10878158 - Final Specifications.pdf

PDF 5 MB Posted

Attached to
Design-Build USCG Hurricane Rebuild San Juan Phase III West/Central
Solicitation number
70Z04722R43000001
Issued by

View the file

Other files

File Type Posted
AMEND_012_RFP3 PRICE PROPOSAL FORM rev2.pdf PDF
AMEND 012 SAN_JUAN_PHASE_III.pdf PDF
AMEND 0011_Exchange Trailer - Sales Area.pdf PDF
AMEND 0011 SAN_JUAN_PHASE_III.pdf PDF
AMEND 011_Exchange Trailer -Storage Room.pdf PDF
AMEND 010 SAN JUAN PHASE III.pdf PDF
AMEND 010_RFP3 PRICE PROPOSAL FORM revised.pdf PDF
AMEND_009_ Revised Drawings - West Amendment 9.pdf PDF
AMEND_009_SAN_JUAN_PHASE_III.pdf PDF
AMEND_009_ Space Criteria Sheets - Buildings 117 and 118.pdf PDF
AMEND_009_Attachment G - San Juan_Phasing Diagrams.pdf PDF
AMEND 0008 SAN JUAN PHASE III.pdf PDF
AMEND_007_10878158_AD_104_rev1.pdf PDF
AMEND_007_10878158_A101_rev1.pdf PDF
AMEND_007_SAN_JUAN_PHASE_III.pdf PDF
AMEND 006 SAN_JUAN_PHASE_III_1.pdf PDF
AMEND 0005 SAN_JUAN_PHASE_III.pdf PDF
AMEND_0004_10878158-E-001.pdf PDF
AMEND_0004_10878158-A-112.pdf PDF
AMEND_0004_10878158-E-003.pdf PDF
AMEND_0004_Wage Determination.pdf PDF
AMEND 0004_SAN_JUAN_PHASE_III.pdf PDF
AMEND_0004_10878158-G-001.pdf PDF
AMEND_0003_Attachment L-Part 3 of 3-As-Built Reference Drawings.pdf PDF
AMEND 003 SAN JUAN PHASE III.pdf PDF
AMEND_0003_Attachment K - Final Geotechnical Report and Soil Sampling Report.pdf PDF
AMEND_0003_Space Criteria Sheet H112 General Storage.pdf PDF
AMEND_0003_10878158C102-rev1.pdf PDF
AMEND_003_Attachment L-Part 2 of 3-As-Built Reference Drawings.pdf PDF
AMEND 0003_10878158C101_rev1.pdf PDF
AMEND 0003_Wage_Determination_PR20220001 01072022.pdf PDF
AMEND_0003_Attachment L-Part 1 of 3-As-Built Reference Drawings.pdf PDF
AMEND 0002 SAN JUAN PHASE III.pdf PDF
AMEND 0001.pdf PDF
RFP W-10878158 Appendix A - ComputerGenDrwgs.pdf PDF
Attachment H - BESEP Base and Sector San Juan 03AUG21.pdf PDF
TO Announcement San Juan_Phase III_Final_1.pdf PDF
Attachment A - Drawings.pdf PDF
RFP W-10878158 Appendix B - ElectDeliv.pdf PDF
Attachment G - San Juan_Phasing diagrams 2.pdf PDF
Wage Determination.pdf PDF
Attachment B - Space Criteria Sheets 10_06_21.pdf PDF
Attachment C - BFR 10_06_21.pdf PDF
RFP W-10878158 Appendix D - Design Narrative.pdf PDF
RFP W-10878158 Appendix C - Adept File Naming.pdf PDF
Attachment J - CSTO Electric Vehicle Support Equipment.pdf PDF
Attachment I - CSTO Advanced Metering Infrastructure .pdf PDF
Attachment F - US Coast Guard Public Address.pdf PDF
Attachment E - US_Coast_Guard_ISP_Cabling_Standards.pdf PDF
Attachment D - Final ACM and LBP Survey_ Base San Juan.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP GUIDE SPECIFICATIONS

FOR

FDCC

Project #10878158

Base San Juan Rebuild West & Central

Sites: Base Support West and Central Locations

San Juan, Puerto Rico

FINAL SUBMITTAL

October 6, 2021

DEPARTMENT OF HOMELAND SECURITY

UNITED STATES COAST GUARD

FACILITIES DESIGN & CONSTRUCTION CENTER

FDCC Norfolk

5505 ROBIN HOOD ROAD SUITE K

NORFOLK, VIRGINIA 23513-2413

UNITED STATES COAST GUARD

REQUEST FOR PROPOSAL

FROM: Facilities Design & Construction Center (Norfolk)

BENEFITING UNIT: Base San Juan

San Juan, Puerto Rico

POINTS OF CONTACT:

ORGANIZATION FUNCTION EMAIL PHONE

USCG LCDR Wes Agee-PM Wesley.M.Agee@uscg.mil 787-729-4307

SIGNATURES:

Design PM Date

Design Supervisor Date

Project Execution Supervisor Date

USCG Base San Juan

San Juan, PR

U.S. DEPARTMENT OF HOMELAND SECURITY

U.S. COAST GUARD

ORDER NUMBER 70Z04721FBSJRFP00

CONTRACT NUMBER 70Z05018DAECOMT06

Final Submittal Base San Juan Rebuild West and Central

Site: Base Support Central and West Locations October 6, 2021

DESIGN/BUILDING REQUEST FOR PROPOSAL HURRICANE REBUILD

AT

US COAST GUARD BASE SAN JUAN

SAN JUAN, PR

P/N: 10878158

AECOM

1300 East 9th Street, Suite 500

Cleveland, OH 44114

Tel: 216.622.2300

USCG Base San Juan, PR

BASE SAN JUAN REBUILD WEST AND CENTRAL PROJECT #10878158

SITES: BASE SUPPORT WEST & CENTRAL LOCATIONS

SAN JUAN, PUERTO RICO

TABLE OF CONTENTS PAGE 1 OF 2

TABLE OF CONTENTS (TOC)

Section 1 Title

TOC TABLE OF CONTENTS

01110 DESIGN-BUILD GENERAL PARAGRAPHS

01115 DEDICATION PLAQUE

01200 DESIGN-BUILD PROGRESS PAYMENTS

01320 DESIGN-BUILD PROGRESS SCHEDULE (COMPLEX PROJECTS)

01330 DESIGN-BUILD SUBMITTAL PROCEDURES

01331 PROJECT MANAGEMENT SYSTEM

01450 QUALITY CONTROL

01500 TEMPORARY COR FACILITIES AND EQUIPMENT

01505 PROJECT MEETINGS

01781 OPERATION AND MAINTENANCE DATA DOCUMENTATION

Section 2 Title

01800 DESIGN BUILD CRITERIA

1.1 GENERAL PROJECT REQUIREMENTS AND DESCRIPTION

1.2 ROLES OF RFP SPECIFICATIONS AND DRAWINGS

1.3 SUSTAINABLE DESIGN

1.4 CIVIL AND SITEWORK DESIGN

1.5 GEOTECHNICAL DESIGN

1.6 LANDSCAPE DESIGN

1.7 ARCHITECTURAL DESIGN

1.8 STRUCTURAL DESIGN

1.9 DEMOLITION

1.10 FIRE PROTECTION

1.11 PLUMBING

1.12 HVAC DESIGN

1.13 ELECTRICAL

1.14 SECURITY AND CLOSED CIRCUIT TELEVISION (CCTV) SYSTEMS

1.15 CABLE TELEVISION (CATV) SYSTEMS

1.16 TELECOMMUNICATION

1.17 FURNISHINGS, EQUIPMENT AND OUTFITTING

1.18 ENVIRONMENTAL PERMITS, CONTROLS, AND PROTECTION

1.19 FACILITY INTERIOR DESIGN (FID)

01801 TEMPORARY FACILITIES

01802 CONSTRUCTION DESIGN DOCUMENTS

01803 RECORD DOCUMENTS AND DRAWINGS

01900 LIST OF DRAWINGS

Appendices Appendix A CRITERIA FOR COMPUTER GENERATED DRAWINGS

Appendix B CRITERIA FOR ELECTRONIC DELIVERABLES

Appendix C ADEPT FILE NAMING REQUIREMENTS

Appendix D BASIS OF DESIGN NARRATIVE

Appendix E INDUSTRY STANDARDS FOR CONSTRUCTION DOCUMENTS

SITES: BASE SUPPORT WEST & CENTRAL LOCATIONS

SAN JUAN, PUERTO RICO

TABLE OF CONTENTS PAGE 2 OF 2

Attachments

Attachment A DRAWINGS (BOUND SEPARATELY)

Attachment B INDIVIDUAL SPACE CRITERIA DATA SHEETS (ISCDS)

Attachment C BASIC FACILITY REQUIREMENTS (BFR)

Attachment D LIMITED LEAD-BASED PAINT & ASBESTOS-CONTAINING MATERIAL

BUILDINGS 100, 101, 103, 125 & 126

Attachment E CSTO - U.S. COAST GUARD INSIDE PLANT (ISP) CABLING STANDARDS

Attachment F CSTO - U.S. COAST GUARD PUBLIC ADDRESS SYSTEM STANDARDS

(SHORE UNITS ONLY)

Attachment G CONSTRUCTION PHASING PLANS

Attachment H BASE ELECTRONICS SYSTEMS ENGINEERING PLAN (BESEP)

Attachment I CSTO ADVANCED METERING INFRASTRUCTURE

Attachment J CSTO ELECTRIC VEHICLE SUPPORT EQUIPMENT

Base San Juan Hurricane Rebuild West and Central Locations

Project No. 10878158 USCG Base San Juan, PR

Section 1

SITES: BASE SUPPORT WEST AND CENTRAL LOCATIONS

SAN JUAN, PUERTO RICO

SECTION 01110 - Page 1

SECTION 01110

DESIGN-BUILD GENERAL PARAGRAPHS

Part 1 GENERAL

1.1 SCOPE OF WORK

Design-build the project entitled ‘Base San Juan Rebuild West and Central’ (Work Order #10878158). Site: Base Support West and Central Locations. Perform the work according to this specification, as shown on the enclosed drawing sheets, and as shown on the Government-accepted, Contractor originated drawings. Refer to section 01800 Design-Build General Paragraph 1.1 for Summary of Work.

1.2 ITEMS FURNISHED TO CONTRACTOR BY FDCC

(A) One electronic set of Contract documents at the time of award

(B) One electronic copy of any changed document due to a Contract modification

(C) One electronic copy of all FDCC forms referred to herein (reproduce as necessary)

(D) Publications incorporated into the technical provisions by reference will not be provided by the Government. Provide those references at the project site when necessary for clarification, or if required for reference to assist with quality control.

1.3 REFERENCES IN ORDER OF PRECEDENCE

Where specifications or standards are referenced in these Contract documents, they apply as if they were incorporated into the contract, except if specifically noted otherwise. If there are differences between referenced documents and any contract documents the following precedence applies:

(A) Contract

(B) RFP Specification

(C) RFP Drawings

(D) References

(E) Applicable code or standard governing the work in question

1.4 CONTRACTOR RESPONSIBILITY

This contract contains both prescriptive and performance-based criteria. The design and subsequent construction shall incorporate all ancillary components as necessary to provide a complete and functional facility for the intended purpose. Where direction is given, it is directed to the Contractor. In each case the meaning is as though written “the Contractor shall….”

1.5 CONTRACTING OFFICER'S AUTHORITY

In no event shall any understanding or agreement between the contractor and any Government employee other than the Contracting Officer on any contract, modification, change order, letter, or verbal direction to the Contractor be effective or binding upon the

SECTION 01110 - Page 2

Government. All such actions must be formalized by a proper contractual document executed by an appointed Contracting Officer. The contractor is hereby put on notice that in the event a Government employee, other than the Contracting Officer, directs a change in the work to be performed or increases the scope of the work to be performed, it is the contractor's responsibility to make inquiry to the Contracting Officer before making the deviation.

Payments will not be made without being authorized by an appointed Contracting Officer with the legal authority to bind the Government.

1.6 PERMITS

Contractor’s responsibility for permits is discussed in Section I contract clause 52.236-7 “Permits and Responsibilities” and Section 01800 1.18 “Environmental Permits, Controls, and Protection”. In addition, the contractor shall pay for and obtain all temporary permits for construction of this contract work. The Contractor shall comply with all terms and conditions of permits, whether the Contractor or the Government obtains the permit.

1.7 MANUFACTURER'S INSTRUCTIONS

Particular items and products specified in these sections are to be provided and/or installed according to the manufacturer's printed instructions. For bidding and contract performance purposes, the contractor is deemed to be aware of the requirements of these instructions.

1.8 DEFINITIONS

The following terms are defined as follows:

A/E Architect-Engineering Firm

COR FDCC Contracting Officer's Representative

DCR Daily Construction Report

DOR Contractor's Design Engineer of Record; central point of contact for all design issues and questions

EPO A station’s Engineering Petty Officer

FDCC Facilities Design & Construction Center

FE A base’s Facility Engineer

GCI Government Contracted Inspector

ID Driver’s License or Company Issued Identification

KO Contracting Officer

KR Contractor

O&M Operations and Maintenance

PM FDCC Project Manager

QAM Contractor's Quality Assurance Manager

RFI Request for Information

RFP Request for Proposal

SECTION 01110 - Page 3

1.9 WORK HOURS

Work is authorized at the site from 7:00 a.m. to 5:00 p.m. Monday through Friday subject to local jurisdiction approval. No work is allowed on weekends or Federal holidays.

1.10 CONTRACTOR USE OF PREMISES

Contractor will be working on an operational Coast Guard installation. Perform and conduct the work to minimize interference with Coast Guard operations.

1.10.1 PARKING – There are very few parking spaces available within the site therefore existing parking spaces shall not be used by Contractors. Contractor’s vehicle parking shall be located within the indicated contractor fenced staging area as shown on the RFP drawings and is limited only to site superintendent and other supervisory positions. Contactors are not permitted to park on-site other than inside the fenced in staging area. Contractors will have to coordinate offsite parking and transportation for their work crews to be dropped off at the front gate. This arrangement will be organized and payed for by the Contractor.

1.10.2 DRIVING RESTRICTIONS – Become familiar with and obey all base fire, traffic, and security regulations. Drivers shall follow all posted speed limits and regulations.

1.10.3 SECURITY – USCG Base San Juan is a Federal facility. All personnel, with a requirement to enter the Base, shall present a valid and not expired issued government identification. All contracted foreign nationals that do not have a permanent residence, must present the US Customs and Immigrations Services (USCIS) Employment Authorization Document, and provide the issued individual Taxpayer ID Number (ITIN) an equivalent to a U.S. Social Security Number, for the Security Clearance, a requirement to enter a DHS and/or DOD Installation. The individual must be legal to work in the United States, including its territories. All vehicles entering the site must be legally registered with the State’s/Islands Transportation Regulatory requirements, provide proof of insurance at all times.

Contractor must provide a written list of expected workers that includes the individuals Full Name (including second last names, if applicable)’ proper identification (ID) numbers and expected on-site duration to the FE/COR at a minimum of 10-days prior to the personnel starting official labor. This is required for the criminal History Verification/check. Proper ID is well-defined as a driver’s license, and passport with a laminated company issued identification. All personnel shall be required to carry proper company ID with photo when on-site. Individuals will not be permitted on any Coast Guard designated areas without ID, to include individual will be escorted off the premises if not displayed. No contractors will stray from the immediate area of work or direct avenues of ingress and egress unless authorized in advance by the FE/COR. During periods of change of conditions related to threat conditions, additional security measures and site access controls may be imposed.

1.10.4 WORK RESTRICTIONS – All lay down or staging areas for materials and equipment must be locked within the indicated contractor fenced staging area and site. Fence around indicated contractor staging area should be minimum 6’ high with a full covering of filter fabric.

1.10.5 MATERIAL DELIVERIES – Shipments of equipment, materials, and supplies shall be addressed to the contractor, NOT the Government. The contractor must be on hand to accept shipments. The Government will NOT accept shipments.

SECTION 01110 - Page 4

1.11 OTHER STATION WORK

The Coast Guard and other contractors will be performing work at and adjacent to the project site during the time of this Contract. Cooperate and coordinate deliveries, access, and work with the Coast Guard and other contractors in accordance with Contract Clause FAR 52.236- 8.

1.12 WORK SEQUENCE

The Work shall be phased, as required, to maintain continued operation of the base.

Contractor shall develop detailed phasing plans for review and approval prior to start of construction. Phasing plans shall include but are not limited to traffic control plans to maintain personnel and traffic access for fuel trucks, heavy equipment, and maintenance vehicles on/off the base to maintain the cutters and boats as well as enabling continued base operations.

Include required utility downtime. All power outages and interruptions shall be kept to a minimum and may be required to occur after normal business hours (after hours or on weekends). Other Base improvements may be under separate contract and may occur concurrently with this project. Refer to Attachment G for Construction Phasing Plans. Phasing shall incorporate the following requirements as shown on the Phasing Plans (some of the items listed below may occur under a separate contract and are listed as not in scope (n.i.s.):

Phase 1:

a. Move the Exchange from Building 120 into an existing 10’x40’ trailer on site.

b. Move training room equipment out of west side of Building 117 to a location TBD. Move storage items from Building 120 to Building 117.

c. Demolish Building 120.

d. Renovate Buildings 118.

e. Install (3) temporary conex boxes (size 8’X40’) for Shops, MK, Carpenter and AC Shop

(n.i.s).

Phase 2:

a. Install temporary construction staging area where Building 120 was demolished

(coordinate limits with facility engineer and other work occurring on site).

b. Move CGIS from Building 125 into a new 24’X44’ temporary trailer.

c. Demolish western portion of Building 125 and construct new exterior western wall to enclose existing building and make weather tight.

d. Construct new water tanks (n.i.s.).

e. Construct Central Utility Plant (CUP) (n.i.s.).

f. Begin utility distribution work (coordinate limits with facility engineer and other work occurring on site).

g. Renovate Building 119 and associated new patio with covering.

Phase 3:

a. Demolish existing Water Tank, Pumphouse 122 and Generator Building 123.

b. Demolish Buildings 108, 110, 111, 112 and 113 (n.i.s.).

c. Move Shop equipment to temporary conex box (n.i.s.).

d. Demolish Transformers and Fuel Farm including old fuel lines on the pier. (n.i.s).

e. Construct new Health Building.

f. Construct parking, drives, sidewalks and landscaping in vicinity of Health Building.

SECTION 01110 - Page 5

Phase 4:

a. Move STA/ANT from Building 103 to temporary trailers. Move Armory from Building 104 to temporary trailers (n.i.s.)

b. Demolish Building 103 (STA/ANT) and Building 104 (Armory) (n.i.s.).

c. Move Dental Health Services from Building 124 and Medical Health Services from

Building 125 into new Health Building.

d. Renovate Building 117 (Shipping and Receiving / Mail Distribution). These functions to remain in place during renovation.

e. Abate and repaint exterior of Building 116 (Sector Command).

f. Renovate Building 126 (Base Command). Base Command to remain in place during renovation or temporarily relocate if necessary

g. Renovate Building 124.

h. Construct Shop Building (n.i.s.)

Phase 5:

a. Renovate interior of existing Building 125.

b. Construct new Multi-Mission Building (MMB) (n.i.s.).

c. Move shop equipment from temporary conex box to new Shop Building (n.i.s.).

d. Remove temporary conex boxes (n.i.s.)

e. Move Exchange from temporary trailer to renovated Building 124.

f. Remove Exchange temporary trailer.

Phase 6:

a. Move CGIS back into renovated Building 125.

b. Remove CGIS temporary trailer.

c. Prevention moves from Building 100 to off-site work space. Response and Intel will remain in Building 10 throughout construction (n.i.s.).

d. Command moves from Building 100 to new Multi-Mission Building (MMB) (n.i.s.)

e. STA/ANT and Armory move from temporary trailers into the new Multi-Mission Building

(MMB) (n.i.s.).

f. MAT, WAT and ESD move from Building 101 into temporary trailers. Overflow from

Building 100 moves to temporary trailers (n.i.s.).

g. Buildings 100 and 101 to be renovated (n.i.s.).

Phase 7:

a. New Guard House and Entry Road to be constructed.

b. Demolish existing Guardhouse. The existing Guardhouse shall remain in operation until the new Guardhouse is operational.

c. Prevention, EMD, Response and Contingency move back into renovated Building 100

(n.i.s.).

d. MAT, WAT and ESD move back into renovated Building 101 (n.i.s.).

e. Temporary EMD trailers removed.

f. Temporary STA/ANT trailers removed (n.i.s.).

g. Construct all remaining parking, drives, sidewalks and landscaping.

h. Move Waterfront Club/Sandbar contents to Building 119 and demolish existing building.

Improvements to happen in any phase:

a. Construct new Travel Lift Pier and Ramp at Pier Alpha – not during hurricane season

(n.i.s.)

b. Install new Armored Revetment Shoreline Protection.

SAN JUAN, PUERTO RICO

SECTION 01110 - Page 6

Site Access:

a. Waterfront and Pier access shall remain fully operational and accessible to the U.S.

Coast Guard through all phases of construction. Fuel truck access to Pier Echo shall also be maintained.

1.13 GOVERNMENT FURNISHED ITEMS

N/A

1.14 RELOCATED EQUIPMENT AND ITEMS

Disconnect, dismantle if necessary, remove, relocate, reinstall, connect, and test items shown on the drawings. Cap disconnected service lines. Provide mechanical and electrical service connections, fittings, fastenings, and other materials needed to assemble and install relocated equipment. Before disconnecting or relocating items, inspect the items to determine their existing condition. See Section 01800 1.9 “Demolition” for further information. The contractor is responsible for damage sustained by the items after this inspection.

1.15 DELIVERY, STORAGE, AND HANDLING OF MATERIALS

Deliver, store, and handle products and materials according to the manufacturer's printed instructions and as follows:

(A) Deliver products and materials in manufacturer's original unopened packages or containers bearing manufacturer's labels.

(B) Store products subject to damage from the elements in weather tight enclosures;

maintain temperature and humidity within the ranges stated in the manufacturer's printed instructions.

(C) Store fabricated products off the ground on platforms, blocking, or skids. Cover or protect products that may discolor or deteriorate due to exposure to the elements.

Provide ventilation to avoid condensation.

(D) Store loose granulated material on solid surfaces such as paving, plywood, or sheet material to prevent mixing with foreign matter. Provide drainage to prevent sheet material from mixing with foreign matter and prevent flow or ponding of rainwater.

Prevent mixing of materials.

1.16 UTILITY OUTAGES AND NOTIFICATIONS

Before interrupting or shutting down any utility, make a request for the interruption to the COR at least 5 days before the anticipated interruption. Identify the utility, reason for interruption, proposed time of interruption, and duration of interruption. Do not interrupt utilities until authorized by the COR.

1.16.1 UTILITY INTERRUPTIONS – Conduct utility cut-over and interruptions in accordance with the following:

(a) Make utility cut-over and interruptions after the normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in contract clause H.3 "Work outside Regular Work Hours.

(b) Ensure that new utility lines are complete, except for the connection, before interrupting existing service.

SECTION 01110 - Page 7

(c) Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, and fire alarm shall be considered utility cut-overs. All outages shall be restored prior to the start of normal working hours on the next work day as defined in contract clause H.3 "Work Outside Regular Work Hours." This time limit includes time for deactivation and reactivation.

1.16.2 OPERATION OF STATION UTILITIES – The Contractor shall not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for the normal conduct of the work. The Contractor shall notify the Contracting Officer giving reasonable advance notice when such operation is required.

1.17 NEW UTILITY SERVICES

Make all arrangements with the local utility providers and pay all fees, charges, and costs of any nature associated with establishing and installing temporary (during construction) and subsequent permanent utility services required to ensure permanent and uninterrupted utility service at project completion. The contract documents may provide a conceptual plan for utility layouts. These plans shall be confirmed by the contractor during the bidding stage with the local utility provider to determine the exact materials, equipment placement, and other features that may be required by the specific utility provider. The term utility service includes, but is not limited to meters, mains, service lines, high voltage feeders, transformers, force mains, lift stations, etc. The contractor is responsible for coordinating the work with the utility provider to ensure the utility connection to the site is completed and that there is no delay in the prosecution of the work or completion of the project. Utility services include electricity, water, sewer and telephone. All utilities within the Base complex are owned by the Government.

1.17.1 Water

There will be no charge to connect to the Government water lines.

1.17.2 Sewer

There will be no charge to connect to the Government sewer lines.

1.17.3 Gas

N/A

1.17.4 Telephone Service

Temporary telephone service to the contractor’s trailer is available via the local telephone company at the contractor’s expense. There will be no charge to connect to the Government telephone lines for permanent telephone service to the cutter shore-ties and the new building.

1.17.5 Electrical

There will be no charge to connect to the Government electrical lines.

1.18 UNDERGROUND UTILITIES

The underground utility locations shown on the drawings are not exact. “Miss Utility” locator services are not available at USCG Base San Juan. Use a private utility locator service, at contractor expense, to locate underground utilities. Notify the COR and the cognizant utility companies at least 48 hours before excavating. Mark the excavation route and intersecting utilities. The utility company representative will review the contractor's layout and notify the contractor if any known utilities have been left unmarked. Where excavation will cross an

SECTION 01110 - Page 8 existing utility line, use hand tools to excavate for a distance of 5 feet on each side of the intersection location shown on the drawings. Once exposed, protect underground utilities from damage. See also Section 01800 1.4 “Civil and Sitework Design” for additional information.

1.19 MINOR DEMOLITION, CUTTING, AND PATCHING:

Minor demolition, cutting, and patching should be conducted in accordance with the following:

(A) Provide COR 48 hour notice before commencing demolition.

(B) Cut surfaces such as masonry, plaster, tile, and metal in straight lines at natural points of division.

(C) Materials for patching, filling-in, repairing, and extending work shall be new, and shall be similar in appearance and equal in quality to the materials used in the adjoining construction or the removed materials when they were new.

(D) Protect existing construction, surfaces, and equipment from damage. Damaged existing construction, surfaces, or equipment shall be restored or replaced to match existing conditions or new adjoining work.

(E) Dust: Erect and maintain temporary dust tight partitions or barriers to prevent the spread of dust, fumes, and noise to other parts of the building. Seal off return air grilles in the areas enclosed by dust barriers. Vent areas enclosed by dust barriers to the outside and provide filters on these vents. Before removing the dust barrier, completely clean the area enclosed by the barrier and both sides of the barrier itself.

Cover existing equipment to protect it from dust.

(F) Disassemble, disconnect, cut, remove, and alter existing construction and equipment without damaging other construction or equipment that is to remain or be reused. Cut and remove to the limits shown on the drawings, or, if not shown, to the minimum extent necessary for the proper installation of new work. Piping shall be removed and capped so as to be concealed in the finished work.

(G) Cut, move, and remove existing construction as necessary to do the work; replace and restore when work is completed.

(H) Completely remove applied finish flooring such as ceramic floor and base, and resilient tile flooring and base, including mastic, to structural floor.

(I) Patching: Patch to provide a neatly finished installation and to restore surfaces and items to the condition they were in before the work started. Where removals leave holes and damaged surfaces that will be exposed in the finished work, patch and repair these holes and damaged surfaces to match adjacent finished surfaces and to provide surfaces that are suitable for the provision of the new work. Install materials according to standard trade practice. Provide a smooth, even line of transition where patched work adjoins existing construction or new work. Patches or repairs shall match existing conditions or new adjoining work and shall provide a uniform finish and texture over the entire surface. When existing finish cannot be matched, refinish the entire surface to the nearest intersection.

(J) Transitions: Make smooth and even transitions where new work abuts or aligns with existing construction. Where finished surfaces are cut such that a smooth transition with new work is not possible, terminate the existing surface along a straight line at a natural point of division and submit written recommendations to the COR on how to proceed.

SAN JUAN, PUERTO RICO

SECTION 01110 - Page 9

(K) Adjustments: Where removal of partitions results in adjacent spaces becoming one, rework floors, walls, and ceilings to a smooth plane without breaks, steps, and bulkheads.

1.20 STORM WEATHER PROTECTION

Should warnings of severe weather or winds of gale force or stronger be issued, the Contractor shall take every practical precaution to minimize danger to persons, the work, and to adjacent property. Precautions shall include, but not limited to, closing all openings, removing all loose material, tools and equipment from exposed locations, and removing or securing scaffolding and other temporary work.

Part 2 PRODUCTS

NOT USED

Part 3 EXECUTION

NOT USED

END OF SECTION

SAN JUAN, PUERTO RICO

SECTION 01115 - Page 1 of 2

SECTION 01115 DEDICATION PLAQUE

Part 1 GENERAL

1.1 SCOPE OF WORK

Building dedication plaque: Furnish and install a 12 inch x 18 inch bronze plaque. Plaque shall be at least 1/8 inch thick with 1/8 inch raised lettering and raised edges burnished to stand out.

Plaque will have Coast Guard logo and dedication language similar to the sample plaque image shown below. The amount and sizing of lettering required will be similar, but not identical to the sample below. Mount plaque where directed by the COR. Mounting shall be at all 4 corners using stainless materials and a brass head to match plaque. Coordinate with COR to identify changes in lettering and names.

The new Health Building and Guard House shall receive dedication plaques. Plaques shall be installed adjacent to main entry door of each building. The locations shall be coordinated with the Facilities Engineer.

Plaque Sample:

SECTION 01115 - Page 2 of 2

Part 2 PRODUCTS

NOT USED

Part 3 EXECUTION

NOT USED

SAN JUAN, PUERTO RICO

SECTION 01200 - Page 1 of 4

SECTION 01200 DESIGN-BUILD PROGRESS PAYMENTS

Part 1 GENERAL

This section covers the submittal requirements for design-build progress payments.

1.1 RELATED CONTRACT CLAUSE

Section I contract clause 52.232-5 "Payments under Fixed-Price Construction Contracts."

1.2 SUBMITTALS

(a) SD-01 Preconstruction Submittals

Schedule of Prices for permits, design and construction activities.

1.3 DESIGN SUBMITTALS

See Section 01802 Construction Design Documents for additional submittal requirements.

(a) Permit (application and submission)

(b) Initial 35% Design Submittal

(c) 65% Design Submittal

(d) Final Design Submittal

(e) Construction Submittal Reviews

(f) Corrected Final Construction Design Submittal

(g) Site Visit Reports During Construction (see section 01802)

(h) Final Inspection Reports (see section 01802)

(i) As-Built Design Drawings (see section 01802)

1.4 SUBMITTALS DURING CONSTRUCTION

1.4.1 Request for Progress Payment

Payment requests during design may be made upon submission of each design submittal, and will be based on the portion of the Base Bid for Design Services indicated in Part 3 of this section. Apply for progress payments using "Contractor's Monthly Estimate for Payment Voucher" which includes (form FDCC-4) and the required payment certification that are available from the Contracting Officer.

Electronic copies are available.

1.4.2 Documentation for Materials Delivered But Not Installed

Paid invoices for materials stored on site for which progress payments are requested shall accompany the application for payment. Requests for payment for materials stored offsite will normally not be approved.

SAN JUAN, PUERTO RICO

SECTION 01200 - Page 2 of 4

Payment requests for services provided for construction submittal review, site visits during construction, and final inspections may be made monthly based on the portion of the Base Bid for Design Services indicated in Part 3 of this section.

Payment request for As-Built Design Drawings may be made upon submission of the as-built drawings (see Section 01802 Construction Design Documents) and will be based on the portion of the Base Bid for Design Services indicated in Part 3 of this section.

1.4.3 Required Schedule Updates

In accordance with FAR Clause 52.236-15, Schedules for Construction Contracts and section 01320, submit updated progress documentation along with the request for payment, including request for final payment.

1.5 TIMING FOR SUBMITTALS DURING CONSTRUCTION

1.5.1 Initial Submission

Submit an original schedule of prices with the progress documentation required by section 01320 for the Government's approval.

1.5.2 Progress Payments

Progress payment requests may be submitted once a month to coincide with the progress update.

Part 2 PRODUCTS

NOT USED.

Part 3 EXECUTION

3.1 SCHEDULE OF PRICES

3.1.1 The schedule of prices shall be prepared in conjunction with the development of the complete performance schedule. The contractor may elect to separate the design activities from the construction activities. However, the items listed on the schedule of prices (construction portion) shall match the activities listed on the complete network schedule. Additionally, the contractor is to separately summarize the construction and design costs associated with the following assets:

Project Management Data Sheet. This is a one-time requirement and shall be shown either on the Schedule of Prices form or a separate sheet attached to the Schedule of Prices form. Prepare and deliver to the Contracting Officer a schedule of prices on the forms furnished by the Government. Provide a detailed breakdown of the contract price, giving quantities for each of the various kinds of work, design phases, unit prices and extended prices therefore.

3.1.2 Design Phase Schedule of Prices during Design

(a) Initial Design Phase - The following design and permit sub-categories shall be included and values provided on the schedule of prices:

1. Draft Permit(s) for review

2. Final Permit (ready for signatures)

SECTION 01200 - Page 3 of 4

3. 35% Civil (if applicable see section 1802)

4. 65% Construction Design Submittal

5. Final Construction Design Documents Submittal

6. Corrected Final Construction Design Documents Submittal

7. Any Design Option

(b) Design Phase Schedule of Prices during Construction

The following design sub-categories shall be included and values provided on the schedule of prices:

1. Construction Submittal Reviews

2. Site Visits During Construction & Final Inspection*

3. As-Built Drawings

* See Section 01802, Construction Design Documents, paragraph 1.11 Site Visit Inspections, for Scope of Work for Site visits and inspections by the Designer of Record.

3.1.3 Construction Phase Schedule of Prices

a. As noted in paragraph 3.1, the schedule of prices shall be prepared in conjunction with the development of the complete performance schedule. The items listed on the schedule of prices (construction portion) shall match the activities listed on the complete network schedule. Use unit prices for items when practical (provide quantities, units, labor and materials). Allocate overhead expenses such as field superintendent, temporary facilities and general conditions across all line items; do not show as individual expenses in the schedule of values. The bonds may be billed separately upon receipt by the government. Once approved, the values listed in the schedule of prices shall not be changed. The fields for the schedule of prices are defined below:

(b) ID # - The identification or activity number shall be obtained from the complete performance schedule. ID #’s shall not change after the schedule of prices is approved by the Government.

(c) Activity Description – The activity description shall be obtained from the complete performance schedule for the corresponding ID #.

3.1.4 Contract Modifications

Each contract modification shall be added to the end of the approved schedule of prices.

3.2 CONTRACTOR MONTHLY VOUCHER ESTIMATE

3.2.1 The contractor's monthly voucher estimate consists of the approved schedule of prices and the data elements below.

(A) Percent of Installation Complete To Date: Insert the percent complete value for this activity.

(B) Material Invoices Submitted To Date: The sum of the paid material invoices for the specific activity shall be placed in this field.

SAN JUAN, PUERTO RICO

SECTION 01200 - Page 4 of 4

(C) Amount Payable To Date: The value in this field shall be automatically calculated and shall not be overtyped. The amount payable to date for stored material equals the greater of (1) the material invoices submitted to date column or (2) the material activity cost multiplied by the percent of installation complete to date value for the activity. The total amount shall not exceed the material activity cost. The labor value payable to date is calculated by multiplying the labor value activity cost by the percent of installation complete to date.

(D) Amount Payable to Date Last Month: The value in this field is carried over from the previous months approved invoice amount payable to date column.

(E) Amount Payable This Month: This value shall be automatically calculated and shall not be overtyped. The value is calculated by subtracting the amount payable to date last month value from the amount payable to date column. This value represents the amount earned for a specific activity without regard to retainage.

(F) Required Calculations: The last page of the contractor monthly voucher estimate shall include the following calculated values - (1) The Total Contract Value which is the sum of the activity cost field column values which shall also equal the current total contract price, including approved modifications;

(2) Subtotals of the amount payable columns (to date, to date last month, this month); (3) Percent Complete Based On Installed Material which is the sum of the activity cost labor column multiplied by the percent of installation complete to date and then divided by the sum of all of the values listed in the activity cost labor column; and, (4) Percent Earned To Date which is the total amount payable to date divided by the total contract value.

(G) Signature of Inspector: During construction phase, voucher should be reviewed (and signed) by Government’s inspector (if available) with contractor’s superintendent indicating agreement with requested percentage of work complete.

3.2.2 Payment for Stored Materials

Although Section I contract clause 52.232-5 does not require payment for materials received but not installed, the Contracting Officer may consider requests for, and may authorize payment for the cost of the material based on the lesser of the following: (1) The total value of all invoices submitted for the activity; and (2) The value listed in the material total cost field. In order for requests for payment to be considered, the material shall be per the approved submittal, on site, and properly stored or protected.

3.2.3 Material Invoices

Paid material invoices shall be legible and clearly document the type, quantity and cost of the materials covered by the invoice. The contractor shall clearly mark on each invoice the activity number which payment is being requested. For invoices covering more than one activity, the contractor shall indicate both the activity number and the percentage of the total invoice to be applied. Incomplete or unreadable invoices will not be considered when processing payment requests.

SAN JUAN, PUERTO RICO

SECTION 01320 - Page 1

SECTION 01320 DESIGN-BUILD PROGRESS SCHEDULE (COMPLEX PROJECTS)

Part 1 GENERAL

1.1 DESCRIPTION

Prepare a time-scaled construction performance schedule pursuant to the clause 52.236-15 "Schedules for Construction Contracts" of the Contract. Include scheduling of construction, creation of the network, production of the reports, execution of the plan described by the network, participation in meetings with the Construction Project Manager, and submission of progress updates and schedule revisions, as set forth below. Utilize conventional network analysis precedence diagram techniques.

1.2 SUMMARY

This Section specifies administrative and procedural requirements for various Design and Construction Progress Documentations required for proper performance of the Work.

(a) All costs incurred by Contractor to correctly implement and update the schedule shall be borne by Contractor and are part of this Contract.

(b) Schedules required include the following:

1. Contract Construction Progress Schedule in Critical Path Method (CPM) format and related narrative.

2. Submittals Schedule.

3. Schedule of Tests and Inspections.

4. Record, As-Built CPM Schedule.

(c) Reports required include the following:

1. Daily Construction Reports.

2. Material Location Reports.

3. Field Correction Reports.

4. Special Reports.

5. Monthly Progress Reports.

1.3 DEFINITIONS

1.3.1 Preliminary Performance Schedule

Is defined as the planned operations during the first 90 days after the Contract Award.

The preliminary performance schedule shall consist of a diagram as described elsewhere in this section. No progress payments will be processed until the complete performance schedule has been approved by the Government.

1.3.2 Complete Performance Schedule

Is defined as the planned operations for the entire contract as described by contract clause 52.236-15.a.. The complete performance schedule shall consist of a chart and required reports as described elsewhere in this section.

1.3.3 Float and Slack

SECTION 01320 - Page 2

Is defined as the amount of time between the early start date and the late start date, or the early finish date and the late finish date of any of the activities in the network analysis schedule. Float or slack is not time for the exclusive use or benefit of either the Government or the contractor.

1.3.4 Schedule Update

A schedule update shall provide actual start, current percent complete, and actual finish field updates to the complete performance schedule. No other fields shall be changed as part of an update.

1.3.5 Schedule Revision

Schedule revisions consist of the addition of new activities, as well as, changes in the approved work schedule, in contract completion date, logic and/or duration of existing activities. Approved schedule revisions change the schedule baseline only from the effective date of the revision for incomplete activities.

1.3.6 Schedule Baseline

The Baseline Schedule is the current approved performance schedule prior to updates.

1.3.7 Activity Description

Each activity shall be described to clearly define the feature of work and its location (Example: Phase I, first floor rough electrical).

1.3.8 Responsibility Code

Field identifying the organization completing the specific activity (i.e. prime contractor, subcontractor's name, Government, etc.).

1.4 SUBMITTALS

1.4.1 General: Contractor shall provide all schedule submittals on computer disk media as well as tabular printouts, and 24-by-36-inch time-scaled logic diagrams. The latest version of, Primavera P6®, SureTrak® or an equally capable scheduling software shall be used. All costs incurred by Contractor to correctly implement, computerize and update the CPM Schedule shall be borne by Contractor and are included in the Contract Price. The number of copies of each submittal shall be as described in this Section or as may be requested by COR.

1.4.2 Contract CPM Schedule: The Contract CPM Schedule and its related narrative as described in this Section shall be submitted as early as practicable after the Notice to Proceed, but in no event later than 30 calendar days after the Notice to Proceed.

Within 15 calendar days, COR will respond with approval or direction to change and Contractor shall resubmit within 10 calendar days, if required.

1.4.3 Daily Progress Report: Submit duplicate copies to COR by noon on the day following the date of actual progress.

1.4.4 Monthly Progress Report: All components of the Monthly Progress Report described in this Section shall be submitted as attachments to Contractor's monthly Application for Payment.

1.4.5 Record As-Built CPM Contract Schedule: A Record Contract Schedule accurately reflecting actual progress of Work shall be submitted, as part of this Contract's Record Documents. All activities shall have actual dates that are true and accurate.

Submit the following in accordance with section 01330 "Submittal Procedures":

SECTION 01320 - Page 3

1.4.6 SD-01 Preconstruction Submittals

(a) Preliminary Performance Schedule

• Network Schedule Chart

(b) Original Complete Performance Schedule

• Network Schedule Chart

• Reports

(c) Monthly Updates

• Electronic Network Schedule Chart

• Progress Payments (See section 01200)

• Reports

(d) Schedule Revisions

• Revised Network Schedule Chart

• Narrative description of changes to activity

• logic/duration

• Reports

1.4.7 Submittal Requirements

For the above submissions submit the following: 3 color copies of all documents plus an electronic copy on CD-ROM except monthly updates of schedule charts may be submitted on the CD-ROM only. Submit both the original software file as well as a .PDF file.

1.5 TIMING

1.5.1 Preliminary Performance Schedule

Within 30 days after Notice of Award, submit a preliminary network defining the planned operations during the first 90 days after Contract Award.

1.5.2 Original Complete Performance Schedule

Submit the complete network analysis, consisting of the network mathematical analysis and network charts, within 45 days after Notice of Award.

1.5.2.1 Resubmittals

Changes necessary as a result of this review shall be submitted for approval of the Contracting Officer within 15 days.

1.5.3 Monthly Updates

Shall be submitted each month along with the request for payment, see section 01200.

1.5.4 Schedule Revisions

Shall be submitted within 15 days of the Contracting Officer's request.

SECTION 01320 - Page 4

1.6 SOFTWARE

1.6.1 Software Description

The Contractor shall use a commercially available, windows based, scheduling software program to manage the project. The software package shall have the characteristics and be capable of producing the time-scaled charts and reports described elsewhere in this section. The program shall also be capable of accepting revised completion dates as modified by approved time extensions, actual activity start/completion dates, and recompilation of tabulation dates and float accordingly without deleting the original proposed activity dates.

1.6.2 Deliverables

1.6.2.1 For the schedule software utilized, provide the following:

1) Schedule familiarization shall be provided by your project scheduler or the individual responsible for updating and managing the inputs into this project. The schedule familiarization shall use the project baseline schedule for all examples and exercises.

2) Review all Activity names, durations and indicate what the item encompasses for the listed cost.

3) The meetings shall include creating, displaying and printing the schedule in conformance to the following contract requirements:

(a) Demonstrate the creation of the weekly look-ahead schedule from the Baseline schedule.

(b) Display and verify all activities are linked directly or indirectly to the award and completion dates of this contract.

(c) Identify RPUID sorts and display formats.

(d) Demonstrate the export of the schedule to MS-project 2010 format; discuss limitations.

(e) Demonstrate how the activities will be updated; updates shall be done by the person who will perform the updates monthly. Identify file naming system used to identify updates for dissemination.

(f) Demonstrate from the updated schedule a sample of a complete monthly submission to the government. This shall include the written schedule analysis update.

(g) Trace a minimum of 3 activities from material procurement through to installation to 100% completion. Review each step to include, Submittal review (who, time frame), Pre-installation (who, time frame), QA activities related (who, time frame).

(h) Create an output format of the updated schedule for the monthly posting in the CI trailer.

(i) Create a 3 sample modifications on critical and non-critical activities for purposes of displaying a “fragnet” schedule that demonstrates time impacts to the schedule from a modification. Create modifications to display (increased contract duration, no effect and reduced contract duration)

(j) Create an earned value report from the baseline schedule.

SECTION 01320 - Page 5

(k) Demonstrate procedures for incorporating Changes to the project Baseline schedule.

Computerized schedule familiarization shall occur in conjunction with the preconstruction meeting.

1.6.3 Payment Requests

Payment request may be prepared for submission using programs other than the scheduling software. See section 01200, Progress Payments for specifics.

1.7 CONTRACT MODIFICATIONS

When change orders or delays are experienced by the Contractor and the Contractor requests an extension of time under one or more of the Contract clauses, the Contractor shall submit a written Time Impact Analysis (TIA) illustrating the influence of each change or delay on the Contract completion date or milestones, utilizing the current updated Project Schedule.

Each TIA shall include a fragnet demonstrating how the Contactor proposes to incorporate the changes or delays into the Project Schedule. A fragnet is defined as a sequence of new activities and/or activity revisions that are proposed to be added to the existing schedule to demonstrate the influence of delay and the method for incorporating delays into the schedule as they are encountered.

The TIA shall be submitted with the cost proposal for each proposed change or delay.

Incorporate contract modifications into subsequent monthly updates only after approval by the Contracting Officer. Contract Modifications shall be added as items posted at the bottom of the original schedule with new activity numbers.

Part 2 PRODUCTS

2.1 NETWORK SCHEDULE CHART

The network shall consist of time scaled activities with logical interdependencies shown on a diagram with accompanying mathematical analyses.

Prepare a horizontal time scaled performance schedule with the total project divided and subdivided into a sufficient number of work activities to accurately graphically display the work schedule, sequence in which the work is to be accomplished, activity duration, and interdependence of activities. A bar shall depict the start, finish, and duration of each activity.

The bar shall be shaded to indicate progress. In addition to construction activities, procurement times for critical items, including submittal turn-around, shall be shown on the schedule. The diagram shall clearly show the activities of the critical path.

2.1.1 Format

Provide network charts on E-size sheets (30 inches by 42 inches). Use continuation sheets as required. Establish the time schedule for the entire project duration across the top of the sheet; divide into months and subdivide into weeks. Extend these division lines vertically from top to bottom of page. Units of 1/2 inch equal to 1 week are suggested.

Indicate project name, location, contract number, data date, submission date, and general schedule data on each sheet. Provide a legend defining all symbols.

2.1.1.1 Required Columns

The following columns shall be provided on the left side of each sheet:

(a) Activity Number (ID #)

(b) Activity Name

(c) Duration

SECTION 01320 - Page 6

(d) RPUID – Real Property Unique Identification number from Project Management Data Sheet

(e) Actual start and actual finish dates

(f) Total float

(g) Actual duration

(h) Percent complete

2.1.1.2 Activity Bars

Each of the activity bars shall be color coded and hatched to distinguish between the baseline, critical, non-critical, milestones, and also indicate progress. Critical path activities shall be colored red. Each activity bar shall be labeled with the activity name and percent complete.

2.1.1.3 Required Sorts

The original network chart shall be sorted by early start and then by early finish dates. The activity numbers shall be assigned in ascending order based on the results of this sort and shall not change for the remainder of the project duration.

2.1.2 Quantity and Numbering of Activities

The minimum number of activities in the final performance schedule shall be 100. New activity numbers shall be assigned to activities required to be added to a revised schedule for contract modifications or logic changes.

2.1.3 Required Activities

The following specific activities shall be shown on the diagram and in the numerical analysis.

The durations indicated are minimum.

(a) Bond

(b) Design Elements:

(c) Site Visit

(d) 35% Design Submission

(e) 65% Design Submission

(f) Government Review (30 days review)

(g) Final Design Submission

(h) Permits requiring Government signature including stormwater discharge permit

(i) Government Review (30 days review)

(j) Completed Final Design Submission

(k) Construction Activities:

(l) Submittal Submission requiring Government review

(m)…

This is the start of the file's text. The full file is on GovTribe.