IR. Please confirm that CMU is an acceptable alternative for these walls.
Of 5
RESPONSE: Yes, CMU is an acceptable alternative and is the basis of design for all new walls. See amendment for Specification 01800 Paragraph 1.7.17.2.1 and Drawing
AD-104.
7 All of the new walls in Building 125 have the same hatching pattern on sheet A101.
Please confirm that the wall types dictated in 01800 Para 1.7.17.2.1 are allowable.
RESPONSE: No, all new partitions shown on sheet A101 are to be masonry. See amendment for Specification 01800 Paragraph 1.7.17.2.1 and Drawings AD-104, A-101.
8 Specification 01800 Paragraph 1.7.17.2.1. Please confirm that Type IR GWB is not required at the Evidence Room.
RESPONSE: Confirmed. Impact resistant gypsum board is not required for the Evidence Room.
9 Specification 01800 Paragraph 1.7.17.2.1. Please provide height requirements for walls enclosing the showers in Building 125.
RESPONSE: Walls to extend to 9'-0" a.f.f. See amendment for Specification 01800 Paragraph 1.17.17.2.1.
10 Drawing A-101. Please provide an existing elevation of the west side of Building 125 including the material and finish of the existing to remain portion of this exterior wall.
RESPONSE: West elevation of Building 125 is not available. Existing adjacent wall is masonry with exterior stucco finish. New wall construction and finish to match existing adjacent wall.
11 Several sections of Specification 01800 Paragraph 1.7 require Type IR GWB walls.
Please confirm that CMU is an acceptable alternate for Type IR GWB.
RESPONSE: CMU walls are an acceptable alternative and is the basis of design for Buildings 124 and 125. Health Building does not require impact resistant gypsum board.
See amendment for Specification 01800 Paragraphs 1.7.13.2.1, 1.7.17.2.1, 1.7.33.3.1 and Drawings A-104, AD-101.
END OF AMENDMENT
FAILURE TO ACKNOWLEDGE AMENDMENTS MAY BE CAUSE OF REJECTION
OF OFFER
| topmostSubform[0]: |
| Page1[0]: |
| AmendmentNo[0]: 0007 |
| Code[0]: |
| Code[1]: |
| AccountingData[0]: |
| A13[0]: |
| C13[0]: |
| D13[0]: |
| NameandTitleSigner[0]: |
| NameandTitleOfficer[0]: |
| Description[0]: DESIGN-BUILD USCG HURRICANE REBUILD SAN JUAN PHASE III WEST SAN JUAN, PUERTO RICO |
THIS AMENDMENT IS ISSUED ONLY TO THOSE OFFEROR UNDER THE NATIONAL MULTIPLE AWARD CONSTRUCTION IDIQ CONTRACT (NMACC II) USCG DEPARTMENT OF HOMELAND SECURITY
(SEE CONTINUATION SHEET)
| FacilityCode[0]: |
| Code[2]: NA |
| IssuedBy[0]: Contracting Division |
USCG, Facilities Design and Construction Center 5505 Robin Hood Road, Suite K Norfolk, VA 23513-2431
| NameandAddress[0]: |
| AdministeredBy[0]: |
| ContractIDCode[0]: |
| ReqNumber[0]: NA |
| AmendmentNo[1]: 70Z04722R43000001 |
| ModificationNo[0]: |
| ProjectNo[0]: |
| Page[0]: 1 |
| Pages[0]: 5 |
| EffectiveDate[0]: 4/05/2022 |
| Dated9B[0]: 01/28/2022 |
| Dated10B[0]: |
| CheckBox9[0]: 1 |
| CheckBox10[0]: Off |
| CheckBox11[0]: 1 |
| CheckBox13A[0]: Off |
| CheckBox13B[0]: Off |
| CheckBox13C[0]: Off |
| CheckBox13D[0]: Off |
| IsNot[0]: Off |
| Is[0]: Off |
| Extended[0]: Off |
| NotExtended[0]: 1 |
| DateSigned[0]: |
| DateSigned[1]: |
| Copies[0]: 1 |
| CopiesReturned[0]: |