Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Amendment 010 70Z04722R43000001 Of 3 010878158, Base San Juan Hurricane Rebuild Phase III West/Central, Amendment 010
SOLICITATION NO. 70Z04722RSJPHII00 IS AMENDED AS FOLLOWS:
Price Proposal Form
DELETE: Price Proposal From
REPLACE WITH: Revised Price Proposal Form
END OF AMENDMENT LANGUAGE
Response to Questions Regarding Solicitation 70Z04722R43000001:
1. Please provide a revised Price Proposal Form which captures the scope reductions associated with Amendment 009
RESPONSE: See Amendment for revised Price Proposal Form.
2. Please clarify whether submission of Amendment 9 revisions should be sent via email or if a DoDSafe link will be provided for upload.
RESPONSE: Submission may be emailed.
3. Please confirm that the new flooring throughout Buildings 124 and 125 can be either seamless vinyl or cementitious epoxy. If different spaces have differing flooring requirements, please provide applicable Space Criteria Sheets and locate rooms on the drawings.
RESPONSE: Confirmed per Amendment 009 new flooring in Buildings 124 and 125 can be either seamless vinyl or cementitious epoxy. Requirement is for the entire building. There are no separate flooring requirements per space.
4. Please provide proposal validity period for submission of Amendment 9 revisions.
RESPONSE: Proposal pricing shall be valid for 45 days.
5. Please confirm that revised pricing is the only submission required in response to Amendment 9.
RESPONSE Revised pricing based upon the changes in Amendment 9 are to be submitted. The Coast Guard is also interested in offeror’s ideas on cost savings which may also be submitted for consideration/negotiation.
6. There are 2 local holidays next week (July 25th and July 27th) which typically results in a significant portion of the local workforce being out of the office for at least 3 days of the week. To allow our local industry partners sufficient time to
Amendment 010 70Z04722R43000001 Of 3 price the changes associated with Amendment 9 without added contingencies, please provide a 1 week extension of the submission due date to August 11th.
RESPONSE: This project has expiring funding; therefore, it is critical the Government award the project prior to fiscal year end. The Coast Guard financial system is anticipated to go down for year-end processing in Mid-September;
therefore we are unable to extend the proposal due date.
END OF AMENDMENT
FAILURE TO ACKNOWLEDGE AMENDMENTS MAY BE CAUSE OF
REJECTION OF OFFER
| topmostSubform[0]: |
| Page1[0]: |
| AmendmentNo[0]: 0010 |
| Code[0]: |
| Code[1]: |
| AccountingData[0]: |
| A13[0]: |
| C13[0]: |
| D13[0]: |
| NameandTitleSigner[0]: |
| NameandTitleOfficer[0]: |
| Description[0]: DESIGN-BUILD USCG HURRICANE REBUILD SAN JUAN PHASE III WEST SAN JUAN, PUERTO RICO |
THIS AMENDMENT IS ISSUED ONLY TO THOSE OFFEROR UNDER THE NATIONAL MULTIPLE AWARD CONSTRUCTION IDIQ CONTRACT (NMACC II) USCG DEPARTMENT OF HOMELAND SECURITY
(SEE CONTINUATION SHEET)
| FacilityCode[0]: |
| Code[2]: NA |
| IssuedBy[0]: Contracting Division |
USCG, Facilities Design and Construction Center 5505 Robin Hood Road, Suite K Norfolk, VA 23513-2431
| NameandAddress[0]: |
| AdministeredBy[0]: |
| ContractIDCode[0]: |
| ReqNumber[0]: NA |
| AmendmentNo[1]: 70Z04722R43000001 |
| ModificationNo[0]: |
| ProjectNo[0]: |
| Page[0]: 1 |
| Pages[0]: 3 |
| EffectiveDate[0]: 7/272022 |
| Dated9B[0]: 01/28/2022 |
| Dated10B[0]: |
| CheckBox9[0]: 1 |
| CheckBox10[0]: Off |
| CheckBox11[0]: 1 |
| CheckBox13A[0]: Off |
| CheckBox13B[0]: Off |
| CheckBox13C[0]: Off |
| CheckBox13D[0]: Off |
| IsNot[0]: Off |
| Is[0]: Off |
| Extended[0]: 1 |
| NotExtended[0]: Off |
| DateSigned[0]: |
| DateSigned[1]: |
| Copies[0]: 1 |
| CopiesReturned[0]: |
File details come from the government source that posted it. Updated .