AMEND_009_ Space Criteria Sheets - Buildings 117 and 118.pdf

PDF 352 KB Posted

Attached to
Design-Build USCG Hurricane Rebuild San Juan Phase III West/Central
Solicitation number
70Z04722R43000001
Issued by

View the file

Other files

File Type Posted
AMEND_012_RFP3 PRICE PROPOSAL FORM rev2.pdf PDF
AMEND 012 SAN_JUAN_PHASE_III.pdf PDF
AMEND 0011_Exchange Trailer - Sales Area.pdf PDF
AMEND 0011 SAN_JUAN_PHASE_III.pdf PDF
AMEND 011_Exchange Trailer -Storage Room.pdf PDF
AMEND 010 SAN JUAN PHASE III.pdf PDF
AMEND 010_RFP3 PRICE PROPOSAL FORM revised.pdf PDF
AMEND_009_ Revised Drawings - West Amendment 9.pdf PDF
AMEND_009_SAN_JUAN_PHASE_III.pdf PDF
AMEND_009_Attachment G - San Juan_Phasing Diagrams.pdf PDF
AMEND 0008 SAN JUAN PHASE III.pdf PDF
AMEND_007_10878158_AD_104_rev1.pdf PDF
AMEND_007_10878158_A101_rev1.pdf PDF
AMEND_007_SAN_JUAN_PHASE_III.pdf PDF
AMEND 006 SAN_JUAN_PHASE_III_1.pdf PDF
AMEND 0005 SAN_JUAN_PHASE_III.pdf PDF
AMEND_0004_10878158-E-001.pdf PDF
AMEND_0004_10878158-A-112.pdf PDF
AMEND_0004_10878158-E-003.pdf PDF
AMEND_0004_Wage Determination.pdf PDF
AMEND 0004_SAN_JUAN_PHASE_III.pdf PDF
AMEND_0004_10878158-G-001.pdf PDF
AMEND_0003_Attachment L-Part 3 of 3-As-Built Reference Drawings.pdf PDF
AMEND 003 SAN JUAN PHASE III.pdf PDF
AMEND_0003_Attachment K - Final Geotechnical Report and Soil Sampling Report.pdf PDF
AMEND_0003_Space Criteria Sheet H112 General Storage.pdf PDF
AMEND_0003_10878158C102-rev1.pdf PDF
AMEND_003_Attachment L-Part 2 of 3-As-Built Reference Drawings.pdf PDF
AMEND 0003_10878158C101_rev1.pdf PDF
AMEND 0003_Wage_Determination_PR20220001 01072022.pdf PDF
AMEND_0003_Attachment L-Part 1 of 3-As-Built Reference Drawings.pdf PDF
AMEND 0002 SAN JUAN PHASE III.pdf PDF
AMEND 0001.pdf PDF
RFP W-10878158 Appendix A - ComputerGenDrwgs.pdf PDF
Attachment H - BESEP Base and Sector San Juan 03AUG21.pdf PDF
TO Announcement San Juan_Phase III_Final_1.pdf PDF
Attachment A - Drawings.pdf PDF
RFP W-10878158 Appendix B - ElectDeliv.pdf PDF
Attachment G - San Juan_Phasing diagrams 2.pdf PDF
10878158 - Final Specifications.pdf PDF
Wage Determination.pdf PDF
Attachment B - Space Criteria Sheets 10_06_21.pdf PDF
Attachment C - BFR 10_06_21.pdf PDF
RFP W-10878158 Appendix D - Design Narrative.pdf PDF
RFP W-10878158 Appendix C - Adept File Naming.pdf PDF
Attachment J - CSTO Electric Vehicle Support Equipment.pdf PDF
Attachment I - CSTO Advanced Metering Infrastructure .pdf PDF
Attachment F - US Coast Guard Public Address.pdf PDF
Attachment E - US_Coast_Guard_ISP_Cabling_Standards.pdf PDF
Attachment D - Final ACM and LBP Survey_ Base San Juan.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPACE CRITERIA SHEET - BASE SAN JUAN

Building 117 - Shipping / Receiving and Mail Distribution

Shipping/ Receiving

117-100

Central Mail Distribution / Administration 117-101

Square Footage per RFP Drawings 989

N/A

Ceiling Exposed structure.

Floor Sealed concrete.

Base Resilient cove 4" H minimum.

Walls Epoxy paint.

N/A

N/A

Contractor Furnished; Contractor

Installed

Interior Signage

Government Furnished;

Contractor Installed

Existing Storage Racks

Government Furnished;

Government Installed

N/A

N/A

N/A

Refer to RFP specifications

N/A

Refer to RFP specifications

Refer to RFP specifications

Telephone Refer to RFP specifications

LAN Refer to RFP specifications

Other Communications N/A

Notes:

Mechanical

Plumbing

Electrical (Power)

Lighting

C o m m u n ic a ti o n s

Sound Attenuation

Space Name

Room Number

Adjacencies

Minimum Ceiling Height

F in is h e s

Casework

F u rn it u re a n d

E q u ip m e n t

Daylight Requirements

Doors

Central Mail Distribution / Administration

117-101

Mail Room 117-102

Square Footage per RFP Drawings 228

8'-0"

Ceiling Exposed structure.

Floor Sealed concrete.

Base Resilient cove 4" H minimum.

Walls Epoxy paint.

N/A

N/A

Contractor Furnished; Contractor

Installed

S1 Task Chair (4), WS9 Sit to Stand Desk with Wardrobe (4)

Interior Signage

Government Furnished;

Contractor Installed

Existing Storage Racks

Government Furnished;

Government Installed

N/A

N/A

N/A

Refer to RFP specifications

N/A

Refer to RFP specifications

Refer to RFP specifications

Telephone Refer to RFP specifications

LAN Refer to RFP specifications

Other Communications N/A

Sound Attenuation

F in is h e s

Doors

Casework

F u rn it u re a u ip m e n t

Daylight Requirements

Notes:

Mechanical

Plumbing

Electrical (Power)

Lighting

C o m m u n ic a ti o s

Mail Room

117-102

Central Mail Distribution / Administration 117-101

Square Footage per RFP Drawings 106

8'-0"

Ceiling Suspended acoustical ceiling panel system.

Floor Porcelain ceramic tile.

Base Porcelain ceramic tile.

Walls Paint.

New interior hollow metal dutch door with frame and new exterior aluminum medium stile door with insulated glass with sidelites.

N/A

Contractor Furnished; Contractor

Installed

Metal mail boxes

Interior Signage

Government Furnished;

Contractor Installed

N/A

Government Furnished;

Government Installed

N/A

Aluminum storefront system

N/A

Refer to RFP specifications

N/A

Refer to RFP specifications

Refer to RFP specifications

Telephone N/A

LAN N/A

Other Communications N/A

Notes:

Mechanical

Plumbing

Electrical (Power)

Lighting

C o m m u n ic a ti o n s

Sound Attenuation

F in is h e s

Doors

Casework

F u rn it u re a u ip m e n t

Daylight Requirements

MWR

117-103

N/A

Square Footage per RFP Drawings 198

8'-0"

Ceiling Suspended acoustical ceiling panel system.

Floor Porcelain ceramic tile.

Base Porcelain ceramic tile.

Walls Paint.

N/A

N/A

Contractor Furnished; Contractor

Installed

S2 Task Chair (5), WS9 Sit to Stand Desk with Wardrobe (3), T7

Occasional Side Table (1), Interior Signage

Government Furnished;

Contractor Installed

N/A

Government Furnished;

Government Installed

Copier / Printer

N/A

STC 45 minimum

Refer to RFP specifications

N/A

Refer to RFP specifications

Refer to RFP specifications

Telephone Refer to RFP specifications

LAN Refer to RFP specifications

Other Communications N/A

Sound Attenuation

F in is h e s

Doors

Casework

F u rn it u re a u ip m e n t

Daylight Requirements

Notes:

Mechanical

Plumbing

Electrical (Power)

Lighting

C o m m u n ic a ti o

Health Building

BARBER

117-104

Unisex 117-105

Square Footage per RFP Drawings 161

8'-0"

Ceiling Suspended acoustical ceiling panel system.

Floor Porcelain ceramic tile.

Base Porcelain ceramic tile.

Walls Paint with ceramic tile wainscot 36" aff.

Exterior full glass aluminum door with integral blinds with aluminum frame

Laminate clad base and wall cabinets, solid surface counter top, wire pulls.

Contractor Furnished; Contractor

Installed

M8 Waste Receptacle w/ Lid

M13 Barber Chair, M17 Plate Glass Mirror (2)

S3 Side Chair (4), TA1 Soap Dispenser, TA2 Paper Towel Dispenser

Interior Signage

Government Furnished;

Contractor Installed

E2 Monitor

Government Furnished;

Government Installed lt

N/A

Refer to RFP specifications

(2) sinks - refer to RFP specifications

Refer to RFP specifications

Refer to RFP specifications

Telephone Refer to RFP specifications

LAN Refer to RFP specifications

Other Communications N/A

Notes:

Mechanical

Plumbing

Electrical (power)

Lighting

C o m m u n ic a ti o n s F in is h e s

Doors

Casework

F u rn it u re a u ip m e n t

Daylight Requirements

Sound Attenuation

Building 100 - CGIS

Unisex

117-105

Refer to RFP drawings

Square Footage per RFP Drawings 42

8'-0"

Ceiling Suspended acoustical ceiling panel system.

Floor Porcelain ceramic tile.

Base Porcelain ceramic tile.

Walls Ceramic tile.

Solid wood door with hollow metal frame

N/A

Contractor Furnished; Contractor

Installed

Grab Bars

M8 Waste Receptacle w/ Lid

TA1 Soap Dispenser, TA2 Paper Towel Dispenser

TA3 Mirror, TA5 Toilet Paper Dispenser

Interior Signage

Government Furnished;

Contractor Installed

N/A

Government Furnished;

Government Installed

N/A

N/A

STC 45 minimum

Refer to RFP drawings

Refer to RFP drawings

Refer to RFP drawings

Refer to RFP drawings

Telephone N/A

LAN N/A

Other Communications N/A

Sound Attenuation

F in is h e s

Doors

Casework

F u rn it u re a n d E q u ip m e n t

Daylight Requirements

Notes:

Mechanical

Plumbing

Electrical (Power)

Lighting

C o m m u n ic a ti o

Building 118

Entry 118-101

See RFP Drawings Square Footage per RFP Drawings 35

8'-0"

Ceiling Suspended acoustical ceiling panel system.

Floor Porcelain Ceramic Tile Base Porcelain Ceramic Tile Walls Paint

Hollow metal door and frame with full lite. Door lite shall be provided with integral blinds N/A

Contractor Furnished; Contractor Installed

Interior Signage

Government Furnished;

Contractor Installed

N/A

Government Furnished;

Government Installed

N/A

N/A N/A

Refer to RFP specifications N/A Refer to RFP specifications LRefer to RFP specifications

Telephone N/A

LAN N/A

Other Communications N/A

Sound Attenuation

Space Name Room Number

Adjacencies

Minimum Ceiling Height

F in is h es

Doors

Casework

F u rn it u re a u ip m en t

Daylight Requirements

Notes:

Mechanical Plumbing Electrical (power) Lighting

C o m m u n ic a ti o

ADA Bathroom

118-102

Entry 118-101

Square Footage per RFP Drawings 52

8'-0"

Ceiling Suspended acoustical ceiling panel system.

Floor Porcelain ceramic tile.

Base Porcelain ceramic tile.

Walls Ceramic Tile

Hollow metal door and frame

N/A

Contractor Furnished; Contractor

Installed

Grab Bars

M7 Garment Hook

M8 Waste Receptacle w/ Lid

TA1 Soap Dispenser, TA2 Paper Towel Dispenser

TA3 Mirror, TA5 Toilet Paper Dispenser

Interior Signage

Government Furnished;

Contractor Installed

N/A

Government Furnished;

Government Installed

N/A

N/A

STC 45 minimum

Refer to RFP specifications

Refer to RFP specifications

Refer to RFP specifications

Refer to RFP specifications

Telephone N/A

LAN N/A

Other Communications N/A

Notes:

Mechanical

Plumbing

Electrical (power)

Lighting

C o m m u n ic a ti o n s F in is h e s

Doors

Casework

F u rn it u re a n d E q u ip m e n t

Daylight Requirements

Sound Attenuation

FAMILY ADVOCACY SPECIALIST

118-103

See RFP Drawings

Square Footage per RFP Drawings 107

8'-0"

Ceiling Suspended acoustical ceiling panel system.

Floor Porcelain ceramic tile.

Base Porcelain ceramic tile.

Walls Paint

Hollow metal door and frame with full lite. Door lite shall be provided with integral blinds

N/A

Contractor Furnished; Contractor

Installed M3 Personal Trash Can, M4 Recycle Container

M5-C Markerboard, M7 Garment Hook

PO1-A Private Office

S1 Task Chair, S2 Side Chair w/ Arms

Interior Signage

Government Furnished;

Contractor Installed

N/A

Government Furnished;

Government Installed

N/A

Aluminum windows with manual roller shades

STC 45 minimum

Refer to RFP specifications

N/A

Refer to RFP specifications

Refer to RFP specifications

Telephone Refer to RFP specifications

LAN Refer to RFP specifications

Other Communications N/A

Notes:

Mechanical

Plumbing

Electrical (power)

Lighting

C o m m u n ic a ti o n s F in is h e s

Doors

Casework

F u rn it u re a u ip m e n t

Daylight Requirements

Sound Attenuation

VICTIM ADVOCATE

118-104

See RFP Drawings

Square Footage per RFP Drawings 107

8'-0"

Ceiling Suspended acoustical ceiling panel system.

Floor Porcelain ceramic tile.

Base Porcelain ceramic tile.

Walls Paint

Hollow metal door and frame with full lite. Door lite shall be provided with integral blinds

N/A

Contractor Furnished; Contractor

Installed M3 Personal Trash Can, M4 Recycle Container

M5-C Markerboard, M7 Garment Hook

PO1-A Private Office

S1 Task Chair, S2 Side Chair w/ Arms

Interior Signage

Government Furnished;

Contractor Installed

N/A

Government Furnished;

Government Installed

N/A

Existing window with manual roller shade

STC 45 minimum

Refer to RFP specifications

N/A

Refer to RFP specifications

Refer to RFP specifications

Telephone Refer to RFP specifications

LAN Refer to RFP specifications

Other Communications N/A

Notes:

Mechanical

Plumbing

Electrical (power)

Lighting

C o m m u n ic a ti o n s F in is h e s

Doors

Casework

F u rn it u re a u ip m e n t

Daylight Requirements

Sound Attenuation