AMEND_009_SAN_JUAN_PHASE_III.pdf
PDF 958 KB Posted
- Solicitation number
- 70Z04722R43000001
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Amendment 0009 70Z04722R43000001 of 36
010878158, Base San Juan Hurricane Rebuild Phase III West/Central, Amendment 009
SOLICITATION NO. 70Z04722RSJPHII00 IS AMENDED AS FOLLOWS:
Drawings:
See sheet G-001 “triangle 3”
• Site plan has been updated
• Drawing Index has been updated to reflect sheets that have been eliminated from project.
See sheet L-101 “triangle 1”
• Overall site plan has been updated.
See sheet L-102 “triangle 1”
• Site Plan – West/Central has been updated.
See sheet L-103, “triangle 1”
• Overall Tree Removal Plan has been updated.
See sheet CD101, “triangle 1”
• Demolition Site – West Central Plan has been updated.
See sheet C-101, “triangle 1”
• Utility Site Plan – West Central has been updated.
See sheet C-102, “triangle 1”
• Geometric Site Plan – West Central has been updated.
See sheet AD104, “triangle 1”
• Demolition plans of Buildings 117, 124 and 125 have been updated along with the demolition Keynotes.
See sheet A-101, “triangle 1”
• Floor plans of Buildings 117, 124 and 125 have been updated along with the floor plan keynotes.
See sheet A-103, “triangle 1”
• Floor plan of Building 118 and west and east elevation of Building 119 has been updated along with keynotes.
See sheet E-001, “triangle 2”
THE PROPOSAL DUE DATE HAS CHANGED TO AUGUST 4, 2022 CLOSE OF BUSINESS
• Revised entire site plan to indicate existing underground ducts and select demolition. Revised all sheet key notes.
See sheet E-002, “triangle 1”
• Revised entire site plan to indicate existing underground ducts and select demolition.
See sheet E-003, “triangle 2”
• Revised entire site plan to indicate existing underground ducts and select new work. Revised all sheet key notes.
See sheet E-004, “triangle 1”
• Revised entire site plan to indicate existing underground ducts and select new work. Revised sheet key note #2.
See sheet E-601, “triangle 1”
• Revised West demolition one-line to indicate existing conditions and select demolition.
See sheet E-602, “triangle 1”
• Revised West one-line to indicate existing conditions and medium voltage feeders from cup re-supplying the existing west loop.
DELETE: Sheet E-113
Attachments:
Attachment B – Individual Space Criteria Sheets (ISCDS)
DELETE: All Building 117 and 118 Space Criteria Sheets
INSERT: Building 117 and 118 Space Criteria Sheets
DELETE: Building 124, Building 125 and Health Building Space Criteria Sheets
Space Criteria Sheet GH-110
INSERT: “(2) Benches” under Contractor Furnished; Contractor Installed category for Space Criteria Sheet GH-110 Lockers/Gear Storage
Attachment G – Construction Phasing Plans
DELETE: Construction Phasing Plans
INSERT: Construction Phasing Plans
SECTION 01110 DESIGN-BUILD GENERAL PARAGRAPHS (page 7)
Section 1.12 Work Sequence
DELETE: All construction phases
INSERT:
Phase 1:
a. Renovate existing double wide trailer and move Exchange into trailer.
b. Move training room equipment out of west side of Building 117 to location TBD.
Move storage items from Building 120 to Building 117.
c. Demolish Building 120.
d. Renovate Building 118.
e. Install (3) temporary conex boxes (size 8’x40’) for Shops, MK. Carpenter and AC
Shop (n.i.c.).
Phase 2:
a. Install temporary construction staging area.
b. Construct new water tanks (n.i.c.).
c. Construct Central Utility Plant (CUP) (n.i.c.).
d. Begin utility distribution work.
e. Renovate Building 119 and associated patio.
Phase 3:
a. Demo existing water tank.
b. Demo Buildings 108, 110, 111, 112, and 113A (n.i.c.).
c. Move shop equipment to temporary conex box (n.i.c.).
d. Demo transformers and fuel farm (n.i.c.).
Phase 4:
a. Move STA/ANT from Building 103 to temporary trailers. Move Armory from Building 104 to temporary trailers (n.i.c.).
b. Demo Building 103 (STA/ANT) and Building 104 (Armory) (n.i.c.).
c. Renovate Building 117. Shipping and Receiving Mail Distribution to remain in place during construction.
d. Construct Shop Building (n.i.c.).
Phase 5:
a. Construct new Multi-Mission Building (MMB) (n.i.c.).
b. Move Shop equipment from temporary conex box to new Shop Building (n.i.c.).
c. Remove temporary conex box (n.i.c.).
Phase 6:
a. Command moves from Building 100 to new Multi-Mission Building (MMB) (n.i.c.).
b. STA/ANT, and Armory moves from temporary trailers into new Multi-Mission Building
(MB) (n.i.c.).
c. MAT, WAT, ESD, moves from Building 101 into temporary trailers (n.i.c.).
d. Second floor Annex of Building 100 and Building 101 to be renovated (n.i.c.).
Phase 7:
a. New Guard House and Entry Road Constructed.
b. Demo old Guard House. The existing Guardhouse shall remain in operation until the new Guard House is operational.
c. CGIS and miscellaneous assigned personnel move back to renovated second floor
Annex of Building 100 (n.i.c.).
d. MAT, WAT, and ESD move back into renovated Building 101 (n.i.c.).
e. Renovate Building 126.
f. Demolish west side of Building 125 where CGIS was stationed.
g. Renovate Building 124 and Building 125.
h. Temporary STA/ANT trailers to be removed (n.i.c.).
i. Construct all remaining parking, drives, sidewalks and landscaping.
j. Move Waterfront Club/Sandbar to Building 119. Demo Sandbar Building.
Improvements to happen in any phase:
a. Construct New Travel Lift Pier and Ramp at Pier Alpha (not during hurricane season).
b. Install Revetment Structure for Shoreline Protection (n.i.s.)
SECTION 01800 DESIGN BUILD CRITERIA PARAGRAPHS (page 74)
Paragraph 1.1.1 PROJECT DESCRIPTION
Base SE A: Site and Civil Work
DELETE: “123”
Base SE B: Utilities Distribution West and Central Zones
DELETE: “Demolition of existing site ductbank electrical system, construction of new medium voltage and low voltage underground distribution ductbanks to supply power to new Health Building, Guard house and re-feed multiple existing buildings”.
Provide exterior ductbanks for medium-voltage system and communications outside plant (OSP) distribution in West contract area. Medium voltage ductbanks shall include ducts for the ‘A’ and future ‘B’ redundant feeders. Ductbanks required to serve the West contract area shall terminate at the East/West demarcation manholes. Provide ‘A’ feeder Medium voltage conductors from the Central Utility Plant 13.2kV Main Switchgear located in the East Contract to respective buildings in the West contract. Provide communications OSP fiber / copper from Building 100 located in the East Contract to respective buildings in the West Contract”
INSERT: “The West medium voltage underground distribution, communications outside plant and associated ductbanks shall remain except for select areas. Partially remove select medium voltage underground distribution and communications outside plant (OSP) in the West contract area. Proposed work shall consist of connecting the remaining existing medium voltage underground and communications OSP to the East contract area for continuity of service. Ductbank extensions serving the West contract area shall terminate at the East/West demarcation manholes. Provide ‘A’ feeder medium voltage conductors from the Central Utility Plant 13.2kV Main Switchgear in the East Contract area to refeed the existing West medium voltage loop and existing equipment.
Provide communications OSP fiber / copper from Building 100 located in the East Contract to select buildings in the West Contract area.”
DELETE: “Partial demolition of the existing underground utilities, construction of new domestic supply water, fire protection water, storm and sanitary systems to the new Health Building and modifying said utilities to multiple existing buildings.”
INSERT: “Partial demolition of the existing underground utilities, modify domestic supply water, fire protection water, storm and sanitary systems to multiple existing buildings.”
Base SE C: New Construction of Health Services Clinic Building
DELETE: Entire Scope Element
Base SE F: Repair, Partial Demo / Full Renovations Building 125 CGIS
DELETE: “Full”
DELETE: “CGIS”
INSERT: “Clinic”
DELETE: “Coast Guard Investigative Services (CGIS)”
INSERT: “Clinic”
DELETE: “Construction of new exterior western wall to enclose the building where the western portion was demolished.”
DELETE: “New interior finishes throughout.”
INSERT: “Removal of all interior finished flooring and replacement with seamless vinyl flooring or cementitious epoxy with integral base. Repainting of all interior walls.
Installation of sound deadening ceiling tiles in exam rooms.
DELETE: “Modification of existing HVAC and electrical systems.”
DELETE: “New Men’s and Women’s restrooms.”
DELETE: “Removal of existing roof system and installation of new roof system at the (2) lower portions of roof at the north and south sides of the building (+/- 200 s.f.).”
INSERT: “Removal of existing sloped roof joists with stem wall above flat roof.
Installation of new concrete roof structure with new roofing system where sloped joists were removed. Installation of new parapet with coping to match existing.
Inspection/repair/resurfacing of existing modified bitumen as required to maintain weather tight condition (approx. 450sf)."
Base SE G: Demo CGX / Full Renovations Building 124 Mini CGX
DELETE: “Demo CGX / Full”
DELETE: “Mini CGX”
INSERT: “Dental Clinic”
DELETE: “Coast Guard Exchange (CGX)”
INSERT: “Dental Clinic”
DELETE: “Complete demolition of the interior of the building including partitions, finishes, and HVAC and electrical systems. The roof structure and roof system shall also be demolished.”
DELETE: “Exterior walls with windows to remain. Main entry door to remain with existing door on the north side to be removed and infilled with construction to match existing.”
DELETE: “New interior partitions and doors.”
INSERT: “Removal of all interior finished flooring and replacement with seamless vinyl flooring or cementitious epoxy with integral base. Repainting of all interior walls.”
DELETE: “New roof structure with roofing system”
INSERT: “Inspection/repair/resurfacing of existing modified bitumen as required to maintain weather tight condition (approx. 200sf)."
DELETE: “New HVAC and electrical systems.”
DELETE: “New Unisex restroom.”
BASE SE H: Repair, Repurpose, Renovations Building 117
After “It will primarily serve as the…”
INSERT: “MWR Office, Barber, and”
DELETE: “Repurpose existing small mail room on south side of building into a new electrical room. The existing exterior door shall be removed and replaced with a new hollow metal door and frame.”
INSERT: “In small mailroom, removal of existing interior wall with existing mailboxes.
Installation of Dutch door for customer transactions along with new mailboxes. Removal of existing exterior door and windows and installation of new aluminum storefront door and frame with windows.”
DELETE: “Provide new interior opening with hollow metal double door and frame between the central mail distribution space and the shipping/receiving area.”
INSERT: “Modification of West side of building to include barber suite with ADA toilet room and new exterior door for accessing the space. MWR personnel shall occupy the remaining portion of the western side of the building.”
DELETE: “New HVAC and electrical systems.”
REPLACE WITH: “The plumbing and electrical systems shall be updated for the western portion of the building where the Barber and MWR are located.”
Base SE HA: Repair, Repurpose, Renovations Building 118
DELETE: “Coast Guard’s CSO’s office”
REPLACE WITH: “Family and Victim Advocate Specialists offices”
Before first bullet
INSERT:
• “Removal of existing toilet room and modification of interior space to include two private offices for family and victim advocacy specialists with a new accessible restroom.
• Installation of new exterior door for accessing the space with removal and infill of the existing exterior door with a window and construction to match existing.”
Optional SE J: Demolish Waterfront Club / Relocate Renovations Building 119
DELETE: “The north canopy shall be removed and the existing concrete patio underneath the canopy to remain.”
INSERT: “The north canopy shall be re-roofed.”
Option SE L: Install PV Solar on the new Health Services Clinic Building
DELETE: Option SE L
SECTION 01800 PARAGRAPH 1.7 ARCHITECTURAL DESIGN (page 98) Building 117 – Shipping & Receiving and Mail Distribution
DELETE: “Shipping & Receiving and Mail Distribution” INSERT: “Shipping & Receiving & Mail Distribution / Barber Shop / MWR Office” DELETE: all bullet points.
INSERT:
• In small mailroom, remove existing interior wall with existing mailboxes. Install new Dutch door for customer transactions along with new mailboxes. Remove existing exterior door and windows and install new aluminum storefront door with sidelights.
• Expand existing Central Mail Distribution / Admin space and expand existing storage mezzanine above this space.
• Modification of West side of building to include barber suite with private ADA toilet room and new exterior door on the west side of the building for accessing the space.
MWR personnel shall occupy the remaining portion of the western side of the building.
• North side of exterior wall to be patched and painted to match existing from the removal of utilities entering the building
• The plumbing and electrical systems shall be updated for the western portion of the building where the Barber and MWR are located.
Building 118 – CSO’s Office
DELETE: “CSO’s office”
INSERT: “Family and Victim Advocate Specialists Offices”
INSERT: The following bullet points:
• Remove existing toilet room and modify interior space to include two private offices for family and victim advocacy specialists with a new private accessible restroom.
• Install new exterior door for accessing the space.
• Remove existing exterior door and infill with new window with wall below window to match existing construction.
• In small mailroom, remove existing interior wall with existing mailboxes. Install new
Dutch door for customer transactions along with new mailboxes. Remove existing exterior door and windows and install new aluminum storefront door with sidelights.
• Expand existing Central Mail Distribution / Admin space and expand existing storage mezzanine above this space.
Building 119 – Waterfront Club
DELETE: “The north canopy shall be removed and the existing concrete patio underneath the canopy to remain.”
INSERT: “The north canopy shall be re-roofed.”
Building 124 – Exchange
DELETE: “Exchange”
INSERT: “Dental Clinic”
DELETE: “Coast Guard Exchange (CGX)”
INSERT: “Dental Clinic”
DELETE: “all the interior walls completely demolished with the exception of the roofs over the (2) small building bump-outs to the southwest corner of the building.”
INSERT: “select interior finishes being upgraded. The existing roof shall also be inspected and re-roofed as necessary for weather tight condition.”
DELETE: “Complete demolition of the interior of the building including partitions, finishes, and HVAC and electrical systems.”
DELETE: “shall also be demolished”
INSERT: “shall remain”
DELETE: “New interior partitions and doors.”
INSERT: “Removal of all interior finished flooring and replacement with seamless vinyl flooring or cementitious epoxy with integral base. Repaint all interior walls.”
DELETE: “New roof structure with roofing system over the main part of the building.”
INSERT: “Inspect/repair/resurface of existing modified bitumen as required to maintain weather tight condition (approx. 200 s.f.)."
DELETE: “New HVAC and electrical systems.”
DELETE: “ Demolition, Structural, HVAC, Plumbing Electrical and Fire Protection”
Paragraph 1.7.12.1.2
DELETE: “New internal overflow drainage system shall be provided.”
DELETE: Section 1.7.12.5.2
Paragraph 1.7.13.1
DELETE: “Where indicated on the Space Criteria Sheets”.
INSERT: “Non-habitable spaces such as electrical and mechanical spaces”
ADD: “All habitable spaces existing finish floor material shall be removed and replaced with a seamless vinyl flooring or cementitious epoxy with integral base.”
DELETE: Sections 1.7.13.2 thru 1.7.15.3 with all subsections.
Building 125 – Coast Guard Investigative Services (CGIS)
DELETE: “Investigative Services (CGIS)”
INSERT: “Clinic”
DELETE: “Construction of new exterior western wall to enclose the building where the western portion was demolished. The existing roof system adjacent to the new wall shall remain and be patched and repaired as required with roof system extending underneath new wall coping for a weathertight condition.”
INSERT: “Where existing sloped bar joists to be removed, a new concrete roof deck with new roofing system shall be installed. The existing western exterior wall shall be extended to the same height of the existing exterior walls. The new roofing shall extend up the side of the western parapet wall underneath new wall coping to match existing for a weathertight condition. Inspection/repair/resurfacing of existing modified bitumen as required to maintain weather tight condition (approx. 450 s.f.)."
DELETE: “New interior finishes throughout.”
INSERT: “Remove all interior finished flooring and replace with seamless vinyl flooring or cementitious epoxy with integral base at all habitable rooms. All existing interior walls shall be repainted. Existing ceiling tiles in exam rooms shall be removed and new sound deadening ceiling tiles shall be installed.”
DELETE: “New HVAC, plumbing and electrical systems.”
Paragraph 1.7.16.2
DELETE: “New exterior doors and frames shall be painted hollow metal. Exterior doors shall be located under exterior canopies or be recessed in alcoves that provide weather protection to the maximum extent possible. Doors and windows shall be designed for lateral windward and leeward wind loads per ASCE 7.”
Paragraph 1.7.17.1
DELETE: “Where indicated on the Space Criteria Sheets”.
INSERT: “Non-habitable spaces such as electrical and mechanical spaces”
DELETE: Sections 1.7.17.2 and 1.7.17.2.1
Paragraph 1.7.17.3.1
INSERT: “New ceiling tiles shall be sound deadening tiles with an NRC above 0.80 and a Ceiling Attenuation Class (CAC) rating of 35 or greater.”
DELETE: Sections 1.7.17.3.2 thru 1.7.20.2
Paragraph 1.7.32 DELETE: “Health Building: This building is new and is a two story totaling +/-24,350 s.f.
of space. The Health Building shall include the following:”
DELETE: all bullet points
DELETE: Sections 1.7.32 thru 1.7.37
SECTION 01800 PARAGRAPH 1.8 STRUCTURAL DESIGN (page 153)
Building 117 – Base Operations / Shipping & Receiving:
DELETE: “Base Operations / Shipping & Receiving:”
INSERT: “Shipping & Receiving & Mail Distribution / Barber Shop / MWR Office” Paragraph 1.8.1
DELETE: “and the roof”.
Building 124 – Exchange:
DELETE: “Building 124 – Exchange:”
DELETE: Section 1.8.2
Building 125 – CGIS
DELETE: “CGIS”
INSERT: “Clinic”
Paragraph 1.8.3
DELETE: “any proposed new or modified openings in the walls or and the roof.”.
INSERT: “new concrete roof structure where existing sloped bar joists were removed.”.
DELETE: “such as operable walls.”.
Health Building
DELETE: “Health Building”
DELETE: Section 1.8.6 and sub-sections
SECTION 01800 PARAGRAPH 1.9 DEMOLITION (page 159) Paragraph 1.9.1.1 Building 116 – Quarters Building: Building shall remain.
DELETE: all sub-bullet points (elec and telcom services to building 116 shall remain)
Paragraph 1.9.1.2 Building 117 – Shipping & Receiving: Building to be renovated.
DELETE: “Shipping & Receiving:”
INSERT: “Shipping & Receiving & Mail Distribution / Barber Shop / MWR Office” DELETE: “storefront system” under Architectural bullet point.
INSERT: “exterior aluminum doors with two windows”
DELETE: “Partial removal of interior partition for installation of new interior door with demolition of interior partitions”
INSERT: “Demolition of interior wall with mailboxes and door to make mail room larger.
Portion of existing interior wall shall be demolished for installation of new Dutch door and mailboxes. The western interior wall supporting the mezzanine shall be removed – contractor shall verify that wall is not a bearing wall and provide additional support of mezzanine if required. A new door opening shall be provided on the west side of the building for access the new Barber Shop.”
DELETE (Electrical bullet): “Disconnect existing 208Y/120V service derived from Building 123 (or Building 120), remove conductors to Building 123 (or Building 120).
Exact service origination could not be determined and may be from Building 123 or Exchange Building 120. Existing underground ducts to building shall remain and be intercepted for the new service. Disconnect and remove existing service panelboard and prepare for replacement. Disconnect and remove existing light fixtures, branch circuit wiring and receptacles.”
INSERT (Electrical bullet): “Exact service origination could not be determined and may be from Building 123 or Exchange Building 120. It is assumed the existing 208Y/120V service is derived from Building 123. Conductors and ductbanks from Building 123 shall remain. Existing underground ducts and conductors shall remain if supplied from Building 123. If Building 117 is supplied from Building 120, provide new ductbanks to Building 123 for 208Y/120V electrical service. Disconnect and remove existing light fixtures, branch circuit wiring and receptacles in the West side of the building to accommodate renovations. Receptacles, lighting and branch circuit wiring in the Eastern side of the building shall remain.”
DELETE (Telecommunications bullet): “Remove all horizontal cabling, pathways and outlets within the building complete to respective telecommunications room to accommodate new architectural layouts. Coordinate re-utilization of existing racks with the COR. Rack mounted telecommunications electronics shall be removed by the Government.”
INSERT (Telecommunications bullet): “Remove all horizontal cabling, pathways and outlets within the western section of the building complete to respective telecommunications room to accommodate new architectural layouts. Existing telecommunications racks associated electronics shall remain. Pathways, cabling and outlets in the Eastern section of the building shall remain.”
Paragraph 1.9.1.3 Building 118 – Building shall be renovated
INSERT: Bullet point that states:
• Architectural: Building is to remain with minimal exterior and interior demolition. The interior bathroom including plumbing fixtures and finishes shall be demolished with suspended acoustical ceiling tiles throughout. A new door opening shall be provided on the west side of the building for accessing the building. The existing door on the west side shall be removed for installation of new window.
DELETE (Electrical bullet): “Disconnect existing 208/120V 1-phase service derived from Building 123, remove conductors to Building 123. Existing underground ducts to building shall remain and be intercepted for the new service.”
INSERT (Electrical bullet): “Existing 208Y/120V 1-phase service derived from Building 123 shall remain.”
Paragraph 1.9.1.4 Building 119 – Chief’s Mess (formerly MWR / Barber Shop) – Building shall be renovated
DELETE: “Exterior north canopy to be removed and”
DELETE (Electrical bullet): “Disconnect existing 208/120V 1-phase service derived from Building 123, remove conductors to Building 123. Existing underground ducts to building shall remain and be intercepted for the new service.”
INSERT (Electrical bullet): “Existing 208Y/120V 1-phase service derived from Building 123 shall remain.”
Paragraph 1.9.1.8 Building 123 – Generator Building – Building shall be demolished.
(Building shall remain)
DELETE: “Building shall be demolished”
DELETE: Architectural bullet point.
DELETE: Electrical bullet point
DELETE: “HVAC systems shall be demolished.”
DELETE: Fire protection bullet point
DELETE: Salvage requirements bullet point
Paragraph 1.9.1.10 Building 124 – Coast Guard Exchange (CGX) (formerly Dental Building) – Building shall be renovated.
DELETE: “Coast Guard Exchange (CGX) (formerly Dental Building) – Building shall be renovated.
INSERT: “Dental Building – update select finishes”.
DELETE: Architectural/Structural bullet point.
INSERT: “Architectural: Existing interior finished floor and base materials to be removed throughout the building and surfaces prepared for new finishes.”
DELETE (Electrical bullet): “Disconnect existing 60A, 480V, 3-phase service derived from Building 125, manual transfer switch ‘MTS-124’. Remove conductors to Building 125 and remove underground ductbank to nearest low volage manhole (480V). Existing exterior 45kVA (480-208Y/120V) transformer and interior 250A, 208Y/120V (MLO) panel shall be disconnected and stored for re-use. Remove existing exterior safety switches for 45kVA transformer. Disconnect and remove existing light fixtures, branch circuit wiring and receptacles. Remove all electrical equipment from western portion of building for demolition. (It should be noted that Building 124 is sub-fed from Building 125, however Building 125 is supplied by Building 123, which is indicated for demolition.)”
INSERT (Electrical bullet): “Feeder from Building 125 shall remain. Existing electrical systems and equipment shall remain.”
DELETE (Telecommunications bullet): “Remove OSP copper and fiber completely to Building 125. Remove all horizontal cabling, pathways and outlets within the building complete to respective telecommunications room to accommodate new architectural layouts. Coordinate re-utilization of existing racks with the COR. Rack mounted telecommunications electronics shall be removed by the Government.”
INSERT (Telecommunications bullet): “Existing OSP from Building 125 shall remain.
Existing telecommunications systems shall remain.”
DELETE: “HVAC system shall be demolished”.
DELETE: “Fire Protection: Existing fire alarm system (including fire alarm control panel, smoke detectors, horn-strobes and pull stations) to be demolished.”
Paragraph 1.9.1.11 Building 125 – Coast Guard Investigative Services (CGIS) (formerly CGIS / Health Building) – Building shall be partly demolished and renovated.
DELETE: “Coast Guard Investigative Services (CGIS)”
INSERT: “Clinic”
DELETE: “2,700”
INSERT: “1,700”
DELET: “2,200”
INSERT: “3,200”
DELETE: “Where load bearing walls are demolished in portions of the building to remain, alternative support shall be provided (beams and/or posts as required). Where shear walls, braces, or rigid frames that are part of the lateral-load-resisting system are demo’d, provide new braces or shear walls as required to maintain stability and comply with code requirements.”
DELETE (Electrical bullet): “Disconnect existing dual redundant 150A, 480V, 3-phase services derived from Building 123, remove conductors to Building 123. Remove underground ductbanks to nearest low-voltage manhole (480V). Disconnect and remove all electrical equipment within the building including all equipment within the main electrical room, panelboards, transformers, (2) manual transfer switches, light fixtures, branch circuit wiring and receptacles. The main Northwest electrical room shall be utilized for proposed new equipment and distribution to Building 124 and 126. (It should be noted that Building 125 currently sub-feeds Buildings 124 and 126).”
INSERT (Electrical bullet): “Feeder from Building 123 Shall remain. Existing electrical systems and equipment shall remain within the eastern portion of the building. Remove lighting, receptacles and branch circuits to accommodate partial demolition scope in the western portion of the building.”
DELETE (Telecommunications bullet): “Remove OSP copper and fiber completely to Building 100. Remove all horizontal cabling, pathways and outlets within the building complete to respective telecommunications room to accommodate new architectural layouts. Coordinate re-utilization of existing racks with the COR. Rack mounted telecommunications electronics shall be removed by the Government.”
INSERT (Telecommunications bullet): “Existing ductbank and OSP from Building 100 shall remain. Existing telecommunications systems shall remain in the eastern portion of the building. Remove all horizontal cabling, pathways and outlets to accommodate partial demolition scope in the western portion of the building.”
DELETE: “HVAC system shall be demolished”.
DELETE: “Fire equipment: Existing smoke alarm systems to be demolished.”
Paragraph 1.9.1.12 Building 126- Base Command (formerly Logistics Command) – Building shall be renovated.
DELETE (Electrical bullet): “Disconnect existing 100A, 480V, 3-phase service derived from Building 125, Panel ‘NDA’. Remove conductors to Building 125 and remove underground ductbank to nearest low voltage manhole (480V).”
(It should be noted that Building 126 is sub-fed from Building 125, however Building 125 is supplied by Building 123, which is indicated for demolition.)
INSERT (Electrical bullet): “Feeder from Building 125 Shall remain (first sentence).”
DELETE (Telecommunications bullet): “Remove OSP copper and fiber completely to Building 125.”
INSERT (Telecommunications bullet): “Existing ductbank and OSP from Building 125 shall remain, existing ductbank and OSP from Building 126 feeding Building 127 shall remain.”
Paragraph 1.9.1.13 Buildings 127 and 128- UPH, Galley and Fitness Center - Buildings shall remain.
DELETE (Electrical bullet): “Both Buildings 127 and 128 are supplied by an exterior pad-mounted 750kVA transformer, ‘T-5’. Disconnect and remove the preferred and alternate 15kV feeders completely to sectionalizing switch ‘PS1’ and transformer ‘T-6’ (loop feed). Underground ductbanks shall remain. Disconnect and remove transformer ‘T-5’ and store for re-installation. Prepare site for new raised transformer pedestal.
Prepare existing 208Y/120V transformer secondary conductors for splicing and extension to raised transformer.”
INSERT (Electrical bullet): “Existing transformer, ‘T-5’, shall remain in place. Existing 15kV feeder supplied from sectionalizing switch ‘PS1’ shall remain. Provide partial demolition of loop feeder derived from transformer ‘T-6’ to manhole near East / West contract demarcation.”
DELETE (Telecommunications bullet): “Remove OSP copper and fiber completely to Building 126. Prepare for new copper and fiber service to building.”
INSERT (Telecommunications bullet): “Existing ductbank and OSP from building 126 shall remain.”
Paragraph 1.9.1.16 Site Work - Electrical
DELETE (Electrical bullets):
• Medium Voltage Equipment: Pad-mounted transformers indicated for demolition shall be removed with the associated buildings noted above. Remove sectionalizing switches ‘PS1’, ‘PS2’ and remaining medium voltage loop conductors.
• West Site Lighting: Disconnect and remove all site lighting throughout the campus including poles and fixture heads, unless noted otherwise. Remove conductors completely to source. Remove all pathways from poles to manholes.
• West site lighting fixture heads near UPH 127 and 128 shall be replaced. Poles and conductors shall be re-utilized. Refer to Contract drawings for additional information.
INSERT (Electrical bullets):
“Exterior medium voltage equipment, select medium voltage ductbanks, west site lighting and associated branch circuits shall remain. Refer to the following list for additional information:
• Sectionalizing Switch ‘PS1’ shall remain
• Sectionalizing Switch ‘PS2’ Shall remain
• Exterior transformers, ‘SUB #1’, shall remain
• Transformer ‘T-5’ shall remain
• Existing medium voltage ductbanks, conductors and manholes serving ‘PS1’, ‘PS2’, ‘SUB #1’ and ‘T5’ shall remain. Existing West loop shall be re-supplied by the CUP located in the East contract area.
• West contract area site lighting shall remain.
• West contract area PA system shall not be installed.
• Building 123, shall remain
• Electrical equipment within Building 123 shall remain. Electrical feeders derived from Building 123 serving Buildings 116, 117, 118, 119, 124, 125, and 126 shall remain.
• Two Electrical feeders (480Y/277V) derived from Building 123 serving Building 120 shall be demolished. One of the breakers supplying the indicated original feeders shall be utilized to supply a 480Y/277V feeder to the proposed Exchange Trailer. Provide new ductbank from nearest existing manhole to Exchange trailers.
• Electrical feeder (208Y/120V) derived from Building 123 serving the Waterfront Club (Chief’s Mess) shall be demolished. Spare breaker within Building 123 made available from Waterfront Club demolition shall be utilized to supply a 208Y/120V feeder to the proposed Guardhouse. Provide new ductbank from manhole near Building 123 to the Guardhouse.
• Telecommunications – Existing ductbanks and OSP shall remain except for select revised items indicated within the proposed electrical site drawings.”
SECTION 01800 PARAGRAPH 1.10 FIRE PROTECTION (page 171)
Building 117 – Shipping & Receiving
DELETE: “Shipping & Receiving:”
INSERT: “Shipping & Receiving & Mail Distribution / Barber Shop / MWR Office” INSERT: “Smoke alarms will be upgraded for new building layout.” after second sentence.
Building 118 – CSO’s Office
DELETE: “CSO’s Office”
INSERT: “Family and Victim Advocate Specialists Offices”
DELETE: “minor”
INSERT: “major”
INSERT: “Existing fire extinguishers and smoke alarms shall be removed and new ones installed per the new interior layout of the building.” after the second sentence
DELETE: “Exchange:”
INSERT: “Dental Building:”
Section 1.10.1
DELETE: “and be renovated.”
INSERT: “and have updated select finishes.”
DELETE: “shall be demolished and upgraded to a voice evacuation or mass notification system.”
INSERT: “and fire extinguishers shall remain.”.
DELETE: Sections 1.10.1.1
DELETE: Sections 1.10.2 thru 1.10.7 with subsections.
Building 125 – Coast Guard Investigative Services (CGIS):
DELETE: “Coast Guard Investigative Services (CGIS):
INSERT: “Clinic:”
Section 1.10.8
DELETE: “and be renovated.”
INSERT: “and have updated selective finishes.”
DELETE: “shall be upgraded to a new voice evacuation fire alarm or mass notification system.”
INSERT: “and fire extinguishers shall remain.”
DELETE: Section 1.10.8.1
DELETE: Sections 1.10.9 thru 1.10.14 with subsections.
Health Building:
DELETE: “Health Building:”
DELETE: Sections 1.10.29 thru 1.10.38 with subsections.
Exchange:
INSERT: Section 1.10.29: Exchange: The existing building is to remain with minor renovations and change of use. The building has no existing sprinkler system but has fire extinguishers and smoke alarms. Existing fire extinguishers and smoke alarms shall be removed and new ones installed per the new interior layout of the building. An automatic sprinkler system is not required per Chapters 5 and 9 of the Building Code 2018 of Puerto Rico.
SECTION 01800 PARAGRAPH 1.11 PLUMBING (page 182)
Building 117 – Shipping & Receiving / Mail Distribution:
DELETE: “Shipping & Receiving / Mail Distribution:”
INSERT: “Shipping & Receiving & Mail Distribution / Barber Shop / MWR Office”
Section 1.11.1.1.2
INSERT: “The restroom/toilet room shall consist of a water closet, and lavatory. The domestic hot water for the lavatory and sinks shall use an electric instantaneous hot water heater. The Barber Shop shall have two solid surface undermount sinks.”
Section 1.11.1.2
DELETE: “There are no sanitary and vent services within the building.”
INSERT: “Sanitary piping shall be extended from the site service and enter the building.
Sanitary piping shall extend to restroom fixtures and barber shop sinks. A floor drain shall be installed in the restroom. Vent piping shall be extended up through the roof of the building”.
Section 1.11.1.3
DELETE: “entrance area of the building.”
INSERT: “north side of the building.”
Building 118 – CSO’s Office DELETE: “CSO’s Office”
INSERT: “Family and Victim Advocate Specialists Offices”
Section 1.11.2.2
DELETE: “and server area sink.”
DELETE: “Floor drains shall be installed in the restroom and server/supplies room.”
Building 124 – Exchange:
DELETE: “Exchange:”
INSERT: “Dental Building:”
Section 1.11.4
DELETE: “Exchange”
INSERT: “Dental Building”
DELETE: Sections 1.11.4.1.2, 1.11.4.2 and 1.11.4.3
Building 125 – Coast Guard Investigative Services (CGIS):
DELETE: “Coast Guard Investigative Services (CGIS):”
INSERT: “Clinic:”
Section 1.11.5
DELETE: “Coast Guard Investigative Services (CGIS):”
INSERT: “Clinic:”
DELETE: Sections 1.11.5.1.2, 1.11.5.2 and 1.11.5.3.
Health Building:
DELETE: Sections 1.11.8 thru 1.11.8.4 with subsections.
SECTION 01800 PARAGRAPH 1.12 HVAC (page 193)
Building 117 – Shipping & Receiving and Mail Distribution
DELETE: “Shipping & Receiving and Mail Distribution:”
INSERT: “Shipping & Receiving & Mail Distribution / Barber Shop / MWR Office”
Paragraph 1.12.1.1
DELETE: every mention of “electrical room.”
INSERT: “Mail Room.”
Paragraph 1.12.1.2
DELETE: “mail and entrance vestibule.”
INSERT: “MWR and Barber”.
DELETE: “both mail and archival areas.”
INSERT: “MWR and Barber areas”.
DELETE: “rear of the building.”
INSERT: “southeast corner of the building.”
INSERT: “Section 1.12.1.3: EF-1: The toilet room shall have a dedicated exhaust fan that is ceiling mounted and interlocked using a relay with the room lighting control. The room lighting shall provide a delayed off for improved exhaust fan function.”
INSERT: “Family and Victim Advocate Specialists Offices”
Section 1.12.2
DELETE: “CSO’s Office”
INSERT: “Family and Victim Advocate Specialists Offices”
Section 1.12.2.1
DELETE: “CSO Office”
INSERT: “Entry and Offices”.
INSERT: “Dental Building:”
Section 1.12.4
DELETE: “Exchange”
INSERT: “Dental Building”
Section 1.12.4.1
DELETE: Contents of this section
INSERT: “Existing HVAC system is to remain.”
DELETE: Sections 1.2.4.2 and 1.12.4.3
DELETE: “Coast Guard Investigative Services (CGIS):”
INSERT: “Clinic:”
Section 1.12.5
DELETE: “CGIS”
INSERT: “Clinic”
Section 1.12.5.1
DELETE: Contents of this section
INSERT: “Existing HVAC system is to remain. Existing ductwork with diffusers and return grilles will need to be removed for installation of new concrete roof deck where existing bar joists are to be removed. New ductwork with diffusers and return grilles shall be installed in this area.”
DELETE: Sections 1.2.5.2 and 1.12.5.4.
DELETE: “Health Building: Provide Air Conditioning and Ventilation to maintain both space temperature and control humidity within the health building. Space conditioning and ventilation shall be de-coupled and provided using two (2) separate air handling unit systems”.
DELETE: Sections 1.12.8 thru 1.12.9.3 with subsections.
SECTION 01800 PARAGRAPH 1.13 ELECTRICAL (page 206) Building 116 – Quarters Building:
DELETE: “Building 116 – Quarters Building” DELETE: Sections 1.13.1 thru 1.13.3
Building 117 – Shipping & Receiving and Mail Distribution:
DELETE: “Shipping & Receiving and Mail Distribution:”
INSERT: “Shipping & Receiving & Mail Distribution / Barber Shop / MWR Office”
Section 1.13.4
DELETE: “The building is equipped with a 150A, 208Y/120V, 3-phase panelboard that is in poor condition and shall be replaced with new 480Y/277V equipment. Service shall be derived from the Health Building unit-substation replacing the service from demolished Building 23. Provide a 480Y/277V feeder from the Health Building unit-substation and new service distribution panel within Building 117. Provide additional 208Y/120V step-down transformers and distribution equipment for Building 117 loads and feeders to adjacent buildings. Provide new LED low-bay lighting in shipping receiving bay, LED industrial chain hung fixtures in storage areas, LED recessed architectural lighting in office space, convenience receptacles and branch circuit wiring.”
INSERT: “The building is equipped with a 150A, 208Y/120V, 3-phase panelboard that is in poor condition and shall be replaced in kind. Feeder from Building 123 shall remain.
Receptacles, pathways and wiring in the Eastern side of the building shall remain.
Provide demolition work and new LED recessed architectural lighting, convenience receptacles and branch circuit wiring to accommodate renovations in the West side of the building. Existing advanced metering Data Acquisition Server (DAS) serving the Base shall remain.”
DELETE: Section 1.13.5
Section 1.13.6.1
INSERT: “in renovated western area”.
INSERT: “Family and Victim Advocate Specialists Offices”
Section 1.13.8
DELETE: “The building is equipped with a 60A, 208/120V, 1-phase load center that is in poor condition and shall be replaced with a 100A, 208Y/120V, 3-phase panelboard.
Proposed electrical service shall be 100A, 208Y/120V 3-phase derived from the Building 117, which shall replace the service from demolished Building 123.”
INSERT: “The building is equipped with a 60A, 208/120V, 1-phase load center that is in poor condition and shall be replaced with a 100A, 208Y/120V, 1-phase panelboard.
Feeder from Building 123 shall remain.”
Section 1.13.11
DELETE: “Both load centers are in poor condition and shall be replaced with a single 200A 3-phase service panelboard. Proposed electrical service shall be 200A, 208Y/120V 3-phase derived from Building 117, which shall replace the service from demolished Building 123.”
INSERT: “Both load centers are in poor condition, each shall be replaced with 100A single-phase panelboards. Feeder from Building 123 shall remain.”
INSERT: “Dental Building”
Section 1.13.14
DELETE: “Proposed electrical service shall be 200A, 480Y/277V derived from Building 125 main electrical room. Provide 480Y/277V service distribution panel, step-down transformer(s) (480V-208Y/120V) and 208Y/120V branch circuit panelboards for electrical distribution within the building. Provide lensed LED recessed architectural lighting, convenience receptacles, dedicated circuits to coolers / food storage equipment and branch circuit wiring throughout the building. New lighting and power layouts shall match proposed renovated space layouts. Final equipment rating shall be per the load study performed by the Design Build Contractor.”
INSERT: “Feeder from Building 125 Shall remain. Existing electrical systems shall remain.”
DELETE: Sections 1.13.15 – 1.13.16
INSERT: “Clinic:”
Section 1.13.17
DELETE: “Proposed electrical service shall be 400A, 480Y/277V derived from the new Health Building unit-substation. Existing Northwest electrical room shall be used for all electrical equipment. Provide 480Y/277V service distribution panel, step-down transformers (480V-208Y/120V) and branch circuit panelboards within the Building 125 Northwest main electrical room. Distribution panel shall supply Building 125 CGIS loads and provide electrical service to Buildings 124. Provide LED recessed architectural lighting in office/conference spaces, convenience receptacles, multi-wire branch circuits for systems furniture feeds where applicable and branch circuit wiring throughout the building. New lighting and power layouts shall match proposed renovated space layouts.
Final equipment ratings shall be per the load study performed by the Design Build Contractor.”
INSERT: “Feeder from Building 123 Shall remain. Existing electrical systems shall remain.”
DELETE: Sections 1.13.18 – 1.13.20
Building 126 – Base Command:
Section 1.13.21
DELETE: “Proposed electrical service shall be 200A, 480Y/277V derived from the Health Building unit-substation.”
INSERT: “Feeder from Building 125 Shall remain.”
Building 127 and 128 – UPH, Galley and Fitness Center:
Section 1.13.24
DELETE: “Provide new raised pedestal above flood plain to support the existing 750kVA transformer, ‘T-5’. Remove and relocate transformer to new pedestal. Provide redundant 15kV class MV-105 feeders derived from the Main Switchgear in the CUP (Central Utility Plant). Extend / splice existing 208Y/120V secondary conductors to reach elevated transformer secondary. Re-install transformer ‘T-5’ on the new pedestal and terminate primary and secondary conductors. Final medium voltage conductor ratings shall be per the load study performed by the Design Build Contractor.”
INSERT: “Existing transformer, ‘T-5’, shall remain in place. Existing 15kV feeder supplied from sectionalizing switch ‘PS1’ shall remain. Provide 15kV feeder extension from existing West contract manhole near sectionalizing switch ‘PS2 and east/west demarcation point to CUP main switchgear. Feeder extension shall provide power continuity to ‘T-5’ and existing west medium voltage loop.”
DELETE: Section 1.13.26
Guardhouse and Entry Point:
Section 1.13.27
DELETE: “Proposed electrical service shall be 150A, 480Y/277V derived from the Health Building unit-substation.”
INSERT: “Proposed electrical service shall be 150A, 208Y/120V derived from Building
123. Spare breaker or available breaker space in Building 123, Panel ‘DT’ may be utilized to supply a 208Y/120V feeder to the proposed Guardhouse. Provide new ductbank from manhole near Building 123 to the Guardhouse.”
Health building:
DELETE: Sections 1.13.30 thru 1.13.33
INSERT: Section 1.13.30
“Exchange Trailer:
Provide ductbank extension from nearest manhole and 100A, 480Y/277V feeder derived from Building 123. Provide 480Y/277V service distribution panel, step-down transformer (480V-208Y/120V) and 208Y/120V branch circuit panelboards for electrical distribution within the trailer. Provide lensed LED recessed architectural lighting, convenience receptacles, dedicated circuits to coolers / food storage equipment and branch circuit wiring throughout the trailer. New lighting and power layouts shall match proposed space layouts. Final equipment rating shall be per the load study performed by the Design Build Contractor.
Provide the following, in addition to the system description:
• Integral batteries for emergency loads per NEC 701 / NFPA 101 (Egress Lighting)
• Dedicated branch circuits to coolers / food storage equipment. Coordinate final requirements with food storage equipment provider.
• Lighting shall adhere to IES standards; lighting power densities and controls per
ASHRAE 90.1.
• Coordinate final food storage equipment connections with the equipment provider and the COR.
Electrical components shall be designed for seismic effects based on criteria in ASCE 7- 16 and the site-specific analysis. Refer to the Structural specification for additional information.”
Site Electrical West:
1.13.34 and 1.13.34.1
DELETE: “Provide new concrete encased medium-voltage ductbank system with schedule 80 PVC conduit from West / East contract demarcation point to buildings within the West contract scope. Coordinate exact interface manhole with the East contract.
Provide ductbank from manholes to each building requiring medium-voltage electrical service in the West contract scope. Refer to the Contract Drawings for additional information.
This contractors shall provide medium-voltage conductors from the Central Utility Plant (CUP) 13.2kV Main Switchgear within the East contract area to the buildings within the West contract scope per scope item BASE SE B: Utilities Distribution West and Central Zones. Conductor terminations within the CUP Main Switchgear supplying buildings within the West scope shall be performed by this contractor and coordinated with the East contract.”
INSERT: “Provide new concrete encased medium-voltage ductbank with schedule 80 PVC conduit from existing manhole adjacent to ‘PS2’ to West / East contract demarcation point. Coordinate exact interface point with the East contract. Refer to the Contract Drawings for additional information.
This contractor shall provide medium-voltage conductors from the Central Utility Plant (CUP) 13.2kV Main Switchgear within the East contract area to existing sectionalizing switch ‘PS2’.