Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Amendment 011 70Z04722R43000001 Of 4
010878158, Base San Juan Hurricane Rebuild Phase III West/Central, Amendment 011
SOLICITATION NO. 70Z04722RSJPHII00 IS AMENDED AS FOLLOWS:
• PROPOSAL DUE DATE HAS CHANGED FROM AUGUST 4, 2022 to AUGUST 9, 2022.
1. Attachment B – Individual Space Criteria Sheets (ISCDS)
INSERT: Exchange Trailer – Storage Room
INSERT: Exchange Trailer – Sales Area
2. SECTION 01800 DESIGN BUILD CRITERIA PARAGRAPH 1.1.1
Base SE F: Repair, Partial Demo / Full Renovations Building 125 CGIS
DELETE: Removal of interior partitions and construction of new interior partitions with new doors.
Base SE G: Demo CGX / Full Renovations Building 124 Mini CGX
ADD BULLET: Renovate existing double-wide trailer adjacent to Building 118 into the Coast Guard Exchange (CGX). Interior of trailer shall be demolished including walls, doors, acoustical tile ceilings, and finishes. Exterior improvements shall include a new double 3’-0” wide delivery door with new pre-engineered aluminum delivery ramp and stair.
3. SECTION 01800 PARAGRAPH 1.7 ARCHITECTURAL DESIGN
After 1.7.31.2
INSERT: “Coast Guard Exchange (CGX) Trailer: Renovate existing double-wide trailer adjacent to Building 118 into the Coast Guard Exchange (CGX). The interior renovations shall include:
• New sales area and storage room with new interior painted gypsum board wall separating the storage room and sales area. Coordinate size and placement of storage room with COR.
• New interior 3’-0” wide double hollow metal door shall be provided between the storage room and the sales area.
• New interior finishes including luxury vinyl tile flooring, rubber base, suspended acoustical tile ceilings with recessed lights, and painted gypsum board.
• Existing vinyl wall covering on interior face of existing exterior walls shall remain.
The exterior improvements shall include:
Of 4
• A new exterior pre-engineered aluminum ramp with stair and landing shall be installed for a new double 3’-0” wide delivery door. Coordinate location of door and ramp with COR.
The exterior walls and roof of the trailer is to remain with no improvements required.
4. SECTION 01800 PARAGRAPH 1.9.1
ADD:
1.9.1.18 Coast Guard Exchange (CGX) Trailer:
• Existing interior walls and doors shall be demolished.
• Existing finishes including carpet and suspended acoustical tile ceiling shall be removed (existing vinyl wall covering shall remain on inside face of exterior walls).
• Portion of existing exterior wall shall be demolished for installation of new 3’-0” wide double delivery door - coordinate location with COR.
END OF AMENDMENT LANGUAGE
Response to Questions Regarding Solicitation 70Z04722R43000001:
1. Please provide scope of work of renovations of double wide trailers where existing Exchange will be relocated.
RESPONSE: See amendment for Section 01800 Paragraphs 1.1.1, 1.7.31.2,
1.9.1 and Attachment B – Individual Space Criteria Sheets.
2. Building 117 – Please indicate if first item of Base SE H “Removal and replacement of existing aluminum storefront system on the south side of the building with new aluminum storefront system for customer entry” will be eliminated.
RESPONSE: This bullet/work item is to remain.
3. Buildings 124 & 125 – please confirm that all fixed equipment, furniture, signs, bathroom accessories, bathroom equipment & specialties among others, are all to be eliminated with the re-scope included in addendum #9. Only flooring finishes & painting of existing walls is required.
RESPONSE: Confirmed per Amendment 009, the only interior work required in Buildings 124 and 125 is any work required to install new flooring finishes, paint existing walls, and install new ceiling tiles as specified (Building 125).
Of 4
4. Building 125 - In Amendment 0009 under Section 01800 DESIGN BUILD CRITERIA PARAGRAPHS, Scope for Building 125 was revised only to replace flooring finishes and paint walls but item “Removal of interior partitions and construction of new partitions with new doors” was not deleted. Please clarify if interior partitions will be included or if line item will be deleted.
RESPONSE: Yes this item should be deleted. See amendment for Section 01800 Paragraph 1.1.1.
END OF AMENDMENT
FAILURE TO ACKNOWLEDGE AMENDMENTS MAY BE CAUSE OF
REJECTION OF OFFER
| topmostSubform[0]: |
| Page1[0]: |
| AmendmentNo[0]: 0011 |
| Code[0]: |
| Code[1]: |
| AccountingData[0]: |
| A13[0]: |
| C13[0]: |
| D13[0]: |
| NameandTitleSigner[0]: |
| NameandTitleOfficer[0]: |
| Description[0]: DESIGN-BUILD USCG HURRICANE REBUILD SAN JUAN PHASE III WEST SAN JUAN, PUERTO RICO |
THIS AMENDMENT IS ISSUED ONLY TO THOSE OFFEROR UNDER THE NATIONAL MULTIPLE AWARD CONSTRUCTION IDIQ CONTRACT (NMACC II) USCG DEPARTMENT OF HOMELAND SECURITY
(SEE CONTINUATION SHEET)
| FacilityCode[0]: |
| Code[2]: NA |
| IssuedBy[0]: Contracting Division |
USCG, Facilities Design and Construction Center 5505 Robin Hood Road, Suite K Norfolk, VA 23513-2431
| NameandAddress[0]: |
| AdministeredBy[0]: |
| ContractIDCode[0]: |
| ReqNumber[0]: NA |
| AmendmentNo[1]: 70Z04722R43000001 |
| ModificationNo[0]: |
| ProjectNo[0]: |
| Page[0]: 1 |
| Pages[0]: 4 |
| EffectiveDate[0]: 8/3/2022 |
| Dated9B[0]: 01/28/2022 |
| Dated10B[0]: |
| CheckBox9[0]: 1 |
| CheckBox10[0]: Off |
| CheckBox11[0]: 1 |
| CheckBox13A[0]: Off |
| CheckBox13B[0]: Off |
| CheckBox13C[0]: Off |
| CheckBox13D[0]: Off |
| IsNot[0]: Off |
| Is[0]: Off |
| Extended[0]: 1 |
| NotExtended[0]: Off |
| DateSigned[0]: |
| DateSigned[1]: |
| Copies[0]: 1 |
| CopiesReturned[0]: |
File details come from the government source that posted it. Updated .